HomeMy WebLinkAbout20060973 Ver 1_More Info Letter_20060623~~~ VV H r ~~0 Michael F. Easley, Governor
~~ G William G. Ross Jr., Secretary
~ r North Carolina Department of Environment and Natural Resources
} ~
p ~ Alan W. Klimek, P.E. Director
Division of Water Quality
June 23, 2006
DWQ Project # 06-0973
Nash County
CERTIFIED MAIL: RETURN RECEIPT REQUESTED
Claude Mayo
Post Office Box 1238
Rocky Mount, NC 27802
Subject Property: Birchwood Homes
UT to Sapony Creek [030302, 28-55-(1), C, NSW]
REQUEST FOR MORE INFORMATION
Dear Mr. Mayo:
On June 16, 2006, the Division of Water Quality (DWQ) received your application dated June.
13, 2006 to impact 0.249 acres of isolated wetlands to construct the proposed residential
neighborhood. The DWQ has determined that your application was incomplete and/or provided
inaccurate information as discussed below. The DWQ will require additional information in
order to process your application to impact protected wetlands and/or streams on the subject
property. Therefore, unless we receive the additional information requested below, we will have
to move toward denial of your application as required by 15A NCAC 2H .0506 and will place
this project on hold as incomplete until we receive this additional information. Please provide
the following information so that we may continue to review your project.
Additional Information Requested:
1. Plan Details
Please show all wetlands and wetland impacts on the same plat with the proposed
development. Also, wetlands and wetland impacts need to be distinguishable on the
construction plat. The wetlands and wetland impacts are the same shaded color on the
plan sheet.
2. Easement Extension
Please clarify the easement extension as referred to in Section 3, Item 10 of the Pre-
construction Notification Application.
401 Oversight/Express Review Permitting Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone: 919-733-1786 /FAX 919-733-6893 /Internet: httn://h2o.enr.state.nc.us/ncwetlands
None Carolina
~tllCQ~~I'
An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper
Claude Mayo
Page 2 of 2
June 23, 2006
Please contact the DWQ within three weeks of the date of this letter to verify that you have
received this letter and that you remain interested in continuing to pursue permitting of your
project and will be providing the DWQ the requested information at a later date. Please contact
me in writing and Mike Horan of the DWQ Raleigh Regional Office. If we do not hear from you
within three weeks, we will assume that you no longer want to pursue this project and we will
consider the project as withdrawn.
This letter only addresses the application review and does not authorize any impacts to wetlands,
waters or protected buffers. Please be aware that any impacts requested within your application
are not authorized (at this time) by the DWQ. Please call Ms. Cyndi Karoly or Mr. Ian
McMillan at 919-733-1786 if you have any questions regarding or would like to set up a meeting
to discuss this matter.
Sincerely,
~~
C ndi Karoly, Supervisor
401 Oversight/Express Review Permitting Unit
CBK/bjs
cc: Mike Horan, DWQ Raleigh Regional Office
USACE Raleigh Regulatory Field Office
File Copy
Central Files
Jay Keller, Keller Environmental, 124 Waiters Way, Youngsville, NC 27596
Filename: S:\2006 Correspondence\06-0973 Birchwood Homes (Nash) Oo Hold.doc