DEPARTMENT OF THE ARMY
WILMINGTON DISTRICT, CORPS OF ENGINEERS
69 DARLINGTON AVENUE
WILMINGTON, NORTH CAROLINA 28403-1343
REPLY TO
ATTENTION OF. March 3, 2011
Planning and Environmental Section
Mr. Ian McMillan
NC Division of Water Quality
2321 Crabtree Boulevard
Suite 250
Raleigh, North Carolina 27604
Dear Mr. McMillan:
?A I Il?
?4 ?10
C
`cam war ?'1
osr????? ?Tr
The U.S. Army Corps of Engineers, Wilmington District (Corps) proposes the construction
of a water booster pumping station and water transmission main south and west of the City of
Albemarle, Stanly County, North Carolina. The proposed booster pumping station and water
transmission line will improve the reliability of water supply in the southern and western portion
of Stanly County. The overall project area is shown in Figure 1, with figures 2-10 showing
details of the areas with temporary stream crossings. Since the project involves installation of a
utility line, (work that would normally be authorized by the Corps Regulatory Nationwide Permit
No. 12; although the Corps does not issue itself permit authorization there has been coordination
with the USACE Asheville Regulatory Field Office), it is the Corps opinion that the project
complies with General Certification # 3819. A PCN and figures that further describe the project
are enclosed.
Thank you for your attention to this matter. Should you have any questions, please contact
Ms. Teresa Russell of my Environmental Resources section at telephone 910-251-4725.
Sincerely,
WPhili.nk
Chief, Environmental Resources Section
4. Applicant Information (if different from owner)
4a. Applicant is: ? Agent ® Other, specify: Corps Section 219 Project
4b. Name:
4c. Business name
(if applicable): US Army Corps of Engineers - Wilmington District
4d. Street address: 69 Darlington Ave
4e. City, state, zip: Wilmington, NC 28403
4f. Telephone no.: 910 251-4725
4g. Fax no.: 910 251-4744
4h. Email address:
5. Agent/Consultant Information (if applicable)
5a. Name:
5b. Business name
(if applicable):
5c. Street address:
5d. City, state, zip:
5e. Telephone no.:
5f. Fax no.:
5g. Email address:
Page 2 of 11
PCN Form - Version 1.3 December 10, 2008 Version
WA
O TF9OG
> -i
O Ni? Y
Office Use Only:
Corps action ID no.
DWQ project no.
Form Version 1.3 Dec 10 2008
Pre-Construction Notification PCN Form
A. Applicant Information
1. Processing
1 a. Type(s) of approval sought from the
Corps:
Section 404 Permit ? Section 10 Permit
T
1b. Specify Nationwide Permit (NWP) number: IKSLo Qor General Permit (GP) number:
1 c. Has the NWP or GP number been verified by the Corps? ? Yes ? No
1 d. Type(s) of approval sought from the DWQ (check all that apply):
® 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit
? 401 Water Quality Certification - Express ? Riparian Buffer Authorization
1 e. Is this notification solely for the record
because written approval is not required? For the record only for DWQ 401
Certification:
? Yes ® No For the record only for Corps Permit:
? Yes ? No
1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation
of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu
fee program. ? Yes ® No
1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h
below. ? Yes ® No
1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ® No
2. Project Information
2a. Name of project: Albemarle to NC Highway 200 Water Transmission Main
2b. County: Stanly
2c. Nearest municipality / town: Albemarle
2d. Subdivision name:
2e. NCDOT only, T.I.P. or state
project no:
3. Owner Information
3a. Name(s) on Recorded Deed: North Carolina Department of Transportation & City of Albemarle
3b. Deed Book and Page No.
3c. Responsible Party (for LLC if
applicable):
3d. Street address:
3e. City, state, zip:
3f. Telephone no.:
3g. Fax no.:
3h. Email address:
Page 1 of 11
PCN Form - Version 1.3 December 10, 2008 Version
B. Project Information and Prior Project History
1. Property Identification
1a. Property identification no. (tax PIN or parcel ID):
1 b. Site coordinates (in decimal degrees): Latitude: 35.332381 Longitude: - 80.304091
(DD.DDDDDD) (-DD.DDDDDD)
1 c. Property size:
2. Surface Waters
2a. Name of nearest body of water (stream, river, etc.) to
proposed project: Big Bear Creek, Little Bear Creek, Ramsy Creek
2b. Water Quality Classification of nearest receiving water: C
2c. River basin: Yadkin
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
The project will be constructed primarily within the right of way of the NCDOT, except at stream crossings, and involve
impacts to the roadside shoulder. Land use in the general vicinity of the project is woods, agriculture and residential.
