HomeMy WebLinkAbout20110091 Ver 1_401 Application_20110111
T.E. ALLEN ENGINEERING, P.C.
Post Office Box 103
Rosman, North Carolina 28772
Phone (828) 877-4883 Firm # C-1997 Fax (828) 877-4893
201 1p09 1
January 17, 2011
SUBJECT: Extend Existing Dock and Install New Riprap, Edwin Wahlen Residence,
382 Island Point Road, Lake Toxaway, Transylvania County, NC
NC DWQ, 401/Wetlands Unit
1650 Mail Service Center
Raleigh, NC 27699-1650
AI ?t
ug(,'Z?o OWE
JAN27 2011,
Dear DWQ:
WfTL"SMDSTORMW TE6PMc8
Enclosed, please find five (5) copies of the 401/404 application (PCN form). A check
for the application review fee is also enclosed.
The project site is a private residence on Lake Toxaway, Transylvania County, North
Carolina. Lake Toxaway is a private lake and is classified as B; Trout. A trout buffer
variance, if required, will be submitted under separate cover to the NCDENR - Division
of Land Resources.
If you have any questions or require any additional information, please do not hesitate
to contact me at (828) 877-4883 or email teallenenggcitcom.net.
Sincerely,
Te llen, P.E.
C ting Engineer
Enclosures
;?
Copy Furnish w/ attachment:
401 PERMITTING
Mr. Kevin Barnett
NCDENR Division of Water Quality
2090 US Hwy 70
Swannanoa, NC 28778
828-296-4500
NC FISH & WILDLIFE PERMITTING
NC Wildlife Res. Commission
Old Fish Hatchery
Attn: Mr. Dave McHenry
20830 Great Smoky Mtn. Expressway
Waynesville, NC 28786
1 copy of 401/404 PCN Application Form
1 copy of 401/404 PCN Application Form
US FISH & WILDLIFE PERMITTING
U.S. Fish and Wildlife Service 1 copy of 401/404 PCN Application Form
Asheville Field Office
160 Zillicoa Street
Asheville, NC 28801
USACE PERMITTING
Mr. Tyler Crumbley
Asheville Regulatory Field Office
US Army Corps of Engineers
151 Patton Ave, Room 208
Asheville, NC 28801-5006
1 copy of 401/404 PCN Application Form
201 1009 1
O?0F W A rFq
r
Office Use Only:
Corps action ID no.
DWQ project no.
Form Version 1.3 Dec 10 2008
Pre-Construction Notification PCN Form
A. Applicant Information
1. Processing au, 04 ar Wh
1 a.
Type(s) of approval sought from the
Corps: 'TOP
® Section 404 Permit ? Section 10 Permit
1 b. Specify Nationwide Permit (NWP) number: 3 & 13 or General Permit (GP) number:
1 c. Has the NWP or GP number been verified by the Corps? ® Yes ? No
1 d. Type(s) of approval sought from the DWQ (check all that apply):
® 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit
? 401 Water Quality Certification - Express ? Riparian Buffer Authorization
1 e. Is this notification solely for the record
because written approval is not required? For the record only for DWQ 401
Certification:
? Yes ® No For the record only for Corps Permit:
? Yes ® No
1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation
of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu
fee program. ? Yes ® No
1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h
below. ? Yes ® No
1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ® No
2. Project Information
2a. Name of project: Extend Existing Dock and Install New Seawall - Wahlen Residence
2b. County: Transylvania
2c. Nearest municipality / town: Brevard _.., r--1 rim ry r
r-A
2d. Subdivision name: Lake Toxaway 0 LV
2e. NCDOT only, T.I.P. or state
project no:
JAN 1 2011
3. Owner Information
3a. Name(s) on Recorded Deed: Wahlen, Edwin A Jr. & Catherine W. tr~r'ETLANDSAN0STOFtWAIMBR IGM
3b. Deed Book and Page No. Book 408 Page 422
3c. Responsible Party (for LLC if
applicable):
3d. Street address: 382 Island Point Road ?j W a. G t?wt? i ? P, Ate;
3e. City, state, zip: Lake Toxaway, NC 28747 1
3f. Telephone no.: 404-841-3325
3g. Fax no.: 678-705-9940
3h. Email address: eaw@cgwiii.com
Page I of 10
PCN Form - Version 1.3 December 10, 2008 Version
4. Applicant Information (if different from owner)
4a. Applicant is: ? Agent ? Other, specify:
4b. Name:
4c. Business name
(if applicable):
4d. Street address:
4e. City, state, zip:
4f. Telephone no.:
4g. Fax no.:
4h. Email address:
5. Agent/Consultant Information (if applicable)
5a. Name:
5b. Business name
(if applicable):
5c. Street address:
5d. City, state, zip:
5e. Telephone no.:
5f. Fax no.:
5g. Email address:
Page 2 of 10
PCN Form - Version 1.3 December 10, 2008 Version
B. Project Information and Prior Project History
1. Property Identification
1a. Property identification no. (tax PIN or parcel ID): 8522-37-3004-000
1 b. Site coordinates (in decimal degrees): Latitude: 35.134117 Longitude: - 82.93719
(DD.DDDDDD) (-DD.DDDDDD)
1 c. Property size: 1.195 acres
2. Surface Waters
2a. Name of nearest body of water (stream, river, etc.) to Lake Toxaway
proposed project:
2b. Water Quality Classification of nearest receiving water: B, Trout
2c. River basin: Savannah
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
This is an existing home site located in Toxaway Estates, a private residential development in western Transylvania
County, NC. The lot borders Lake Toxaway which has a classification of B: Trout. The general land use is residential.
