Loading...
HomeMy WebLinkAbout20201923 Ver 1_PreFiling Email 30-Day Clock Reached Email_20210109Strickland, Bev From: laserfiche@ncdenr.gov Sent: Saturday, January 9, 2021 12:01 AM To: geifried63@gmail.com Cc: Johnson, Alan Subject: Pre -Filing Time Clock has been reached for Repair rip -rap at 8050 blades Trail Denver NC - 20201923 Ver 1 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Repair rip -rap at 8050 blades Trail Denver NC that you submitted on 12/9/2020. The ID number for that project is 20201923, Version 1. Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be accepted. When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored ID#* 20201923 Version* 1 Regional Office* Mooresville Regional Office - (704) 663-1699 Reviewer List* Alan Johnson Pre -Filing Meeting Request submitted 12/9/2020 ........................................................................................................................................................................................................................................................................................................ Contact Name * Gary Eifried Contact Email Address* geifried63@gmail.com Project Name* Repair rip -rap at 8050 blades Trail Denver NC Project Owner* Project County* Owner Address: Gary Eifried Lincoln Street Address 8050 Blades trail Address Line 2 aty Denver Rbstal / Zip Code 28037 Is this a transportation project?* r Yes r No State / Frovince / Region NC Country United States Type(s) of approval sought from the DWR: r- 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express r- Individual Permit r- Modification W Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? Alan Johnson Please give a brief project description below. Soil at the top of rip- rap is eroding, resulting in erosion holes and movement of soil into Lake Norman. Need to pull back rip -rap, install silt cloth, fill hoes and replace rip -rap. Also, need to take down dead tree within 30 feet of the normal lake level. Photos attached. Please give a couple of dates you are available for a meeting. 12/16/2020 12/29/2020 1 /12/2021 1 /19/2021 Please attach the documentation you would like to have the meeting about. Eroding rip.pdf 386.36KB pdr only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 12/9/2020