Loading...
HomeMy WebLinkAbout20100699 Ver 1_Approval Letter_20110124NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary Pastor Mark Miles Truth Temple PO Box 8186 Kannapolis, NC 28082 APPROVAL of 401 Water Quality Certification with Additional Conditions Dear Pastor Miles: January 24, 2011 DWQ# 10-0699 Ashe County You have our approval, in accordance with the attached conditions, to impact 0.014 acres of wetlands and 45 linear feet of stream in order to install a road for The Haven Subdivision located off of Denny Rd near Pond Mountain, NC in Ashe County, as described in your application received by the Division on August 26, 2010 and additional information received January 12, 2011. After reviewing your application, we have determined that this fill is covered by General Water Quality Certification Numbers 3821, which can be viewed on our web site at http://h2o.enr.state.nc.us/ncwetlands/rd_wetlands_ certifications.htm. This Certification allows you to use Nationwide Permit Number 29 when it is issued by the U.S. Army Corps of Engineers. In addition, you should secure any other applicable federal, state or local permits before you proceed with your project, including (but not limited to) those required by Sediment and Erosion Control (including trout buffer waivers as necessary), Non-Discharge, State Stormwater, and Water Supply Watershed regulations. Also, this approval will expire when the accompanying 404 permits expire unless otherwise specified in the General Certification. This approval is valid only for the purpose and design that you have described in your application. If you change your project, you must notify us in writing, and you may be required to send us a new application for a new certification. If the property is sold, the new owner must be given a copy of the Certification and approval letter and is thereby responsible for complying with all conditions. If total wetland fill for this project (now or in the future) exceeds one acre, or total fill to perennial streams equals or exceeds 150 linear feet, additional compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). For this approval to be valid, you must follow the conditions listed in the attached certification, as well as the additional conditions listed below: 1. The following impacts are hereby approved as long as all other specific and general conditions of this Certification are met. No other impacts, including incidental impacts, are approved: Wetland site Type of Impact Impact area W6 Fill 0.004 acres W5 Fill 0.01 acres Total 0.014 acres permanent impact North Carolina Division of Water Quality, Winston-Salem Regional Office Location: 585 Waughtown St. Winston-Salem, North Carolina 27107 Phone: 336-771-50001 FAX: 336-771-46301 Customer Service: 1-877-623-6748 Internet: www.ncwaterquality.org An Equal Opportunity 1 Affirmative Action Employer North Carolina AaAmallry Pastor Mark Miles DWQ# 10-0699 January 24, 2011 Page 2 Stream site Stream Name Impact length S1 UT to Big Laurel Creek 20 linear feet permanent impact S2 UT to Big Laurel Creek 25 linear feet temporary impact Total 20 linear feet permanent impact 25 linear feet temporary impact 2. Prior to road construction (including clearing and grubbing) the 30 foot stream setback must be accurately flagged and/or staked to ensure compliance with the design plans submitted with this permit application. 3. You are reminded that if at any time in the future you modify the subdivision design or further develop the project beyond what was shown in the PCN Application and supporting documentation, you will be required to comply with Condition No. 12 in GC No. 3821. 4. Upon finishing the project, the Applicant shall fill out and return the enclosed "Certificate of Completion" to notify NCDWQ when all work included in the 401 Certification has been completed. This certificate should be returned to the Winston-Salem Regional Office of the NCDWQ at the address listed on the form. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please contact Sue Homewood in the DWQ Winston-Salem Regional Office at 336-771-4964 or at sue.homewood@ncdenr.gov. Sincerely, jlku 1??. 'v Coleen H. Sullins, Director Division of Water Quality cc: Tasha McCormick, U. S. Army Corps of Engineers, Asheville Regulatory Field Office (via email) John Vilas, ENV-ECS, Inc. (via email) DWQ Winston-Salem Regional Office DWQ Wetlands/401