Hi Amy,
Page 1 of 2
C) g0)15
r -L-0 ?e
I have attached a document from May 2009 which has the project commitments included. It appears to refer to
Mitigation for the project on Pages 5-10 with 10 probably having the impacts laid out most clearly and
referencing EEP. I also attached the special conditions from Action ID 199821203 just in case you need those as
well. I think this covers the items I had found. Let me know if you need anything else.
Thanks,
Vickie
Vickie Miller, AICP, PWS
Environmental Scientist
HDR ONE COMPANY I Many Solutions
3733 National Drive, Suite 2071 Raleigh, NC 127612-4845
Phone: 919.232.6637 1 Fax: 919.785.1187 1 Email: vickie.miller(a)hdrinc.com
From: Easterly, Sara E [mailto:seeasterly@ncdot.gov]
Sent: Thursday, September 16, 2010 11:38 AM
To: Miller, Vickie M
Cc: Euliss, Amy
Subject: FW: impacts
Vicky,
Can you help answer these below questions?
Thanks,
Sara
From: Euliss, Amy
Sent: Wednesday, September 15, 2010 10:17 AM
To: Easterly, Sara E
Subject: impacts
https://mail.nc.gov/owa/?ae=Item&t=IPM.Note&id=RgAAAADMSzLcd9 W2TJHI4%2bm... 1/27/2011
FW: Yadkin Site 2 Mitigation information
Page 2 of 2
Our copy of the first permit mod (04-0275, v 2) lists the following total impacts for Section AA:
Riverine 0.12
Non Riverine 1.08
Total 1.20
On-Site Wetland Restoration 0.12
Mitigation required 1.08
My understanding from before was that all impacts at site 2 (which encompasses all of Section
AA) had not been accounted for. So, are the proposed impacts in addition to the previously
permitted impacts listed above?
Also, the some holds true for the stream impacts. Previously section AA permitted 11,104 feet
of stream, 0.05 acres, and 2,644 feet of mitigation was required. I'm beginning to think AA is
not the some as Site 2, even though that is what the permit application states.
Thanks.
Amy
Please note my new email address: amy.eulissQncdenr.gov
Amy Euliss
NC DENR Winston-Salem Regional Office
Division of Water Quality, Surface Water Protection
585 Waughtown Street
Winston-Salem, NC 27107
Voice: (336) 771-5000
FAX: (336) 771-4630
Email correspondence to and from this sender is subject to the N.C. Public Records Law and maybe disclosed to third parties.
https:Hmail.ne.gov/owa/?ae=Item&t=IPM.Note&id=RgAAAADMSiLcd9 W2TJHI4`/`2bm... 1/27/2011
PROJECT CONMTMENTS
1-85
North of SR 2120 (Est 81) in Rowan County to
US 29-52-7011-85 Business (Est 87) in Davidson County
Rowan-Davidson Counties
Federal Aid Project No. NHF-85-3(164)80
WBS No. 34156, State Project No. 8.1631403
T.LP. Project No. 1-2304A
Commitments Developed Through Project Development and Design
Project Development and Environmental Analysis Branch / Transportation Program
Management Unit
Because the subject project lies within a Federal Energy Regulatory Commission (FERC)
licensed hydro plant project boundary (the Yadkin Project), approval for land transfer must be
obtained by NCDOT in the form of a FERC license revision. Coordination with the proper
FERC officials shall take place and the process to obtain a FERC permit will be followed
A portion of the subject project lies within the Yadkin Hydroelectric Project boundary, (Project
No. 2197), as licensed by the Federal Energy Regulatory Commission (FERC). For this reason,
NCDOT must receive prior written permission from Alcoa Power Generating, Incorporated
(APGI), before beginning construction. This permission would most likely be in the form of a
Construction Permit and/or easement, in accordance with the Yadkin Project Shoreline
Management Plan (SMP). More specifically, the Industrial Use Approval Procedures are
outlined in Appendix F to the SMP. Because the project is considered a 'new bridge or road, '
the.SMP requires 1) agency consultation, 2) 45-day prior notice to, FERC and 3) APGI written
permission (SMP Appendix F, Table 2). The Transportation Program Management Unit will
coordinate with the properAPG1 officials to obtain a FERCpermit revision for this project.
