Loading...
HomeMy WebLinkAbout20071823 Ver 1_Information Letter_20110203NC®ENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary February 3, 2011 MEMORANDUM To: Art King, Division Environmental Officer, NCDOT Division 8 From: Mason Herndon, NCDWQ, Fayetteville Regional Office Subject: Response to Division 8 Letter Regarding Compliance TIP No. R-2502B Richmond County This memo is a follow-up to your response to DWQ's letter dated November 3, 2010 concerning compliance issues on the widening and bridge replacement project in Richmond County noted on our field visit on October 19. 2010. DWQ appreciates your prompt response to our letter and for taking immediate action in reestablishing the permitted area with safety fence and flagging, as well as the removal of fill material and equipment from the adjacent wetland area that was permitted for hand clearing only. In regards to the change of construction methodology from a elevated work bridge to timber mats at Site 9, DWQ acknowledges that this can often be an adjustment made in the field and we appreciates NCDOT's coordination with the USACE on this change. We also understand that there have been numerous changes in DWQ personnel assigned to this project in the past two years, which could have complicated coordination with this agency. However, it should be noted that any changes in construction methodology that are made, which could have either a temporary or permanent affect on a jurisdictional resource or which may deviate from a 401 certification condition, must be coordinated and approved by DWQ. In the future, DWQ, request all such changes are coordinated with this agency prior to the work commencing. To document any changes, DWQ will provide NCDOT with an e-mail, tear sheet or written notification for the project file. In addition to the change in construction methodology at Site 9, DWQ is very concerned with the unauthorized excavation and discharge of material in this site. According to your letter, the excavation at the interior bents of the bridge, within the area permitted for hand clearing, was required for the construction of bent caps. We understand that preliminary plans used in permitting often do not include structure plans which dictate bent elevations and impacts cannot always be accurately quantified at the time of permit application. However, as stated above, NCDOT must notify DWQ of any changes in activity and /or of any additional impact within a jurisdictional resource prior to their occurrence. In your response, you stated that NCDOT impacted an additional 0.005 acres of wetlands when excavating around the interior bents. Dill is requesting that NCDOT provide us calculations on how you derived at the estimated 0.005 acres of additional impact. This should include the typical area impacted at each interior bent and the number of bents that required excavation to construct. Since these impacts have already occurred and appear to be less than 0.01 acres of impact, DWQ will not require NCDOT to submit an after the fact permit application at this time. However pe ndition 7 of the 401 Water Quality Certification, NCDOT is required to monitor the temporary impacte 1,2,3 & 9 and provide annual reports for a period of three years after completion of proje =s A ?V 225 Green St., Suite 714, Fayetteville, NC 28301-5043 ? Phone: 910-433-33001 FAX: 910-48H707 U' B 2 4 Internet: www.ncwaterauality.org NorthCaroloA9b An Equal Oppwtundy 1 AfBrmarve Action Employer -50% Recycled 1 10% Post Consumer Paper R-2502B January **, 2011 this condition, DWQ will use these reports and the mandated agency field meeting at the end of the three year period, to determine if additional compensatory wetland mitigation is required. DWQ request that NCDOT provide the items requested above within 30 days of receipt of this letter. Failure to comply with this request may result in a Notice of Violation. We appreciate your efforts to recognize and resolve these issues and will continue to work with NCDOT to minimize these occurrences in the future. If you have any questions or need any additional information on the items described above, please do not hesitate to give me a call at (910) 308-4021. Cc: John R,G.Olinger, Division 8 Construction Engineer, Ronnie Smith, US Army Corps of Engineers, Wilmington District Office Barry Harrington, NCDOT Roadside Environmental, Div. 7 & 8 David Wainwright, DWQ Wetlands/401 Transportation Group Lelani Paugh, NEU Mitigation Unit Sonia Carillo, NCDWQ Central Office File Copy ti -Z5 0; -3 a 7 STATE OF NORTH CAROLINA Mason Herndon DEPARTMENT OF TRANSPORTATION +, BEVERLY EAVES PERDUE GOVERNOR February 23, 2011 NCDWQ Fayetteville Regional Office 225 Green St. Suit 714 Fayetteville NC 28301 Mr. Herndon, This letter is in response to your memo dated February 3, 2011. FFg 2 ?o(/ja EUGENE A. CONTI, JR. SECRETARY We agree with, and will comply with your request regarding the notification to your agency of any changes in construction methodologies that result in a change in the calculated impact to streams and/or wetlands on future projects. We will also make every effort in the future to coordinate with both the DWQ and the Corps of Engineers when such issues arise. We will also comply with your request for additional monitoring of the impacted areas on the R-2502B bridge site for what ever time period that you prescribed. Included with this letter is a work sheet with a more precise accounting of the impacts that were involved in the excavation around the interior bents for the bridge at Drowning Creek on R-2502B. As we had discussed by phone last week, the original estimate in the December 9, 2010 letter of 0.005 acres of impact was not accurate due to a misplaced decimal point (0.05), and some imprecise measurements of the actual excavations. We have since gone back and checked the inspectors' notes and have obtained a more accurate total for the 5 interior bents that were excavated within the wetland area. The following calculations reflect the corrected total for both the north bound bridge (2 bents) and south bound bridge (3 bents) for the total of 5 bents. According to Mr. John Olingers calculations, the total area excavated at each individual bent is 677.1 ft. square. 677.1 ft x 5 = 3385.6ft = 0.08 acres of total impacts 43560 ft Thank you for your cooperation. Please contact me if you need additional information. Sincerelly, Art C. King, Division Environmental Officer P.O. BOX'1067, ABERDEEN, NORTH CAROLINA 28315 PHONE (910) 944-2344 FAX (910) 9445623 Highway Division 8 Cc. John R.G. Olinger, Highway Division 8 Ronnie Smith, USCOE, Wilmington District Office Barry Harrington, NCDOT Roadside Environmental, Div. 7 & 8 David Wainwright, DWQ 401 Wetlands Group Lelani Paugh, NEU Mitigation Unit Sonia Carillo, NCDWQ central Office File NC Department of Transportation Division of Highways Highway Building 1 S. Wilmington Street Raleigh, NC 27601 SUBJECT -r>, S PROJECT ,A-r- i e.r_r?. COUNTY PREPARED BY JRf o DATE 411 STATION CHECKED BY -DATE _STR NO- SHEET- OF 11 SD-01 DOT #161003399 ?4 '1 t r r"f' f_ a'?°= .