Subject: Notice of Violation - (NOV-2020-PC-0545) NPDES #NC0026626
January 6, 2021
Dear Mr. Snider,
NC Department of
Environmental Quality
Received
JM 1 1 2021
Winston-Salem
Regional Office
I am writing in response to your letter of December 21, 2020 that I received on December 26th, 2020.
Below I have responded to the problems found in our inspection of December 28th, 2020 and the
schedule for addressing these problems. Some of the major problems that were found with the
oxidation ditch and one of our clarifiers is included in a scheduled plant upgrade this year. The Town
has secured funding from DEQ to upgrade these facilities, Withers Ravenal Engineering has completed
the plans for the upgrade and construction is hopefully to start this spring. Some of the items we will fix
here in house even though we have found it difficult to get vendors to come and quote us prices due to
the Covid-19 Pandemic, some of the items have already been corrected.
1. The leak in the oxidation ditch has been fixed and is not longer leaking. During the inspection I
believe I was misunderstood as to the time this leak started, I told Mr. Henderson that I know it
was not leaking 6 weeks prior because that was the last time the operators mowed around the
basin. I did not know it was leaking until Mr. Henderson noticed it during the inspection, we
began notifying your office on December 16th of the leak and I submitted the by-pass report to
Mr. Henderson on December 19th letting him know that the leak was fixed.
2. We are awaiting pricing from Carolina Technical Services for the necessary equipment to begin
chilled flow proportional sampling for the Influent and Effluent samples , we hope to have all
this installed in the next 60 days. We have moved the effluent sample location to the very end
of the contact chamber after all treatment.
3. New ph buffer has been received and a closer check will be kept on all expiration dates.
4. After contacting Waste Management our sludge hauler, we have not removed any sludge to the
landfill since 2015. We have such a low flow very few solids are coming into the plant.
5. All lab equipment is calibrated before use and noted on the daily lab work sheet, all lab
equipment was sent to Meritech Labs for yearly calibrations.
6. The clarifier scum box was unstopped before Mr. Henderson left on December 10th
7. The brush rotor repair in the oxidation ditch is also part of the plant upgrade scheduled for this
year.
8. The clarifier that is not in operation is also included in the plant upgrade, all sweep arms, valves
and motor are to be replaced.
The Town understands the urgency in which all the items found in the inspection will need fixing or
replacing and we will work diligently to make sure each item is addressed. If any further
information is needed please contact me at 336-326-8365.
Sincerely,
Kent Scott
WWTP/WTP ORC