Loading...
HomeMy WebLinkAbout20110089 Ver 1_401 Application_20110111• A S S O C I A T E S January 24, 2011 Mr. Ian McMillan, 401 Coordinator NC DWQ, 401 /Wetlands Unit 1650 Mail Service Center Raleigh, NC, 27699-1650 Dear Mr. McMillan: 10089 k§@90Wffl_ DO JAN 2 6 2011 ?? DENR - WATER QUALITY WEnMM AND STORMWATER BRANCH RE: Airlie Industrial Park Lincoln County, North Carolina I am enclosing the following items for review and approval for the subject project. ? Five (5) Copies of the PCN ? Two (2) (24" x 36") Copies of the Proposed Plan ? Three (3) (11' x 17") Copies of the Proposed Plan ? Executed Agent Authorization Letter ? Check for $250 for -149 LF of Stream Impact ? Five (5) Copies of USGS Maps and Location Maps If you have any comments or questions regarding this submission, please do not hesitate to call me at (828) 328-2024. Sincerely, McGILL ASSOCIATES, .A DAVID E. RICHMOND Senior Project Manager DER:war Attachments Cc: Steve Chapin, Army Corps. (Asheville Regional Office) Rob Krebs, NC DWQ (Mooresville Regional Office) F:\10.01415 LINCOLN COUNTY -Arlie Park Engineering\02_Design Phase\Correspondence\DWQ_Transmittal Letter 1-21-2011.doc E n g i n e e r i n g P l a n n i n g F i n a n c e McGill Associates, P.A. • P.O. Box 1136, Hickory, NC 28603 • 1240 19th St. Lane NW, Hickory, NC 28601 Office: 828-328-2024 • Fax: 828-328-3870 oaCF W ATF9OG o -? 201 1008 9 Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre-Construction Notification C Form A. Applicant Information 41 J C 1. Processing ` 1 a. Type(s) of approval sought from the Corps: ® Section 404 Permit F-1 Section Vfi0'1'ermit t 1 b. Specify Nationwide Permit (NWP) number: 39 or General Permit (GP) number: 1 c. Has the NWP or GP number been verified by the Corps? ® Yes ? No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit ? 401 Water Quality Certification - Express ? Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ? Yes ® No For the record only for Corps Permit: ? Yes ® No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. ® Yes ? No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1h below. ? Yes ® No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ® No 2. Project Information 2a. Name of project: Airlie Industrial Park 2b. County: Lincoln 2c. Nearest municipality / town: Denver 2d. Subdivision name: z011 2e. NCDOT only, T.I.P. or state project no: DER- 3. Owner Information 3a. Name(s) on Recorded Deed: INGLESIDE REAL ESTATE INVESTMENT PARTNERS, LLC 3b. Deed Book and Page No. 2203-541, 534 3c. Responsible Party (for LLC if applicable): DAVID CLARK 3d. Street address: 218 WEST MAIN STREET 3e. City, state, zip: LINCOLNTON, NORTH CAROLINA 28092 3f. Telephone no.: 3g. Fax no.: 3h. Email address: Page I of 11 PCN Form - Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ? Agent ® Other, specify: PROJECT OWNER 4b. Name: BURNS WHITTAKER, P.E., DIRECTOR OF PUBLIC WORKS 4c. Business name (if applicable): LINCOLN COUNTY 4d. Street address: 115 WEST MAIN STREET 4e. City, state, zip: LINCOLNTON, NC 28092 4f. Telephone no.: 704-736-8471 4g. Fax no.: 704-736-8820 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: DAVID RICHMOND, P.E. 5b. Business name (if applicable): MCGILL ASSOCIATES, P.A. 5c. Street address: 1240 19TH STREET, LANE NW HICKORY, NC 28601 5d. City, state, zip: HICKORY, NORTH CAROLINA 28601 5e. Telephone no.: 828-328-2024 5f. Fax no.: 828-328-3870 5g. Email address: Dave.Richmond@mcgiIlengineers.com Page 2 of 11 PCN Form - Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 4603235803, 4603242275 Latitude: 35.476 Longitude: - 81.007 1 b. Site coordinates