Loading...
HomeMy WebLinkAbout20091325 Ver 1_Meeting Minutes_20110225FW: Final 012011 TEAC Minutes Page 1 of 2 FW: Final 012011 TEAC Minutes Wrenn, Brian Sent: Friday, February 25, 2011 11:11 AM To: Carrillo, Sonia Attachments: 2011-2-23-Final Jan20 TEAC-1.pdf (53 KB) Please scan and file the attached email and documents. thanks Brian Wrenn Transportation Permitting Unit, Supervisor NC Division of Water Quality brian.wrenn@ncdenr.gov 585 Waughtown Street Winston-Salem, NC 27107-2241 336-771-4952 (Winston-Salem no 336-771-4631 (Fax) or 1650 Mail Service Center Raleigh, NC 27699-1650 919-807-6432 919-807_ 6494 (Fax) -----Original Message----- From: Kiersten Giugno [mailto:system@constructware.com) Sent: Wednesday, February 23, 2011 1:08 PM To: amy.simes@ncmail.net; Gamber, Anne D; Johnson, Benjetta L; Wrenn, Brian; Ellis, Bruce 0; Dagnino, Carla S; Chris.Lukasina@campo-nc.us; militscher.chris@epa.gov; Chang, David S; Riffey, Deanna; Sykes, Dewayne L; Hall, Dolores; Ed.Johnson@ci.raleigh.nc.us; Lusk, Elizabeth L; eric.c.alsmeyer@usace.army.mil; gary_jordan@fws.gov; george.hoops@dot.gov; Huang, Herman; Hart, Kevin; kmarkham@esinc.cc; Brooks, Lonnie I; Clawson, Marshall W; Pair, Missy; Sandbeck, Peter; Beauregard, Rachelle; Gledhill-earley, Renee; Roach, Renee B; Rob.Ridings@ncmail.net; scott.c.mclendon@usace.army.mil; Gurganus, Stephen J (Steve) - HEU; Houser, Anthony A; Wilson, Travis W.; Bowman, John W; wsmith@mulkeyinc.com; Barrett, William A Cc: Keener, Donna; Harris, Jennifer; Burris, John D; Giugno, Kiersten R; Kristin Maseman; Roy Bruce; Franklin, Spencer T; Dewitt, Steve Subject: Final 012011 TEAC Minutes All, attached is the final version of the minutes for the January 20, 2011 TEAC meeting. These minutes incorporate all comments received on the draft version. Also available for download on Constructware are the following documents: 1) Upgrade Existing LOS Figures (per action item from November 2010 TEAC meeting) 2) Hybrid LOS Figures (per action item from November 2010 TEAC meeting) 3) 2035 Build Toll Capacity Analysis (Red Corridor) Figures (per action item from January 2011 TEAC meeting. 4) Southeast Extension Traffic Methodology Memo (per action item from January 2011 TEAC meeting) Please feel free to contact me with any questions or concerns regarding these documents. https://mail.nc.gov/owa/?ae=Item&t=IPM.Note&id=RgAAAADMSzLcd9 W 2TJHI4°/u2bm... 2/25/2011