3b. List the total estimated acreage of all existing wetlands on the property:
none
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:
none
3d. Explain the purpose of the proposed project:
Extend existing dock & install new seawall. All work to be performed using hand labor & small equipment.
3e. Describe the overall project in detail, including the type of equipment to be used:
Extend existing 10'x16' dock to 10'x32' w/ concrete footers. Install new riprap seawall dock (NWP #13). Repair existing
seawall (NWP #3). See attached sketches.
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
El Yes ®No El Unknown
project (including all prior phases) in the past?
Comments:
4b. If the Corps made the jurisdictional determination, what type
? Preliminary ? Final
of determination was made?
4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company:
Name (if known): Other:
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
5. Project History
5a. Have permits or certifications been requested or obtained for ? Yes ® No ? Unknown
this project (including all prior phases) in the past?
5b. If yes, explain in detail according to "help file" instructions.
6. Future Project Plans
6a. Is this a phased project? ? Yes ® No
6b. If yes, explain.
Page 3 of 10
PCN Form - Version 1.3 December 10, 2008 Version
C. Proposed Impacts Inventory
1. Impacts Summary
1 a. Which sections were completed below for your project (check all that apply):
? Wetlands ? Streams - tributaries ? Buffers
® Open Waters ? Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. 2b. 2c. 2d. 2e. 2f.
Wetland impact Type of jurisdiction
number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact
Permanent (P) or (if known) DWQ - non-404, other) (acres)
Temporary T
W1 ? P ? T ? Yes ? Corps
? No ? DWQ
W2 ? P ? T ? Yes ? Corps
? No ? DWQ
W3 ? P ? T ? Yes ? Corps
? No ? DWQ
W4 ? P ? T ? Yes ? Corps
? No ? DWQ
W5 ? P ? T ? Yes ? Corps
? No ? DWQ
W6 ? P ? T ? Yes ? Corps
? No ? DWQ
2g. Total wetland impacts
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a. 3b. 3c. 3d. 3e. 3f. 3g.
Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact
number - (PER) or (Corps - 404, 10 stream length
Permanent (P) or intermittent DWQ - non-404, width (linear
Temporary (T) (INT)? other) (feet) feet)
S1 ? P ? T ? PER ? Corps
? INT ? DWQ
S2 ? P ? T ? PER ? Corps
? INT ? DWQ
S3 ? P ? T ? PER ? Corps
? INT ? DWQ
S4 ? P ? T ? PER ? Corps
? INT ? DWQ
S5 ? P ? T ? PER ? Corps
[:1 INT ? DWQ
S6 ? P F-1 T ? PER ? Corps
? INT E] DWQ
3h. Total stream and tributary impacts
3i. Comments:
Page 4 of 10
PCN Form - Version 1.3 December 10, 2008 Version
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individually list all open water impacts below.
4a. 4b. 4c. 4d. 4e.
Open water Name of waterbody
impact number - (if applicable) Type of impact Waterbody type Area of impact (acres)
Permanent (P) or
Temporary T
Repair existing wall. Extend
existing dock and install concrete
01 ®P ? T Lake Toxaway footers. Install 20 LF of new Lake 0.01 Acres
riprap wall behind new portion of
dock. The 20 LF riprap and the
dock footers will be new impacts.
