Loading...
HomeMy WebLinkAbout20110102 Ver 1_401 Application_20110111201 10 102 TF,9QG ark WA 1 r D 1 > r I Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre-Construction Notification PCN Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: El Section 404 Permit El Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: or General Permit (GP) number: 1 c. Has the NWP or GP number been verified by the Corps? ? Yes ? No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ? 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit ? 401 Water Quality Certification - Express ® Riparian Buffer Authorization le. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ® Yes ? No For the record only for Corps Permit: ? Yes ® No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. ? Yes ® No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ? Yes ® No 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ? No 2. Project Information 2a. Name of project: Shirley Residence 2b. County: Wake L5 '?? La V 2c. Nearest municipality / town: Raleigh AM UU 2d. Subdivision name: N/A 11 2e. NCDOT only, T.I.P. or state project no: ?SATERQUgd1y TOR14ryyq 3. Owner Information 3a. Name(s) on Recorded Deed: Graham and Kim Shirley 3b. Deed Book and Page No. 13762, 1062 3c. Responsible Party (for LLC if applicable): 3d. Street address: 2100 St. James Rd. 3e. City, state, zip: Raleigh NC 2760$ 3f. Telephone no.: 3g. Fax no.: 3h. Email address: Page 1 of 10 PCN Form - Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ? Agent ? Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: Page 2 of 10 PCN Form - Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 0795721555 1 b. Site coordinates (in decimal degrees): Latitude: Longitude: - (DD.DDDDDD) (-DD.DDDDDD) 1 c. Property size: 0.48 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to proposed project: Neuse 2b. Water Quality Classification of nearest receiving water: 2c. River basin: Neuse 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Natural area around drainage ditch and existing house 3b. List the total estimated acreage of all existing wetlands on the property: 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 3d. Explain the purpose of the proposed project: Proposed drive way & parking area w/ retaining wall and walk leading to front door and front door landing 3e. Describe the overall project in detail, including the type of equipment to be used: Construction of retaining walls & Asphalt or concrete drive in parking area;concrete or stone walk and landing equipment- bobcat and backhoe 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? Comments: ? Yes ? No ? Unknown 4b. If the Corps made the jurisdictional determination, what type of determination was made? ? Preliminary ? Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ? Yes ? No ® Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ? Yes ® No 6b. If yes, explain. Page 3 of 10 PCN Form - Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ? Wetlands ? Streams - tributaries ® Buffers ? Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) Temporary T W1 ? P ? T ? Yes ? Corps ? No ? DWQ W2 ? P ? T ? Yes ? Corps ? No ? DWQ W3 ? P ? T ? Yes ? Corps ? No ? DWQ W4 ? P ? T ? Yes ? Corps ? No ? DWQ W5 ? P ? T ? Yes ? Corps ? No ? DWQ W6 ? P ? T ? Yes ? Corps ? No ? DWQ 2g. Total wetland impacts 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ - non-404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ? P ? T ? PER ? Corps ? INT ? DWQ S2 ? P ? T ? PER ? Corps ? INT ? DWQ S3 ? P ? T ? PER ? Corps ? INT ? DWQ S4 ? P ? T ? PER ? Corps ? INT ? DWQ S5 ? P ? T ? PER ? Corps ? INT ? DWQ S6 ? PEI T ? PER ? Corps ? INT ? DWQ 3h. Total stream and tributary impacts 3i. Comments: Page 4 of 10 PCN Form - Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. Open water impact number - Permanent (P) or Temporary T 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 ?P?T 02 ?P?T 03 ?P?T 04 ?P?T 4E Total open water impacts 4g. Comments: 5. Pond or Lake Construction If and or lake construction proposed, then complete the chart below. 5a. Pond ID 5b. Proposed use or purpose of 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) number pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5E Total 5g. Comments: 5h. Is a dam high hazard permit required? ? Yes ? No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: Page 5 of 10 PCN Form - Version 1.3 December 10, 2008 Version 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require mitigation, then you MUST fill out Section D of this form. 6a. ® Neuse ?Tar-Pamlico ? Other: Project is in which protected basin? ? Catawba ? Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number - Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) for impact Stream name mitigation (square feet) (square feet) or Temporary required? T B1 ®P ? T wall ® Nos 26 sf 51 sf walk/steps ? Yes B2 ® P ? T and ® No 258 sf landing B3 ?P?T ?Yes ? No 6h. Total buffer impacts 26 sf 309 sf 6i. Comments: D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Minimum impact in Zone 2 and 1, rebuilding house ontop of old building footprint 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Provide silt & tree protection fence 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for ? Yes ® No impacts to Waters of the U.S. or Waters of the State? 2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps ? Mitigation bank 2c. If yes, which mitigation option will be used for this project? ? Payment to in-lieu fee program ? Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity Page 6 of 10 PCN Form - Version 1.3 December 10, 2008 Version 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ? Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ? Yes ® No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Page 7 of 10 PCN Form - Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified ? Yes ? No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ? Yes ? No Comments: 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? % 2b. Does this project require a Stormwater Management Plan? ? Yes ? No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: ? Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ? DWQ Stormwater Program ? DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? ? Phase II 3b. Which of the following locally-implemented stormwater management programs ? NSW ? USMP apply (check all that apply): ? Water Supply Watershed ? Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No attached? 4. DWQ Stormwater Program Review ? Coastal counties ? HQW 4a. Which of the following state-implemented stormwater management programs apply ? ORW (check all that apply): ? Session Law 2006-246 ? Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ? Yes ? No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No 5b. Have all of the 401 Unit submittal requirements been met? ? Yes ? No Page 8 of 10 PCN Form - Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ? Yes ® No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ? Yes ? No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ? Yes ? No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes ® No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after-the-fact permit application? ? Yes ? No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. City sewer Page 9 of 10 PCN Form - Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ? Yes ® No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ? Yes ® No impacts? El Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ? Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? No endangered species on property since it's within a dense single family residential neighborhood 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ? Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ? Yes ? No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? y1j, __n V-1 Applicant/Agent's Printed Name ppli rlSig ture Date (Agent's signature is valid if an authorization r fro the applicant is provided.) Page 10 of 10 PCN Form - Version 1.3 December 10, 2008 Version ~ 3ry O n ~ I ~ ~ 4~ ~.AL Jll ~ e!' ~ ~ ~ ~ w Q ~ z ~a~~ ~ ~ U ~ n ;i ((S PROPERTY DOES i~OT ~I E ICI i Hii`~ A~nl~ L~NI'~ ~ EX(STI!~'G IROI~I PIPE 2000 ~ OF No C. G. S, i~~O1\i~(~E~~JTo (~f'E~~ iRO1'~i PIPS- T~'~S SUR~~/EY OF Al\a EX(ST(I~JG PARCEL ~q R R FENCE ~4 ~~a;~ KE `~yll. COI~PUi-ED CORI~+`E"f~ OR PARCELS CF I A~'~~Da B~~NF TR \ T ICI T IES SHO~`I~' ARE FOR REt°RESENT~OT(O1~1 ~ ~ Q~~v`~Y A~'D ~10~ TO ~E ~JSED FOR o ~ ~ PRPERTY ~{I~1T- I_OCATIOr~I ~1~~ EASE ~c ~\~TS, BUFFERS, ~ / FLOOD I_I~~/((~.S ~ SET~AC~CS TALC FROM( BO~i~ i 0~~ PG 0~7 4 .-a. /~e~~o~~~ FENCE ON ~ 9 ~r' ( ~ ~ f t Y E S BJ E C T TO .A i r-(~ S T ~fA. PROPERTY LINE ~ ' / I ~~lEUSE "R('~'ER RIPARIAN ~UFFERo ~ ~ ~ 1 V T T ~ ~9 ,S o~ ~o ~0' ~~EUSE / ~ ~oT IAA ~ BE s~~~EG < < o A ° ~ ~ RIVER BUFFER ~m~ 1~~°I~ ZONE 2 FLOCD ~~'A~ARD PER~~/((T FRO~,~ COUI`JT`~ OIL!"SIG AD~~iINISTRATOOI~~ - ~ a ~-'?~?ELDED WIRE / ~ EI_EVc~;T(ON ARE TIE TO GRID V 299.3' ~ ~ BASED ON NAVD88 ~ FENCE / INV 299. 30' NEUSE HEAD'v~!4 / ~ RIVER BUF-FER , ~ i ~ m 28.0' \soo, ZONE 1 DECK ~ / ~ ~ N ~ / ~ ~ i I~ 10.0 ' / - - ~ W Q 79.0' _~j~-- ~ ~ 4 m~,~~~~ / TCP OF ~ ~ ~ W o BANK- / _ _ ~ ~ o ~ ~ ~ ~ ~ ~ l! ~ i C~ ~~I~PdD5AN0 3T~~ QllAIiTY ~ FFE 314,609 ~.5~ ~ ~ ~ ~~~r ~.1/ ~ ° ~ / , ~ 27.0' ° , ~ ~ ~ ~ i cE~vTE~~i~vE OVERHEAD ) OF STREAM ~ ~ ~ SERVICE ~ INV 3046' So 00 ~ UTILITY POLE / ~o PK NAIL IN CONC GRAVt~ PARKiII~ / / INV 308.8' ~ ~ ~ ~ ~ ~ ~ FIRE HYD HEADWALL H€~~~~~~_ 1V H YD R/~~ ~ 11~V 30 7.6' ~F THE NORTH n OVERHEAD ~ ENV 308.5' WA E.R METER 71E POINT INTERSECTION OF TH UTILITY Rj 'v"~l G~ RUNNyn ;~~DE °OAC J ~ U J ~ v,-ni i~v~ L J G' nir~, ini GOAD ~ ~!)'T. JAMES ROAD (PUBLIC R/W) N (12-7-09) REVISED TO SHOW GRASS LINE I~ (12-2-09) REVISED TO SHOW NRB, FFE & EP'S - i I CC'T ~ 300 ~ ~}'I,~~ r ®ES'~N GROUP / LANDSCAPE ARCHITECTURE SPfE PLANNING &DESIGN i~l~_ ~ 726A PERSHING ROAp RALEIGH,NG 27608 d~ ~ i_..-- PHONE 919.833.0303 FAX 919.833.7176 ® i MAIL@LIGGETfDESIGNGROUP.COM - ~ ~ _ _ SURVEYOR: ¦ ~ ~ JOHN Y PHELPS JR SURVEYORS ~ ~ (919) 787-3658 J. ~ PROPOSED HOUSE ~ ~ / o`e ~ 51 10 BUR OAKCIR, RALEIGH, NC 27512 ~ _j li _ I FOOTPRINT ~ ~ ~ 9 U ~ L / CONSULTANTS i o ,1~. ~ o ON ~ a FENCE ~ ~ ~ / :.