HomeMy WebLinkAbout20081327 Ver 1_Site Inspection_20110225
North Carolina
Beverly Eaves Perdue
Governor
NCDENR'
Department of Environment and Natural Resou
Division of Water Quality
Coleen H. Sullins
Director
February 22, 2011
Mr. J. B. Setzer, P.E.
Division 14 Engineer
N.C. Department of Transportation
253 Webster Road
Sylva, North Carolina 28779
Subject: Inspection
NCSR 1783 Upward Road
DWQ Project 08-1327
TIP No. R-4430
Henderson County
Dear Mr. Setzer:
?o.?q slo ?'??
'?0s, Via„ /i
Freeman
On February 3, 201 1, I inspected the construction work on Upward Road between US Highway 176 and
Howard Gap Road in Henderson County. Construction work is now taking place all along Upward Road
between Howard Gap Road and US Highway 176.
Recent rains have resulted in sediment and erosion control structures being impacted and the loss of sediment
in some areas. Please ensure that all sediment and erosion control structures are repaired and maintained and
that any off-site sediment is removed. Seeding and mulching should be performed as needed, to protect
downstream waters.
Please refer to the attached copy of the inspection report for additional comments regarding the inspection.
If you have questions, please call me at 828-296-4500.
Sincerely,
Michael R. Parker
Environmental Senior Specialist
Attachment
cc: Aaron Powell
Mark Davis, Division 14, DEO
Ed Ingle, Roadside Environmental
Transportation Permitting Unit
Mike Parker, Asheville Regional Office
Upward Road R-4430 Inspection Letter February 2011
SURFACE WATER PROTECTION SECTION -Asheville Regional Office
2090 U.S. 70 Highway, Swannari NC 28778-8211
Phone: 828-296-05001 FAX : 828-2997043 One
Customer Service: 1-877823-6748 NorthCarotlna
Internetw .ncvvatemuality.om (?L{ur [/ 1y?
An Equal Opportunity 1 Affirmative Action Employer N - " u a" l
DWQ Site Visits for DOT Projects
Field Sheet
DWQ representative: Michael R. Parker Date: February 3, 2011
County: Henderson Region: Asheville
DOT Division: Division 14
Activity: X 401 Compliance Evaluation ? Complaint
?DWQ Follow Up Evaluation ? Other
DWQ 401 #: 08-1327 NW Permit #: 13, 12, 14 IP #: 0
Project Name:
Location of Project:
FuPward Road Widenina Proiect R-4430
Upward Road (NCSR 1783) between US Highway 176 and Howard Gap Road
Project Complete: ?Yes X No
Activities (DOT):
X? Bridge
X? Culvert
? Bottomless Culvert
? Bottomless Arch
X? Riprap Inlet/Outlet Stabilization
? Spoil Pile
? Borrow Pit
? Wetland Mitigation
? Stream Restoration
? On-site Stream Relocation
? Buffer Restoration
X? Bank Stabilization
? Other
If no, estimated date of completion:
? Steam Standards Violation
X? Turbidity
? Evidence of spills
? Oil/Petroleum
? Solid Waste
? Failed E & S control measures
X? Sedimentation Impacts
? Stormwater Permit Violation
X? Fill
? Buffer Impacts (see below)
? Other
Additional Wetland Impacts: ? yes X? no Estimated Acres
? Zone I Est Acres ? Zone 2 Est Acres
Additional Stream Impacts: ? yes X? no Est Linear feet
Estimated linear feet of impact:
Buffer Impacts: ?Neuse ?Tar-Pam ?Randleman ?Catawba
Zone 1: ?Yes ?No Est linear ft/ acreage of buffer impact fr/ ac
Zone 2: ?Yes ?No Est linear ft/ acreage of buffer impact fU ac
Buffer Designation: ?Exempt ?Allowable ?Allowable w/mitigation ?Prohibited
Name of Waterway(s):
DWO Site Visits for DOT Projects
Background Info
Bat Fork Creek and tributaries, tributary to Dunn Creek and tributaries
to King Creek
Basin/ Subbasin: French Broad 040302
Wetland Type: ?Isolated x?Non-Isolated (Waters of US)
Stream Class: ?Class B ?303d Listed ?WS-II ?WS-V ?SB
X?Class C ?ORW ?Trout ?WS-III ?NSW
?HQW ?WS-I ?WS-IV ?SA ?CA
Type of Authorized Impact: X?Culvert ?Bottomless Culvert
?Bridge ?Bottomless Arch
X?Riprap Inlet/Outlet Stabilization X?Fill
Authorized Wetland Impacts: X?0- 1/10'h acre ?l/I Ph to 1/3`d acre 0.1 acre
?1/30 to 1.0 acre ?> 1.0 acre
Authorized Stream Impacts: ?< 150 linear feet X?> 150 linear feet 891 linear feet
Additional comments:
Reviewed project with DOT staff.
Recent rains have resulted in sediment and erosion control structures being impacted and sediment loss in
several locations. Any off-site sediment should be removed.
Repair slope areas between the old culvert and new culvert near US Highway 176.
Remove off-site sediment that has accumulated off right of way near Station 103+00.
Repair and maintain all erosion control devices and continue with seeding and matting as required to protect
State surface waters.
Upward Road R-4430 Inspection February 2011