Loading...
HomeMy WebLinkAbout20201947 Ver 1_PreFiling Email 30-Day Clock Reached Email_20210111Strickland, Bev From: laserfiche@ncdenr.gov Sent: Monday, January 11, 2021 12:01 AM To: mackenzie.richards@kimley-horn.com Cc: Homewood, Sue Subject: Pre -Filing Time Clock has been reached for Three R's Mobile Home Park Expansion - 20201947 Ver 1 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Three R's Mobile Home Park Expansion that you submitted on 12/11/2020. The ID number for that project is 20201947, Version 1. Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be accepted. When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored ID#* 20201947 Version* 1 Regional Office* Winston-Salem Regional Office - (336) 776-9800 Reviewer List* Sue Homewood Pre -Filing Meeting Request submitted 12/11/2020 Contact Name * Mackenzie Richards (Kimley-Horn) Contact Email Address* mackenzie.richards@kimley-horn.com Project Name* Three R's Mobile Home Park Expansion Project Owner* Jones Estates Three R, LLC Project County* Forsyth Owner Address: Street Address PO BOX 14466 Address Line 2 aty State / Province / Region Durham NC Fbstal / Zip Code Country 27709 USA Is this a transportation project?* r Yes r No Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F- 401 Water Quality Certification - Regular Express r- Individual Permit r- Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? Please give a brief project description below. * The project site currently exists as a residential mobile home park along Leak Creek in Winston-Salem, Forsyth County, NC. The project vicinity is primarily composed of scattered residential development, undeveloped forested areas, and some agricultural land. The project proposes to expand and improve the existing mobile park for future use. As part of the expansion, the project proposes to clear and grade an area along the eastern boundary of the existing parcel to add new mobile home lots. Additionally, the project is proposing the construction of a new road into and through the mobile park for access to the additional mobile home lots. The road will perpendicularly cross Leak Creek within the project area. A box culvert will be installed to carry Leak Creek under the proposed road crossing. Typical site preparation and construction equipment will be utilized, including bulldozers, excavators, graders, cranes, dump trucks, concrete trucks, and pavers. It is assumed that the project will qualify for authorization under a Nationwide Permit 29 (Residential Developments) or a Nationwide Permit 14 (Linear Transportation Projects). Please give a couple of dates you are available for a meeting. 12/17/2020 12/22/2020 Please attach the documentation you would like to have the meeting about. ThreeRs_Mobile Home Prk Expansion Plan.pdf 1.27MB ThreeRs_MobileHome_Fig2_USGS.pdf 832.67KB ThreeRs_MobileHome_Fig3_JDfeat.pdf 2.02MB ThreeRs_MobileHome_Fig4_NRCS.pdf 5.36MB pdF only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature �r1.rs�r t�j�rx$��1 Submittal Date 12/11/2020