Loading...
HomeMy WebLinkAbout20081754 Ver 1_Site Inspection_201101140 `1 A=. ?_ NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality „ Beverly Eaves Perdue Colleen H. Sullins Deb Freeman Governor - Director Secretary January 14, 2011 Mr. J. B. Setzer. P.E. Division 14 Engineer N.C. Department of Transportation_ 253 Webster Road Sylva, North Carolina 28779 Subject: Inspection US Highway 25 DWQ Project 08-1754 TIP No. R-505 Henderson County Dear Mr. Setzer: On January 6, 2011, 1 inspected the construction work on US Highway 25 between Interstate 26 and NC Highway 225 in Henderson County. Most all of the construction work is taking place at the south end of the project around the bridge construction and in the median between lanes. The inspection found that'recent rains had impacted the area with sediment loss mainly located in roadway ditches and embankments. Some sediment and erosion control devices were affected by these rain events. Please ensure that all sediment and erosion control structures are repaired and maintained and that seeding and mulching are performed as needed to protect downstream waters. All sediment and erosion control devices should be checked and maintained prior to closing down construction operations for the season. Please refer to the attached copy of the inspection report for additional comments regarding the inspection. If you have questions, please call me at 828-296-4500. Sincerely, Michael R. Parker Environmental Senior Specialist Attachment cc: Aaron Powell Mark Davis, Division 14, DEO Ed Ingle, Roadside Environmental Transportation Permitting Unit - Mike Parker, Asheville Regional Office US 25 1nspection1etter January2011 •,. SURFACE WATER PROTECTION SECTION -Asheville Regional Office 2090 U.S. 70 Highway, Swannanoa, NC 28778211 Phone: 828-296-05001 FAX : 828-299-7043 Customer Service: 1-877£23-6748 Internet: www.ncwaterQuality.org An Equal Opportunity 1 Affirmative Action Employer NorthCarolina Nahmallp, DWO Site Visits for DOT Projects Field Sheet DWQ representative: Michael R. Parker Date: January 6, 2011 County: Henderson Region: Asheville DOT Division: Division 14 Activity: X 401 Compliance Evaluation ? Complaint ?DWQ Follow Up Evaluation ? Other DWQ 4014: 08-1754 NW Permit #. IP #: Project Name: U S Highway 25-1-26 Connector R-505 Location of Project: U S Highway 25 from NC 225 near Zirconia to Interstate 26 in Henderson County Project Complete: ?Yes X No If no, estimated date of completion X? Culvert ? Bottomless Culvert ? Bottomless Arch X? Riprap Inlet/Outlet Stabilization ? Spoil Pile ? Borrow Pit ? Wetland Mitigation ? Stream Restoration ? On-site Stream Relocation ? Buffer Restoration X? Bank Stabilization ? Other Additional Wetland Impacts: ? yes Water Ouality Concerns (DWQ): ? Steam Standards Violation X? Turbidity ? Evidence of spills ? Oil/Petroleum ? Solid Waste ? Failed E & S control measures X? Sedimentation Impacts ? Stormwater Permit Violation X? Fill ? Buffer Impacts (see below) ? Other X? no ? Zone 1 Est Acres Additional Stream Impacts: ? yes X? no Estimated Acres ? Zone 2 Est Acres Est Linear feet Estimated linear feet of impact: Buffer Impacts: ?Neuse ?Tar-Pam ?Randleman ?Catawba Zone 1: ?Yes ?No Est linear ft/ acreage of buffer impact ac Zone 2: ?Yes ?No Est linear ft/ acreage of buffer impact ft/ ac Buffer Designation: ?Exempt ?Allowable ?Allowable w/mitigation ?Prohibited Name of Waterway(s): DWO Site Visits for DOT Projects Background Info Laurel Creek, Green River, Bat Fork, King Creek, Freeman Creek, Lake Summit, Hill Branch, Jones Branch, Mill Creek, Laurel Branch, Jones Creek Basin/ Subbasin: Broad 030501 Wetland Type: ?Isolated x?Non-Isolated (Waters of US) Stream Class: ?Class B ?303d Listed ?WS-II ?WS-V ?SB X?Class C ?ORW X?Trout ?WS-III ?NSW X?HQW ?WS-I ?WS-fV ?SA ?CA Type of Authorized Impact: X?Culvert ?Bottomless Culvert ?Bridge ?Bottomless Arch X?Riprap Inlet/Outlet Stabilization X?Fill Authorized Wetland Impacts: X?0- I/10'h acre ?1/3`d to 1.0 acre Authorized Stream Impacts: ?< 150 linear feet Additional comments: ?1/11's to 1/3`d acre ?> 1.0 acre X?> 150 linear feet 1,346 linear feet Recent rains resulted in loss of sediment in several areas. Most areas affected were ditch lines and embankments. Most all of the construction work is on the south end of the project at the bridge or associated with pipe work in. the median and north side of US Highway 25. Repair and maintain all sediment and erosion control devices. Continue with seeding and matting as required to protect State surface waters. Ensure that all sediment and erosion control devices are checked and maintained prior to closing construction operations for the season. -US Highwav 25 Inspection January 2011