HomeMy WebLinkAbout20100251 Ver 2_Staff Comments_2011020110-0251 Brightwater Medical Complex APPROVAL
AML suggestions for 401 Certification wording
February 1, 2011
1. The DWQ approves the stormwater management plan (SMP) for Phase One of this project, the
southwestern portion of the Brightwater Medical Complex, to satisfy the stormwater condition
required by the General Water Quality Certification GC 3821 corresponding to US Army Corps
of Engineers Nationwide Permit NW 39 for your project. The following requirements apply to
the SMP:
a. The SMP approved by this office consists of four wet detention basins and all associated
stormwater conveyances, inlet and outlet structures, vegetated shelf planting plan, the grading
and drainage patterns depicted on plan sheets received by the DWQ on November 30, 2010,
and the O&M agreement dated November 24, 2010.
b. The approved SMP must be constructed and operational before any permanent
building or other structure is occupied at the site.
c. The approved SMP must be maintained in perpetuity. No changes to the structural
stormwater practices shall be made without written authorization from the DWQ.
d. The stormwater management structures shall have maintenance access and at least a 10-foot
drainage easement on each side to allow for the ability to maintain the structures, and to
perform corrective actions. The stormwater easements shall be recorded to provide protection
of the structures from potential alterations by future property owners.
e. Maintenance activities for the proposed wet detention basin shall be performed in accordance
with the notarized wet detention basin Operation and Maintenance Agreement signed by Mr.
Johnson Tilghman on November 24, 2010. The Operation and Maintenance Agreement must
transfer with the sale of the land or transfer of ownership/responsibility for the BMP facility.
DWQ must be notified promptly of every transfer.
f. The applicant and/or authorized agent shall contact the DWQ Express Review Program in
writing at the letterhead address within 60 days of the commencement of construction.
2. All future phases of this project must receive approval for an SMP that treats all of the
stormwater from that phase in accordance with Condition 12 of General Certification Number
3821. The approval of the SMP must be obtained prior to any land disturbance or impacts
associated with that phase. After the SMP for each future phase is approved, it will be subject to
requirements a-f above.