There are scattered businesses.
3b. List the total estimated acreage of all existing wetlands on the property:
0.25 acre (0.00 impacted)
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:
223 linear feet (impacted)
3d. Explain the purpose of the proposed project:
The purpose of the proposed action is to improve the reliability of water supply in the southern and western portion of
Stanly County. Currently, water is supplied to the south and western portion of Stanly County from an elevated tank at
the intersection of West Oakland Avenue and Monroe Street in the City of Albemarle which feeds two booster pumping
stations. From each booster pumping station, a waterline at each site conveys water to a 200,000-gallon elevated storage
tank, one west of Albemarle and one southwest of Albemarle, as shown on Figure 1. These elevated storage tanks
provide drinking water and fire protection to their respective service areas and to the public schools where they are
located. These pump stations are the only source of water to these storage tanks. If one station were to fail, no reliable
backup is available to supply these areas.
3e. Describe the overall project in detail, including the type of equipment to be used:
The proposed project involves the construction of a water booster pumping station and water transmission main south
and west of the City of Albemarle. The western water transmission main (Line Segment 1) involves a 12-inch water line
totaling approximately 8,300 linear feet along Bost Road from Canton Road to NC Highway 24/27, and approximately
11,250 linear feet along Canton Road from Bost Road to Austin Road. The southern water transmission main (Line
Segment 2) will involve approximately 36,900 linear feet of 12-inch waterline along Austin Road from Ridgecrest Road
(SR 1227) to N.C. Highway 73. Line Segment 2 will connect to existing waterlines at each end and to Line Segment 1.
Line Segment 1 will connect with Line Segment 2 approximately 16,650 linear feet south of N.C. Highway 73, at the
intersection of Canton Road and Austin Road.
Page 3 of 11
PCN Form - Version 1.3 December 10, 2008 Version
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
project (including all prior phases) in the past?
Comments:
? Yes ? No ? Unknown
4b. If the Corps made the jurisdictional determination, what type
of determination was made?
? Preliminary ? Final
4c. If yes, who delineated the jurisdictional areas?
Name (if known) Agency/Consultant Company:
Other:
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
5. Project History
5a. Have permits or certifications been requested or obtained for
this project (including all prior phases) in the past? ? Yes ® No ? Unknown
5b. If yes, explain in detail according to "help file" instructions.
6. Future Project Plans
6a. Is this a phased project? ? Yes ® No
6b. If yes, explain.
Page 4 of 11
PCN Form -Version 1.3 December 10, 2008 Version
C. Proposed Impacts Inventory
1. Impacts Summary
1 a. Which sections were completed below for your project (check all that apply):
? Wetlands ® Streams - tributaries ? Buffers
? Open Waters ? Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. 2b. 2c. 2d. 2e. 2f.
Wetland impact Type of jurisdiction
number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact
Permanent (P) or (if known) DWQ - non-404, other) (acres)
Temporary T
W1 ? P ? T ? Yes ? Corps
? No ? DWQ
W2 ? PMT ? Yes ? Corps
? No ? DWQ
W3 ? P ? T ? Yes ? Corps
? No ? DWQ
W4 ? P ? T ? Yes ? Corps
? No ? DWQ
W5 ? P ? T ? Yes ? Corps
? No ? DWQ
W6 ? P ? T ? Yes ? Corps
? No ? DWQ
2g. Total wetland impacts 0.00
2h. Comments: No impacts to wetlands.
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a. 3b. 3c. 3d. 3e. 3f. 3g.
Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact
number - (PER) or (Corps - 404, 10 stream length
Permanent (P) or intermittent DWQ - non-404, width (linear
Temporary (T) (INT)? other) (feet) feet)
S1 ? P ®T Excavation Little Bear Creek ® PER
? INT ® Corps
® DWQ g 38
S2 ? P ®T Excavation Ramsey Creek ® PER
? INT ® Corps
? DWQ 12 17
S3 ? PET Excavation UT to Ramsey ? PER ® Corps 10 8
Creek ® INT ? DWQ
S4 ? P ® T Excavation Ramsey Creek ® PER
? INT ® Corps
? DWQ 17 35
S5 ? P ® T Excavation UT to Little Bear ? PER ® Corps 18 103
Creek ® INT ? DWQ
S6 ? P ®T Excavation Little Bear Creek ® PER
? INT ® Corps
? DWQ 28 46
S7 ? PET Excavation UT to Little Bear ® PER ® Corps 26 38
Creek ? INT ? DWQ
S8 ? P ®T Excavation UT to Little Bear ® PER ® Corps 25 41
Creek ? INT ? DWQ
3h. Total stream and tributary impacts 326
3i. Comments:
Page 5 of 11
PCN Form - Version 1.3 December 10, 2008 Version
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individually list all open water impacts below.
4a. 4b. 4c. 4d. 4e.
Open water Name of waterbody
impact number - (if applicable) Type of impact Waterbody type Area of impact (acres)
Permanent (P) or
Temporary T
01 ?P?T
02 ?P?T
03 ?P?T
04 ?P?T
4f. Total open water impacts 0.00
4g. Comments: No impacts to open waters.
5. Pond or Lake Construction
If and or lake construction proposed, then complete the chart below.
5a. 5b. 5c. 5d. 5e.
Wetland Impacts (acres) Stream Impacts (feet) Upland
Pond ID Proposed use or purpose (acres)
number of pond
Flooded Filled Excavated Flooded Filled Excavated Flooded
P1
P2
511 Total
5g. Comments: No impacts to streams or wetlands to construct lakes or pond.
5h. Is a dam high hazard permit required?
? Yes ®No If yes, permit ID no:
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If an impacts require mitigation, then you MUST fill out Section D of this form.
6a.
? Neuse ? Tar-Pamlico ? Other:
Project is in which protected basin? ? Catawba ? Randleman
6b. 6c. 6d. 6e. 6f. 6g.
Buffer impact
number - Reason Buffer Zone 1 impact Zone 2 impact
Permanent (P) or for Stream name mitigation (square feet) (square feet)
Temporary T impact required?
131 ?P?T -
?Yes
? No
B2 ? P ? T ? Yes
? No
B3 ?P?T ?Yes
? No
6h. Total buffer impacts 0
6i. Comments: The proposed project does not exist in a buffered basin.
Page 6 of 11
PCN Form - Version 1.3 December 10, 2008 Version
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
Wetlands have been avoided. Stream impacts have been avoided by a directional bore at Bear Creek, and minimized by
temporary dewatering for other crossings and returning banks and stream bed to original contours and elevations.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
The construction of the waterline will involve the implementation of an approved sedimentation and erosion control plan.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for
impacts to Waters of the U.S. or Waters of the State? ? Yes ® No
2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps
2c. If yes, which mitigation option will be used for this
project? ? Mitigation bank
? Payment to in-lieu fee program
? Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank: NA
3b. Credits Purchased (attach receipt and letter) Type Quantity
3c. Comments:
4. Complete if Making a Payment to In-lieu Fee Program
4a. Approval letter from in-lieu fee program is attached. ? Yes
4b. Stream mitigation requested: linear feet
4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold
4d. Buffer mitigation requested (DWQ only): square feet
4e. Riparian wetland mitigation requested: acres
4f. Non-riparian wetland mitigation requested: acres
4g. Coastal (tidal) wetland mitigation requested: acres
4h. Comments:
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
Page 7 of 11
PCN Form - Version 1.3 December 10, 2008 Version
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires
buffer mitigation? ? Yes ® No
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
Zone 6c.
Reason for impact 6d.
Total impact
(square feet)
Multiplier 6e.
Required mitigation
(square feet)
Zone 1 3 (2 for Catawba)
Zone 2 1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund).
6h. Comments:
Page 8 of 11
PCN Form -Version 1.3 December 10, 2008 Version
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1 a. Does the project include or is it adjacent to protected riparian buffers identified ? Yes ® No
within one of the NC Riparian Buffer Protection Rules?
1 b. If yes, then is a diffuse flow plan included? If no, explain why.