„w PROPERTY LINE cn RE I 1 WELDED WI i i i FENCE j SEALS/SIGNATURE ~,F I ~ ~ ~H BAR 1 --~_S~ ~ ~~4G~ I 2qq V 2~~~ I i = f e ~i I- ~ - I i'-- I ~V ~ HEADWP ~~~pw~LL ~ ~ _ C-150; ~ _ =cT: :a: I ~ Y EXISTING NOOSE . r~ FOOTPRINT _ o' ~ / ~ I I ~~~IIU11I~~ O~ ~O , ~ ~ s~ ~ 2 ~~F i ~ / Y i~ q~s "9 1 ~ °'~F ~F m ~ R ~ ~ ~ - ~T 1147 ; > _ FFE ~ i B5 30: ~ e 312.6 + o~~ 308.86 N~ r,, f ~F ~s~ 1, r T t~ BU i ~o~, ~fi r ~ ~ NOT APPROVED FOR / + 310.86 ~ ~ t.; , , CONSTRUCTION UNLESS SIGNED i _ ~ 0 BS r WALKWAY ~ ~ - O BY LANDSCAPE ARCHITECT _ ~ ~ 310.x4 i r' ~ AND 5TEP5_ , r , - CLIENT (V ° , ( ~ r f TOP OF r V 1 , N~ + BA ~ 312;:4 ~ ` ~ ~ i ~ i r~ ~ i ~ ; ` ' ~ ~ i ~ _ ~ i + 310.4 ` i ~ ~ - i. STORM WATER ~ ~ ~ ORTION OF THE ` i 51NGE A P _ T ~1 . i ~ ~ ~ ~ 15 BEING PIPED ON THE PROPERTY, ~v (1) 1" RISER ~ 31 .8b `F ) ~ ~ ~ ~ ~ ~ Y SNOWED BUFFER ~ ~ , ~ - THE SURVE ~ ~ tv ~ , 0 0 0 / I~ ZONES I AND 2 IN THE PIPED 5 ~ r FFE , ~ ~ D6 MET W/ DWQ ON AREAS. L - I .I I - 308.86 ' ~ ~ i ~ ~ ~ i x _ Y CONFIRMED 3 2 r DECEMBER STN AND THE ~ i T THE ZONES SHOWN IN ~ ~ ~ THA t , ~ ~ I ~ NEED TO BE REVISED. ~ ~ THIS ARE ' N 1 , NE5 WERE TO BE t ~ ~ ACCORDING TD DWQ, THE ZD • ~ i DELINEATED WHERE THE PIPE / i THE STREAM. ~ I ~ ! ~ ~ DAYLIGHTS INTO ~ 0 i ATED ~ I m SLOPE ' ~ ~ THE OTHER BUFFER ZONES DELINE ~ I ~ / ~ ON THE SURVEY WERE NOT ; i REVISED EXGEPT'Fi~ THAT B5 r i ~ ~ 311.bq ~ ~ ONE AREA WHERE THE STORM WATER + 308. ~ r i ~ w + ~ / ~ WA5 BEING PIPED. THE SURVEYORS DRAWING u ' j fjRETAINING WALL i / i f ' ~ ~ U 5NOW5 THE OLD DELINEATION OF THE v ~ i ~ j` ~ ; - ~ ~ ~ ~ z BUFFER ZONES I AND 2 IN THE PIPED AREA ~ ~ PLANTIN NE , Cy; ~ T.W.;` GENTERLI I WHERE LDG 5 SHEET LI 5HOW5 THE ~ i N AI~~-~ ~ w 1 I 0~ ~ , ; ~ ~ z REVISED DELINEATION PER LDGS MEETING ~ ~ DEGEMBER STN 2010. Iv ~ I 311.31 / i W/ DWQ ON ~ , / ~ ~ ~ - ~ GK l.- i r > ~ 30 SETBA ~ ~ ~ ~ c~ r i 0 , / o ~.6 ~ I I ° ~ ~ ~ ~ ~ ~ iNV 30 i ~ 11.13 / N ~ ~ ~ ~ 3 ~ 308) ` ~ i a°~ i z DRIVE/PARKING ~ o AREA ~ ~ ~ " - I I ~ ~ PROP05ED STORM WATER DEVICE ~ ~ ~Q -l N i ° 4 .1~' (i.e. GB ~ BERM OR RAIN GARDEN) ~ ~ ' D / J¢ SIZE AND LOCATION T.B. OL ~ ~ ~ I ~ ISSUED FOR; i TI IT!' P / ~ J ~ { ~ ; II DWQ SUBMITTAL +310.81 , 311.01+ ~ 0 Nrny~ 4 ¢ ~rn ~ ~ ~ / ~ ISSUED DATE: 311 ~ - ~ ~ o ~ NoTE: ` y ~ ~ , ~ ~1271~~ R SHALL HAVE AN / rn c rn 0 I. OWNE - TNE / T.W. r ~ ® ~ ' ~ i ENGINEER REVIEW 1 - --.311.5 rn PROP05ED STORM NAIL ~ ~ ~ , ° ~ ~ ~ ~ ~ ~ REVISIONS: ~ ~I~~ F4~ i P ~ ~ / WATER DEVICES IN GONG , ~ ~ ~ ~ ~ ~ ~ N~ 3~~.6 NO. ITEM DATE \ TO ENSURE THAT DIFFUSE FLOW ~ T.W. ~ I t u~ ~ 0 QO' 15 MAINTAINED ON PROPERTY , + 311.5 ~~O ~5 STABILIZE EXISTING DITGN _ - _ P~i p1, i i % PROVIDE'; ' ® W/STONE TO CONTROL ~IN6 DITG}-I ~ ~ L~ ~ITROL ~ _ I l IT 15 ~ ~ ~ ~ ~ ~ ' E - ( (3) WEEP ' EROSION WHERE NGea L PLASTIC IP ~ a~. -R HOLES IN OGGURRING 308~8`~-' °1~6TTG+~' ~I ~ VEY)N.P E~ META R_, { INS I,~ I. OM 5 ~ T WALL FO Nrn y (FR .21 . 31 ~ . A rn a ~ . ~ ~ DRAINAGE ~ c 3 I ' I I~ - _ 1 NV 30 ° PURPOSES ~ ~ ~ DRAWING TITLE: N 0 ~I~- rn t ~ ~ , ~ ~ ~ ; SITE & 312.05 ~ Ott ~ y~ ~a , ~ ~ ~ GRADING PLAN NEW DRIVEWAY ENTRANCE (A55UMED) EXISTING DRIVE ~ ~ ~ ~ N DRAWN BY: 1lY ~ CHECKED BYBL SCALE: ~~'~jB' 10' 0 SHEET NUMBER: I I I ~ _ ~ - ~ ..a i I 5 20 SCE: I"= 10' (CHECK SCALE BEFORE USING) © 201 1 L.IGGETf DESIGN GROUP PLLC; ALL RIGHTS RESERVED