HomeMy WebLinkAbout20091325 Ver 1_Meeting Minutes_20110225FW: Final 012011 TEAC Minutes Page 1 of 2
FW: Final 012011 TEAC Minutes
Wrenn, Brian
Sent: Friday, February 25, 2011 11:11 AM
To: Carrillo, Sonia
Attachments: 2011-2-23-Final Jan20 TEAC-1.pdf (53 KB)
Please scan and file the attached email and documents. thanks
Brian Wrenn
Transportation Permitting Unit, Supervisor
NC Division of Water Quality
brian.wrenn@ncdenr.gov
585 Waughtown Street
Winston-Salem, NC 27107-2241
336-771-4952 (Winston-Salem no
336-771-4631 (Fax)
or
1650 Mail Service Center
Raleigh, NC 27699-1650
919-807-6432
919-807_ 6494 (Fax)
-----Original Message-----
From: Kiersten Giugno [mailto:system@constructware.com)
Sent: Wednesday, February 23, 2011 1:08 PM
To: amy.simes@ncmail.net; Gamber, Anne D; Johnson, Benjetta L; Wrenn, Brian; Ellis,
Bruce 0; Dagnino, Carla S; Chris.Lukasina@campo-nc.us; militscher.chris@epa.gov;
Chang, David S; Riffey, Deanna; Sykes, Dewayne L; Hall, Dolores;
Ed.Johnson@ci.raleigh.nc.us; Lusk, Elizabeth L; eric.c.alsmeyer@usace.army.mil;
gary_jordan@fws.gov; george.hoops@dot.gov; Huang, Herman; Hart, Kevin;
kmarkham@esinc.cc; Brooks, Lonnie I; Clawson, Marshall W; Pair, Missy; Sandbeck,
Peter; Beauregard, Rachelle; Gledhill-earley, Renee; Roach, Renee B;
Rob.Ridings@ncmail.net; scott.c.mclendon@usace.army.mil; Gurganus, Stephen J (Steve)
- HEU; Houser, Anthony A; Wilson, Travis W.; Bowman, John W; wsmith@mulkeyinc.com;
Barrett, William A
Cc: Keener, Donna; Harris, Jennifer; Burris, John D; Giugno, Kiersten R; Kristin
Maseman; Roy Bruce; Franklin, Spencer T; Dewitt, Steve
Subject: Final 012011 TEAC Minutes
All, attached is the final version of the minutes for the January 20, 2011 TEAC
meeting. These minutes incorporate all comments received on the draft version.
Also available for download on Constructware are the following documents:
1) Upgrade Existing LOS Figures (per action item from November 2010 TEAC meeting)
2) Hybrid LOS Figures (per action item from November 2010 TEAC meeting)
3) 2035 Build Toll Capacity Analysis (Red Corridor) Figures (per action item from
January 2011 TEAC meeting.
4) Southeast Extension Traffic Methodology Memo (per action item from January 2011
TEAC meeting)
Please feel free to contact me with any questions or concerns regarding these
documents.
https://mail.nc.gov/owa/?ae=Item&t=IPM.Note&id=RgAAAADMSzLcd9 W 2TJHI4°/u2bm... 2/25/2011