? Yes ? No
Comments:
2. Stormwater Management Plan
2a. What is the overall percent imperviousness of this project? 0%
2b. Does this project require a Stormwater Management Plan? ? Yes ® No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why:
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
? Certified Local Government
2e. Who will be responsible for the review of the Stormwater Management Plan? ? DWQ Stormwater Program
? DWQ 401 Unit
3. Certified Local Government Stormwater Review
3a. In which local government's jurisdiction is this project?
? Phase II
? NSW
3b. Which of the following locally-implemented stormwater management programs ? USMP
apply (check all that apply): ? Water Supply Watershed
? Other:
3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No
attached?
4. DWQ Stormwater Program Review
? Coastal counties
? HQW
4a . Which of the following state-implemented stormwater management programs apply ? ORW
(check all that apply): ? Session Law 2006-246
? Other:
4b. Has the approved Stormwater Management Plan with proof of approval been
attached? ? Yes ? No
5. DWQ 401 Unit Stormwater Review
5a . Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No
5b . Have all of the 401 Unit submittal requirements been met? ? Yes ? No
Page 9 of 11
PCN Form - Version 1.3 December 10, 2008 Version
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ® Yes ? No
use of public (federal/state) land?
1 b. If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State ® Yes ? No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1c. If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
letter.) ? Yes ® No
Comments:
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes ® No
or Riparian Buffer Rules (15A NCAC 2B .0200)?
2b. Is this an after-the-fact permit application? ? Yes ® No
2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes ® No
additional development, which could impact nearby downstream water quality?
3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
Based on a review of the DWQ's Internal Policy "Cumulative impacts and the 401 Water Quality Certification and Isolated
Wetland Permit Programs, Version 2.1" the proposed water line will not result in cumulative impacts that will impact
downstream water quality. The project purpose is to increase the reliability of the water supply in southern and western
portions of Stanly County and as such it is not believed to have a growth-stimulating effect. There will be no new
impervious surface added by this project which will almost entirely located in NCDOT right of way.
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
The project is a utility line which will not generate wastewater.
Page 10 of 11
PCN Form - Version 1.3 December 10, 2008 Version
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or ? Yes ® No
habitat?
5b. Have you checked with the USFWS concerning Endangered Species Act ® Yes ? No
impacts?
?
Raleigh
5c. If yes, indicate the USFWS Field Office you have contacted.
® Asheville
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
Natural Heritage Program data base
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat? T[-
] Yes No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
Project occurs in Stanly County, several hours from the coast and Essential Fish Habitat area.
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation ? Yes ® No
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
Scoping letter sent to the NC-SHPO.
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain? -0 yes ? No
8b. If yes, explain how project meets FEMA requirements: After installation of the water main, the ground will be return to pre-
construction elevation.
8c. What source(s) did you use to make the floodplain determination? NC Floodplain Mapping - Panel #6506 and 6527
Applicant/Agent's Printed Name A icant/Agent's Signature Date
(Agent's signature is valid only if an authorization letter from the applicant
is provided.)
Page 11 of 11
PCN Form - Version 1.3 December 10, 2008 Version
_Z w
J
J a
(n
W
Q c/^^
V
Z
OFn
o V)
N U
� U Q
= Q w
wly
U
Z cn LL -
0
w
wo
J
d.
Q
W
m
J
Q F
C)
CL n
0d
U c z
E.0O
) Qul z
E3(1)o
s_
f
1
t
.r
r-
, i
1
_Z w
J
J a
(n
W
Q c/^^
V
Z
OFn
o V)
N U
� U Q
= Q w
wly
U
Z cn LL -
0
w
wo
J
d.
Q
W
m
J
Q F
C)
CL n
0d
U c z
E.0O
) Qul z
E3(1)o
s_
:?? _ Sri ? ??.:,'??? - ?'? _ . ? \ •` -- - ? ??____ ? ?:,?? I? ' ` _ '
?.'?_?.r,: ??-' ? ,f?•: r., "? err, l? , ?_:-•--. ?-?f'J;?, ,??"?. Sr:; ?? ?-
_? _ I l5cjfl_ o /Jft^`'??-7
F
. _ --', 1 \!p i• y,,' ?-- i I ? -'_ .??•I ?..? l'1.;r• !.1?1??1,, ? J '_..?-_,? %l?, -f_:????.?? ? n , t , € ,
LLJ
, VF
cl?
