Loading...
HomeMy WebLinkAbout20202009 Ver 1_ePCN Application_20210111DWR mrlslon of Water Resources Pre -Construction Notification (PCN) Form October 26, 2020 Ver 3.3 Initial Review Has this project met the requirements for acceptance in to the review process?* r Yes r No Is this project a public transportation project?* C Yes r No Change only if needed. BIMS # Assigned 20202009 Is a payment required for this project?* r No payment required r Fee received r Fee needed - send electronic notification Select Project Reviewer* Sue Homewood:eads\slhoma=od Information for Initial Review la. Name of project: COURTESY COPY - Line 333 Retrofit 1a. Who is the Primary Contact?* Joey Lawler, PWS 1b. Primary Contact Email:* jlaWer@smeinc.com Date Submitted 1/11/2021 Nearest Body of Water UWharrie River Basin Yadkin-PeeDee Water Classification WS-III Site Coordinates Latitude: Longitude: 35.896743'-79.9445150 Pre -Filing Meeting Information ID# Not required for courtesy submittal Pre -fling Meeting or Request Date* 12/21/2020 Attach documentation of Pre -Filing Meeting Request here:* Pre -File Meeting Request Form.pdf Version#* 1 Reviewing Office* Winston-Salem Regional Office - (336) 776- 9800 1c. Primary Contact Phone:* (704)604-6474 Version IwA 224.5KB A. Processing Information C^U County (or Counties) where the project is located: Randolph Is this a NCDMS Project r Yes r No Is this project a public transportation project?* r Yes r No la. Type(s) of approval sought from the Corps: * Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Has this PCN previously been submitted?* r Yes r No 1b. What type(s) of permit(s) do you wish to seek authorization? W Nationwide Permit (NWP) r Regional General Permit (RGP) r Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? r Yes r No Nationwide Permit (NWP) Number: 12 - Utility Lines NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: W 401 Water Quality Certification - Regular r Non-404 Jurisdictional General Permit r Individual Permit le. Is this notification solely for the record because written approval is not required? For the record only for DWR401 Certification: For the record only for Corps Permit: r 401 Water Quality Certification - E)press r Riparian Buffer Authorization 1f. Is this an after -the -fact permit application?* r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No Acceptance Letter Attachment 1h. Is the project located in any of NC's twenty coastal counties? r Yes r No 1j. Is the project located in a designated trout watershed? r Yes r No B. Applicant Information 1d. Who is applying for the permit? r Owner W Applicant (other than owner) le. Is there an Agent/Consultant for this project?* r Yes r No 2. Owner Information 2a. Name(s) on recorded deed: Piedmont Natural Gas 2b. Deed book and page no.: N/A - Project located in easement 2c. Responsible party: Piedmont Natural Gas 2d.Address * r Yes r No r Yes r No Street Address 4720 Piedmont Row Drive Address tine 2 aty Charlotte Postal / Zip Code 28210 2e. Telephone Number: (704)731-4153 2g. Email Address:* Aaron.Weldon@duke-energy.com 3. Applicant Information (if different from owner) 3a. Name: Aaron Weldon 3b. Business Name: Piedmont Natural Gas 3c.Address Street Address 4720 Piedmont Row Drive Address tine 2 aty Charlotte Postal / Zip Code 28210 3d. Telephone Number: (704)731-4153 3f. Email Address:* Aaron.Weidon@duke-energy.com 4. Agent/Consultant (if applicable) 4a. Name: Joey Lawler, PWS 4b. Business Name: S&ME, Inc. 4c.Address Street Address 2016 Ayrsley Town Blvd., Suite 2-A Address Line 2 City Charlotte Postal / Zip Cede 28273 4d. Telephone Number: (704)604-6474 4f. Email Address:* jlaWer@smeinc.com Agent Authorization Letter* Agent Authorization Form.pdf C. Project Information and Prior Project History Project Information 1b. Subdivision name: it apprcprate) WA 1c. Nearest municipality/ town: Archdale 2. Project Identification State / Ravine / Rion NC Country USA 2f. Fax Number: Slate/Fr vine/tllegion NC Country USA 3e. Fax Number: State / Rmince / Region NC Country USA 4e. Fax Number: 201.29KB 2a. Property Identification Number: N/A 2c. Project Address Street Address Multiple Randolph County locations along Line 333 Address tine 2 CKY Archdale Postal / Zip Gxle 27263 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Uwharrie River 3b. Water Resources Classification of nearest receiving water:* WS-III 3c. What river basin(s) is your project located in?* Yadkin-PeeDee 3d. Please provide the 12-digit HUC in which the project is located. 