Geotechnical Unit
it is anticipated that the proposed widening of I-85 and interchange, reconstruction along 1-85
will encroach on one property identified as an underground storage tank (UST) site. The project
has been designed to minimise impacts to this UST site to prevent the possibility of long-term
costly remediation. This impacted site will be further evaluated before the project's construction,
Project Development and Environmental Analysis Branch
Due to its historical significance, Bridge # 46, which carries US 29-70 over the Yadkdn River in
the southbound direction, will remain in place but will be closed to vehicular traffic. The bridge
will remain in -place to serve pedestrian and bicycle traffic. Ownership, liability, and
maintenance responsibilities are currently being discussed by the Rowan and Davidson County
Commissioners, the Transportation Museum, and the State Historic Preservation Office (SHPO).
It is anticipated that these issues will be resolved before the project construction.
The issues related to ownership, liability and maintenance responsibilities have not been resolved
by the above-mentioned parties. These issues continue to be discussed by the local officials.
I-2304A Permit Green Sheet Page I of 10
May 11, 2009
PROJECT CONMTMENTS
Rehabilitation of Bridge No. 46 (VII-Cox Bridge) is not an option due to the present state of
deterioration. After submission of the Notice ofAdverse Effect to the Council in February 2009,
FHWA entered into negotiations with NCDOT, NC HPO and other consulting parties to develop
a Memorandum of Agreement (MOA) to mitigate the effects of the project on the Yadkin River
Crossings Historic District. Davidson and Rowan Counties attended the initial meeting and
informed all parties that they may not be able to honor their original intention to take ownership
of the historic Wil-Cox Bridge. Rowan County commissioners voted against participating in
preservation of the bridge, while the Davidson County commissioners have decided to work in
good faith with FHWA and NCDOT towards taking ownership of the Vril-Cox Bridge, once the
entire M5 Yadkin River Bridge Project is completed. The ultimate fate of the bridge is unknown
at this time, but the attached MOA has been drafted to accommodate for the effects of either
outcome.
Right of Way Branch
It is anticipated that thirteen Geodetic Survey markers will be impacted by this project. The
North Carolina Geodetic Survey will be contacted prior to construction regarding the relocation
of survey markers along the project.
Project Development and Environmental Analysis Branch / Structure Design Unit
Removal of Bridge # 137, which spans the Yadkin River, potentially results in 1,254 cubic yards
of temporary fill. NCDOT will implement Best Management Practices for Bridge Demolition
and Removal.
Upon further analysis of the amount of temporary fill resulting from bridge demolition, it was
determined that only the amount of fill from the substructure would result in temporaryfill The
likely potential amount of fill resulting from bridge demolition will be approximately 430 cubic
yards. NCDOT will implement Best Management Practices for Bridge Demolition and Removal.
Project Development and Environmental Analysis Branch
The project may have an impact on a low income community in the Williams Trailer Park area
located along 1-85, south of SR 2124 (Hackett Road). During the project development process,
no concerns have been raised by the public or local government officials concerning
environmental justice issues. NCDOT will aggressively seek participation of this low-income
community in the public involvement process.
NCDOT held two meetings with the citizens of the Williams Trailer Park. The first meeting was
held in the Spencer Town Hall on 6/19/2001, and the second meeting was held in the North
Carolina Transportation Museum on 6/24/2002. During these meetings, the design was
presented to the trailer park residents and their input and concerns, related to the project, were
obtained. In addition to these meetings, a more detailed analysis was performed to determine the
impacts to this area and the determination has been made that this project does not create impacts
related to Environmental Justice for the Williams Trailer Park.
I-2304A Permit Green Sheet Page 2 of 10
May 11, 2009
PROJECT COADUTMENTS
An on site community studies review and analysis was conducted by the NCDOT Community
Studies staff on March 6, 2009. No major area development or land use changes were observed
inside the project limits since the Design Public Hearing was held.
Project Development and Environmental Analysis Branch / Design Services Unit
Based on preliminary studies, five areas were identified as possible noise barrier locations.
These noise barriers were determined to be unreasonable, due to the cost of the noise reduction
benefits versus the cost of the abatement measures. However, the proj ect will be re-evaluated for
noise abatement measures once more detailed designs are complete.
The project was re-evaluated for noise abatement measures. Noise mitigation in the form of a
wall was analyzed for several areas along the project. For the I-2304AA section, one location,
known as Barrier Location.2, it was determined that a barrier in this location is considered
reasonable and feasible by NCDOT guidelines. Hence, a noise wall is recommended in this area.