LLJ
'A l1v
?"'!r(i ( ?IIS?,? TM ,?•t" ?1 \.I Yom. O
?? Tt1f!•??r'r' !('j•'I?Y`? /.• " yJ f - - ,.. t ? ?.c? ?Jr, Z
i -- I \= w :D
L.L
• '" J ( r } ? ? t {gyn... , l) `'? _• I •. _ .
Li-i
-sr \
LLJ
w z
,? •I ? ? ;J??.: S•'<,:?ti? .? ,\??1 1 I ? _ ?-? is .l' ? - r
?`?•`-` ;.? .rte '.e, '?f/,. - `. \ I ? _e11T• ? ) .1 `? -i;?:? ;;?
` i• ? \ .`y
fc,
?) ??`? .? ` -J? % ..?._1? // . - ?; ?• .r -: /r ::i ' f i J, 1, ..• f`?'? r ?
16
/'/! v I ' ; y / . \?1 .? ??y-?\\\ ` ? `i ?.. 1 , +1 ? .' J I / J ? ??-}-- it L- l • ? ? J
LLI 441 w
JA
AWN,
.01
. (1 - O
41,
/ ? ` ?? ? •.I . • -?-.? O O
?_` ???`/-? ? ???..---`/'J'am//??` /??''?!r ? t.. ^ '???_.??,? ••-,.._?= ; " ? ?
LJJ
'. Q? `
-' '-? rr 7 J fJ,
_J a-
-70
LLJ
oil
f ?' } t .?? q ?,I
+ : ?! i ` `??.. , t - , ? • -- O, . Ilt'?? it l ? {? v \ ? '?? \ f / - - (? d Z
3
cam
r ?l i- ` ` ?T• • \4-? "-•._ ,_" `n ` Y7 ?/ - 1 / l 1/? `,? i •___ - ._ I l \ ? ?- 1 / J l r ?-, J ?
.?,? ) l ? _`?`f ?`? ? ? ? ? 1 jam-, /' ?. t A r ?\ ? 1 • ? t', ? a
''?' '` ?, !? ? 1.1 •, ' I i
LLJ
LLJ
'"/+., ' i •i• \ - I • t ` \ f_ ?- 'tl: i J JJ`_' I'li U
_i`r i?, ??•}; 1 ,?-,_? - I t??. i.\` `? ` I .+?'`L?'i , !•- ?. - %, I ?i .-1?` LwL V1
LLJ
LLJ
Z U)
W O
LLJ
t?( ;j,.f •,, \' ti,;?i!' ,lam ,? ",.', '\
`s `oa U co
c c9
- i
✓ � 1 . �li"/'-•�'-`^, � �\ ✓� r'1 car
•� _J L '
,_ �`•, - J r I J •� �`� `,_ , \,r"�-, _ t ` '.e/��\: l•� `•_ -, "`! T — Q Y 2 is F
t" 1 � ,-�
ri
` • : ; .^. J ,J , �.1 C; \� - j �, 'ter•=� `,
,♦_ f!_ l�%_ �%1 L__� '..� \ �•�..,,�,.,/Iii �=
. > % ' _.} \ � ♦ • \' _ 1 (t.- tri! / / 1
it
LLJ
����` .may
1. �♦ +� ` > Ind t� �`1 �_ ' ♦ �,n',� r\
►,ice `l��_ �: _ ` ♦ �\ } } \, - J)'` ^>Syti� -r�lr ` !- I `ti -^'>.�- —f J
� t Q
LLJ
♦� \\ V `\ , '� 1���� y' ' (•�'`�1''\'\;;.�. 1�•'7 7 1 t `�! �, •:-~ ' O Ln
to
-kr LL
vv, LLj LL
cn
LLJ
LLJ
r U
31
.
1�_ l} .ice ' - V) V)
BMW Rd
: I
JJ
G
}t N ?
Y;(? S
? R
ry Y Sa
"o. ?
?SisGN 4?
1 @ @ A&a;pAenhy
J ? ]art <
a'
cv
}1
A?ly
M
te
`a r 1 y -+d
a
c
R a
_
?7y
T H Pt/47ftp`?rJ v <
?? T
C _ W m
Z W
?
N
H
? o
a ?
d
F ?[J ?c?,T
sad
s G tvl
?
Pa iaywr?
c> oo
II
W
Z
?b
q`? to uvi
a
U d W
C P-
< LL
D (n mt-
Rd dY 4 M jgo-lri
L
U)
(n ? ?
