Loading...
HomeMy WebLinkAbout20081327 Ver 1_Site Inspection_20110114 Beverly Eaves Perdue Governor NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Coleen H. Sullins Director January 14, 2011 Mr. J. B. Setzer, P.E. Division 14 Engineer N.C. Department of Transportation 253 Webster Road Sylva, North Carolina 28779 Subject: Inspection NCSR 1783 Upward Road DWQ Project 08-1327 TIP No. R-4430 Henderson County Dear Mr. Setzer: C) ? • Dee Freeman Secretary On January 6, 2010, I inspected the construction work on Upward Road between US Highway 176 and Howard Gap Road in Henderson County. Construction work is now taking place all along Upward Road between Howard Gap Road and US Highway 176. Rains have resulted in sediment and erosion control structures being impacted and the off-site loss of sediment in some areas. Please ensure that all sediment and erosion control structures are repaired and maintained and that any off-site sediment is removed. Seeding and mulching should be performed as needed, to protect downstream waters. Please refer to the attached copy of the inspection report for additional comments regarding the inspection. If you have questions, please call me at 828-296-4500. Sincerely, Jz p? Michael R. Parker Environmental Senior Specialist Attachment cc: Aaron Powell Mark Davis, Division 14, DEO , Ed Ingle, Roadside Environmental Transportation Permitting Unit Mike Parker, Asheville Regional Office Upward Road R-4430 Inspection Lette' ijznuary 2011' SURFACE WATER PROTECTION SECTION - Asheville Regional Office 2090 U.S. 70 Highway, Swannanoa, NC 28778-8211 Phone: 828-2964500 I FAX: 828-299.7043 Customer Service: 1-877-623-6748 Internet: wvvw.ncwatemualitj.om An Equal Opportunity I Affirmative Action Employer NorthCarolina Naturally DW Site Visits for DOT Projects Field Sheet DWQ representative: Michael R. Parker Date: January 6, 2011 County: Henderson Region: Asheville DOT Division: Division 14 Activity: X 401 Compliance Evaluation ? Complaint ?DWQ Follow Up Evaluation ? Other DWQ 40141 08-1327 NW Permit # 13, 12,14 IP #: Project Name: Location of Project: Upward Road Widening Project R4430 Upward Road (NCSR 1783) between US Highway 176 and Howard Gap Road Project Complete: ?Yes X No Activities (DOT): X? Bridge X? Culvert ? Bottomless Culvert ? Bottomless Arch X? Riprap Inlet/Outlet Stabilization ? Spoil Pile ? Borrow Pit ? Wetland Mitigation ? Stream Restoration ? On-site Stream Relocation ? Buffer Restoration X? Bank Stabilization ? Other If no, estimated date of completion: Water Ouality Concerns (DWO): ? Steam Standards Violation X? Turbidity ? Evidence of spills ? Oil/Petroleum ? Solid Waste ? Failed E & S control measures X? Sedimentation Impacts ? Stormwater Permit Violation X? Fill ? Buffer Impacts (see below) ? Other Additional Wetland Impacts: ? yes X? no Estimated Acres ? Zone I Est Acres ? Zone 2 Est Acres Additional Stream Impacts: ? yes X? no Est Linear feet Estimated linear feet of impact: Buffer Impacts: ?Neuse ?Tar-Pam ?Randleman ?Catawba Zone 1: ?Yes ?No Est linear ft/ acreage of buffer impact ac Zone 2: ?Yes ?No Est linear ft/ acreage of buffer impact ft/ ac Buffer Designation: ?Exempt ?Allowable ?Allowable w/mitigation ?Prohibited Name of Waterway(s): DWO Site Visits for DOT Projects Background Info Bat Fork Creek and tributaries, tributary to Dunn Creek and tributaries to King Creek Basin/ Subbasin: French Broad 040302 Wetland Type: ?Isolated x?Non-Isolated (Waters of US) Stream Class: ?Class B ?303d Listed ?WS-II ?WS-V ?SB X?Class C ?ORW ?Trout ?WS-III ?NSW ?HQW ?WS-I ?WS-IV ?SA ?CA Type of Authorized Impact: X?Culvert ?Bottomless Culvert ?Bridge ?Bottomless Arch X?Riprap Inlet/Outlet Stabilization X?Fi11 Authorized Wetland Impacts: X?0 - 1/1 Od' acre ? 1 /3 `d to 1.0 acre Authorized Stream Impacts: ?< 150 linear feet Additional comments: ?1/1Id'to 1/3`d acre 0.1 acre ?> 1.0 acre X?> 150 linear feet 891 linear feet Reviewed project with DOT staff. Recent rains have resulted in sediment and erosion control structures being impacted and the off-site sediment loss in several locations. Any off-site sediment should be removed. Remove silt in ditches along Upward Road near Bat Fork Creek. Place rip rap on slopes at culvert outlet near US 176. Repair and maintain all erosion control devices and continue with seeding and matting as required to protect State surface waters. Upward Road R4430 Inspection January 2011 ; . G