Loading...
HomeMy WebLinkAbout20060172 Ver 1_Approval Letter_20060321., o~OF w H ~F9PG r ~ ~ ~-. --I D ~~ ~ Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources March 21, 2006 Mr. Jeff W. Baran Hughes Baran Development, LLC 6409 Westgate Road Raleigh, NC 27617 Alan W. Klimek, P.E. Director Division of Water Quality DWQ Project # 06-0172 Durham County Subject Property: Hope Valley Commons Ut to Third Fork Creek [030605, 16-41-1-1-12-(2), WS1V, NSW] Approval of 401 Water Quality Certification with Additional Conditions Dear Mr. Baran: You have our approval, in accordance with the attached conditions and those listed below, to place fill within or otherwise impact 7791inear feet of intermittent stream to construct the proposed retail development at the subject property, as described within your application dated February 2, 2006, and received by the N.C. Division of Water Quality (DWQ) on February 2, 2006, with more information received by the DWQ on November 23, 2005. After reviewing your application, we have decided that the impacts are covered by General Water Quality Certification Number(s) 3402 (GC3402). The Certification(s) allows you to use Nationwide Permit(s) NW 18 and NW39 when issued by the US Army Corps of Engineers (USAGE). In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, Non-discharge, and other regulations. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. This approval is for the purpose and design that you described in your application. If you change your project, you must notify us and you maybe required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 1501inear feet of stream, compensatory mitigation maybe required as described in 15A NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. The Additional Conditions of the Certification are: Conditions of Certification: 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: 401 OversighUExpress Review Permits Unit 1650 Mail Service Center, Raleigh, North Carolina 27699.1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 /FAX 919-733.6893 /Internet: http://h2o.enr.state.nc.us/ncwetlands No ehCarolina ~atura!!y An Equal Opportunity/Affirmative Action Employer - 50% Recycledll0% Post Consumer Paper Hughes Baran Development. LLL Page 2 of 3 March 21, 2006 Amount A roved (Units) Plan Location or Reference Stream 779 intermittent linear feet PCN a e 5 of 9 Sediment and Erosion Control: 2. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. Sufficient materials required for stabilization and/or repair of erosion control measures and stormwater routing and treatment shall be on site at all times. 3. No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the 404/401 Permit Application. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur; 4. Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources has released the project; 5. Protective Fencing -The outside buffer, wetland or water boundary and along the construction corridor within these boundaries approved under this authorization shall be clearly marked with orange warning fencing (or similar high visibility material) for the areas that have been approved to infringe within the buffer, wetland or water prior to any land disturbing activities to ensure compliance with 15 NCAC 2H, Section .0500; Deed Notifications -Deed notifications or similar mechanisms shall be placed on all retained jurisdictional wetlands, waters and protective buffers in order to assure compliance for future wetland, water and buffer impact. These mechanisms shall be put in place prior to impacting any wetlands, waters and/or buffers approved for impact under this Certification Approval and Authorization Certificate. A sample deed notification can be downloaded from the 401/Wetlands Unit web site at http://h2o.enr.state.nc.us/ncwetlands. The text of the sample deed notification may be modified as appropriate to suit to this project; 7. Written Stormwater Management Plan (Final Plan Needed) A final, written stormwater management plan (including a signed and notarized Operation and Maintenance Agreement) shall be submitted to the 401 Oversight and Express Permitting Unit (2321 Crabtree Blvd., Suite 250, Raleigh, NC, 27604) within 60 days of the issuance of the 401 Water Quality Certification. The stotmwater management plans shall be approved in writing by nugnes rsaran Leveiopmen~. i.Lt, Page 3 of 3 March 21, 2006 this Office before the impacts specified in this Certification occur. You have the option of using the Express Review Program for expedited approval of these plans. If you propose to use the Express Review Program, remember to include the appropriate fee with the plan. The stormwater management plan must include plans, specifications, and worksheets for stormwater management facilities that are appropriate for the surface water classification and designed to remove at least 85% TSS according to the most recent version of the NC DENR stormwater Best Management Practices Manual. These facilities must be designed to treat the runoff from the entire project, unless otherwise explicitly approved by the Division of Water Quality. Also, before any permanent building is occupied at the subject site, the facilities (as approved by this Office) shall be constructed and operational, and the stormwater management plan (as approved by this Office) shall be implemented. The structural stormwater practices as approved by this Office as well as drainage patterns must be maintained in perpetuity. No changes to the structural stormwater practices shall be made without written authorization from the Division of Water Quality. Additionally, in watersheds that are classified as nutrient sensitive waters (NSV~, the Division shall require that constructed wetlands (designed according to latest version of the NC DENR Stormwater Best Management Practices Manual) be utilized as part of the stormwater management plan when asite-specific stormwater management plan is required. For streams classified as Water Supply, High Quality Waters and Outstanding Resource Waters, post-construction, on-site stormwater