Endy R11 N z
cv I
U
aF C
? T (n U Q
-
n ?d
,
ar. z
t% y
P21 w}s f O
_ Q
-. 4??Ifn?7par ,Rtl ?t O in
d
F`! f'•J"' ? ? F-
?N °d W W a
G j CL
O6 _
O
Q U?
Q x u7 J
t
(V
Li
t?
Q
H
O
eon Q ~
o
NG H„y 1227
Q `
L.
?r o CD
(D
Jl- z
E3
w z
Juy Rai Q
w o
I:T 'M-% Sd SZSZONIAVS\93S\\'uo}6up7!gM0 'Wd Lb:TT:Z OTOZ/ZT/TT 'dVW kUNDIA'6mP M-DAaswea-yTT-n:)TO\6u!mei(3 ia4ng\sdjoj - DN 'a!yewaq!V u! V3 - SZO'OTN3\1e1uawua!nu3\:E)
Q
Q ? O E O
Z - w w 0
?r000 p o c? m
?Z Q U o+ Q
W U? ?'C C ? Z O
< H y N
Q Q ??? 7 v c v O w
W
p
Si
Z r ,? m
I0
N qa J 0a,o? 3? N
w Q <,< 3 c w < O
I a 1: z Q
(n H ?i (. C O
Q- z
o
J 86
s
' m I I ,2j ; Y a
w
+ r., rn z
Z ^? ? V I W? m
0
\A FS
0
V
I ?
? I
`f o
? II
D_ W o '-
z
a. I ? 0
w o
+ c- I 5.00' a
°
I
Inn
\\
\ z
N? Q
U 00
Q
_ LLJ_ LO
III -; .,+s<....`< dl V J U
LL- 0
cr) 00
O LIJ o
29.50 ? .. F +
CO
\ ? I \ o = W cn ?
w z Q
stn \ 7 Q Q J (1)
v W
- m
J
Ic I z 7 U U Q
GR AVEE v - Q Q
mo El- a
q1t v, Q
DRIV'EWA` a z
EL 12 D
O d Q
Ln z
00 C-4 O
16.
r? ?I! Q'W
O >J_
7
T:T 'M'9B Sd SZSZJNTAVS\93S\\'uol6u!AlgM(I'Wd 9O:ZT:Z OTOZ/ZI/TT 'OSE-Bb£ V1S'6mp'IaaJ:)Aosweb*TT-n:)TO\6ulmeip jagng\sdio0 - JN 'aliewaqlV ulV3 - SZO'OTN3\IeluawuaIAU3\:g
Iiz-ow -I
0
o
w 0
z J
_
? U
U)
W
Q
Q O
C/') Z
O n F-
0 Q
N Q
?
~ °
>
Q O
N +
W
?
- ~ N
L? LL-
? J
z ? O
H
00 Q
o ill
O
G) +
W Lr)
Q
J N
Q W Q
-1 '5
00 W
WW m
I J
UU Q
Q Q U
a_ Cl-
CL 12 Lo
O d C2
-- VC Z
_ • E C C7
Q W Z
D O
T:T 'MV8 Sd SZSZJNUAVS\93S\\'uo16uru14/ O'Wd 6Z:ZT:Z OTOZ/ZT/TT '9LZ-SLZ V- S'6mp•AaaJj Aasw"-oTT-n:)TO\6u mej0 ja_4ng\sdjo:) - 3N 'aliewaglV ul V3 - SZO'OTN3\leauawuoJinu3\:E)
Q r
Zn Oap E E o
a, 00
a rn a
W C) a `` Z o
Q Q = O
° Q
u w
r2? ?rn?a O
?? U O poi z
N EL ? z =,a'a?
-Q Orno? i rn
ft: 0
0 0-
w a a 3.? o
O z 1 ndHO N o
- H Q
N
m d cgs w.
i ,? W v a
C7 w
L' N O c{,f.r? 3 x
Z ?LL
_ E C/? m 3
I J V a Z
LL ?? 3
U a o
a
o
O
O 0
cp L2 II
LPL o
U w N
_z
U
V)
W
cc
100'ti L o
LLI
V) a O z
a3
mit N z
a?
