Loading...
HomeMy WebLinkAbout20110080 Ver 1_Triage Comments_20110203Use this form instead of writing inside the folder DWQ# Triaged By: Reviewer 1 Reviewer 2 Reviewer 3 ^ Issue Project (Reviewer 1) Triage Comment Sheet ~ ` oo ~'~ V / c--- ~ Date: ~ Date: ~ 3 // Date: ^ Issue Project (Reviewer 2) ^ Issue with conditions (Reviewer I ) ^ Issue with. conditions (Reviewer 2) More Information (Reviewer 1) ~ More Information (Reviewer 2) ^ Return Application (Reviewer 1) ^ Return Application (Reviewer 2) ^ Send to Regions (Reviewer 1) ^ Send to Regions (Reviewer 2) S:\Triage Forms\Triage Issue Sheet.doc PLEASE PRINT CLEARLY DWQ#: ,. ~~~ Date: ~ ` ` Who Reviewed: Plan Detail Incomplete ^ lease provide alocation/most recent bound and published county soil survey/USGS 1:24,000 top graphic map for the project. ^ Please re-submit yow site plans on full plan sheets at a scale of no smaller than 1"=50' with topographic contours shown. ^ Please provide cross section details showing the provisions for aquatic life passage. Please provide building envelopes for all lots with wetlands,.streams or buffers (or lots ) on the site plans. [~ Pease indicate proposed lot layout as an overlay on the site plan. ^ Please. provide a signed and sealed geotechnicsl report of subsurface soils at the proposed bottomless culvert location. The report must comply with the Divis on of Highways Guidelines for Drainage Stutiies and Hydraulic Design, prepared by A.L. Hankins, Jr., State Hydraulics Engineer -1999. ^'~lease locate any planned sewer lines on the site plan. ^ Please provide a detailed pleating plan for (standard format includes: scientific name, common name, source of the plant material, plant spacing, wetland indicator status, etc., as well as planting specifications). Please indicate all proposed stream or wetland driveway crossings on your plan sheet (including future proposed). Please indicate all stream impacts including all fill slopes, dissipaters, and bank stabilization on the site plan. t[~Pl se indicate all wetland impacts including fill slopes on the site plan. ~P ase enumerate all riparian buffer impacts on the site plan and clearly label impacts (Buf6er Impact 1, etc.). Pl a locate all isolated ornon-isolated wetlands, streams, and other waters of the State as overlays on the site plan. lease locate all of the protected riparian buffers as overlays on the site plan, clearty showing Zone 1 and Zone 2. Avoidance and Minimization ^ The labeled as on the plans does not appear to be necessary. Please eliminate the or provide additional information as to why it is necessary for this project. ^ This Office believes that the labeled on the plans as can be moved or reconfigured to avoid the impacts ~to the .Please revise the plans to avoid the impacts. ^ This Office believes that the labeled on the plans as can be moved or reconfigured to minimize the impacts to the .Please revise the plans to minimize the impacts. ^ Yow proposed stream crossing appears to be aligned at approximately .Please re-configure your proposed stream crossing to show it aligned approximately perpendicular (between 75° and 105°). Diffuse Flow and Stormwater ^ Per the requirements of the Riparian Buffer Rule, you must show that this site meets diffuse flow requirements with a level spreader or other BMP per Chapter 8 of the BMP Manual (gee httpriportai.n~aenr.org/wet~wq/w9/soromp•manaan. ^ Please submit a Level Spreader Supplement Form with all required items for each proposed level spreader (gee' 6ttp://portal.ncdenr.org/web/wq/wa/su/bmp-manual). ^ Please show contour lines down slope of the level spreader to show that it-has been correctly sited per the BMP Manual. ^ The slope from the proposed level spreader(s) lip ( ) to the top of bank of the stream exceeds the allowable slope for type of vegetated filter strip (5% for riparian buffer VFS, and 8% for. engineered filter strip). You must either relocate the level spreader(s) to a location where the filter strip slope(s) is/are appropriate or provide a BMP that removes 30 percent TN and TP: For each proposed BMP, provide a completed BMP Supplement Form with all the required items (htlp://portal.ncdenr.org/web/wq/wslaulbmp-manual). ^ Please provide calculations to show the outlet velocity from outlet(s) to the wetland(s). Anon-erosive velocity of two feet per second or less must be achieved for the peak flow from the 10-year storm. ^ [Drainage Area Map and Percent Imperviousness Breakdown] ^ Please delineate the drainage areas on the site plan (Drainage area map on full plan sheets). ^ Please provide the overall percent imperviousness of the project, and an inventory of impervious surfaces in each drainage area. The inventory should include all proposed building footprints, roads, driveways, sidewalks, gravel- surfaced areas, amenity areas, etc. ^ [High Density] Per the requirements of GC ,this