02 ?P?T
03 ?P?T
04 ?P?T
4L Total open water impacts 0.01 Acres
4g. Comments: Work will be accomplished "in the dry" while the lake level is down. Excavation with small excavator with
minimual incidental fall back.
5. Pond or Lake Construction
If and or lake construction proposed, then complete the chart below.
5a. 5b. 5c. 5d. 5e.
Wetland Impacts (acres) Stream Impacts (feet) Upland
Pond ID Proposed use or purpose (acres)
number of pond
Flooded Filled Excavated Flooded Filled Excavated Flooded
P1
P2
5L Total
5g. Comments:
5h. Is a dam high hazard permit required?
? Yes ? No if yes, permit ID no:
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
Page 5 of 10
PCN Form - Version 1.3 December 10, 2008 Version
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If an impacts require mitigation, then you MUST fill out Section D of this form.
6a.
? Neuse ?Tar-Pamlico ? Other:
Project is in which protected basin? ? Catawba ? Randleman
6b. 6c. 6d. 6e. 6f. 6g.
Buffer impact
number - Reason Buffer Zone 1 impact Zone 2 impact
Permanent (P) or for Stream name mitigation (square feet) (square feet)
Temporary T impact required?
131 ®P?T ?Yes
? No
B2 ? P ? T ? Yes
? No
B3 ?P?T ?Yes
? No
6h. Total buffer impacts
6i. Comments:
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
Work will be performed during a scheduled lake drawdown to minimize contact with surface waters. Excavation is the
minimum amount necessary to install seawall.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
To minimize disturbance during construction, the work will be accomplished with the smallest mechanical equipment
practicable.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for ? Yes ® No
impacts to Waters of the U.S. or Waters of the State?
2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps
? Mitigation bank
2c. If yes, which mitigation option will be used for this
El Payment to in-lieu fee program
project?
? Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank:
3b. Credits Purchased (attach receipt and letter) Type Quantity
Page 6 of 10
PCN Form - Version 1.3 December 10, 2008 Version
3c. Comments:
4. Complete if Making a Payment to In-lieu Fee Program
4a. Approval letter from in-lieu fee program is attached. ? Yes
4b. Stream mitigation requested: linear feet
4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold
4d. Buffer mitigation requested (DWQ only): square feet
4e. Riparian wetland mitigation requested: acres
4f. Non-riparian wetland mitigation requested: acres
4g. Coastal (tidal) wetland mitigation requested: acres
4h. Comments:
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires
buffer mitigation? ? Yes ? No
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
Zone 6c.
Reason for impact 6d.
Total impact
(square feet)
Multiplier 6e.
Required mitigation
(square feet)
Zone 1 3 (2 for Catawba)
Zone 2 1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund).
6h. Comments: Should project exceed 10% or 100' in 1000', a trout buffer waiver will be sought from NCDENR - Div of Land
Resources
Page 7 of 10
PCN Form - Version 1.3 December 10, 2008 Version
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1a. Does the project include or is it adjacent to protected riparian buffers identified ? Yes ® No
within one of the NC Riparian Buffer Protection Rules?
1 b. If yes, then is a diffuse flow plan included? If no, explain why.
? Yes ? No
Comments:
2. Stormwater Management Plan
2a. What is the overall percent imperviousness of this project? %
2b. Does this project require a Stormwater Management Plan? ? Yes ® No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why:
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
? Certified Local Government
2e. Who will be responsible for the review of the Stormwater Management Plan? ? DWQ Stormwater Program
? DWQ 401 Unit
3. Certified Local Government Stormwater Review
3a. In which local government's jurisdiction is this project?
? Phase II
3b. Which of the following locally-implemented stormwater management programs ? NSW
? USMP
apply (check all that apply): ? Water Supply Watershed
? Other:
3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No
attached?
4. DWQ Stormwater Program Review
? Coastal counties
? HQW
4a. Which of the following state-implemented stormwater management programs apply ? ORW
(check all that apply):
? Session Law 2006-246
? Other:
4b. Has the approved Stormwater Management Plan with proof of approval been
attached? ? Yes ? No
5. DWQ 401 Unit Stormwater Review
5a. Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No
5b. Have all of the 401 Unit submittal requirements been met? ? Yes ? No
Page 8of10
PCN Form - Version 1.3 December 10, 2008 Version
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ? Yes ® No
use of public (federal/state) land?