in decimal degrees): ( (DD.DDDDDD) (-DD.DDDDDD) 1 c. Property size: 84.06 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to UT's of Forney Creek proposed project: 2b. Water Quality Classification of nearest receiving water: FoRney Creek - Class 'C' 2c. River basin: Catawba 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The proposed project site for the Ailie Industrial Park is pirmarily wooded with two UT's of Forney Creek running through the property. The property is primarily surrounded by residential development with the East Lincoln Community Center and Sporting complex located to the West. The property is also bordered to the West with a rail road track. 3b. List the total estimated acreage of all existing wetlands on the property: Unknown 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: The total amont of of estimated linear feet of perrenial streams on the property is approximately 3406 linear feet. 3d. Explain the purpose of the proposed project: The purpose of the project is to install an access road for the proposed Airlie Industrial Park in Lincoln County. 3e. Describe the overall project in detail, including the type of equipment to be used: This project will involve the installation of an access road for the proposed Airlie Industrial Park in Lincoln County. One (1) UT of Forney Creek will be impacted due to this developlment in Phase 1. Approximately 149 LF of the UT of Forney Creek will be impacted for the installation of a 84" RCP Ciruclar Culvert constructed on grade and buried 1 foot below the stream bed per NCDOT requirements. Headwall and Endwalls will also be constructed. All work will most likely be completed used a tracked equipment consisting of dozers and excavators. All precaustion shall be taken around the propsed stream crossing to ensure minimal impact is incurred during construction activities. A Sediment and Erosion Control plan shall be submitted to DENR - Land Quality for approval. Phase II of the project will impact a second UT of Forney Creek, however; that impact is undertermined at this time. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ? Yes ? No ® Unknown project (including all prior phases) in the past? Comments: 4b. If the Corps made the jurisdictional determination, what type ? Preliminary ? Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Name (if known): Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. Page 3 of 11 PCN Form -Version 1.3 December 10, 2008 Version 5. Project History 5a. Have permits or certifications been requested or obtained for ? Yes ? No ® Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ® Yes ? No 6b. If yes, explain. Phase 1 of the project will include a portion of the access road and some grading for portions of the proposed industrial park. Phase 1 will impact UT #1 of Forney Creek. At this time, it is undetermined when Phase 2 of the Industrial Park will begin, but will include the remaining portions of the access road and grading for the remaining portions of the industrial park. Phase 2 will impact UT #2 of Forney Creek. It is expected that the total sum of cumulative impacts will be greater than 150 LF. Page 4 of 11 PCN Form - Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ? Wetlands ® Streams - tributaries ? Buffers ? Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2f. Wetland impact number - Type of impact Type of wetland Forested F urisdiction 404, 10 Area of impact Permanent (P) or (if known) -404, other) (acres) Tem ora T ? Yes ? Corps W1 ? P ? T ? No ? DWQ ? Yes ? Corps W2 ? P ? T ? No ? DWQ ? Yes ? Corps W3 ? P ? T ? No ? DWQ ? Yes ? Corps W4 ? P ? T ? No ? DWQ ? Yes ? Corps W5 ? P ? T ? No ? DWQ ? Yes ? Corps W6 ? P ? T ? No ? DWQ 2g. Total wetland impacts 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 39• Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ - non-404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ®P ? T Fill / Culvert Crossing UT # 1 ® PER ? INT ® Corps ® DWQ 5 149 S2 ? P ? T ® PER ? INT ? Corps ? DWQ S3 ? P ? T ? PER ? INT ? Corps ? DWQ S4 ? P ? T ? PER ? INT ? Corps ? DWQ S5 ? P ? T ? PER ? INT ? Corps ? DWQ S6 ? P ? T ? PER ? Corps ? INT ? DWQ 3h. Total stream and tributary impacts 149 3i. Comments: Page 5 of 11 PCN Form - Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number - (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 01 ?P?T 02 ?P?T 03 ?P?T 04 ?P?T 4f. Total open water impacts 4g. Comments: 6. Pond or Lake Construction If and or lake construction proposed , then complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ? Yes ? No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require mitigation, then you MUST fill out Section D of this form. 6a. ? Neuse ?Tar-Pamlico ? Other: Project is in which protected basin? ? Catawba ? Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number - Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact required? 61 ?P?T ?Yes ? No B2 ?P?T ?Yes ? No B3 ?P?T ?Yes ? No 6h. Total buffer impacts 6i. Comments: Page 6 of 11 PCN Form - Version 1.3 December 10, 2008 Version D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Unfortuantely, no other access points to the site are available. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. All construction activities shall adhere to the approved Sediment and Erosion Control Plan. Every precaution shall be taken to ensure that minimal impacts to the surrounding creek areas are not disturbed. Any disturbed area shall be restored per the provided plans. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ? Yes ® No 2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps 2c. If yes, which mitigation option will be used for this project? ? Mitigation bank ? Payment to in-lieu fee program ? Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ? Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 7 of 11 PCN Form - Version 1.3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ? Yes ® No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Page 8 of 11 PCN Form -Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ? Yes ® No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ? Yes ? No Comments: 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 2.66% 2b. Does this project require a Stormwater Management Plan? ? Yes ® No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: Phase 1 of the project only inlcudes a protion of the access road. Futher development of the site under Phase 1 and Phase 2 of the project site will require a Stormwater Management Plan. 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: ® Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ? DWQ Stormwater Program ? DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? Lincoln ® Phase II ? NSW 3b. Which of the following locally-implemented stormwater management programs El USMP apply (check all that apply): ? Water Supply Watershed ? Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ® No attached? 4. DWQ Stormwater Program Review ? Coastal counties ? HQW 4a. Which of the following state-implemented stormwater management programs apply ? ORW (check all that apply): ? Session Law 2006-246 ? Other: 4b. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No 5b. Have all of the 401 Unit submittal requirements been met? ? Yes ? No Page 9of11 PCN Form - Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ® Yes ? No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ? Yes ® No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ? Yes ? No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes ® No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after-the-fact permit application? ? Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. At this time, it is unknown what the full extent of the project / total disturbance and/or development will occur at the Airlie Industrial park. It is anticipated that any further development will adhere to the Policies of the DWQ and DENR and to the local designated athorities. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. No sewage will be generated from this phase of the project. Page 10 of 11 PCN Form - Version 1.3 December 10, 2008 Version S. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ? Yes ® No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ? Yes ® No impacts? El Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ? Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? http://www.fws.gov/nc-es/es/countyfr.html, http://www.ncnhp.org/ 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? http://www.saw.usace.army.miIMETLANDS/esa/, http://ocean.floridamarine.org/efh_coral/ims/viewer.htm 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ? Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? hftp://www.hpo.ncdcr.gov/ 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ? Yes ® No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? www.ncfloodmaps.com David Richmond, P.E. 7L?j? Applicant/Agent's Printed Name Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 11 of 11 PCN Form - Version 1.3 December 10, 2008 Version INGLESIDE REAL ESTATE INVESTMENT PARTNERS, LLC POST BOX 9 218 WEST MAIN STREET LINCOLNTON, N. C. 28093-0009 December 21sT, 2010 Mr. Steve Chapin Asheville Regulatory Field Office US Army Corps of Engineers 151 Patton Avenue, Room 208 Asheville, North Carolina 28801-5006 RE: Airlie Industrial Park Lincoln County, North Carolina Dear Mr. Steve Chapin: Pursuant to the requirements necessary in obtaining the 404 permitting for the proposed Airlie Industrial Park in Lincoln County, please accept this letter as authorization for McGill Associates, P.A. to act as our Agent. This authorization letter shall not extend past the scope of work outlined in the 404/401 permit submittal for the proposed construction efforts on parcel numbers 51879 and 56205 (Tax Pin ID #'s: 4603235803, 4603242275) in Lincoln County, North Carolina. Please contact Mr. David Richmond of McGill Associates, P.A. with any other issues or considerations that need to be addessed to secure approval for the Lincoln County Airlie Industrial Park project. He can be reached via phone 828-328-2024 or email Dave. Richmond?mcgillengineers.com. Since , DAVID CLARK, JR. INGLESIDE REAL ESTATE INVESTMENT PARTNERS, LLC Cc: Mr. David Richmond, P.E., McGill Associates, P.A. - Hickory Office Mr. Rob Krebs, NC Division of Water Quality - Mooresville Regional Office Mr. Burns Whittaker, P.E., Director of Public Works, Lincoln County i r 6 LINCOLN COUNTY, NORTH CAROLINA AIRLIE INDUSTRIAL PARK USGS QUAD MAP Feet 0 1,40Q,800 5,600 8,400 11,200 0 McGM A s s 0 c[ A T E s LINCOLN COUNTY, NORTH CAROLINA Legend MAPWTRLN MAPWfRAR DOT Transportation parcels AIRLIE INDUSTRIAL PARK PROJECT LOCATION MAP Feet McGiff 0 1,450,900 5,800 8,700 11,600 A s s 0 c I A T E s ;, "u?? Ara ?y1 tl .jti t,t? s:t r }M 1 