Further coordination with the affected residents and/or businesses, will take place concerning this
proposed noise wall.
One traffic noise barrier is proposed for construction on I-2304AA and is located on the west
side ofl-85, immediately south of the 1-85 Business/1-85 interchange. the projects are proposed
to be concurrently let as Design/Build. To facilitate the Design/Build process, NCDOT will
revise the existing Design Noise Reports by using the current TNMOversion 2.5 sojhvare and
incorporating the analytical results for both project sections into one report. The proposed
noise barrier is anticipated to remain. Completion of the revised NCDOT Design Noise Report
is expected in mid-May 2009.
Proiect Development and Envirommental Analysis Branch / Design Services Unit / Construction
Unit
A roadside memorial exists within the project limits; however it is not anticipated to be impacted
by this project. This memorial, dedicated in 1929 by the North Carolina Historic Commission
which currently owns the property, was investigated for its historical significance. It was
determined that the Trading Ford Monument is not eligible for the National Register of Historic
Places. Based on this site visit and other information compiled by NCDOT, no additional
archaeological work was deemed necessary for this site. The Historic Preservation Office has
requested that the bronze plaque be returned to them if the monument has to be removed during
construction. Additionally, NCDOT will coordinate with local officials and SHPO to determine
if there is a more suitable location for the marker.
According to the current plans, the roadside memorial (Trading Ford Monument) will not be
affected by the construction of this project.
Design Services Unit / Structure Design Unit
In accordance with the FERC requirements, a Construction Permit will be issued to NCDOT
once all requested information is reviewed and approved by the FERC. The construction permit
I-2304A Permit Green Sheet Page 3 of 10
May 11, 2009
PROJECT COMAHMENTS
will contain a condition, among many others, with regard to existing bridges that NCDOT will
be required to remove all concrete down to the existing muck line so that it will not be a hazard
or act as a "catch" for floating debris.
Project Development and Environmental Analysis Branch
The biological conclusion for the Bald Eagle was revised to "Not Likely to Adversely Affect".
This conclusion was approved by the USFWS. Because eagles may potentially nest in.this area,
NCDOT will survey for bald eagles prior to construction of the project.
As of January 31, 2008, the United States Fish and Wildlife Service lists two federally protected
species for Davidson County. Those species are the bog turtle and Schweinitz's sunflower. The
USFWS lists one federally protected species for Rowan County, which is Schweinitz's sunflower.
No new species have been added by the USFWS since the completion of the E.A. however, the
bald eagle has been delisted since then. The bald eagle was officially delisted on August 8, 2007
(CFR 50 Part 17) and is still afforded protection under the Bald and Golden Eagle Protection
Act. The biological conclusion of No Effect' remains valid for the above mentioned species.
The NCDOT Natural Environment Unit will update the project Threatened or Endangered
Species Report during the fall 2009 survey window.
Commitments Developed Through Permitting
No new special conditions were developed through the permit extension. The following
commitments are from the original permit.
Section 401 Water Quality Certifications Conditions
Division 9 Roadway Environmental Unit (REU)
Sediment and erosion control measures shall not be placed in wetlands or waters to the
maximum extent practicable. If placement of sediment and erosion control devices in wetlands
and waters is unavoidable, they shall be removed and the natural grade restored within 30 days
after the project has been released.
Division 9
Stormwater management shall be constructed in accordance with the hydraulic design plans
submitted in the February 20, 2004 application.
Hydraulic Unit
The hazardous spill catch basins (I-2304AA Plan Sheet 9)sball be designed and located to afford
ready access to maintenance and emergency response personnel and equipment.
The volume of spill containment storage provided will be approximately 10,000 gallons plus the
estimated nmoffvolume from rainfall intensity equating to a two year return period event.
I-2304A Permit Green Sheet Page 4 of 10
May 11, 2009
PROJECT COMMMVIENTS
A means will be provided such that the normal free flow of runoff at the basin outlet can be
interrupted to cause containment of hazardous runoff. This can be accomplished by providing a
mechanical control gate or by constructing a minimum control section in the outlet channel. The
mechanical gate alternative will generally be utilized in areas where normal operational activities
would allow close scrutiny and control, reducing the potential for problems with vandalism.
Maintenance plans for constructed basins shall be developed in accordance with Best
Management Practices (BMPs) and good engineering practices. Additional guidance for properly
maintaining containment basins can be found at 40 CFR Part 112, § 112.7, et at. (Spill
Prevention Control and Countermeasures).
