Loading...
HomeMy WebLinkAbout20170526_Scoping Comments_20090512ern NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Colleen H. Sullins Governor Dee Freeman Director Secretary May 12, 2009 MEMORANDUM TO: Christy Wright Huff, NCDOT PDEA FROM: Amy Euliss, NCDWQ, Winston Salem Regional Office 's SUBJECT: Scoping Review of NCDOT's Proposed Bridge Replacement Projects' 4965, B-4964, B-4807, B-4725, and B-5119 (Caswell, Guilford, and Rockingham Counties), In reply to your correspondence dated April 14, 2009 (received April 16, 2009) in which you requested comments for the above referenced projects, the NCDWQ offers the following comments: Project-Specific Comments B-4965, Bridge No. 249 Over Little Beaver Island Creek, Rockingham County *no project specific conditions B-4964, Bridge No. 85 Over Southern IItalrayd,Raeking!Pmm County with.potential impacts to UTs to Troublesome Creek and Little Tram'Oesome CrrccA - - 1. UTs to Little Troublesome Creek are class C;NSW; 303(d) canters of the State. Little Troublesome Creek is on the 303(d) list for impaired use for aquatic life due to impervious surface, road construction, andMS4 NPDES. NCDWQ is very concerned with sediment and erosion impacts that could result from this project. NCDWQ recommends that the most protective sediment and erosion control BMPs be implemented in accordance with Design Standards in Sensitive Watersheds to reduce the risk of nutrient runoff to Little Troublesome Creek. NCDWQ requests that road design plans provide treatment of the storm water runoff through best management practices as detailed in the most recent version of NCDWQ Stormwater Best Management Practices. 2. UTs to Troublesome Creek and Little Troublesome Creek are class C; NSW waters of the State. NCDWQ is very concerned with sediment and erosion impacts that could result from this project. NCDWQ recommends that highly protective sediment and erosion control BMPs be implemented to reduce the risk of nutrient runoff to UTs to Troublesome Creek and Little Troublesome Creek. NCDWQ requests that road design plans provide treatment of the storm water runoff through best management practices as'detailed in the most recent version of NCDWQ's Stormwater Best Management Practices. B-4807, Bridge No. 6' Over Haw River, Rockingham County 1. The Haw River is class C; NSW waters of the State. NCDWQ is very concerned with sediment and erosion impacts that could result from this project. NCDWQ recommends that highly protective sediment and erosion control BMPs be implemented to reduce the risk of nutrient runoff to the Haw River. NCDWQ requests that road design plans provide treatment of the storm water runoff through best management practices as detailed in the most recent version of NCD WQ's Stormwater Best Management Practices. Transportation Permitting Unit 1650 Mail Service Center Raleigh, North Carolina 27699-1650 . Location: 2321 Crabtree Blvd., Raleigh, North Carolina 27604 - Phone: 919-733.1786 \ FAX. 919-733-6893 Internet: http:llh2o.e6r.state.nc.ustncwedands/ " NorthCarolina _: ?Vatirrally _, An Equal Opportunity 1 Affirmative Action Employer B-4725, Bridge No. 12 Over County Line Creek, Caswell County *no project specific conditions B-5119, Bridge No. 349 and No. 291 Over US 29-70-220, Guilford County I. South Buffalo Creek and its unnamed tributaries are class C;NSW; 303(d) waters of the State. South Buffalo Creek is on the 303(d) list for impaired use for aquatic life due to turbidity. NCDWQ is very concerned with sediment and erosion impacts that could result from this project. NCDWQ recommends that the most protective sediment and erosion control BMPs be implemented in accordance with Design Standards in Sensitive Watersheds to reduce the risk of nutrient runoff to South Buffalo Creek. NCDWQ requests that road design plans provide treatment of the storm water runoff through best management practices as detailed in the most recent version of NCD WQ Stormwater Best Management Practices. 2. South Buffalo Creek, its unnamed tributaries, Mile Run Creek, and Ryan Creek are class C; NSW waters of the State. NCDWQ is very concerned with sediment and erosion impacts that could result from this project. NCDWQ recommends that highly protective sediment and erosion control BMPs be implemented to reduce the risk of nutrient runoff to South Buffalo Creek, its unnamed tributaries, Mile Run Creek, and Ryan Creek. NCDWQ requests that road design plans provide treatment of the storm water runoff through best management practices as detailed in the most recent version of NCD WQ's Stormwater Best Management Practices. B-4757, Bridge 175 over Buffalo Creek 1. Buffalo Creek are class C; NSW waters of the State. NCDWQ is very concerned with sediment and erosion impacts that could result from this project. NCDWQ recommends that highly protective sediment and erosion control BMPs be implemented to reduce the risk of nutrient runoff to Buffalo Creek. NCDWQ requests that road design plans provide treatment of the storm water runoff through best management practices as detailed in the most recent version of NCD WQ's Stormwater Best Management Practices. General Comments Regarding All of the Above Bridge Replacement Projects I. Any anticipated bank stabilization associated with culvert installations or extensions should be addressed in the Categorical Exclusion (CE) document. It is understood that final designs are not determined at the time the CE is developed. However, the CE should discuss the potential for bank stabilization necessary due to culvert installation. 2. Any anticipated dewatering or access structures necessary for construction of bridges should be addressed in the CE. It is understood that final designs are not determined at the time the CE is developed. However, the CE should discuss the potential for dewatering and access measures necessary due to bridge construction. i 3. NCDWQ is. very concerned with sediment and erosion impacts that could result from this project. NCDOT shall address these concerns by describing the potential impacts that may occur to the aquatic environments and any mitigating factors that would reduce the impacts. 4. If foundation test borings are necessary; it shall be noted in the document. Geotechnical work is approved under General 401 Certification Number 3687/Nationwide Permit No. 6 for Survey Activities. 