HomeMy WebLinkAbout20081327 Ver 1_Site Inspection_20101122North Carolina
Beverly Eaves Perdue
Governor
NCDENR
Department of Environment and
Division of Water Quality
Coleen H. Sullins
Director
November 22, 2010
Mr. J. B. Setzer, P.E.
Division 14 Engineer
N.C. Department of Transportation
253 Webster Road
Sylva, North Carolina 28779
Natural Resources
Dee Freeman
Secretary
Subject: Inspection
NCSR 1783 Upward Road
DWQ Project 08-1327
TIP No. R-4430
Henderson County
Dear Mr. Setzer:
On November 4, 2010, 1 inspected the construction work on Upward Road between US Highway 176 and
Howard Gap Road in Henderson County. Construction work continues at various places along Upward Road
and work on the culvert near US Highway 176 is progressing.
Sediment and erosion control measures appeared to be in good condition. Please ensure that all sediment and
erosion control structures are maintained and that seeding and mulching are performed as needed to protect
downstream waters. Please refer to the attached copy of the inspection report for additional comments
regarding the inspection.
If you have questions, please call me at 828-296-4500.
Sincerely,
Michael R. Parker
Environmental Senior Specialist
Attachment
cc: Aaron Powell
Mark Davis, Division 14, DEO
Ed Ingle, Roadside Environmental
ansportation Permitting Unit
2Mike Parker, Asheville Regional Office
Upward Road R-4430 Inspection Letter November 2010
SURFACE WATER PROTECTION SECTION -Asheville Regional Office
2090 U.S. 70 Highway, Swannanoa, NC 28778-8211
Phone: 828-296-45001 FAX : 828-299-7043
Customer Service: 1-877-623-6748
Internet: www.ncwaterguality.org
An Equal Opportunity 1 Affirmative Action Employer
NorthCarolina
Naturally
DWQ Site Visits for DOT Proiects
Field Sheet
DWQ representative: Michael R. Parker Date: November 4, 2010
County: Henderson Region: Asheville
DOT Division: Division 14
Activity: X 401 Compliance Evaluation
?DWQ Follow Up Evaluation
? Complaint
? Other
DWQ 401 #: OS-1327 NW Permit # 13, 12, 14 IP #:
Project Name: Upward Road Widening Proiect R-4430
Location of Project:
Upward Road (NCSR 1783) between US Highway 176 and Howard Gap Road
Project Complete: ?Yes X No
XU Bridge
X? Culvert
? Bottomless Culvert
? Bottomless Arch
X? Riprap Inlet/Outlet Stabilization
? Spoil Pile
? Borrow Pit
? Wetland Mitigation
? Stream Restoration
? On-site Stream Relocation
? Buffer Restoration
X? Bank Stabilization
? Other
If no, estimated date of completion:
U Steam Standards Violation
X? Turbidity
? Evidence of spills
? Oil/Petroleum
? Solid Waste
? Failed E & S control measures
X? Sedimentation Impacts
? Stormwater Permit Violation
X? Fill
? Buffer Impacts (see below)
? Other
Additional Wetland Impacts: ? yes X? no Estimated Acres
? Zone 1 Est Acres ? Zone 2 Est Acres
Additional Stream Impacts: ? yes X? no Est Linear feet
Estimated linear feet of impact:
Buffer Impacts: ?Neuse []Tar-Pam []Randleman []Catawba
Zone 1: ?Yes ?No Est linear ft/ acreage of buffer impact f? ac
Zone 2: ?Yes ?No Est linear ft/ acreage of buffer impact ft/ ac
Buffer Designation: []Exempt []Allowable []Allowable w/mitigation []Prohibited
DWO Site Visits for DOT Projects
Background Info
Name of Waterway(s):
Bat Fork Creek and tributaries, tributary to Dunn Creek and tributaries
to King Creek
Basin/ Subbasin: French Broad 040302
Wetland Type: []Isolated x?Non-Isolated (Waters of US)
Stream Class: []Class B ?303d Listed ?WS-II []WS-V ?SB
X?Class C ?ORW []Trout ?WS-III []NSW
?HQW ?WS-I ?WS-IV ?SA ?CA
Type of Authorized Impact: X?Culvert []Bottomless Culvert
[]Bridge []Bottomless Arch
X?Riprap Inlet/Outlet Stabilization X[]Fill
Authorized Wetland Impacts: X?0- 1/10e acre ?1/1In'to 1/3`d acre 0.1 acre
?1/3 dto 1.0 acre ?> 1.0 acre
Authorized Stream Impacts: ?< 150 linear feet X?> 150 linear feet 891 linear feet
Additional comments:
Reviewed project with DOT staff.
Seeding and/or matting should be performed as areas are graded.
Maintain erosion control devices and continue with seeding and matting as required to protect State surface
waters.
Construction work on the culvert is progressing on culvert near US 176.
The stormwater control pond appears to be complete.
Upward Road R-4430 Inspection November 2010
Beverly Eaves Perdue
Governor
ATA
NCDENR
\'"@ (3-z
y
oJ4`y� 0/J
North Carolina Department of Environment and Natural Resources % 9 of
o
�ee Free
Secretary
Mr. J. B. Setzer, P.E.
