Loading...
HomeMy WebLinkAbout20110124 Ver 1_More Info Received_20110218KINIS&TON PS CES Buildings & Grounds. Business Office, Electric, Engineering, Environmental Services, Fleet Maintenance, Meter Reading, Stormwater, Streets, Wastewater, and Water Kinston, the rig ht place ... Kinston Public Senlices, the right choice lI-0kQ.4 February 15, 2011 Ian McMillan Division of Water Quality 401 / Wetlands Unit 1650 Mail Service Center Raleigh, North Carolina 27699-1650 RE: Gravity Sewer Carey Road Fire Station City of Kinston Dear Mr. McMillan: F-B 1 8 2011 Kinston All-AmericaCilly t1111F 2009 In response to your letter dated February 4, 2011, find enclosed five (5) copies of our corrected page 4 of 10 of PCN form for the above referenced project. When checking the final layout of the Sewer line the changes were made, but the total was not figured using the corrected figures. This over site has been corrected and the impact length total in column 3g on page 4 of 10 has been corrected to 2,009 linear feet. I trust that this Application for 401 Water Quality Certification is now correct and complete. If any additional information is needed do not hesitate to contact me by phone at (252) 939-3239, or by e-mail at johxa.jarrellr?i).ci.kinston_nc.us. Sincerely, ` J? John A. Jarrell, I City Engineer Enclosure cc: Steve Miller, Water Resources Manager Mike Blackburn, Civil Engineer II Charles Sutton, Engineering Construction Inspector Post Office Box 339 Kinston, North Carolina 28502 Phone (252) 939-3287 Fax (252) 939-3279 ii-o1a.4 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ® Wetlands ® Streams - tributaries ® Buffers ? Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) Temporary T W1 ? P ®T Parallel to Stream Streams ? Yes ® No ? Corps ® DWQ 0.25 acres W2 ? P ? T ? Yes ? Corps ? No ? DWQ W3 ? P ? T El Yes El Corps lid L 5i ? No ? DWQ - D W4 ? P ? T ? Yes ? Corps FEB 1 8 2011 ?No ?DWQ W5 [] P ? T El Yes El Corps WNR ?TEK ?No ?DWQ Snwwk W6 ? P ? T ? Yes ? Corps ? No ? DWQ 2g. Total wetland i mpacts 0.25 acres 2h. Comments: Sewer Line is less than 100 feet from the Stream at the South property line of First Baptist Church or the North Right of Way line for Cary Road Extension. Impact Area is stream length X Trench width where construction is within 100 feet of the stream. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ - non-404, width (linear Temporary (T) (I NT)? other) (feet) feet) S1 ? P ® T Parallel within 100' Taylor's Branch ® PER ? INT ? Corps ® DWQ 16 feet 452 feet S2 ? P ®T Parallel within ' Tributary to ' ® PER ? Corps 16 feet 557 feet 100 Taylor s Branch ? INT ® DWQ S3 ? P ? T ? PER ? Corps ? INT ? DWQ S4 ? P ? T ? PER ? Corps ? INT ? DWQ S5 ? P ? T ? PER ? Corps ? INT ? DWQ S6 ? P ? T ? PER ? Corps ? INT ? DWQ 3h. Total stream and tributary impacts 1,009 feet 3i. Comments: The stream will be protected and the impact will be neqliqible. Page 4 of 100 PCN Form - Version 1.3 December 10, 2008 Version