project is subject to Stormwater Manageme»t Plan (SMP) Requirements for Applicants Other Than the North Carolina Department of Transportation (see http://portel.ncdenr.org/web/wq/swp/ws/401/certsandpermits/swmanagemeat). For each proposed BMP, please provide a completed BMP Supplement Form With all required items (seehttp://portal.ncdenr.org/web/wq/ws/su/bmp-manual). ^ [Low Density] Per the requirements of GC ,this project is categorized as low density. For each vegetated sormwater conveyance, please provide a completed Low Density Supplement Form along with all supporting information (see http://portal.ncdenr.org/web/wq/wa/su/bmp-manual). ^ Please provide a BMP Supplement Form with all required items for every BMP on the site (:ee httpJ/portal.neaenr.org/wel,/wq/ws/sulbmp- manual). ^ Please use the most current version of the BMP Supplement Form (See: nnp:nportal.ncdenr.orgrwebiwq/ws/sa/hmp-manual>. Mitigation ^ of compensatory mitigation is required for this project. Please provide a compensatory mitigation plan. The plan must conform to the requirements of 15A NCAC 2H .0500 and must be appropriate to the type of impacts proposed. ^ Buffer mitigation is required for the proposed buffer impacts. Please submit a mitigation plan detailing the amount of buffer impact for Zone 1 ancUor Zone 2 and how the impact will be mitigated. ^ Please provide documentation from an appropriate mitigation bank or the NCEEP indicating their willingness to accept your request to purchase (type of mitigation) credit to mitigate for the proposed (type of mitigation) impacts listed in your PCN application per Section D. Mitigation provider selection must conform to the requirements of G.S.143-214.11(for wetland and stream mitigation) or G.S. 143-214.20 (for riparian buffer mitigation). Other ^ The application fee is insufficient because over 150 feet of stream and/or over 1 acre of wetland impacts were requested. Please ^ ^ ^ Please submit electronic CAD files showing You can download via email to ian.mcmillan@ncdenr.gov and provide a CD (TIFF Group 4 format (black and white, not grayscale or color)) along with your response to the additional information requested. ^ Please provide stream determination documentation on the site (upstream and downstream photos and DWQ stream identification forms). ^ Please provide a qualitative indirect and cumulative impact analysis for the project. Please see DWQ's policy for guidance on our website at: http://portal.ncdenr.org/web/wq/swp/ws/401/policies ^ For areas in nutrient sensitive waters (NSVf~ or buffered river basins fertilizer specifications for stormwater BMPs should state that that only an initial minimal application of fertilizer to establish the plants shall be used. ^ Please complete Section of the PCN Form. ^ Please provide proposed septic fields on all (or) lots showing that additional impacts will not be required. ^ Please resubmit 3 copies of your information on the July 2009 Variance Application Form. ^ Variance application forms must be signed by the owner. Please resubmit the application page of the variance application with the owner's signature. ^ The proposed buffer impacts in your application require a major variance from the Environmental Management Commission. Please submit 3 copies of your information of the July 2009 Variance Application Form with supporting documentation. ^ Please provide one (1) data CD of full size plans in TIFF Group 4 format (black and white, not gayscale or color). If the plans are too large to store in TIFF format, they can be stored in PDF. provide $ .This additional fee must be received before your application can be reviewed. Please provide a signed copy of the application. Please provide an agent authorization letter for the application signature. Please i>idicate which 404 Permit the USACE has authorized for this project. Please resubmit copies of your information on the January 2009 PCN form or a more recent version. this format the following web address: (see http://www.saw.usace.army.miUWETLANDS/pcri~ Notes: 10-0080 Ritchie Bros. Auctioneers Butner Site AML comments January 28, 2011 1. Please be advised that the stormwater ponds shown on the plans will need to be wet detention ponds in order to meet the pollutant removal requirements on this site. 2. Please provide a BMP Supplement Form for each proposed wet detention pond and each proposed level spreader-vegetated filter strip that will be used on the site (a total of four separate supplement forms). Each supplement form must include both worksheets, Design Summary and Required Items Checklist), as well as all of the required items. Failure to provide the forms with ALL of the required items in the next submittal will result in a return of application. 3. The BMP Supplement Forms must be obtained from the DWQ web site at: http://portal.ncdenr.or web/wq/ws/su/bmp-manual.