Loading...
HomeMy WebLinkAbout20061251 Ver 1_Certification of Completion_20110203 Certification of Completion ~ •D W Pro ect No. Q j ~ `~-1 ~.5 i county: ~aCs711 Applicant: v• Project Name: L Date of Issuance of Wetland Permit: q- \i- ~ Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any subsequent modifications, the applicant.is required to return this certificate to the 401 Oversight/Express Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certif Cates from all of these. Applicant's Certification I, ,hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification-and Buffer Rules, the~approved plans and specifications, and other supporting materials. ~iature: Date: Agent's tificati ~ I, >~ %~ ~ r hereby state that, to the best of my abilities, due care and diligence was us in the observation oft construction such that the construction was observed to be built within substantial compliance and intent of th,¢'1 Water aliyty Certification and Buffer Rules, the app 9 ns, and other supporting maw rals. ~ ~ , ~~" ,/'`` Signature: ~,.% ~-~.~~ ..~=1',~ , Date: ~ 7 FE ~ ~ ~ zo~~ ,~ If this project was designed by a Certified Professional t7ENR -WATER QUALITY YVETIANDS AND STQRMWATF,H g(~H I, as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly,. full time) the construction of the project, for the Permiee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. ~anature: Registration No. Date