HomeMy WebLinkAbout20081327 Ver 1_Site Inspection_20110114
Beverly Eaves Perdue
Governor
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Coleen H. Sullins
Director
January 14, 2011
Mr. J. B. Setzer, P.E.
Division 14 Engineer
N.C. Department of Transportation
253 Webster Road
Sylva, North Carolina 28779
Subject: Inspection
NCSR 1783 Upward Road
DWQ Project 08-1327
TIP No. R-4430
Henderson County
Dear Mr. Setzer:
C) ?
• Dee Freeman
Secretary
On January 6, 2010, I inspected the construction work on Upward Road between US Highway 176 and
Howard Gap Road in Henderson County. Construction work is now taking place all along Upward Road
between Howard Gap Road and US Highway 176.
Rains have resulted in sediment and erosion control structures being impacted and the off-site loss of sediment
in some areas. Please ensure that all sediment and erosion control structures are repaired and maintained and
that any off-site sediment is removed. Seeding and mulching should be performed as needed, to protect
downstream waters.
Please refer to the attached copy of the inspection report for additional comments regarding the inspection.
If you have questions, please call me at 828-296-4500.
Sincerely,
Jz p?
Michael R. Parker
Environmental Senior Specialist
Attachment
cc: Aaron Powell
Mark Davis, Division 14, DEO ,
Ed Ingle, Roadside Environmental
Transportation Permitting Unit
Mike Parker, Asheville Regional Office
Upward Road R-4430 Inspection Lette' ijznuary 2011'
SURFACE WATER PROTECTION SECTION - Asheville Regional Office
2090 U.S. 70 Highway, Swannanoa, NC 28778-8211
Phone: 828-2964500 I FAX: 828-299.7043
Customer Service: 1-877-623-6748
Internet: wvvw.ncwatemualitj.om
An Equal Opportunity I Affirmative Action Employer
NorthCarolina
Naturally
DW Site Visits for DOT Projects
Field Sheet
DWQ representative: Michael R. Parker Date: January 6, 2011
County: Henderson Region: Asheville
DOT Division: Division 14
Activity: X 401 Compliance Evaluation ? Complaint
?DWQ Follow Up Evaluation ? Other
DWQ 40141 08-1327 NW Permit # 13, 12,14 IP #:
Project Name:
Location of Project:
Upward Road Widening Project R4430
Upward Road (NCSR 1783) between US Highway 176 and Howard Gap Road
Project Complete: ?Yes X No
Activities (DOT):
X? Bridge
X? Culvert
? Bottomless Culvert
? Bottomless Arch
X? Riprap Inlet/Outlet Stabilization
? Spoil Pile
? Borrow Pit
? Wetland Mitigation
? Stream Restoration
? On-site Stream Relocation
? Buffer Restoration
X? Bank Stabilization
? Other
If no, estimated date of completion:
Water Ouality Concerns (DWO):
? Steam Standards Violation
X? Turbidity
? Evidence of spills
? Oil/Petroleum
? Solid Waste
? Failed E & S control measures
X? Sedimentation Impacts
? Stormwater Permit Violation
X? Fill
? Buffer Impacts (see below)
? Other
Additional Wetland Impacts: ? yes X? no Estimated Acres
? Zone I Est Acres ? Zone 2 Est Acres
Additional Stream Impacts: ? yes X? no Est Linear feet
Estimated linear feet of impact:
Buffer Impacts: ?Neuse ?Tar-Pam ?Randleman ?Catawba
Zone 1: ?Yes ?No Est linear ft/ acreage of buffer impact ac
Zone 2: ?Yes ?No Est linear ft/ acreage of buffer impact ft/ ac
Buffer Designation: ?Exempt ?Allowable ?Allowable w/mitigation ?Prohibited
Name of Waterway(s):
DWO Site Visits for DOT Projects
Background Info
Bat Fork Creek and tributaries, tributary to Dunn Creek and tributaries
to King Creek
Basin/ Subbasin: French Broad 040302
Wetland Type: ?Isolated x?Non-Isolated (Waters of US)
Stream Class: ?Class B ?303d Listed ?WS-II ?WS-V ?SB
X?Class C ?ORW ?Trout ?WS-III ?NSW
?HQW ?WS-I ?WS-IV ?SA ?CA
Type of Authorized Impact: X?Culvert ?Bottomless Culvert
?Bridge ?Bottomless Arch
X?Riprap Inlet/Outlet Stabilization X?Fi11
Authorized Wetland Impacts: X?0 - 1/1 Od' acre
? 1 /3 `d to 1.0 acre
Authorized Stream Impacts: ?< 150 linear feet
Additional comments:
?1/1Id'to 1/3`d acre 0.1 acre
?> 1.0 acre
X?> 150 linear feet 891 linear feet
Reviewed project with DOT staff.
Recent rains have resulted in sediment and erosion control structures being impacted and the off-site sediment
loss in several locations. Any off-site sediment should be removed.
Remove silt in ditches along Upward Road near Bat Fork Creek.
Place rip rap on slopes at culvert outlet near US 176.
Repair and maintain all erosion control devices and continue with seeding and matting as required to protect
State surface waters.
Upward Road R4430 Inspection January 2011 ; . G