Loading...
HomeMy WebLinkAbout20080067 Ver 3_More Info Received_20110208WITHERS RAYENEL ENGINEERS 1 PLANNERS I SURVEYORS February 7, 2011 NC-Division of Water Quality Attn: Mr. Ian McMillan 165o Mail Service Center Raleigh, NC 27699-i65o Re: Alston Pond Subdivision - DWQ On-Hold Letter Response DWQ Project #08-0067, Ver. 3 Dear Mr. McMillan: This letter is in response to your letter, dated February 4, 2oi1, requesting additional information for the Alston Pond PCN. i. Incorrect and/or missing wetland, intermittent-perennial stream and/or buffer impacts. OWQ is unable to review this project without noted or corrected impacts reflected. Page ~ of s3, item 3~ totals s7~ linear feet of stream impacts; Item 3h Total stream impacts are shown as sso linear feet. .Please correct that entry accordingly and submit five (5) copies ofthe corrected page. The stream impacts on Page 4 of i3 have been revised and five (5) copies of the corrected page have been enclosed with this letter. Please feel free to contact me if you have any questions or require additional information to complete your review of the application. Sincerely, ~~ Troy Beasley Environmental Scientist WITHERS & RAVENEL, INC. Copies Furnished: James Latsinger -Corps of Engineers 111 Macl<enan Drive Cary, NC 27511 I tel.: 91q.y69.334o fax: 919.467-6008 I www.withersraveneLcom 141o Commonwealth Drive Suite 101 I Wilmington, NC z84o3 I teL• 910.256.9277 fax: 91o.z56.z584 416 D GaUimore Dairy Road Greensboro, NC 274og I teL• 336.993.5504 fax: 919.467.6008 N.C. Engineering Board No. C~o83z D g -~ D O to ~ ~/ ~ C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): ~ Wetlands ®Streams -tributaries ~ Buffers ^ Open Waters ^ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number- Permanent Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact P or Tempora T if known DWQ -non-404, other acres Impact 8 ®P ^ T Permanent /Fill Headwater Forest ®Yes ^ No ®Corps ®DWQ 0.005 ac Impact 9 ®P ^ T Permanent /Fill Headwater Forest ®Yes ^ No ®Corps ®DWQ 0.011 ac Impact 11 ^ P ®T Sewer Construction Headwater Forest ®Yes ^ No ®Corps ®DWQ 0.014 ac Impact 12 ®P ^ T Permanent /Fill Headwater Forest ®Yes ^ No ®Corps ®DWQ 0.003 ac 2g. Total wetland impacts 0.033 ac 2h. Comments: Impacts to wetlands will occur from rehabilitation of an existing dam to meet dam safety requirements. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number -Permanent (PER) or (Corps - 404, 10 stream length (P) or Temporary (T) intermittent DWQ -non-404, width (linear (INT)? other) (feet) feet) Impact 2 ®P ^ T Fill /Culvert UT to Basal Creek ®PER ^INT ®Corps ®DWQ 5' 147 If Impact 15 ^ P ®T Sewer Crossing. UT to Basal Creek ^ PER ®INT ®Corps ®DWQ 3' 27 If 3h. Total stream and tributary impacts 174 If 3i. Comments: 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water impact Name of number -Permanent waterbody Type of impact Waterbody type rea of impact (acres) P or Tem ora T if a licable 01 ^P^T 03 ^ P ^ T ~~: ' ~ , 04 ^ P ^ T ~,, „~ 4f. Total open water impacts ~• 'fie ~ " ~/,~~ ~~ 4g. Comments: ~ ~r~~h Page 5 of 13 PCN Form -Version 1.3 December 10, 2008 Version