1 b. If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State ? Yes ? No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1 c. If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
? Yes
? No
letter.)
Comments:
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes ® No
or Riparian Buffer Rules (15A NCAC 2B .0200)?
2b. Is this an after-the-fact permit application? ? Yes ® No
2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in El Yes ®No
additional development, which could impact nearby downstream water quality?
3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
N.A.
Page 9of10
PCN Form - Version 1.3 December 10, 2008 Version
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or ? Yes ® No
habitat?
5b. Have you checked with the USFWS concerning Endangered Species Act ? Yes ® No
impacts?
El Raleigh
5c. If yes, indicate the USFWS Field Office you have contacted.
? Asheville
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ® No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation ? Yes ® No
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain? ? Yes ® No
8b. If yes, explain how project meets FEMA requirements:
8c. What source(s) did you use to make the floodplain determination?
Edwin A. Wahlen Jr.
Applicant/Agent's Printed Name Applicant/Agent's Signatufte Date
(Agent's signature is valid only if an authorization letter from the applicant
is rovided.)
Page 10 of 10
PCN Form - Version 1.3 December 10, 2008 Version
Transylvania County, NC -- Printable Map
Transylvania County, NC
Page 1 of 2
47
Lake Toxaway
1 42
3D04
42
5
42
DISCLAIMER: The information contained on this page is NOT to be construed or used as a --iegai aescnptlorr-. map Inrorma
believed to be accurate but accuracy is not guaranteed.
Extend Existing Dock and Install 20 LF of New Seawall
Parcels
Pin: 8522-37-3004-000 Acres: 1.195 Zoning:
Owner: Heated Sq.Ft.: 4068 Land Value: $0
WAHLEN EDWIN A JR & Township: 8 Bldg Value: $0
CATHERINE W Deed Book: 408 Year Built: 1974
742 CONWAY GLEN DR Deed Page: 422 XFOB Value: $0
ATLANTA,GA 30327
Sale Date: 199611 Sale Inst: WD Assessed Value: $0
Sale Price: $0 Sale Imp: I Legal Address: B F OFF ISLANI
POINT DR
Other Attributes
at point 823334, 527117
Zoning:
None
Map Grid:
Tile Name: 852201
http://arcims.webgis.net/nc/transylvania/printable2.asp 1/17/2011
Q. O 7 0 4?
(mn ??(p P Pp ?A< O
7 t0 m
aO n 0 0 0 p X 00 m
o p
?< rta Mm -< O m
O c O =X 0,p m'":N
O C
SrO+O) X 0 m m 0-o
no-3 0- 3 C n 3 n
C - p O a'a <' rt
a-a .-. 0 Q 0 7 O
p? 0F?•,.p0c
a rt: 0 0
0 ..• St0 N O
=m Op0 -0 .
0 to c. j
m =t0-0 a m
a0
n a ° ;:;: 0
m m 7
n N 0 Oa a
o? m o f fi
n m aO.NO N 0
m p N oo o p N
F 0. OON i °
lp p
:7 n o v?p 3 m
(n co M
m, m 0 0 O
O
M" m C o 0 C
r+
0 0 < p C n
0 ° Q. Q. O o 7 m m
p D a
F c p
3 a
p rt
0 7 O 0
J O p
M =0 0 0.0-0 - Q< a N
v ono ar?00n0m S0
?aNOm?.a-0
z
0
0 7--'to0 y
' (p 0 N N
m y.m O 0 mtp ° N r m D
N?yz rtp Occ?Npp
° m 0 0 m N A p nN 'C D
1 ;u a p 7 N 7 O--1
F p , 7'
??
7c <a7 ?<-mM
p rn0(n to 0S 0 mZ
3 3M ° o rt?m 0 0 a - 3 cn
C -,j r, oo°m?3oo?
rtpy? (,?NQ?co N+y
Z -0 a: =r Q
O MT 5 p-6 7rt p =1
00
a' C, '..-? N O O N um) a p?