5. If a bridge is being replaced with a hydraulic conveyance other than another bridge, NCDWQ believes the use of a Nationwide Permit may be required. Please contact the US Army Corp of Engineers to determine the required permit(s). 6. If the old bridge is removed, no discharge of bridge material into surface waters is allowed unless _ otherwise authorized by the US ACOE. Strict adherence to the Corps of Engineers guidelines for . bridge demolition will be a condition of the 401 Water Quality Certification. 7. Whenever possible, NCDWQ prefers spanning structures. Spanning structures usually do not require work within the stream or grubbing of the streambanks and do not require stream channel realignment. The horizontal and vertical clearances provided by bridges shall allow for human and wildlife passage beneath the structure. Fish passage and navigation by canoeists and boaters shall not be blocked. Bridge supports (bents) should not be placed in the stream when possible. 8. Bridge deck drains shall not discharge directly into the stream. Stormwater shall be directed across the bridge and pre-treated through site-appropriate means (grassed swales, pre-formed scour holes, vegetated buffers, etc.) before entering the stream. Please refer to the most current version of NCDWQ's Stormwater Best Management Practices. 9. If concrete is used during construction, a dry work area shall be maintained to prevent direct contact between curing concrete and stream water. Water that inadvertently contacts uncured concrete shall not be discharged to surface waters due to the potential for elevated pH and possible aquatic life and fish kills. 10. If temporary access roads or detours are constructed, the site shall be graded to its preconstruction contours and elevations. Disturbed areas shall be seeded or mulched to stabilize the soil and appropriate native woody species shall be planted. When using temporary structures the area shall be cleared but not grubbed. Clearing the area with chain saws, mowers, bush-hogs, or other mechanized equipment and leaving the stumps and root mat intact allows the area to re-vegetate naturally and minimizes soil disturbance. 11. Sediment and erosion control measures sufficient to protect water resources must be implemented and maintained in accordance with the most recent version of North Carolina Sediment and Erosion Control Planning and Design Manual and the most recent version of NCS000250. 12. All work in or adjacent to stream waters shall be conducted in a dry work area unless otherwise approved by NCDWQ. Approved BMP measures from the most current version ofNCDOT Construction and Maintenance Activities manual such as sandbags, rock berms, cofferdams and other diversion structures shall be used to prevent excavation in flowing water. 13. Heavy equipment shall be operated from the bank rather than in stream channels in order to minimize sedimentation and reduce the likelihood of introducing other pollutants into streams. This equipment shall be inspected daily and maintained to prevent contamination of surface waters from leaking fuels, lubricants, hydraulic fluids, or other toxic materials. 14. In most cases, the NCDWQ prefers the replacement of the existing structure at the same location with road closure. If road closure is not feasible, a temporary detour shall be designed and located to avoid wetland.impacts,.minimize the need for clearing and to avoid destabilizing stream banks.. If the structure will be on a new alignment, the old structure shall be removed and the approach fills removed from the 100-year floodplain. Approach fills shall be removed and restored to the natural ground elevation. The area shall be stabilized with grass and planted with native tree species.. Tall fescue shall not be used in riparian areas. General Comments if Replacing the Bridge with a Culvert 1. Placement of culverts and other structures in waters, streams, and wetlands shall be below the elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches, and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches, to allow low flow passage of water and aquatic life. Design and placement of culverts and other structures including temporary erosion control measures shall not be conducted.in a manner that may result in dis- _-_- equilibrium of wetlands or streambeds or banks, adjacent to or upstream and down stream of the above structures. The applicant is required to provide evidence that the equilibrium is being maintained if requested in writing by NCDWQ. If this condition is unable to be met due to bedrock or other limiting features encountered during construction, please contact the NCDWQ for guidance on how to proceed and to determine whether or not a permit modification will be required. 2. If multiple pipes or barrels are required, they shall be designed to mimic natural stream cross section as closely as possible including pipes or barrels at flood plain elevation, floodplain benches and/or sills may be required where appropriate. Widening the stream channel shall be avoided. Stream channel widening at the inlet or outlet end of structures typically decreases water velocity causing sediment deposition that requires increased maintenance and disrupts aquatic life passage. 3. Riprap shall not be placed in the active thalweg channel or placed in the streambed in a manner that precludes aquatic life passage. Bioengineering boulders or structures shall be properly designed, sized and installed. Thank you for requesting our input at this time. NCDOT is reminded that issuance of a 401 Water Quality Certification requires that appropriate measures be instituted to ensure that water quality standards are met and designated uses are not degraded or lost. If you have any questions or require additional information, please contact Amy Euliss at (336) 771-4959. cc: Andy Williams, US Army Corps of Engineers, Raleigh Field Office Federal Highway Administration Jerry Parker, Division 7 Environmental Officer Kathy Matthews, Environmental Protection Agency (electronic copy only) Travis Wilson, NC Wildlife.Resources Commission Wetlands/401-Transportation. Permitting Unit File Copy