Q r) o
Cl p
+ c / _? ?P+
LO O ? U _
_ i z? o
co 00 <
0 0°0= 0? °?+
0 m (/)
00 LLJ w
CO
l = z ? W c~n
w Q? Q
> o o w
z 00 Lli o ?`'J
Ln m
- ?'? 3 v~i U U J
C) > U_
O -
CL LO
O ai
z
e} swo?
EW Z
T:T'MIN Sd SZSZDNlAVS\93S\\'uoi6ulplymo'Wd 00:6I:Z OTOZ/ZI/IT'uoa ueq 9-yyj.S'6mp-l-jD Aaswel"TT-f1JT0\6ulmeja jagng\sdjoD -DN'aliewagltl ul tl3 - SZO'OTN3\le4uawuoJinu3\:g
V JI Q F
Z^ O. D OE E w w 0
h o cT
Lu T:
I N -w
^
O
N I
Ye
UN Q
La] v?
¢EL >- w
g? Z a? zz ?a
Z^? o
= r ;
LLI
H ?i U w
'
--
O? Q
z o m
g= o
m I O ai ; y a
_
_ I
?
2
c7 ° W
z
C) Il
O
O
Q
W ~ m
?
` 3 0
I J
100 QZ I /
O
G O
_! _
CD rf _ w O
N
dvU
A3380 A3SM ? - w o
?
o
?, o
\ --
--
-
- _ o
Q
n ? _ 3: [if
N I V) Z:
O a- o
> N
N O Q
z ?N
o ° 1 (
D
F- N:2 z
Q
Z 1 I
? L
?
zF ?
° LLJ
°
?
o
o
z
LLJ
LLJ
m
w
I N° N? 11 ?O
?Q C',? LL- J O
0L'i
H
CV .? (n
Ln O
~ +
00 L-Li
I
LO
O
+
Q ~
Q (n
N I wz
11-1 w w
Q J m
J
G 0 0 Q
? I
LLJ LLI
U U !-
U
Q Q
a
0 a
°0°
°..
z _
- - U (D z
(D
L.
Z
W
O
D
T:T 'MVG Sd SZSZJNIAVS\93S\\'uoT6uµ1IgM4 'Wd 6Z:£T:Z OTOZ/ZT/TT 'uoaueOZZ-SZ VJS'6mp•la jD A-wey-t li-nJT0\6ulmei(ija,4ng\sdjo:)- :)N 'aljewagltl uI tl3 - SZO'OTN3\leTuawuonnu3\:g
-L Q
Z- o
z,To? E Oo
rn Q 00
h
?
{y? I W
Q cn
d
U U C'? Z
0
Q H m V c o 0
3Nbl
lla
d
' Q
z
h r .? •°-?
c
b
_?- MAII ?° ~o° 3p o N
_ 0
W
[if M
w E
W
Q W ?i7 O 3 p U
Q Q 3.. FW-
S a Q
c
c
-? C/)
!
N
F
U
z, o
3,J
'o I
j "
??
Z m
0 n 0
g
18.0 o C
s °
T.
y^ sa r
r? `:
r , ?,"-"r \
r? ?1 c/ J W
z m
b
o
C- -C- #... ...
F F z - r--- > ?N <
O
Q
7.00'
II 0
I W
z
C)
J
II II ?
o
RC, ~ Q
s Q O
7.00' (I I \ Q:?
O Q N
0 III I 0 N? O z
Q
i u 3 F - C)
>
z
? >
> Q O
W
_ W 4
$ c0
-??
-
z <
- Q LC)
11? LL- 0
-
cn ?
?
? ? o ? LO
o J
???? ? Q V)
=
W? m
??? QLi
Q
U
0 0 0
8
RGP W W h
C Ln
? UU 0 0)
z
\ •
a m \\\ ?
