Loading...
HomeMy WebLinkAbout20110119 Ver 1_More Info Letter_20110301NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director March 1, 2011 Mr. Ray Maxwell Gaston County PO Box 1578 Gastonia, NC 28053 Subject: Hold - High Shoals Interconnect DWQ #11-0119 Gaston County, NC Dear Mr. Maxwell: Dee Freeman Secretary On February 3, 2011, 1 met with Eric Mularski at the site to discuss the proposed project. In general, no obvious problems/concerns were discussed. However, we did discuss the need for riprap (permanent impact) in the stream channels given the flow. We also discuss the culvert replacement proposed that was not included in the original submittal. We agreed to allow the culvert replacement to be added to the existing application. For procedural concerns this project will be placed on hold until the required information is received. Once received, there should be no problem with issuance of the approval. Pursuant to 15A NCAC 2H .0507(h), please be advised that this project will be placed on hold until all the necessary information is provided. Failure to submit the requested information may result in the application being withdrawn from consideration. You may reapply, but a new fee and application will be required. In addition, this office is requesting that the Army Corps of Engineers place a hold on processing the application. If you have any questions, please contact me at (704) 663-1699. Sincerely, Alan D. Johnson Surface WafefProtection Sr. Env. Specialist CC: Steve Chapin, Asheville, COE Ian McMillan, Wetlands Unit Mooresville Regional Office Location: 610 East Center Avenue, Suite 301, Mooresville, NC 28115 Phone: (704) 663-1699\Fax (704) 663-6040\ Customer Service: 1-877-623-6748 Internet: www.ncwaterguality.org NorthCarolina .naturally An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper