Loading...
HomeMy WebLinkAbout090183_Plan of Action (POA)_20201214r� Wive - PLANS OF ACTION (P®A) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: A County: Facility Name: Ie I6hA nt1SlMnq �1 v . Certified Operator Name: Operator#_LOO 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Lagoon Name/identifier (ID): Spillway (Yes or No): Level (inches):_ 2. Check ail applicable items -- fix--Qlnsion Tjw l ll itol zou Po is Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. ./ Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section III tables. Included- within this plan is a list of the proposed sites •with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Quality prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a.complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: /a 1 jq / aUaO I hereby certify. that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my Knowledge and ability, the information is accurate and correct. l �Sqlx.C, Si nq I t Facility Owne Facility Ow PoA Cover Page 2121100 Phone: U — 0 % 4 ` � jq<g nager (print) Date: 12-1 19 1 z0go nag,g(signature) II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR: STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Singletary Finishing 9-183 line m = 2070.E 1 lb PAN 2. Structure ID: 3. Structure ID: 4. Structure ID: 5. Structure ID: 6. Structure ID: line m = lb PAN line m = lb PAN line m = lb PAN line m = lb PAN line m = lb PAN n. lines 1 + 2 +.3 + 4 + 5 + 6 = 2070.6- lb PAN Ill. TOTAL PAN BALANCE REMAINING FOR AVAILABLE. CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p.: field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window' 1068 1 os - ryegrass 13.60 50.00 680.0 Aug -July 10681 2 os - ryegrass 16.20 50.00 810.0 Aug -July 1068 3 os - ryegrass 7.30 50.00 365.0 Aug -Jul 1068 9 os 7.30 50.00 365.0 Mar -Sept 1068 10 os 7.30 50.00 365.0 Mar -Sept 1068 11 os 15.50 50.00 775.0 Mar -Sept *** PAN are estimates*** 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 3360.0 Ib. PAN_ IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) _ 2070.6 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 3360.0 lb: PAN y. Overall PAN balance (w - x) _ -1289 lb.,PAN NARRATIVE: Will begin pumping as soon as field conditions permit. PoA (30 Day) 2/21 /00 13 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD 1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Sin leta Finishing 9-183 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 14.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 5.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 188760 fe e. line c/12 x line d x 7.48 gallons/fts 588302 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 261105.9 fts h. current herd # 7920 certified herd # 7920 actual waste produced = current herd # x line g = 261106 fts certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 11/18/2020 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) Offs 110110 fts 462782 gallons 1.97 Ibs/1000 gal. 2070.6 lbs. PAN PoA (30 Day) 2/21 /00