Inspections of the hazardous spill catch basin and opening/shutting of the gate should be
performed annually at a minimum, and within six (6) months after a spill incident to ensure
integrity of the catch basin.
Repairs should occur in a timely manner.
NCDOT should provide annually, a site location map of all hazardous spill catch basins and
similar devices to Federal (USEP A, USCG), DENR, State Emergency Response Coordinator,
and all applicable county and urban center response groups. -Signage indicating the presence of a
hazardous spill catch basin shall be provided
REU. Division 9
The removal of vegetation in riparian areas should be minimized. NCDOT is encouraged to use
existing on-site vegetation and materials for stream bank stabilization and to minimize the use of
rip rap. Rip rap shall not be placed in the stream bottom. Riparian vegetation, using native trees
and shrubs, must be re-established within the construction limits of the project by the end of the
growing season following completion of construction to re-establish the riparian zone and to
provide long-term erosion control.
Division 9
Culverts that are less than 48-inch in diameter should be buried to a depth equal to or greater
than 20% of their size to allow for aquatic life passage. Culverts that are 48-incb diameter or
larger should be buried at least 12 inches below the stream bottom to allow natural stream
bottom material to become established in the culvert following installation and to provide aquatic
life passage during periods of low flow. If any of the existing pipes are perched, they shall be
removed and replaced, and re-installed correctly, unless demonstrated that this is topographically
unfeasible.
PDEA
Summary of Compensatory Mitigation: Compensatory mitigation shall be the same as that
approved by the US Army Corps of Engineers, as long as the mitigation required equals a ratio
of 1:1 restoration or creation of lost wetland acres as described in 15A NCAC 211.0506 (h)(6),
and consists of the following:
I-2304APermit Green Sheet Page 5 of 10
May 11, 2009
PROJECT COMIVIITMENTS
1-2304 Section AA
• 0.02 acres of on-site riverine wetland restoration within 1-2304 Section AA.
• 2644 linear feet of stream impacts will be mitigated through NCDENR Ecosystem
Enhancement Program (EEP).
1.08 acres of impacts to non-riverine wetlands will be mitigated through EEP.
1-2304 Section AB
• 1.03 acres of on-site riverine wetland restoration within 1-2304 Section AA.
1811 linear feet of stream will be mitigated through EEP.
• 0.16 acres of impacts to non-riverine wetlands will be mitigated through EEP.
In accordance with 15A NCAC 21-0500, this contribution will satisfy NC Division of Water
Quality's compensatory mitigation requirements under 15A NCAC 2H.0506(h). Until the EEP
receives and clears NCDOTs payments, wetland or stream fill shall not occur. The payments to
EEP shall be sent within two (2) months of issuance of the 404 permit.
Division 9 Design Services Unit Hydraulics Unit
Two copies of the final construction drawings shall be fiunished to NCDWQ prior to the pre-
construction meeting. Written verification shall be provided that the final construction drawings
comply with the permit drawings contained in the Application dated February 20, 2004 and May
11, 2004.
Division 9
The dimension, pattern and profile of the stream above and below the crossing should not be
modified by widening the stream channel or reducing the depth of the stream. Disturbed
floodplains and streams should be restored to natural geomorphic conditions. All stream
relocation and restoration activities shall comply with the final natural channel design plans
approved by the NC Division of Water Quality.
Division 9. REU
All channel relocations will be constructed in a dry work area, and stabilized before stream flows
are diverted. Channel relocations will be completed and stabilized prior to diverting water into
the new channel. Wherever possible, channel relocations shall be allowed to stabilize for an
entire growing season. Vegetation used for bank stabilization shall be limited to native woody
species, and should include establishment of a 30 foot wide wooded and adjacent 20 foot wide
vegetated buffet on both sides of the relocated channel to the maximum extent practical- A
transitional phase incorporating
coir fiber and seedling establishment is allowable. Also, rip-rap may be allowed if it is
necessary to maintain the physical integrity of the stream, but NCDOT must provide
I-2304A Permit Green Sheet Page 6 of 10
May 11, 2009
PROJECT COMN UTMENTS
written justification and any calculations used to determine the extent of rip-rap
coverage requested. ,
All temporary fills in wetlands and surface waters shall be removed upon completion of
the project. In addition, the post-construction removal of any temporary bridge
structures or fill will need to return the project site to its pre-construction contours and
elevations. The revegetation of the impacted areas with appropriate native species will,
be required.
