HomeMy WebLinkAbout090183_Plan of Action (POA)_20201214r� Wive -
PLANS OF ACTION (P®A) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: A County:
Facility Name: Ie I6hA nt1SlMnq
�1 v .
Certified Operator Name: Operator#_LOO
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Lagoon Name/identifier (ID):
Spillway (Yes or No):
Level (inches):_
2. Check ail applicable items -- fix--Qlnsion Tjw l ll itol zou Po is
Liquid level is within the designed structural freeboard elevations of one or more structures. Five
and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within
acceptable ranges.
./ Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day
Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to
pumped and hauled is reflected in section III tables. Included- within this plan is a list of the
proposed sites •with related facility number(s), number acres and receiving crop information.
Contact and secure approval from the Division of Water Quality prior to transfer of waste
to a site not covered in the facility's certified animal waste management plan.
Operation will be partially or fully depopulated.
- attach a.complete schedule with corresponding animal units and dates for depopulation
- if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: /a 1 jq / aUaO
I hereby certify. that I have reviewed the information listed above and included within the attached Plan
of Action, and to the best of my Knowledge and ability, the information is accurate and correct.
l
�Sqlx.C, Si nq I t
Facility Owne
Facility Ow
PoA Cover Page 2121100
Phone: U — 0 % 4 ` � jq<g
nager (print)
Date: 12-1 19 1 z0go
nag,g(signature)
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR: STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: Singletary Finishing 9-183 line m = 2070.E 1 lb PAN
2. Structure ID:
3. Structure ID:
4. Structure ID:
5. Structure ID:
6. Structure ID:
line m =
lb PAN
line m =
lb PAN
line m =
lb PAN
line m =
lb PAN
line m =
lb PAN
n. lines 1 + 2 +.3 + 4 + 5 + 6 = 2070.6- lb PAN
Ill. TOTAL PAN BALANCE REMAINING FOR AVAILABLE. CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract #
p.: field #
q. crop
r. acres
s. remaining IRR
2 PAN balance
(lb/acre)
t. TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column r x s
u. application window'
1068
1
os - ryegrass
13.60
50.00
680.0
Aug -July
10681
2
os - ryegrass
16.20
50.00
810.0
Aug -July
1068
3
os - ryegrass
7.30
50.00
365.0
Aug -Jul
1068
9
os
7.30
50.00
365.0
Mar -Sept
1068
10
os
7.30
50.00
365.0
Mar -Sept
1068
11
os
15.50
50.00
775.0
Mar -Sept
*** PAN are estimates***
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 3360.0 Ib. PAN_
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) _ 2070.6 lb. PAN
x. Crop's remaining PAN balance (line v from section III) = 3360.0 lb: PAN
y. Overall PAN balance (w - x) _ -1289 lb.,PAN
NARRATIVE:
Will begin pumping as soon as field conditions permit.
PoA (30 Day) 2/21 /00
13
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): Sin leta Finishing 9-183
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 14.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches
c. line b - line a (inches in red zone) = 5.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 188760 fe
e. line c/12 x line d x 7.48 gallons/fts 588302 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 261105.9 fts
h. current herd # 7920 certified herd # 7920
actual waste produced = current herd # x line g = 261106 fts
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 1 11/18/2020
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
Offs
110110 fts
462782 gallons
1.97 Ibs/1000 gal.
2070.6 lbs. PAN
PoA (30 Day) 2/21 /00