Loading...
HomeMy WebLinkAbout20202009 Ver 1_LINE 333 TYPICAL 8IN RETROFIT NOTES (1) (1)_20210111TYPICAL 8" SINGLE FITTING REPLACEMENT NOTES -.- I . SINGLE FITTING REPLACEMENT INCLUDES REMOVAL AND REPLACEMENT OF 1 - 900 OR 1 - 450 FITTING OR A CUT SEGMENT OF ETHER AND UP TO 10 FT. OF ENE PPE IN EACH DRECTON. THIS WILL BE REPLACED BY A 3R FITTING, OR A CUT SEGMENT OF A 3R, WITH 2 TRANSITION FECES, AND THE NECESSARY LINE PPE TO MAKE THE TIE INS TO THE EXISTING PIPE. 2. IF FITTING S TO BE 450 OR SMALLER ITEM 3 FROM THE BOM SHALL BE USED IN PLACE OF ITEM 2. 3. QUANTITIES IN THE BILL OF MATERIALS IS FOR THE REPLACEMENT OF A SINGLE FITTING. TYPICAL 8" STACKED FITTING REPLACEMENT NOTES: 1. STACKED FITTINGS REPLACEMENT - INCLUDES REMOVAL AND REPLACEMENT OF 2 - 900 OR 2 - 450 FITTINGS OR CUT SEGMENTS OF ETHER AND/OR ANY COMBINATION THEREOF PLUS UP TO 10 FT. OF LINE PPE IN EACH DIRECTION. THIS WILL BE REPLACED BY 2 - 3R FITTINGS, OR CUT SEGMENTS OF 3R, WITH 2 TRANSITION PIECES, AND THE NECESSARY LINE PIPE TO MAKE THE TIE INS TO THE EXISTING PPE. A STACKED FITTING REPLACEMENT MAY ALSO INCLUDE A PUP BETWEEN THE FITTINGS OF UP TO 10 FT. IN LENGTH. ANY FITTINGS REQUIRING MORE THAN A 10 FT. PUP BETWEEN THEM WILL BE CONSIDERED AS 2 SINGLES. 2. IF FITTING S TO BE 450 OR SMALLER ITEM 3 FROM THE BOM SHALL BE USED IN PLACE OF ITEM 2. 3. QUANTITIES IN THE BILL OF MATERIALS IS FOR THE REPLACEMENT OF A SINGLE STACKED FITTING. TYPICAL 8" BOX SECTION REPLACEMENT N OTES: 1. BOX SECTION REPLACEMENT - INCLUDES THE REMOVAL OF THE EXISTING BOX SECTION WITH UP TO 10 FT. OF PPE IN EACH DIRECTION BEYOND THE TOP FITTINGS. THIS WILL BE REPLACED BY A NEW BOX SECTION ASSEMBLY INCLUDING 3R FITTINGS, 2 TRANSITION PIECES, AND 3 PUP PIECES UP TO 10 FT. IN LENGTH EACH. NOTE: THE REPLACEMENT OF 1.5R STACKED FITTINGS WITH 3R MAY REQUIRE THE LOWER RUN OF THE NEW BOX SECTION TO BE INSTALLED LOWER THAN THE ORIGINAL WAS. ANY FITTINGS REQUIRING MORE THAN A 10 FT. PUP BETWEEN THEM WILL BE CONSIDERED AS 2 SINGLES. THIS MAY ALSO CAUSE A BOX SECTION TO BE REPLACED AS 1 STACKED AND 2 SINGLES, OR 2 SETS OF STACKED, OR IF LARGE ENOUGH POSSIBLY 4 S NGLES, OR ANY COMBINATION THEREOF. 2. QUANTITIES IN THE BILL OF MATERIALS IS FOR THE REPLACEMENT OF A SINGLE BOX SECTION. TYPICAL 8" TRANSITION ADDITION NOTES: 1. TRANSITION ADDITION - INCLUDES ADDING 2 TRANSITION PIECES ON EITHER SIDE OF A PREVIOUS TIE IN THAT HAS DIFFERING WALL THICKNESS TO THE MAIN LINE. THERE ARE NO FITTINGS INVOLVED. QUANTITIES IN THE BILL OF MATERIALS IS FOR 2 TRANSITION PIECES. PPE SPECIFICATIONS: ALL UNDERGROUND PIPING SHALL BE COATED PER PIEDMONT SPECIFICATIONS. NorthStar Energy Services, Inc.NC Engineering License F-0626 n 11712 Statesville Rd, Huntersville, NC 28078 PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY 0 PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 r NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS e LINE 200 - SEG 2 - RETROFIT 0 07/07/2020 ISSUE FOR 30% REVIEW SM KB RP AREA CODE 2500 DATE INITIALS REGIONAL NIA N/A ENGINEER % DUKE Piedmont �� TYPICAL 8 RETROFIT DESIGN NOTES B 01/06/2021 ISSUE FOR 90% REVIEW SM MC RP ACCOUNT NUMBER 10700 DATE INITIALS PROJECT NUMBER 0232884 N/A N/A MGR TECH �. ENERGY 011 Natural Gas DRAWING BY SM -_ REC &STD BU RLI NGTON, NC STATION ID _ DATE INITIALS PRINCIPAL PROFESSIONAL ENG/ARCHSTAMP u NIA N/A ENGINEER COPYRIGHT 2018 Burlington Resource Center -Reidsville, North Carolina CHECKER INITIALS MC 90% NOT FOR CONSTRUCTION REF. DWG(S) SHEET(S) 4 OF 6 1 DWG SCALE NTS DWG DATE 05/07/2020 1 SUPERSEDED DRAWING NUMBER REVISION PNIG M-333-0001002 B DISCIPLINE / RESOURCE CENTER / LINE NUMBER