Section 404 Individual Permit Conditions
Comnliance With Plans
Division 9 Desim Services Unit
All work must be performed in strict compliance with the plans, which are a part of the
Section 404 permit. Any modification to the permit plans must be approved by the US
Army Corps of Engineers (USACE) prior to implementation.
Construction Plans
NCDOT will ensure that the construction design plans for this project do not deviate
from the permit plans. Written verification shall be provided that the final construction
drawings comply with the attached permit drawings prior to any active construction in
waters of the United States, including wetlands _ Any deviation in the construction
design plans will be brought to the attention of the Corps of Engineers, Raleigh
Regulatory Field Office prior to any active construction in waters or wetlands.
Sedimentation and Erosion Control Measures
Division 9. REU
NCDOT shall remove all sediment and erosion control measures placed in wetlands or
waters,, and shall restore natural grades in those areas, prior to project completion .
Mitigation
PDEA
NCDOT shall mitigate for 2.29 acres of wetland impacts, and 4,455 linear feet of impact
to streams with important aquatic function, for this project, as described below (1.05
acres of riverine bottomland hardwood wetland restoration at the Yadkin River Swamp
Hardwoods Restoration Mitigation Site, and 2.48 acres of restoration equivalent nonriverine
wetlands, and 8,910 linear feet of restoration equivalent warm water stream
channel, through the North Carolina Ecosystem Enhancement Program (EEP), in the
Yadkin River basin (Cataloging Unit 03040103).
I-2304A Permit Green Sheet Page 7 of 10
May 11, 2009
PROJECT COMMITMENTS
YADKIN RIVER SWAMP HARDWOODS RESTORATION MITIGATION SITE
PDEA. Division 9= Roadside Environmental Unit
NCDOT shall implement the compensatory wetland mitigation plan entitled
"Restoration Plan for Swamp Hardwoods Wetlands At Existing Bridge Causeway of the
1-85 Yadkin River In Rowan County", dated July 12,2004, to provide the restoration
described in conditions below. NCDOT shall complete grading for the mitigation within
one year of demolition of the existing 1-85Yadkin River bridge, and complete planting
of the site within the first planting season (November 15 to March 15) after grading is
completed. NCDOT shall contact the Corps of Engineers, Raleigh Regulatory Field
Office NCDOT Regulatory Project Manager, a minimum of sixty days before
completion of grading at the mitigation site, and inform the Project Manager of the
expected completion date of the grading.
NCDOT shall mitigate for 1.05 acres of unavoidable impacts to riverine bottomland
hardwood forest wetlands associated with this project with 1.05 acres of riverine
bottomland hardwood forest wetland restoration, at the Yadkin River Swamp
Hardwoods Restoration Mitigation Site (Yadkin Site).
NCDOT will do a boundary survey of the 1.05 acres of wetland restoration at the
Yadkin Site, and submit a copy of the survey to the District Engineer within 90 days
after construction of the site is completed.
NCDOT will monitor the site vegetation between June I and November 30, inclusively,
of each year, and document plant mortality and stress. A minimum of one 0.05-acre
sample plots will be established within the 1.05 acre restoration area, and will be placed
randomly within a representative position..NCDOT will continue monitoring of the
planting area annually until the specified performance criteria is met, as described
below.
YADKIN SUE MITIGATION MONITORING
PDEA Division 9 Roadside Environmental Unit
Performance criteria for tree planting areas will be met if sample plots demonstrate that
for each of the first three complete years of monitoring, 320 target-species trees per acre
have survived, such that at the end of three years, 320 three-year old target-species trees
per acre have survived on the site, and, in years four and five, 288 and 260 trees per
acre, respectively, have survived on the site, such that at the end of year five, 260 five year
old target-species trees per acre have survived on the site.
If for any monitoring year, vegetation survival is not favorable, as determined by the
Corps of Engineers, any remedial action required by the Corps of Engineers will be
performed, the required restoration areas will be replanted , and the five-year monitoring
I-2304A Permit Green Sheet Page 8 of 10
May 11, 2009
PROJECT COINMTAIENTS
period will begin again with year one.
