HomeMy WebLinkAbout20110119 Ver 1_More Info Letter_20110301NCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Coleen H. Sullins
Governor Director
March 1, 2011
Mr. Ray Maxwell
Gaston County
PO Box 1578
Gastonia, NC 28053
Subject: Hold - High Shoals Interconnect
DWQ #11-0119
Gaston County, NC
Dear Mr. Maxwell:
Dee Freeman
Secretary
On February 3, 2011, 1 met with Eric Mularski at the site to discuss the proposed project. In general, no obvious
problems/concerns were discussed. However, we did discuss the need for riprap (permanent impact) in the stream
channels given the flow. We also discuss the culvert replacement proposed that was not included in the original
submittal. We agreed to allow the culvert replacement to be added to the existing application. For procedural concerns
this project will be placed on hold until the required information is received. Once received, there should be no problem
with issuance of the approval.
Pursuant to 15A NCAC 2H .0507(h), please be advised that this project will be placed on hold until all the
necessary information is provided. Failure to submit the requested information may result in the application being
withdrawn from consideration. You may reapply, but a new fee and application will be required. In addition, this office is
requesting that the Army Corps of Engineers place a hold on processing the application.
If you have any questions, please contact me at (704) 663-1699.
Sincerely,
Alan D. Johnson
Surface WafefProtection
Sr. Env. Specialist
CC: Steve Chapin, Asheville, COE
Ian McMillan, Wetlands Unit
Mooresville Regional Office
Location: 610 East Center Avenue, Suite 301, Mooresville, NC 28115
Phone: (704) 663-1699\Fax (704) 663-6040\ Customer Service: 1-877-623-6748
Internet: www.ncwaterguality.org
NorthCarolina
.naturally
An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper