Loading...
HomeMy WebLinkAbout20110039 Ver 1_Email_20110209Chatham SR 2316 Page 1 of 1 I ?oo3'1 Chatham SR 2316 1 Herndon, Mason Sent: Thursday, February 10, 2011 2:51 PM To: King, Art C Cc: Smith, Ronnie D SAW [Ronnie.D.Smith@usace.army.mil]; Carrillo, Sonia Art, I have reviewed your application for Zeb Brook Rd (SR 2316) in Chatham and did a site visit yesterday. I have a couple of questions and/or clarifications that need to be addressed, before I can issue the 410: Site 1-The permit drawing does not show the existing pipe so I cannot determine for sure if you are proposing to adjust the skew of the proposed pipe to align with stream channel at the R/W limits. Currently the stream enters the roadside ditch and flows down the road ^25 ft before entering the existing pipe. So are you proposing to install the new pipe in line with the channel intercept at the R/W on both the inlet and outlet ends? Based on the drawing and proposed length of new pipe, it appears that you are. Just want to make sure Site 2 -The permit drawing appears to show rip rap bank stabilization beyond the inlet and outlet ends of the proposed pipe. However, you only requested authorization for 28 ft of impacts for the additional length of proposed pipe (60 ft proposed minus 32 ft of existing). You need to either eliminate the rip rap from the permit drawing or modify page 4 of your PCN and include a separate line of impacts for bank stabilization at Site 2. If you can, make the appropriate changes on either the drawing or PCN, scan it and e-mail it to me as soon as possible. If you have any questions or want to discuss any of these items, please do hesitate to give me a call. Thanks! Mason Mason Herndon Environmental Senior Specialist NCDENR, Division of Water Quality Surface Water Protection mason.herndon(o)ncdenr.gov Phone: (910) 308-4021 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. https:Hmail.nc.gov/owa/?ae=ltem&t- W2TJHI4%2bm... 2/25/2011 RE: Pitt 64 Revisions RE: Pitt 64 Revisions Ward, Garcy Sent: Wednesday, February 09, 2011 10:53 AM To: Sutton, Michael W; Garcy Ward (garcy.ward@ncmail.net); Carrillo, Sonia Cc: Johnson, Jay B; Steffens, Thomas A SAW [Thomas.A.Steffens@usace.army.mil] Page 1 of 1 . Mike, Thanks for the revisions. Did you find out about the on-site detour? The NRTR submitted with the application indicates there will be one. This would create additional impacts that need to be accounted for. Thanks. - Garcy E-mail correspondence to and form this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. -----Original Message----- From: Sutton, Michael W [mailto:msutton@ncdot.gov] Sent: Friday, February 04, 2011 4:19 PM To: Garcy Ward (garcy.ward@ncmail.net); Carrillo, Sonia Cc: Johnson, Jay B Subject: Pitt 64 Revisions Good Afternoon Ms. Sonia and Mr. Garcy.... Attached are revisions for Pitt 64; please replace the old 404 wetland sheet with this revision, as well as page numbers 5 and 7 of the PCN... Thank You...Have a Great Week-End ..... mike Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. https:Hmail.nc. gov/owa/?ae=Item&t=I PM.Note&id=RgAAAADMSzLcd9 W 2TJHI4%2bm..: 2/25/2011