GENERAL WETLANDS ATIGATION
PDEA, Division 9
NCDOT and subsequent property owners shall maintain the Yadkin Site in its natural
condition, as altered by work in the mitigation plan, in perpetuity. Prohibited activities
within the mitigation site specifically include; but are not limited to: the construction or
placement of roads, walkways, buildings, signs, or structures of any kind (i.e.
billboards, interior fences, etc.); filling, grading, excavation, leveling, or any other earth
moving activity or activity that may alter the drainage patterns on the property; the
cutting, mowing, destruction, removal, or other damage of any vegetation; disposal or
storage of any debris, trash, garbage, or other waste material; except as may be
authorized by the mitigation plans, or subsequent modifications that are approved by the
Corps of Engineers. In addition, NCDOT shall take no action, whether on or off the
mitigation property, which will adversely impact the wetlands on the mitigation
property, except as specifically y authorized by this permit, or subsequent modifications
that are approved by the Corps of Engineers.
NCDOT shall make every effort to convey the Yadkin Site property to a nonprofit
conservation organization or a natural resource agency, which is willing to hold the
areas in perpetuity for conservation purposes, and which is acceptable to the Corps of
Engineers. The annual monitoring reports, as required, will include the status of the
conveyance efforts.
NCDOT shall not sell or otherwise convey any interest in the property used to satisfy
mitigation requirements for this permit, to any third party, without 10 days prior
notification to Wilmington District Corps of Engineers in writing, which writing shall
reference this permit Action ID number.
Any sale, lease, or other conveyance of the mitigation site property shall include
restrictions on the use of the property as described in conditions above, which conditions
shall be enforced by the North Carolina Department of Transportation. Such restrictions
shall include language providing for third party enforcement rights in favor of the Corps
of Engineers. Such restrictions must be approved prior to conveyance by the Corps of
Engineers.
GENERAL MITIGATION
PDEA
NCDOT shall contact the Corps of Engineers, Raleigh Regulatory Field Office NCDOT
Regulatory Project Manager, to provide that individual with the opportunity to attend the
yearly mitigation monitoring efforts.
NC-EEP STREAM AND WETLAND MITIGATION:
I-2304A Permit Green Sheet Page 9 of 10
May 11, 2009
PROJECT COMMTMENTS
Compensatory mitigation for the unavoidable impacts to 1.24 acres of non-riverine
wetland s, and 4,455 linear feet of stream associated with the proposed project shall be
provided by the Ecosystem Enhancement Program (EEP), as outlined in the letter dated
April 30, 2004 from William D. Gilmore, EEP Transition Manager. Pursuant to the
EEP Memorandum of Agreement (MOA) between the State of North Carolina and the
US Army Corps of Engineers signed on July 22, 2003, the EEP will provide 2.48 acres
of restoration equivalent non-riverine wetlands, and 8,910 linear feet of restoration
equivalent warm water stream channel in the Yadkin River basin (Cataloging Unit
03040103) by one year of the date of this permit. For wetlands, a minimum of 1:1
(impact to mitigation) must be in the form of wetland restoration. The NCDOT shall,
within 30 days of the issue date of this permit, certify that sufficient fiords have been
provided to EEP to complete the required mitigation, pursuant to Paragraph V. of the
MOA.
Navigation
Division 9 Hydraulics Unit. Structure Design Unit
The authorized fill and structures, and associated activities, in the Yadkin River must not
interfere with the public's right to free navigation on the river. No attempt will be made
by NCDOT to prevent the full and free use by the public of the river at or adjacent to the
authorized work for reason other than safety. NCDOT shall not modify the des ign of
the temporary work bridges to provide an unobstructed main channel lgss than fifty feet
wide, with no vertical structural obstructions from the work bridges extending into the
opening.
Construction Plans
Division 9 Hydraulics Unit. Design Services Unit
Prior to commencing construction within jurisdictional waters of the United States,
NCDOT shall forward the latest version of project construction drawings to the USACE,
Raleigh Regulatory Field Office NCDOT Regulatory Project Manager. Half-size
drawings are acceptable.
Historic Property
Division 9. PDEA
NCDOT shall leave Bridge No. 46, which currently carries US 29-70 over the Yadkin
River in the southbound direction; in place, due to its historical significance. NCDOT
shall close the bridge to vehicular traffic, but it will serve pedestrian and bicycle traffic.
NCDOT shall work out ownership and maintenance responsibilities with the Rowan and
Davidson County Commissioners, the Transportation Museum, and the North Carolina
State Historic Preservation Office
I-2304A Permit Green Sheet Page 10 of 10
May 11, 2009