Loading...
HomeMy WebLinkAbout090169_Plan of Action (POA)_20201113PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: - t I IV q County: Nadal Facility Name: ^iIle Certified Operator Name: _ re - mms Operator # 1 & 2qo 1. Current liquid levels) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 9 Lagoon Name/identifier (ID): Spillway (Yes or No): Level (inches): 2. Check all applicable items Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. V/ Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to . pumped and hauled is reflected in section III tables. Included, within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Quality prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: I hereby certify.that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. S W, (gilt Phone: -2eiej 2 Facility Owner/Manager (print) 2 LUG Date: _ T �G 2 ^ Facility Owner/Mans er (signature) PoA Cover Page 2121/00 1. PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Gilles ie 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 17.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 2.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 78408 ff e. line c/12 x line d x 7.48 gallonslW 97749 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 105497 ft3 h. current herd # 3200 certified herd # 3200 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 10/19/2020 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00 105497 ft' Ofts 48020 ft3 191385 gallons 1.45 Ibs/1000 gal. 419.2 lbs. PAN II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Gillespie line m = 419.2 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n.lines 1+2+3+4+5+6= 419.2lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN =121nn nn NnT 11eT G11Z1 nc Tn wwirw PAN coNNnT RF APPLIFn DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s u. application window' 1754 15 overseed 9.20 100.00 920.0 Sept -April 1754 6 overseed 4.00 100.00 400.0 Sept -April *"guestimate on PAN left 'State current crop ending application date or next crop application beginning date Tor available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 1320.0 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section 11) = 419.2 lb. PAN x. Crop's remaining PAN balance (line v from section 111) = 1320.0 lb. PAN y. Overall PAN balance (w - x) = -901 lb. PAN NARRATIVE: Will begin pumping as soon as field conditions permit. PoA (30 Day) 2/21100