Loading...
HomeMy WebLinkAbout20201283 Ver 1_401_IC_Comments to USACE_20210104ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANI£L SMITH Director NORTH CAROLINA Environmental Quality January 4, 2021 Corps Action ID# SAW-2015-02646 DWR# 20201283 v1 Person County Chris Hopper U.S. Army Corps of Engineers Raleigh Regulatory Field Office 331 Heritage Trade Drive Suite 105 Wake Forest, NC 27587 (Delivered via email at Christopher.D.Hopper@usace.army.mil) Subject Project: Duke Energy Roxboro Steam Electric Plant Ash Basin Landfill Project Dear Mr. Hopper, On behalf of the NC Division of Water Resources (Division), we respectfully request that you consider the following comments within your review of the 404 Individual Permit request for the above referenced project: 1. The Division recommends that the USACE consider accepting a reduced 1:1 mitigation ratio only for those areas with a NCSAM or NCWAM score of low, or those with a score of medium that are directly influenced by the existing ash basins. 2. The application indicates that borrow areas located near the Roxboro plant have been chosen primarily due to "shorter distances between borrow areas and the landfill expansion" which "decreases time and cost for each load of suitable fill material." The Division does not believe that cost and/or ease of transport of borrow material meets purpose and need or satisfies avoidance and minimization. While the Division understands the desire to reduce costs and potential safety issues, more justification for impacts related to borrow areas is needed beyond these considerations. 3. The Division has requested additional technical information from the applicant and requests that the USACE also consider the attached letter during the review of the application. North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 1 1617 Mail Service Center I Raleigh, North Carolina 27699-1617 N11H fH (:Ai(1!.INA � 0­O,toreWM—talQ"I 919,707.9000 Corps Action ID# SAW-2015-02646 DWR# 20201283v1 Page 2 of 2 Thank you for your considering the Division's comments during your review of this Individual Permit. If you have any questions, please contact Rick Trone at rick.trone@ncdenr.gov. Sincerely, DocuSigned by: � , e 10 949D91BA53EF4E0... Paul Wojoski, Supervisor 401 & Buffer Permitting Unit cc: Julia Tillery, Wood MIS (via email) Lori Tollie, Duke Energy (via email) Steven Lanter, DWR GRS DWR 401 & Buffer Permitting Branch file