HomeMy WebLinkAbout20081754 Ver 1_Site Inspection_201101140 `1
A=.
?_
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
„
Beverly Eaves Perdue Colleen H. Sullins Deb Freeman
Governor - Director Secretary
January 14, 2011
Mr. J. B. Setzer. P.E.
Division 14 Engineer
N.C. Department of Transportation_
253 Webster Road
Sylva, North Carolina 28779
Subject: Inspection
US Highway 25
DWQ Project 08-1754
TIP No. R-505
Henderson County
Dear Mr. Setzer:
On January 6, 2011, 1 inspected the construction work on US Highway 25 between Interstate 26 and NC
Highway 225 in Henderson County. Most all of the construction work is taking place at the south end of the
project around the bridge construction and in the median between lanes.
The inspection found that'recent rains had impacted the area with sediment loss mainly located in roadway
ditches and embankments. Some sediment and erosion control devices were affected by these rain events.
Please ensure that all sediment and erosion control structures are repaired and maintained and that seeding and
mulching are performed as needed to protect downstream waters. All sediment and erosion control devices
should be checked and maintained prior to closing down construction operations for the season. Please refer to
the attached copy of the inspection report for additional comments regarding the inspection.
If you have questions, please call me at 828-296-4500.
Sincerely,
Michael R. Parker
Environmental Senior Specialist
Attachment
cc: Aaron Powell
Mark Davis, Division 14, DEO
Ed Ingle, Roadside Environmental
Transportation Permitting Unit -
Mike Parker, Asheville Regional Office
US 25 1nspection1etter January2011 •,.
SURFACE WATER PROTECTION SECTION -Asheville Regional Office
2090 U.S. 70 Highway, Swannanoa, NC 28778211
Phone: 828-296-05001 FAX : 828-299-7043
Customer Service: 1-877£23-6748
Internet: www.ncwaterQuality.org
An Equal Opportunity 1 Affirmative Action Employer
NorthCarolina
Nahmallp,
DWO Site Visits for DOT Projects
Field Sheet
DWQ representative: Michael R. Parker Date: January 6, 2011
County: Henderson Region: Asheville
DOT Division: Division 14
Activity: X 401 Compliance Evaluation ? Complaint
?DWQ Follow Up Evaluation ? Other
DWQ 4014: 08-1754 NW Permit #. IP #:
Project Name: U S Highway 25-1-26 Connector R-505
Location of Project: U S Highway 25 from NC 225 near Zirconia to Interstate 26 in Henderson County
Project Complete: ?Yes X No If no, estimated date of completion
X? Culvert
? Bottomless Culvert
? Bottomless Arch
X? Riprap Inlet/Outlet Stabilization
? Spoil Pile
? Borrow Pit
? Wetland Mitigation
? Stream Restoration
? On-site Stream Relocation
? Buffer Restoration
X? Bank Stabilization
? Other
Additional Wetland Impacts: ? yes
Water Ouality Concerns (DWQ):
? Steam Standards Violation
X? Turbidity
? Evidence of spills
? Oil/Petroleum
? Solid Waste
? Failed E & S control measures
X? Sedimentation Impacts
? Stormwater Permit Violation
X? Fill
? Buffer Impacts (see below)
? Other
X? no
? Zone 1 Est Acres
Additional Stream Impacts: ? yes X? no
Estimated Acres
? Zone 2 Est Acres
Est Linear feet
Estimated linear feet of impact:
Buffer Impacts: ?Neuse ?Tar-Pam ?Randleman ?Catawba
Zone 1: ?Yes ?No Est linear ft/ acreage of buffer impact ac
Zone 2: ?Yes ?No Est linear ft/ acreage of buffer impact ft/ ac
Buffer Designation: ?Exempt ?Allowable ?Allowable w/mitigation ?Prohibited
Name of Waterway(s):
DWO Site Visits for DOT Projects
Background Info
Laurel Creek, Green River, Bat Fork, King Creek, Freeman Creek,
Lake Summit, Hill Branch, Jones Branch, Mill Creek, Laurel Branch,
Jones Creek
Basin/ Subbasin: Broad 030501
Wetland Type: ?Isolated x?Non-Isolated (Waters of US)
Stream Class: ?Class B ?303d Listed ?WS-II ?WS-V ?SB
X?Class C ?ORW X?Trout ?WS-III ?NSW
X?HQW ?WS-I ?WS-fV ?SA ?CA
Type of Authorized Impact: X?Culvert ?Bottomless Culvert
?Bridge ?Bottomless Arch
X?Riprap Inlet/Outlet Stabilization X?Fill
Authorized Wetland Impacts: X?0- I/10'h acre
?1/3`d to 1.0 acre
Authorized Stream Impacts: ?< 150 linear feet
Additional comments:
?1/11's to 1/3`d acre
?> 1.0 acre
X?> 150 linear feet 1,346 linear feet
Recent rains resulted in loss of sediment in several areas. Most areas affected were ditch lines and
embankments.
Most all of the construction work is on the south end of the project at the bridge or associated with pipe work in.
the median and north side of US Highway 25.
Repair and maintain all sediment and erosion control devices.
Continue with seeding and matting as required to protect State surface waters.
Ensure that all sediment and erosion control devices are checked and maintained prior to closing construction
operations for the season.
-US Highwav 25 Inspection January 2011