Division 14 Engineer
N.C. Department of Transportation
253 Webster Road
Sylva, North Carolina 28779
Dear Mr. Setzer:
Division of Water Quality
Coleen H. Sullins
Director
July 27, 2010
Subject: Inspection
NCSR 1783 Upward Road
DWQ Project 08-1327
TIP No. R-4430
Henderson County
On July 20, 2010,' I inspected the construction work on Upward Road between US Highway 176 and Howard
Gap Road in Henderson County. Most of the construction was taking place between Interstate 26 and Howard
Gap Road.
Sediment and erosion control were being installed during the inspection. Please ensure that all sediment and
erosion control structures are maintained and that seeding and mulching are performed as needed to protect
downstream waters. Please refer to the attached copy of the inspection report for additional comments
regarding the inspection.
If you have questions. please call me at 828-296-4500.
Sincerely,
Michael R. Parker
Environmental Senior Specialist
Attachment
cc: David Baker, USACE, Asheville Field Office.
Aaron Powell
Mark Davis, Division 14, DEO
Ed Ingle, Roadside Environmental
Transportation Permitting Unit
Mike Parker, Asheville Regional Office
Upward Road R-4430 Inspection Letter July 2010
SURFACE WATER PROTECTION SECTION — Asheville Regional Office
2090 U S 70 Highway Swannanoa. NC 28778-8211
Phone 828-296-45001 FAX 828-299-7043
Customer Service 1-877-623-6748
Internet www ncwaterquality.orq
An Equal Opportunity Affirmative Action Employer
One
NorthCarolina
Naturally
DWQ representative:
County:
DOT Division:
DWQ Site Visits for DOT Projects
Field Sheet
Michael R. Parker
Henderson
Division 14
Activity: X 401 Compliance Evaluation
fDWQ Follow Up Evaluation
DWQ 401 #:
08-1327
Project Name:
Location of Project:
NW Permit #:
Date:
Region:
July 20, 2010
Asheville
n Complaint
❑ Other
IP #:
13, 12, 14
Upward Road Widening Project R-4430
Upward Road (NCSR 1783) between US Highway 176 and Howard Gap Road
Project Complete: nYes X No
Activities (DOT):
XI I Bridge
X❑ Culvert
Bottomless Culvert
n Bottomless Arch
X❑ Riprap Inlet/Outlet Stabilization
I I Spoil Pile
❑ Borrow Pit
n Wetland Mitigation
Stream Restoration
❑ On -site Stream Relocation
n Buffer Restoration
XI I Bank Stabilization
n Other
II
Additional Wetland Impacts:
❑ Zone 1 Est Acres
Additional Stream Impacts: n yes
Estimated linear feet of impact:
Buffer Impacts: nNeuse
Zone I: ['Yes f No
Zone 2: I (Yes [JNo
❑ yes
If no, estimated date of completion:
Water Quality Concerns (DWQ):
Steam Standards Violation
XE Turbidity
❑ Evidence of spills
❑ Oil/Petroleum
❑ Solid Waste
❑ Failed E & S control measures
X❑ Sedimentation Impacts
Stormwater Permit Violation
XI I Fill
n Buffer impacts (see below)
PI Other
XTIno
II
Estimated Acres
Zone 2 Est Acres
XI I no Est Linear feet
Buffer Designation:
C
Tar -Pam nRandleman
Est linear ft/ acreage of buffer impact
Est linear ft/ acreage of buffer impact
❑Catawba
ft/ ac
ft/ ac
Exempt nAllowable [knowable w/mitigation ❑Prohibited
Name of Waterway(s):
Basin/ Subbasin:
DWO Site Visits for DOT Projects
Background Info
Bat Fork Creek and tributaries, tributary to Dunn Creek and tributaries
to King Creek
French Broad 040302
Wetland Type: ❑Isolated x❑Non-Isolated (Waters of US)
Stream Class: ❑Class B 0303d Listed DVS-11 ❑WS-V ❑SB
X❑Class C ❑ORW ['Trout ❑WS-III ❑NSW
❑HQW nWS-1 ❑WS-IV ❑SA nCA
Type of Authorized Impact: X❑Culvert ['Bottomless Culvert
❑Bridge nBottomless Arch
X❑Riprap Inlet/Outlet Stabilization XUFiII
Authorized Wetland Impacts: X00 — 1/10`h acre nl/11'h to 1/3rd acre 0.1 acre
❑ 1/3rd to 1.0 acre n> 1.0 acre
Authorized Stream Impacts: n< 150 linear feet X❑> 150 linear feet 891 linear feet
Additional comments:
Reviewed project with DOT staff. Suggested installing sediment basin at the start of grading on the east side of
I-26 across from Zaxby's.
Sediment and erosion control structures were being installed during the inspection
Seeding and/or matting should be performed as areas are graded.
Maintain erosion control devices and continue with seeding and matting as required to protect State surface
waters.
Upward Road R-4430 Inspection July 2010