O o r- ? 7 N p v
m e y p ,< a p p 7
(e Z (n
M
g
F- aI o m7p>> g
m r to m Qa? m o
a z rna W _rtmv 0 0 a F
- t1 O 3 0 N S a i F
mZ m mc pm(Nmeo(no-Q
m zrtM as< ?,I N m
° CL N 10 o
m m° Z 0 CD m ? -3 CL-
p ;u to o O S N to
z rt << o 0
n? S -0 S,:03 0 p S3
'+• to O N m - ,+ a" m
0 -a =r Try 0 l 7
=r -'a SSM U3 ? p _r+0 Q.
7' r+ 7 m, m a p N to O
np 0- m m N 5,17-m o
.16 0 n
Q. 0 0 '.'o m 0 F 3
V) 0 p ''te a S aX
m ?<
?a to hn?
O 77=0o O 0 -
0 5rtF N
p
o mfepp:3
t0 O O tT '? p U3 D
7
N .°+ rt m m rt 0 ?.
0
f N n rt 3 0
m ??OO?,N
X O 7=3
0 (eap cp
N emu) 7N o-3
CL fe 0 m N D n
Om`<°p?mN
F Cro 0 O
J T O rt m ? 2. tT
C O S 7 N
7 O MUD =t0 N
r+0a 0 0Q
a tp N m l -
.?+ m m -0
7
0 =3 p 7 0 0
? p
0
M CD
_•=r -00
0 M- m
0 -n
(rte 7< 0 7 00(1)
a rt' o a= OO p
° 7 O n a p
2.3
N N 0 N 0 (D 0
7 c 7 1 O
O 0 n Z?
W 0 .0 -0
M o -a' 0
m 1 N
.?+ 0-0 - N 00 C
rt C O O -0 3
M .f < N O
M
?q 9 m
c p?a O
to ?O
N O N -tip
° S
v m
o o0-1L o0
CD m
3
?c<?m7=
7c
Q Ora
a <mto <p O
,m+'< 6 p O p 0 M 3
0 c 0 0 7 ?0 0 0 C)
0 ,°-. rt3SOz
oN:3 - 07°cvair0
tp N (e rt m 7 m
a O a g F c s
l 0 0.(C O
c - (a
o7 ?3X, a v N (W 0
7t'O 0•C O N F rt7
N 7 n
t0 7' a n `< < O M
1 7 a
c ? 7 a a Ica n
0 `< rt
a? (e `G a C 7 0
D o n C Q a W O O N 3 =r
m m - N n° m 0 0
N C a- a .0+n 7-
fe 0
.0+ N- art N N
a
?Ornm?n0
mccmoDO "O
_S -
c 3 Q. ZZN
QazN m Dtn o a
o.m c 0 0 , F
`tcFNVmi 0 a
7 Ort? D]0 ?M
m O t
N 00
Q 0
7 .CZ1
N
na p
00.
7
p a
Uy
M O
`p
S
ap
O ?
m
rr
S N
Q p
a-
0
7
F (p
N3
rt
O
0
30
F m
p a
Q
rt
O
o
c N
C
N
N m
rt
S
p
O
0 7 m O c rta"7N
O o 0 -«7 0 m m 0
F
rt N S N 7 '-'
()vim mt010 33
.n
p 0 rt O O> tp r+
C
(gyp (0 - "7 a F F 0
N O F C n I
.i F 7C 7r
rFO+ m ? S r-. O O
3 N
n
.N+ (D nS
N N o O p
h a 0 O
a 3 n-- OM no no <M
O ,. O O
0 M C= 7 C O O
-0
O m I o O N N p
1 o a-, S70
0
NO N I to N p p.
0 F S-m
-
Q 000°N+
0 U
O t0 p
O O m 0 (p
N
0 0 "o?op7
o m 0771. -o
n 0 ??mrn
0 0-0
o•' Ot0
F C m 0 p N C<
0 0 7 rt m
m n o o a•< ao
r.
7 N 0 _-0 7V N
O ° c n
O a ( S() 0:3 3-0
D
3pma-o•
n O 7 m- N n
C m N rt 0 O N ?. O
rt - K 'a O
0 -0 l
rt
p O 0
.-r
r--I nn*D?71
O O O O 0 n m O
mFo?m3a
?p ?O O D
Xp0_
: 00000-0 Q*
a7 77
D-0 C'N
zo m a0rn° 7
g
N(aj) O 0?(a to
a
'Dj O m D
0nm0
? SDD
3 6.