management shall be required as appropriate and as outlined in 15A NCAC 2B .0104(m) and 2H .1000 to .1007, respectively, in addition to that required in this General Certification. Alternative designs may be requested by the applicant and will be reviewed on a case-by-case basis by the Division of Water Quality. Approval of stormwater management plans by the Division of Water Quality's other existing state stormwater programs including appropriate local programs are sufficient to satisfy this Condition as long as the stormwater management plans meet or exceed the design requirements specified in this condition. This condition applies unless more stringent requirements are in effect from other state water quality programs. • Unless specified otherwise in the approval letter, the final, written stormwater management plan shall be approved in writing by the Division of Water Quality's Wetlands Unit before the impacts specified in this Certification occur. • The facilities must be designed to treat the runoff from the entire project, unless otherwise explicitly approved by the Division of Water Quality. • Also, before any permanent building or other structure is occupied at the subject site, the facilities (as approved by the Wetlands Unit) shall be constructed and operational, and the stormwater management plan (as approved by the Wetlands Unit) shall be implemented. • The structural stormwater practices as approved by the Wetlands Unit as well as drainage patterns must be maintained in perpetuity. • No changes to the structural stormwater practices shall be made without written authorization from the Division of Water Quality. Hughes Baran Development. LLC Page 4 of 3 March 21, 2006 8. Construction Stormwater Permit NCGO10000 Upon the approval of an Erosion and Sedimentation Control Plan issued by the Division of Land Resources (DLR) or a DLR delegated local erosion and sedimentation control program, an NPDES General stormwater permit (NCGO10000) administered by DWQ is automatically issued to the project. This General Permit allows stormwater to be discharged during land disturbing construction activities as stipulated by conditions in the permit. If your project is covered by this permit [applicable to construction projects that disturb one (1) or more acres), full compliance with permit conditions including the sedimentation control plan, self-monitoring, record keeping and reporting requirements are required. A copy of this permit and monitoring report forms may be found at httv.'//h2o.enr.state.nc.us/su/Forms Documents htm.; 9. Culvert Installation Culverts required for this project shall be installed in such a manner that the original stream profiles are not altered. Existing stream dimensions (including the cross section dimensions, pattern, and longitudinal profile) must be maintained above and below locations of each culvert. Culverts shall be designed and installed to allow for aquatic life movement as well as to prevent head cutting of the streams. If any of the existing pipes are or become perched, the appropriate stream grade shall be re-established or, if the pipes installed in a perched manner, the pipes shall be removed and re- installed correctly. Culvert(s) shall not be installed in such a manner that will cause aggradation or erosion of the stream up or down stream of the culvert(s). Existing stream dimensions (including the cross section dimensions, pattern and longitudinal profile) shall be maintained above and below locations of each culvert. Placement of culverts and other structures in waters, streams, and wetlands must be placed below the elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches, and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches, to allow low flow passage of water and aquatic life. Design and placement of culverts and other structures including temporary erosion control measures shall not be conducted in a manner that may result in disequilibrium of wetlands or streambeds or banks, adjacent to or upstream and down stream of the above structures. The applicant is required to provide evidence that the equilibrium shall be maintained if requested in writing by DWQ. The establishment of native, woody vegetation and other soft stream bank stabilization techniques must be used where practicable instead of rip rap or other bank hardening methods. If rip-rap is necessary, it shall not be placed in the stream bed, unless specifically approved by the Division of Water Quality. Installation of culverts in wetlands must ensure continuity of water movement and be designed to adequately accommodate high water or flood conditions. Upon completion of the project, the Applicant shall complete and return the enclosed "Certificate of Completion" form to notify NCDWQ when all work included in the §401 Certification has been completed. The responsible party shall complete the attached form and return it to the 401/Wetlands Unit of the NC Division of Water Quality upon completion of the project. Please send photographs upstream and downstream of each culvert site to document correct installation along with the Certificate of Completion form. nugr-c~ saran ueveiopmem. i,t,~, Page 5 of 3 March 21, 2006 Certificate of Completion: 10. Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification shall expire upon expiration of the 404 or CAMA Permit. If you do not accept any of the conditions of this Certification (associated with the approved wetland or stream impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Cyndi Karoly or Ian McMillan in the Central Office in Raleigh at 919-733-1786 or Eric Kulz in the DWQ Raleigh Regional Office at 919-791-42: 0. AWKlijm Enclosures: GC 3402 Certificate of Completion ely, n ~/r: ., USG ~;..~ Alan W. Klimek, P.E. ec: Eric Kulz, DWQ Raleigh Regional Office USAGE Raleigh Regulatory Field Office File Copy Central Files Steve Macko, Little Bear, LLC, P.O. Box 1154, Morrisville, NC 27560 Jason Payne, Soil & Environmental Consultants, P.A., 11010 Raven Ridge Road, Raleigh, NC 27614 Filename: 060172HopeValleyCommons(Durham~01