030300030106 and 030401030402 4. Project Description and History 2b. Property size: N/A State / Province / I?gion NC (buntry USA 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Line 333 natural gas transmission line was originally constructed in 1984-1985.The project area consists primarily of an existing, maintained utility easement. A temporary access road will be required at one location. A portion of the temporary access road will pass through a small forested area. The project vicinity ranges from largely undeveloped agricultural and forested land, and mixtures of residential and light industrial development. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* r Yes r No r Unknown 4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) FIG2A-2D_USGS.pdf 1.91 MB 4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) FIG3A-3D_SOILS.pdf 2.79MB 4f. List the total estimated acreage of all existing wetlands on the property: - 0.20 4g. List the total estimated linear feet of all existing streams on the property: -100LF 4h. Explain the purpose of the proposed project:* The purpose of the project is to retrofit the natural gas transmission line to accommodate an in -line inspection (ILI) device and is compatible with current safety and inspection requirements. 41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* The work will occur at approximately multiple locations along the existing pipeline, and with the exception of an access road, will be conducted within the existing 50-foot wide easement. The proposed work will involve excavation and exposing the existing pipeline in areas wfiere replacement of existing fittings or similar upgrades are necessary to make the pipeline compatible with the ILI device. The work will first involve demarcation of disturbance limits, which in most instances will not exceed a 50' x 50' area within the existing easement. t'jurisdictional boundaries are present, these areas will be demarcated as well. Appropriate erosion and sedimentation control (E&SC) measures will be installed in advance of excavation to prevent sedimentation of adjacent jurisdictional features. Equipment crossing over herbaceous wetlands that may be located within the existing easement will do so on mats to avoid impacts. A track hoe will then excavate a pit and expose the pipe. Spoil material will be temporarily stockpiled within the easement adjacent to the pit and contained within silt fence. In wetland areas, topsoil will be segregated from the subsoil. At one location (Site 4), temporary equipment access from Weant Road will be required. Construction of the temporary road will result in clearing a minor amount of forested wetlands. Access from this location is required in order to avoid additional disturbance by utilizing the existing easement, where disturbance to agricultural fields, along with multiple crossings of more significant wetlands and a stream would be required. Following completion of the work to the pipeline, the spoil material will be replaced in the pit, and the topsoil will be replaced last. The affected areas will be restored to their pre - construction grades and contours, and permanent seed and will be mulch applied. All work within wetland areas will be conducted in accordance with the applicable permit conditions. 4j. Please upload project drawings for the proposed project. LINE 333 TYPICAL 81N RETROFIT DESIGN (1) (1).pdf 525.84KB LINE 333 TYPICAL 81N RETROFIT NOTES (1) (1).pdf 479.09KB Line 333 IFC Details.pdf 14.49MB 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* r Yes r No f Unknown Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made?* r Preliminary r Approved r Not Verified r Unknown r N/A Corps AID Number: 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): J. Lawter, PWS Agency/Consultant Company: SRME, Inc. Other: 5d1. Jurisdictional determination upload WETS Data 2020-12-29.pdf WA data forms. pdf Photo Log.pdf 6. Future Project Plans 92.92KB 235.68KB 1.29MB 6a. Is this a phased project?* r Yes r No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? No additional permits should be required. D. Proposed Impacts Inventory 1. Impacts Summary la. Where are the impacts associated with your project? (check all that apply): W Wetlands r Streams -tributaries P Buffers r Open Waters r Pond Construction 2. Wetland Impacts 2a1 Reason (?) 2b. Impact type * M 2c. Type of W. * 2d. W. name* 2e. Forested* 2C Type of Jurisdicition*(?) 