O A CD CD
0 p
m ?? 0 O00
?N-0 C X20
-=;,-a Da
l 0 0 m fe p
p 3 (n
O m pO
0 o o mrtm
?°-z-a0
p W C)C
0 'n
r+ _ 1 z
p m (nm =0
0 m 3
7 3 rt
F p m N 7 C)
000 ° 0 p
o m .-
, 0 z? o
N r 0.0
F 0vcap
?"00rn?
7 z
M
3 ,«ao ?3 p
S m
7 m rt-<Oh0
•N
7 0'
Ln
O
f 7 F 0 Q a0 ('e 0
C S
pp'D? 'p cD
?3.<m ?N.* - =
O
M 0
n 7 - 0 (<e h 0 7
N (p tp O °
rtp rt7 =3 C
p
.p+Q0 O p rt0
0 1. 0 1. 7 n per' 0 0
O N M N o 7 OM
c 0 0 0 ° 00 0
N o 0--a
m 0 0 <. 7 7
N rt 0 + _p, m g
m m
Q. =r v N
o ?
p ?
0 0 C n n
l
0C
- 2.0 CL
N
Q.F
0. U) a -0
(lD p M N 7 M? N
tp ao 0 F p_m o
c F -3 7 F p=
ayoa Isom
o M acr C ssrn
rt 3 amo3
m 7 3 =O
o r« 0 0 0-0
O (p S < C m n
rj) c m Ot0
n m N N -0 O
M 0 rt p rt a 3
3 S a m m
cn p a,pzT
rt ° m
7
N a0-0 (n
7 m 0 M
-c < 0.0
m N
m n O. Q m
,+ -0
n 0 c Z'
0 7 7
CD N C C n
O 0 > > o
? 0 CL 0
a ?. 7 (mj p °0
D to (D
m
N N n N
o to
.+ n n p
7 p "<?
m 3 Er
O to m 0 7 X
00Cm
N
o l O 7 N
0 m
rt a? O O -0
0 ? n 0
N 0 a ca j m
CD =r a-
X m _0 C °
M 0 F 0 rt?
N 0-
Q rt N
:r 0mm
m l 1
D (M ao Q
p =0
1 C n m
°g:'o?
CD to p p
d y O N c
rtp
n p S O
O? CD
V
m
0
M
z
rn
D
r
z
O
m
N
U LJ
OM
?N
Z
??=72q
00
Q
0
00
Q
?
o
? ?v v
?
Oo ?^
u u u
00
1057°
5.51
(141
Preliminary - Notl for Construction
EXTEND DOCK & INSTALL RIPRAP Prepared for:
T.E. ALLEN ENGINEERING PC
g WAHLEN RESIDENCE CONSULTING ENGINEERS Edwin A Wahlen Jr
m fc a Catherine W Wahlen
FIRM # C-1997 742 Conway
' 382 Island Point Rd. PO eox 103 y Glen Dr.
ROSMAN, NORTH CAROLINA 28772 Atlanta, GA 30327
Island off Island Point Dr. (828) 877_4883 404-841-3325
(828) 877-4893 678-705-9940 fax
Lake Toxaway, NC FAX email : tealleneng Ocitcom.net eawOcgwiii.com
co m
o .0
CT c
v
a K
W M
W z
O ?
? r
fN
0
A
77
J
O
CD
O
1
(D
C
O
u
v0 (°Dc-00(0isaw
0 n- 0-0 A N ,N..
n -a 0. W
O (A al CD viOO?'•'?N)
< 7 .+ - 7 < N n Q
o a c CD o
Or t7 7 Q 0 p- 7 rA+• 7 S
0+.:3 CO D 0 0 `G (D N (D al
(D l ,•+ ca O J J N N
0 rn
z? .+0 p s3
mJ o - 00 p_7
N o a0 a j Z00 -N
?. C . N a .'D CD 3 0
rt 7 C .+
W n) -0 J 0 7? (D 3 (D
7 C o- A a C S X
-.-.0? O
O. C - 7 rt? p CD 7 C 0
D CD
7 O O OO 0
a7 N N ?' ?7 7
(D m c (D CD - a
J
(?D Z 0 3
0o O a7--I?
c`< 7 N ap-10 - 0 3
rn CD
,.ae;-•a
ov; r:((DD W rn W SJ
N A r+ "? D• to C 7
A Q O O O rt (D
O D_ (D (7n
D' a' N
F N C N j ca 0 0
S rt N 0 A A :3 :3
0
7 7 al
F.
J ?6 +
J
nl 0 Cr
co (b
o o c F aa(Aart+??v N o cr o
7 7
0 S 0 a •Ci 3 ,+ 0 M A N <.
(o m
m m O' o ?3 a`D N' CD N 3
D' a CD M (D in
A p < 0 0 N 7 rtc 0
a (D O _ 0 0 = (D p 7 F CD
, n)
(Nii 7 A° 0'0 A 0_ _. CID n --I
M F t: 7 '+? 0 0 Jv - N U3 V1
0 fD C< 0< -0 0 J? 5' -A
:3 C o OD
F Qp rt
-n Cr <0O>
°:y> CD os..5???caxa
C NN -rte AN)- :3M0.3NW
rt 3 .-«c (D X ..7 0 C 7 0,< -n
c CC Sip J(<DvFNy00 rtA ?1
0
.. - O C = O O
+ n. p (o (D y0 0 ;1
rt , _ 7
0 oai N oo `°0' a°= (Dmocp
D :3 CD (D a- M 3
(D W n O a y C A 7 N. CD c
O X
A D F 0(D N? 7 0 0? (p o 7
p o0 o rnJ_0 ?cC(D on
nl 7 nl J al 0< M to rN•rt J "a..-F O
(D (D rt 0-0 Q 7 Q c (D (D J S I
0 N 3 0 C 7 a 0 0 ( D J N 0 O p rn z
N rt N ?? N (?,aQa Jo - 3 0
c CD
(D N JN rtcr 0 rt j 0
a aOc0a -c- + W *0c na
-w 3 J<J0(D(D-M0n
Cr m _ao N CD 7 n c 7 c N -a-
0 C a mn rt-ti N O N
fi rt 7 F
3 N 7 Cr N _
o p C N A _n - O < 7 0 C o c
o 7a ?o ao ° m o`o -°«m as
(b N 7 0h rtN3A O (Nn NtO
rt J A O. (nO 0 S
17 0< al 7 (D CD < 0 0
(D a o
00vo0O
a??°Fo
_ m
?NrnO?D
N U1 p o9' -{
O a
c O + l0
N --1 a C
J N '+ C rt
CO --
N CO• 0 7-• CO
o3
fio rta
0 ° CD <
N o c O
N ? c 7
p 7 n N A
=A 0 m
O cb p o N
O a)? rt7
3 C cr N O
0 (D CO (a N
D + a F
rt 6.0
_rt
O C C T. A
rt N 0 0
J C CD +
fD N a1
z'`..aa
0-Jab -
00 Q -0
M CD
Zcn0 3 N
D 7
I ?O(D
000 (D
v<,'00 ° o
7 J 3
O
O =-1
(D
Preliminary - Not for Construction
EXTEND DOCK & INSTALL RIPRAP
T.E. ALLEN ENGINEERING PC Prepared for:
n
I WAHLEN RESIDENCE CONSULTING ENGINEERS
FIRM I C-1997 Edwin in Wahlen
Catherine W Wahle
n
i s 382 Island Point Rd. PO 8ox 103 742 Conway Glen Dr.
0
N ROSMAN, NORTH CAROLINA 28772 Atlanta, GA 30327
Island off Island Point Dr.
(828) 877-4883
404-841-
3325
ake Toxaway, NC
FAX (828) 877-4893
email : tealleneng Ocitcom.net
994 fax
eaw0cgorn
5-
aw®cgwiii.cm
z
O
--1
0
N
n
D
r
M
;;u
-13
;;u
D
U
D
Z
<n
D
C?
r
N
D
O
Z
0
M
D_
T-
2.v'm
-vox
° n h
?O 7
O t°
n c
c °
v'0
a
? n• rN•r
l
O 0 a)
0 ^a
0 0;0
`G 0 0
O 0a
-h -D C
7 c
3
o F•
0 =r
N O 7
0 0'3
C
o 3
. m
D
m
N
cn
I
n'I
°
x
--00 0
- C fD Z
7c O S 3
CD =r 7 CD CD
v, a o ,<
o m m p
o °
( F 7
rt^O CU
°mvC
O a
viCL
F ° o
=r
3 7 O
7 Q.
3 CD a)
c 3 2:z
(D O
J
r ?
D
X
°
n
? O
n =.
