HomeMy WebLinkAbout20201925 Ver 1_PreFiling Email 30-Day Clock Reached Email_20210110Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Sunday, January 10, 2021 12:01 AM
To: saraj.sherman@gmail.com
Cc: Goss, Stephanie
Subject: Pre -Filing Time Clock has been reached for Eno River Boating Access Area Renovation
- 20201925 Ver 1
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Eno River Boating
Access Area Renovation that you submitted on 12/10/2020. The ID number for that project is 20201925, Version 1.
Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be
accepted.
When you submit your application please upload a copy of the attached document in this email.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as
responses are not monitored.
ID#* 20201925 Version* 1
Regional Office* Raleigh Regional Office - (919) 791-4200
Reviewer List* Stephanie Goss
Pre -Filing Meeting Request submitted 12/10/2020
Contact Name * Sara Sherman
Contact Email Address* sara.j.sherman@gmail.com
Project Name* Eno River Boating Access Area Renovation
Project Owner* NC Wildlife Resources Commission
Project County* Durham
Owner Address: Street Address
1720 Mail Service Center
Address Line 2
oty State / Province / Region
Raleigh NC
Postal / Zip Code Country
27699 USA
Is this a transportation project?* r Yes r No
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F 401 Water Quality Certification -
Regular Express
r- Individual Permit r- Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Do you know the name of the staff member you would like to request a meeting with?
no
Please give a brief project description below.
This is a renovation project of an existing NCWRC public boat ramp
facility on Falls Lake/Neuse River. This project will apply for a NWP 3
from USACE and will require written approval because an 8'-w4de
floating dock is requested (wider than 6'). A Neuse River Buffer
Authorization will also be required.
The project consists of removing the existing boat ramp and
constructing a new single -lane concrete boat ramp that is 15' x 129'.
The proposed floating dock is 60' x 8'.
The existing asphalt parking lot will be resurfaced and a small
expansion will be added to create a row of single car parking spaces.
Please give a couple of dates you are available for a meeting.
12/17/2020
1 /5/2021
12/15/2020
Please attach the documentation you would like to have the meeting about.
EnoRiver pcn plans.pdf 1.72MB
Eno River location map.pdf 111.71KB
pdr only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
11_ I tlL �_9141 11 !._Ir
Submittal Date 12/10/2020