Loading...
HomeMy WebLinkAbout20190230_Information Letter_20110201M February 1, 2011 Section 404/NEPA Merger Project Team Agreement Widening of US 158; TIP #R-2582 & R-2584, Northampton County, Division 1 Concurrence Point 4A Avoidance and Minimization Project Name & General Description: Widening of US 158 from the 1-95 / NC 46 Interchange West of Garysburg to the Murfreesboro Bypass, Northampton County, Division 1; TIP Project R-2582 & R-2584. 404 Avoidance and Minimization Measures In an effort to avoid and minimize impacts to jurisdictional wetlands and streams associated with the LEDPA (Garysburg Southern Bypass 1, Northern Jackson Bypass, Faison's Old Tavern Northern Bypass 2, and Conway Northern Bypass 2), NCDOT will implement the following measures that are identified with an [ X ]. [ X ] Bridging S(B 15) with 120-ft bridge and &B_25/ WB 27) with 1295-ft bridge. Estimated impacts avoided or minimized: Stream - 196 feet), Wetlands - (6.2 acre). [ X ] Steeper side slopes in jurisdictional areas (e.g., 3:1 fill slopes). Estimated impacts avoided or minimized: 5.6 acre. [ X ] Horizontal or vertical alignment shifts to avoid or minimize jurisdictional areas: General location(s) along the project corridor: WA 08, WB 08, WB 14, WB 11, WB 12, WB 13, WB 17, WA 20, WB 20, WB 94, WA 93, WA 47, WA 43, WA 53, WA 57, WA 58, WA 61, WA 62, WA 63, WA 65, WA 67, WA 70-72-73, WA 77(1-24), WA 77(25- 56), WB, 76, WB 83, and WB 84. [ ] Reduced median widths (NCDOT typical vs. proposed): [ ] Reduced shoulder widths (NCDOT typical vs. proposed): [ ] Construction of retaining walls: General location(s): [ X ] Other proposed design changes (e.g., Flyovers; SPUIS, Compressed diamonds, Equalizer pipes, etc.) Two Half-Cloverleaf interchanges will be utilized to minimize impacts to (WB 02, WB 03) and (SA 36, SA 37 Estimated impacts avoided and minimized: Stream - 809 feet , Wetlands - (5.6 acre). Other Measures to Avoid and Minimize Impacts to the Human and Natural Environment NCDOT has also documented the following measures to avoid and minimize impacts to the human and natural environment associated with the LEDPA, as appropriate: [ ] Specific Section 401 water quality measures: (e.g., Stornnwater basins, Hazardous Spill Basins, Pre-formed scour holes, Energy dissipators, etc.) [ X ] Measures to avoid or minimize adverse impacts to historic properties (Describe): Northern Jackson Bypass was shifted to the north to minimize impacts on the Jackson Historic District. The project will widen on the south side of US 158 to minimize impacts on the Historic Francis Parker House. R-2582 & R-2584 Page 1 of 2 February I, 2011 [ ] Measures to avoid or minimize residential or business relocations (Describej: _ [ ] Measures to avoid or minimize other human resource impacts (e.g., Noise abatement walls, Cemeteries, Schools, Churches, Community facilities, Parks, etc.) [ X ] Control of access issues (Describe): All sections on new location will include full control of access to minimize indirect impacts. [ X ] Other environmental commitments or proposed measures (Describe resource and avoidance and minimization effort) Archeological surveys will be completed on the LEDPA. Impacts to any archeological sites eligible for listing on the National Register of Historic Places will be minimize through possible data recovery excavations. The Project Team Members listed below have concurred with the avoidance and minimization measures, for the proposed project, as stated above. US Army Corps of Engineers Bill Biddlecome DATE US Fish & Wildlife NC Division of Water Quality NC Division of Marine Fisheries Kevin Hart DATE National Marine Fisheries Ron Sechler DATE Wildlife Resources Wilson DATE Environmental Protection Agency Chris Militscher DATE NC Department of T r.-t??016_ ;? -1- Matthew Potter State Historic Preservation Office Renee Gledhill-Earley DATE R-2582 & R-2584 Page 2 of 2