Loading...
HomeMy WebLinkAbout20040275 Ver 10_Information Letter_20110208A pA NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director ?c-(' a 27 5 Dee Freeman Secretary February 8, 2011 Mr. Darin Waller Resident Engineer, Division 9, North Carolina Department of Transportation 4770 South Main Street Salisbury, NC 28147 Subject: I-85 Yadkin River Bridge Project I-2304AC Davidson/Rowan Counties DWQ No: 20040275 Dear Mr. Waller: On February 8, 2011, Amy Euliss, Division of Water Quality (Division) regional staff conducted a site visit following the discovery by Flat Iron-Lane Joint Ventures and NCDOT staff, of sediment in jurisdictional wetlands on the I-85 Yadkin River Bridge Project in Davidson and Rowan Counties. The site visit was in conjunction with yourself, Mrs. Stephanie Braquet, Division Environmental Specialist, NCDOT Division 9, Phil Suggs, Roadside Environmental, and other NCDOT and contractor staff. During the site visit, it was noted that a sediment loss had occurred as a result of a series of two failed basins, including a skimmer failure on one basin which led to a dam failure on the second basin. However, the extent of the sediment loss was unable to be determined, because the bulk of the material had been removed from the jurisdictional wetland. The fill of a jurisdictional wetland without authorization is a violation of Title 15A NCAC 2B .0231(a) and (b) (1) and (5). Upon discovery, NCDOT quickly contacted the Division to report the sediment. Prior to recommendation from the Division, NCDOT and Flat Iron-Lane removed the sediment from the wetland. During the aforementioned site visit, Amy Euliss determined that no additional restoration work was required. Please be advised that the Division of Water Quality shall be contacted to direct all future sediment removals, as detailed in the "NPDES Permit No. NCGO10000 Construction Stormwater Guidance Frequently Asked Questions", which is accessible at http•//www ncdot org/doh/operations/dp chief eng/roadside/fieldopss/. NCDOT and Flat Iron-Lane Joint Ventures are at this time in compliance with their NPDES permit. NPDES inspection records are up to date and thorough, and the Division was notified within 24 hours of the loss (not counting Sunday). The Division would like to commend both NCDOT Division 9 and Flat Iron-Lane Joint Ventures for their prompt response to this matter. The Division appreciates the time NCDOT staff spent discussing the site, and the immediate response taken by NCDOT and the contractor. We look forward to continued communication and assistance on this, and future projects. If you have any questions or comments, please do not hesitate to contact Amy Euliss at 336-771-4959 or at amy.euliss@ncdenr.gov. Sincerely, W. Corey Basinger Acting Water Quality Regional Supervisor N°or`thCarolina Naturally North Carolina Division of Water Quality 585 Waughtown Street Phone (336) 771-5000 Customer Service Internet: vmv.mmaterquality.org Winston-Salem, NC 27107 FAX (336) 771-4630 1-877-623-6748 An Equal OpportunitylAffrmative Action Employer - 50% Recycled/10% Post Consumer Paper Mr. Darin Waller, P.E.. February 8, 2011 DWQ #04-0275 Page 2 CC: Casey P. Hurley, PE, 105 Jacobs Lamb Lane, Salisbury, NC 28146 Stephanie Braquet, NCDOT, Division 9 DES Phil Suggs, NCDOT Roadside Environmental Unit John Thomas, USACE Wilmington Regulatory Field Office DWQ-Winston-Salem Regional Office DWQ_W.etland s/401-Transportation-P ittin g-Un it- Matt Gantt-WSRO Land Quality- E-copy Zahid Khan-MRO Land Quality- E-copy