HomeMy WebLinkAbout20201912 Ver 1_PreFiling Email 30-Day Clock Reached Email_20210108Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Friday, January 8, 2021 12:00 AM
To: jpoetzsch@thewootencompany.com
Cc: Goss, Stephanie
Subject: Pre -Filing Time Clock has been reached for Little Creek Outfall Sewer Line
Replacement - 20201912 Ver 1
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Little Creek Outfall
Sewer Line Replacement that you submitted on 12/8/2020. The ID number for that project is 20201912, Version 1.
Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be
accepted.
When you submit your application please upload a copy of the attached document in this email.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as
responses are not monitored.
ID#* 20201912 Version* 1
Regional Office* Raleigh Regional Office - (919) 791-4200
Reviewer List* Stephanie Goss
Pre -Filing Meeting Request submitted 12/8/2020
Contact Name *
Contact Email Address*
Project Name*
Project Owner*
Project County*
Owner Address:
John D. Poetzsch
jpoetzsch@thevvootencompany.com
Little Creek Ouffall Sewer Line Replacement
Town of Clayton
Johnston
Street Address
111 East Second street
Address Line 2
aty
Clayton
Fbstal / Zip Code
27520
Is this a transportation project?* r Yes r No
State / Province / Region
NC
Country
USA
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F 401 Water Quality Certification -
Regular Express
r- Individual Permit r- Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Do you know the name of the staff member you would like to request a meeting with?
Stephanie Goss
Please give a brief project description below.
A 1,500 ft long 24-inch sanitary sewer outfall will replace an aging 18-
inch sanitary sewer outfall. In addition there is approximately 800 feet
of side branches. Of the total 2,300 feet of gravity sewer, 1,900 ft are
in maintained easements and 400 ft in newwork easements. The
existing 18-inch sewer will be replaced by the 24-inch sewer main
within or adjacent to the existing easement. Approximately 350 feet of
the new easement will require tree clearing. A small (2-3 ft wide)
unnamed tributary of Little Creek will be crossed by open cut
trenching for installation of the gravity sewer. This crossing is
replacing the existing sewer and is within an existing maintained utility
easement. There will be a permanent impact of approximately 0.037
acres of wooded wetlands. The project will require bypass pumping of
the sewage during installation of some of the sewer mains.
The buffet impact is below the Allowable Limits.
Please note I can arrange my schedule to meet at your convenience.
Please give a couple of dates you are available for a meeting.
12/18/2020
Please attach the documentation you would like to have the meeting about.
C1_01_.pdf 1.94MB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 12/8/2020