O 00
X
C `°
?o
-o
Q
X
al
P
F F v'(00 (n NC) rtn w -N n 0 0
=rQ =0 ° C art
77
N? Ln 0 0 00 n-? 3.0 0? m°= D
Ul rt '?' rt I l° N F 3 O F
30 ?o sao -nc>o'F O N p ? ° ~ o
p?pN m -`< KN O 0 O rt (D M, N N S?
3 rt3 NG7o N On CD p w
ON 00N x ?n(0 ?? o ke n?
J 3 q) w 3 rt
=r =r Vy N C ?? ?a (n
0 o3o° I I M0 7? 0-CD
1< a -?, O O
a0 aa(a -GNU) ° 0.0 CD S
CD M (D =r m 3 m°° (D C = v m°
O n (0 - fn 0- O a) a
3 3 r. v r _U c v °
;` DC 0 0 p o o W
a(nD an0 a o_(n ?? o j o ca
c F
M ca :3 r- W 77
Z O° 1 ¢O =- O 0 a::F
n N n M O I u! v' - n N 7 rt
m ° m
0- ° m rinc?fD Cr
a 0.0a ?-? ° :3 C-)
.+ 3 o
7 7 7 0 00rt0. (D (D
n 0 o -Um W
rt
(D (D -+ Q.
a=3 00
3J
F30)
°
On n
0--0 naa
va
N _ W0
rt -•
O
.-n 3 m rt3 =
o
"
`G QO
Z 3 CO
M 3;0 Or
r J
? ?
0 0
-wa0
O ° N
m w0 F
m a, o° N D
o -0
n
o
N O N y ? _
,
7 N
O
Z
0O Z
I rt
r; r o o
D
a
0 C co 0 U)
0 F N A n
? n
C
-03 m
? 0 0
c
0 Ln n
avo
(n m
°
0
S C
7 70
a:.N
v' N
m
° c00
3 rt Q
n a
0-
:3 `+ C
Q r m
n O C O'
n N N
7 C rt p
O N
m S 3 rtz
3r ao .7
J
c:r ° oo0
3" O
n cD
C
O ' CD - O
a
CD
q CD 0
n
0
:3
° ?•
= C
3= rt
N (D 0
?v
)
U3
-
0 (
n o
,
co =r
0 0 '0 O
O ,
<D
fi (
O
O
°
3z°rn=r
0 Q l
ml< C -{
M+m 7 ?
'oz°a-
0 to
0
n
rn (?`? m S C?
n' m- D- n
aaD°`3-0
(D
,a'- 0 0
(D n CD
v.o -1= N o
o? !m3 0
aD D2 F
?Nr5°<
7 0 z 0 3 n
° -^ - 0
° rt a)
av v
C L4
.
C lC cr
(D O ? ab
rt 0
G7
v X=D
n U3 °
0 O - 0
O X (D -0
L'; n M
o (D 0< -0
M r, N rt
0 ? (D x
(7 o.
O F Z
O r«
° n s
V ?D
oou,
--.C
uJ
O (n -O
0
O 0
-,Q y -
I co Ort N
O (D (D
X C0
al n
O
O -v
Ca?
n p
f 7 D_
?o z
° I v
n
30°
0 N
3%0
3aLn
0 J
Xv
(D C f)
7 > m
N O 0
O (D 7
?a
1 ((DDOO
40 0 ::3
O 0 (1)
X 0
0
Ov z
a-
0 _. p
F v
A: 00 ?
° I
3 O
7 N O
3 v m
C
3mz
0
Sa.
m ?
xV J
CD c
> > 0
° m
o m
-h a
w (°
<
O Z
, N
N =
o D
M pm
co
m
_
z
0
D
r
r
0
a
(D
EXTEND DOCK & INSTALL RIPRAP
T.E. ALLEN ENGINEERING PC Prepared for:
l 1 WAHLEN RESIDENCE CONSULTING ENGINEERS •
FIRM # C-1997
Edwin A Wahlen Jr
Catherine W Wahlen
I 382 Island Point Rd. PO g0x 103 742 Conway Glen Dr.
ROSMAN, NORTH CAROLINA 28772 Atlanta, GA 30327
Island off Island Point Dr. (828) 877-4883 404-
-
8413325
ake Toxaway
NC
FAX (828) 877-4893 7
-994
05
eaw0cg orn fax
awOcgwiii.cm
, email : tealleneng Ocitcom.net
(XDW lj--V) S3RldA
- Not for Construction
z
C)
p
0
Q
e
N
W
N
Z11
D