HomeMy WebLinkAbout20202009 Ver 1_LINE 333 TYPICAL 8IN RETROFIT NOTES (1) (1)_20210111TYPICAL 8" SINGLE FITTING REPLACEMENT
NOTES -.-
I . SINGLE FITTING REPLACEMENT INCLUDES REMOVAL AND REPLACEMENT OF
1 - 900 OR 1 - 450 FITTING OR A CUT SEGMENT OF ETHER AND UP TO
10 FT. OF ENE PPE IN EACH DRECTON. THIS WILL BE REPLACED BY
A 3R FITTING, OR A CUT SEGMENT OF A 3R, WITH 2 TRANSITION FECES,
AND THE NECESSARY LINE PPE TO MAKE THE TIE INS TO THE EXISTING
PIPE.
2. IF FITTING S TO BE 450 OR SMALLER ITEM 3 FROM THE BOM SHALL BE
USED IN PLACE OF ITEM 2.
3. QUANTITIES IN THE BILL OF MATERIALS IS FOR THE REPLACEMENT OF A
SINGLE FITTING.
TYPICAL 8" STACKED FITTING REPLACEMENT
NOTES:
1. STACKED FITTINGS REPLACEMENT - INCLUDES REMOVAL AND REPLACEMENT
OF 2 - 900 OR 2 - 450 FITTINGS OR CUT SEGMENTS OF ETHER AND/OR
ANY COMBINATION THEREOF PLUS UP TO 10 FT. OF LINE PPE IN EACH
DIRECTION. THIS WILL BE REPLACED BY 2 - 3R FITTINGS, OR CUT
SEGMENTS OF 3R, WITH 2 TRANSITION PIECES, AND THE NECESSARY LINE
PIPE TO MAKE THE TIE INS TO THE EXISTING PPE. A STACKED FITTING
REPLACEMENT MAY ALSO INCLUDE A PUP BETWEEN THE FITTINGS OF UP
TO 10 FT. IN LENGTH. ANY FITTINGS REQUIRING MORE THAN A 10 FT. PUP
BETWEEN THEM WILL BE CONSIDERED AS 2 SINGLES.
2. IF FITTING
S TO
BE
450
OR SMALLER ITEM 3 FROM THE BOM SHALL BE
USED IN
PLACE
OF
ITEM
2.
3. QUANTITIES IN THE BILL OF MATERIALS IS FOR THE REPLACEMENT OF A
SINGLE STACKED FITTING.
TYPICAL 8" BOX SECTION REPLACEMENT
N OTES:
1. BOX SECTION REPLACEMENT - INCLUDES THE REMOVAL OF THE EXISTING
BOX SECTION WITH UP TO 10 FT. OF PPE IN EACH DIRECTION BEYOND
THE TOP FITTINGS. THIS WILL BE REPLACED BY A NEW BOX SECTION
ASSEMBLY INCLUDING 3R FITTINGS, 2 TRANSITION PIECES, AND 3 PUP
PIECES UP TO 10 FT. IN LENGTH EACH. NOTE: THE REPLACEMENT OF 1.5R
STACKED FITTINGS WITH 3R MAY REQUIRE THE LOWER RUN OF THE NEW
BOX SECTION TO BE INSTALLED LOWER THAN THE ORIGINAL WAS. ANY
FITTINGS REQUIRING MORE THAN A 10 FT. PUP BETWEEN THEM WILL BE
CONSIDERED AS 2 SINGLES. THIS MAY ALSO CAUSE A BOX SECTION TO BE
REPLACED AS 1 STACKED AND 2 SINGLES, OR 2 SETS OF STACKED, OR IF
LARGE ENOUGH POSSIBLY 4 S NGLES, OR ANY COMBINATION THEREOF.
2. QUANTITIES IN THE BILL OF MATERIALS IS FOR THE REPLACEMENT OF A
SINGLE BOX SECTION.
TYPICAL 8" TRANSITION ADDITION
NOTES:
1. TRANSITION ADDITION - INCLUDES ADDING 2 TRANSITION PIECES ON
EITHER SIDE OF A PREVIOUS TIE IN THAT HAS DIFFERING WALL THICKNESS
TO THE MAIN LINE. THERE ARE NO FITTINGS INVOLVED. QUANTITIES IN THE
BILL OF MATERIALS IS FOR 2 TRANSITION PIECES.
PPE SPECIFICATIONS:
ALL UNDERGROUND PIPING SHALL BE COATED PER PIEDMONT SPECIFICATIONS.
NorthStar Energy Services, Inc.NC Engineering License F-0626
n 11712 Statesville Rd, Huntersville, NC 28078
PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED *
DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY
0
PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE *
TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001
r
NO.
DATE
REVISION(S) DESCRIPTION
BY
CHK
APPD
DESCRIPTION
APPROVALS
e
LINE 200 - SEG 2 - RETROFIT
0
07/07/2020
ISSUE FOR 30% REVIEW
SM
KB
RP
AREA CODE
2500
DATE
INITIALS
REGIONAL
NIA
N/A
ENGINEER
% DUKE Piedmont
��
TYPICAL 8 RETROFIT DESIGN NOTES
B
01/06/2021
ISSUE FOR 90% REVIEW
SM
MC
RP
ACCOUNT NUMBER
10700
DATE
INITIALS
PROJECT NUMBER
0232884
N/A
N/A
MGR TECH
�. ENERGY 011 Natural Gas
DRAWING BY
SM
-_
REC &STD
BU RLI NGTON, NC
STATION ID _
DATE
INITIALS
PRINCIPAL
PROFESSIONAL ENG/ARCHSTAMP
u
NIA
N/A
ENGINEER
COPYRIGHT 2018
Burlington Resource Center -Reidsville, North Carolina
CHECKER INITIALS
MC
90% NOT FOR
CONSTRUCTION
REF. DWG(S)
SHEET(S) 4 OF 6 1 DWG SCALE NTS
DWG DATE 05/07/2020 1 SUPERSEDED
DRAWING NUMBER REVISION
PNIG M-333-0001002 B
DISCIPLINE / RESOURCE CENTER / LINE NUMBER