2g. Impact area* 4 Access Road T Headwater Forest WA Yes Both 0.005 (acres) Sb Fitting Replacement T Seep WB Both 0.050 (acres) 7 Fitting Replacement T Headwater Forest WC �No Both ]0.040 (acres) 8 Fitting Replacement T Headwater Forest WD �No Both ]0.001 (acres) 9 Fitting Replacement T Bottomland Hardwood Forest WF No Both 0.020 (acres) 2g. Total Temporary Wetland Impact 0.116 2g. Total Wetland Impact 0.116 2h. Comments: All impacts are temporary 6. Buffer Impacts (for DWR) 6a. Project is in which protect basin(s)? Clh ck all that apply. r Neuse r- Catawba r- Goose Creek r- Other 2g. Total Permanent Wetland Impact 0.000 r Tar -Pamlico R Randleman r Jordan Lake ib. Impact Type 6c. Per or Temp 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact 6g. Zone 2 impact lccess Road T S1 No 780 492 6h. Total buffer impacts: Zone 1 Zone 2 Total Temporary impacts: 780.00 492.00 Zone 1 Zone 2 Total Permanent impacts: 0.00 0.00 Zone 1 Zone 2 Total combined buffer impacts: 780.00 492.00 6i. Comments: Buffer impact is "deemed allowable" by the buffer rules because less than 2,500 sf of buffer Will be impacted, and the area will be restored to pre - construction topographic and hydrologic conditions and replanted with comparable vegetation within two months of Wien construction is complete. Supporting Documentation FIG4A-4D_IMPACTS.pdf 3.09MB E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: See cover letter 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: See cover letter 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? r Yes r No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: Project does not result in permanent wetland impacts. F. Stormwater Manaqement and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes r No What type of SCM are you providing? r Level Spreader r Vegetated Conveyance (lower SHWT) r Wetland Swale (higher SHWT) r Other SCM that removes minimum 30 % nitrogen W Proposed project will not create concentrated stormwater flow through the buffer Diffuse Flow Documentation 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* r Yes r No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? G Yes r No Comments: NA G. Supplementary Information u 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r Yes r No 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 21-1.1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * r Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* r Yes r No 3b. If you answered "no," provide a short narrative description. Project is deigned to retrofit an wasting utility line to meet current safety and inspection requirements. It is not designed in induce growth. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* r Yes r Nor N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* r Yes r No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes r No Sc. If yes, indicate the USFWS Field Office you have contacted. Raleigh 5d. Is another Federal agency involved?* r Yes r No r Unknown 5e. Is this a DOT project located within Division's 1-8? r Yes r No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? r Yes r No 5g. Does this project involve bridge maintenance or removal? r Yes r No 5h. Does this project involve the construction/installation of a wind turbine(s)?' r Yes r No 51. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? r Yes r No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? See cover letter Consultation Documentation Upload Site 4.pdf Site 5B.pdf Site 7.pdf Site 8.pdf Site 9.pdf Site4.pdf Site5B.pdf Site7.pdf Site8.pdf Site9.pdf 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* r Yes r No 179.64KB 179.13KB 186.29KB 185.99KB 187.9KB 996.77KB 1.02MB 917.8KB 910.45KB 910.91 KB 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* https://www. fisheries. noaa. gov/resou rce/ma p/esse ntia I -fish -habitat -ma ppe r 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* r Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* See cover letter 7c. Historic or Prehistoric Information Upload 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-yearfloodplain?* r Yes r No lic. What source(s) did you use to make the floodplain determination?* hftps://flood.nc.gov/ncflood/ Miscellaneous Comments Please see attached cover letter for additional information Miscellaneous attachments not previously requested. FIG1_VICINrfY.pdf 697.21 KB Cover Letter.pdf 199.03KB Signature u * W By checking the box and signing below, I certify that: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief; and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: ,bey Lawler Signature J-#EY L_4WLI�— Date 1 /11 /2021