HomeMy WebLinkAbout20090656 Ver 1_Reports_20100401
NCDENR
North Carolina Department of Environment and Natural
Division of Water Quality
Beverly Eaves Perdue
Governor
Mr. J. B. Setzer, P.E.
Division 14 Engineer
N.C. Department of Transportation
253 Webster Road
Sylva, North Carolina 28779
Coleen H. Sullins
Director
March 29, 2010
Irces o1
?OSq'Fq ee eman
%gir?kn Secretary
Subject: Inspection-NCSR 1331
Hanging Dog Road
DWQ Project 09-0656
Cherokee County
Dear Mr. Setzer:
On March 10, 2009, I inspected the construction work at Bridge 15 on NCSR 1331 (Hanging Dog Road) in
Cherokee County. The project appears to be in relatively good shape but sediment should be removed from
behind the sediment fence on the southwest side of the project and the area seeded. The erosion and
sedimentation control structures, vegetative covering, and matting appear to be working properly.
Please continue to ensure that all sediment and erosion control structures are maintained and that seeding and
mulching are performed as needed to protect downstream waters. A copy of the inspection report is attached
to this letter.
If you have questions, please call me at 828-296-4500.
Sincerely,
Michael •R: Parker
Environmental Senior Specialist
Attachment
cc: W. Trent Anderson
Mark Davis, Division 14, DEO
Ed Ingle, Roadside Environmental
Transportation Permitting Unit
Mike Parker, Asheville Regional Office
(Selzer) Bridge 15 NCSR 13311nspection Letter March 2010
SURFACE WATER PROTECTION SECTION - Asheville Regional Office
2090 U.S. 70 Highway, Swannari NC 28778-8211
Phone: 828-296-45001 FAX : 828299-7043 One
Customer Service: 1-877-623-6748 NOft}l CaC011 na
Internet www.ncwatemualitv.org ?ry??/N????
An Equal Opponunilyl AKrmalive Action Employer fi `!
DWQ Site Visits for DOT Projects
Field Sheet
DWQ representative: Michael R. Parker Date: March 10, 2010
County: Cherokee Region: Asheville
DOT Division: Division 14
Activity: X 401 Compliance Evaluation
?DWQ Follow Up Evaluation
? Complaint
? Other
DWQ 4014:1 09-0656 NW Permit #: GP 31 IP #:
Project Name: NCSR 1331 Bridae Construction
Location of Project:
From the intersection ofNCSR 1326 and 1331 travel north on NCSR
1331 approximately 2.5 miles to the intersection of NCSR 1345.
Project Complete: ?Yes X No
Activities (DOT):
X? Bridge
? Culvert
? Bottomless Culvert
? Bottomless Arch
X? Riprap Inlet/Outlet Stabilization
? Spoil Pile
? Borrow Pit
? Wetland Mitigation
? Stream Restoration
? On-site Stream Relocation
? Buffer Restoration
? Bank Stabilization
? Other
If no, estimated date of completion:
Water Quality Concerns (DWO):
X Steam Standards Violation
X Turbidity
? Evidence of spills
? Oil/Petroleum
? Solid Waste
? Failed E & S control measures
X Sedimentation Impacts
? Stormwater Permit Violation
? Fill
? Buffer Impacts (see below)
? Other
Additional Wetland Impacts: ? yes X? no Estimated Acres
? Zone 1 Est Acres ? Zone 2 Est Acres
Additional Stream Impacts: ? yes X? no Est Linear feet
Estimated linear feet of impact:
Buffer Impacts: ?Neuse ?Tar-Pam ?Randleman ?Catawba
Zone 1: ?Yes ?No Est linear ft/ acreage of buffer impact ac
Zone 2: ?Yes ?No Est linear fU acreage of buffer impact fU ac
Buffer Designation: ?Exempt ?Allowable ?Allowable w/mitigation ?Prohibited
Name of Waterway(s):
DWO Site Visits for DOT Projects
Background Info
Owl Creek
Basin/ Subbasin: Hiwassee 040502 71
Wetland Type: ?Isolated x?Non-Isolated (Waters of US)
Stream Class: ?Class B ?303d Listed ?WS-11 ?wS-V ?SB
X?Class C ?ORW ?Trout ?WS-Ill ?NSW
?HQW ?WS-I ?WS-IV ?SA ?CA
Type of Authorized Impact: ?Culvert ?Bottomless Culvert
X?Bridge ?Bottomless Arch
X?Riprap Inlet/Outlet Stabilization X?Fill
Authorized Wetland Impacts: ?0 - 1/10'h acre ?1/11`h to 1/3`d acre
? 1/3`dto 1.0 acre ?> 1.0 acre 1.59 acres
Authorized Stream Impacts: X?< 150 linear feet ?> 150 linear feet 205 linear feet
Additional comments:
Construction is almost complete except for final grading and paving.
Sediment had collected at silt fence on southwest side of bridge. The sediment should be removed and the areas
seeded.
Continue to maintain erosion control devices and continue with seeding and matting as required.
NCSR 1331 09-0656 Inspection March 2010