1 0- 0
/ Ec
-- Q w z
Mod
I:T 'MIN Sd SZSZ3NIAVS\99S\\'uo16U1UNMd'Wd OS:£T:Z OTOZ/ZT/TT 'uo7ue:)y9-6S VIS'6mP'?-» Aasw2"TT-n:)TO\6wmejd jayng\sdjoo -3N 'aNewoglV ui V3 - SZO-OTN3\le7u8wuajnu3\:E)
a
w o
Z?o? Et
0 o a m
Q ! \ Lil W OQ U O+ z O
rn d ,` .- Z
N z O
N W o
F= m
Q [? Q?J ?QI d' A C C j O w
W U O O c
CL I d Z, -^ o
CL >- uj
J C7 of 0 3
OLaJ ox EL w ??=
a
~Q m s9 CC-) ?? N 3 o 0
N O
`r' 3N y,
0
wi : Y a
u U
? w
rr 3 U
T-c
CI F >
m
o
a
?' CJ ij
O ?? fr
6.00' I / O
% I LO o
e:. o
r r II
C
Q N
W o
• Via,....; -s
y, 0:: w
`'J !-- w F- ? o
•,y•'? IWI
C ?_ C Q
?C z.` Q O
_I
-- C -
F ltr.eyj`. O a_ N O
LL-0 <
C)
a?a ?U No 'jj _El- w+
V)
Q Lf)
LLJ
LL- LL- o W
o°
U) -J
cn?
°? L?
C)
Q Cf)
N _ RC _
` ?\ Q W
wz m
7.00'' IN Q J Q H
l Z 0 C y 2
=Z W W
0 LLJ 12 LO
Z? ~ ~ p d o
o =o U U __ U c z
0
CD Q Q
00 a0 Q`W Z
= O
T:T 'M'89 Sd SZSZ3NIAVS\93S\\'uoT6urg!4Md'Wd ST:bT:Z OTOZ/ZT/TT '(Z) u01ueOg9-6S tl1S'6Mp'4aajJ Aaswea-bIT-noTO\6wMej4 jaj4ng\sdiorj -:)N lopewag1V u! V3 - SZO'OTN3\le;uawuainu3\:g
LL
LL-
V) J
O ?o
Q U
W z
Q:? W
Q J
0 Q
UU
QQ
a C)
0
II
W °
z
U
W °
?- o
Q
o
3: V) Z
On O
OQ z
N? Q
C)
U ID o
U-
z?
Q
Ow o
+
W V)
Q
CIL'
Q V)
W
m
Q ?
U
Q `
3 J
O N cl
C) d z
??
1_ EW
Q
=off
T:T 'M)N Sd SZSZONIAVS\93SU'u016upl!4MG 'Wd b£:bT:Z OTOZ/ZT/TT 'uoaueD SL-£L V- S '6mp•M-:) Aaswea-bTT-nOT0\6u!mei0 ja_4ng\sdia:) - ON 'a!iewaq!tl u! V3 - SZ0'0TN3\!eauawu0nnu3\:9
w
z
0 of
w
W
)
V) V
X
I CN
z_
J cn
/. o
V z
OEl- ?o
OQ z
N? v
U
o
LLI o
z?
Q
LL-
LL 0w o
-
U) J +
00
00 Cf) W 0
O
00
07 .. Q
? < V)
Q
LLJ
Qw m
Q Q Q U
W I
~
v Q Q a y c
n
o
_ ow
W
C)
z
o
Et
Q LU z
o
IASaioD - 7N -a!iewaglV u! V3 - SZO.OTN3\IejuawuoJ!nu3\:9
O
N
II
n
D
,3:
0
m J
?
0
z
w
O
cV rn
N
s? p
N
Q0
0
Ln
z
„GL j
r
00 N
r?
Ln o^O
t
z ?a w
2- m
CX to,
m N +F-J
H O ? ~
N H =
O
N ?'
u
u
Q Z
Q
a w
? J
Q C) Lj
of M Q
L? W
,00'5
,007
FS-
0
F1 I(IS
U-
S?
?? w v T
n:
w? m 3
z
~ Q
CD
O in
a
?
0
O
II
W °
J
z
_
0
to
v o
Q
Q
>
U)
00-
n
Q o
0
a ? o
.
: Q °o rn
Z
W ~ ?
cn
U_ U)o
?? -
- z :2i
Q O
o
O W o
Q 0 W
co W z J
Q
W or?
Ln ?
Q J Q (n
o 0
LLi Li W
m
z UU
Q Q Q
? W U
U)
E' 12 Ln
o 0 0
V C Z
E c C7
aW z
rn o
dW <<ZL I No
,?05'0c?
T:T'MV9 Sd SZSZDNTAVS\93S\\'uo16UM14Ma'Wd 64:ST:Z OTOZ/ZT/TT'uo8 611-UT V.S'6mp•la D Aaswe'd--M-n:)T0\6uimejp jaMn8\sdjoD -DN'aliewaglV ul V3 - SZO'OTN3\leluawuaInu3\:9