l JI { I r - '.J 7 i 4e 1. A R k; ? t 1/ 11 1 LINCOLN COUNTY, NORTH CAROLINA AIRLIE INDUSTRIAL PARK USGS QUAD MAP Feet McGM 0 1,40(2,800 5,600 8,400 11,200 A s s 0 c I A T E s 0 0 Project Location 1 11 73 0 O Legend LINCOLN COUNTY, NORTH CAROLINA I AIRLIE INDUSTRIAL PARK MAPWTRLN MAPWTRAR DOT Transportation parcels PROJECT LOCATION MAP Feet McGM 0 1,45(2,900 5,800 8,700 11,600 A s s 0 c I A T E s ~ ~ \ ! ~ ~ ~ \ ~ I I 1 W~ ~ ~ ~ ~ ~ ~ \ ~ \ IJ ~ ~ \ ~ \ I ! ~ GENERAL NOTES z W \ ~ ~ \ I \ ~ ~ \ I ~ 0 5 10 20 30 ~ ~ PROPOSED ~ \ ~ I to ~ ~ ~ t ~ ~ 2:1 FILL SLOPE v ~ ~ i1 ~ k , ~ 1. EXISTING CONTOURS GENERATED FROM NCDOT ~ Z a ~ ~ ~ \ \ ~ ! ' GRAPHIC SCALE 1 INCH = 10 FEET ~ 1 ` LIDAR. SURVEY DATA AROUND CREEK ~ ~ ~ \ ~ 1` \ ~ w rr ' CROSSING FROM MCGILL ASSOCIATES, P.A. ~ ° ~ \ ` ~ ~ 1 ~ ~ ~ ~ DATED 1 /19/11. ~ ~ ~ ~ ~ ~ 1 ~ I ~ ~ ~ \ ~ 2. SURVEY DATA SET TO NC -STATE PLANE 83 I-1 Z N N ~ ~ \ \ I ~ l ~ ~ ~ ~ ~ ~ ~ \ ~ ~ ~ ~ ' AND NAVD 88' N \ \ \ ~ ~ r r ~ ~ 3. ALL CONSTRUCTION ACTIVITIES TO BE APPROVED ~ Z f BY ON-SITE REPRESENTATIVE OF MCGILL Z a TING STREAM PROPOSED I EXIS ~ ~ \ ~ \ ASSOCIATES, P.A. T RLINE ` ` ~ I ~ ~ ~ ~ CEN E ~ 6 SHOULDER \ I \ I ~ ~ ~ ~ \ ~ ~ ~ ~ ~ \ ~ N ~ ~ TYPICAL) ~ ~ \ ~ ~ 1 ` \ ` ~ f ~ ° .•~1 \ e . v SITE DESCRIPTION ~ z ® e A \ ~ ~ ~~0 ~ \ \ I \ ~ \ e / ~ ~ PROPOSED ~ ~ ' i" \ ~ 6' SHOULDER THE PROPOSED DEVELOPMENT AIRLIE INDUSTRIAL Q~ ~ ~ ~ \ ~ ~ / \ ~ ~ ~ v l ~ ~ (TYPICAL) PARK IS LOCATED OFF OPTIMIST CLUB ROAD NEAR W r ~ THE TOWN OF DENVER, NC IN LINCOLN COUNTY. W H ~ , \ ~ - ~ r ~ MCGILL ASSOCIATES, P.A. HAS BEEN CONTRACTED Z ~ ~ \ ~ ,l t ` ~ ` BY LINCOLN COUNTY TO DESIGN AND OBTAIN THE ~ ~ ~ ~ r=:, ,'r vi ~ / \ \ , 84 RCP LE. 734.50 ~ ~ ~ r APPROPRIATE PERMITS FOR THIS PROJECT. E~ ~ Q \ ~ . I I I ~ ~ \ i ~ \ ~ ~ I \ \ \ I ~ ~ I ~ \e I \ ~ ~ ~ THE PROJECT CONSIST OF THE DESIGN AND W / ~ ~ I ` \ 1 ~_1 \ ~ \ ~ ~ CONSTRUCTION OF APPROXIMATELY 1,500 LINEAR I ~ ~ ~ \ ~ \ 1 / ~ ~ 1 \ ~ ~ ~ e I ~ PROPOSED FEET (LF) OF ROADWAY IN ORDER TO ACCESS .THE ~,,~A~`""""''r~~ ~ PROJECT SITE. THE PROPOSED ROADWAY WILL oe°°°°°e ti ~ I \ \ ~ ~ 2:1 FILL SLOPE CROSS ONE (1) UT OF FORNEY CREEK (DWQ - o`~°°°~~'~ d~°°° • / I I \ ~ ~ ~ \ e e ~ ~ , :fie o ~ M ~~~v ~ CLASS C WATERS). APPROXIMATELY 149 LF OF . Q o~ Q ~ z• ~ ~ / I / \ \ STREAM WILL BE IMPACTED DUE TO THE N M e e 4l ~ , / ~ / ~ INSTALLATION OF AN 84" RGP CULVERT. %ti,~'o°~d ~ o, I .tee. / \ ~ ° . .9x ~ / ' THE EXISTING PROJECT SITE IS MOSTLY WOODED, ` ~ I I ~ ~ HOWEVER, LOGGING OPERATION ARE UNDERWAY. ~ r' I \ / ~ ~ ~ - I I ~ ~ THE ADJACENT PROPERTIES CONSIST OF RESIDENTIAL, RECREATIONAL, AND SERVICE DUMP r SITE RUN BY THE COUNTY. I ~ Y \ EXISTING ROCK ~ I J / ~ OUTCROPPING ~ ~ ~I i I I / ~ I ~ / ~ ~ \ ~ , , r , I \ I / \ Z ~ i T \ / ~ 1 I I ~ ~ ` r \ \ \ N J ~ I~ I , ` I 1 / \ ~ ~ ~ I1 I .I ` / ~ GENERAL CONSTRUCTION p ~ I I \ REINFORCED CONCRETE ENDWALL \ ~I. I ~ / ~ v ` I I I / ~ ~ I ~ \ \ PER NCDOT STANDARDS. ~ ~ ~ ~ I I INSTALLED ~ If I \ \ ~ \ ' NOTES 1 / i I / ~ ~ _ ~ ~ ~ \ ~ DETAIL ON SHEET C 501 ~ , I I \ I / I , \ \ PROPOSED Z U ~ ~ \ ~ ~ 1 I i I / ` ~ 30" CURB AND GUTTER 1. ALL APPROPRIATE .PERMITS WILL BE OBTAINED W = ( ) FROM: ARMY CORPS, NCDWQ, NCDENR, NCDOT. ~ . I I I / ~ TYPICAL ~ 2. APPROPRIATE SEDIMENT AND EROSION CONTROL ~ ~ ~ ~ ~ e ~ I i / \ ' MEASURES WILL BE INSTALLED IN ORDER TO ~ \ I I I I I~ ~ ~ I / I 1 I ~ ~ \ / \ ~ MINIMIZE THE IMPACT TO THE UT OF FORNEY J Z ~ ~ \ \ CREEK DURING CONSTRUCTION. ~ ~ \ ~ ` V / ~ 111 I ~ I ~ / \ 1 / ~ IV t / ~ ~ ~ ~ I I T ~ i \ 3. A PUMP AROUND WILL BE INSTALLED TO. ALLOW W A ~ ~ ~ . / I I I ~ r \ FOR CONSTRUCTION IN THE. DRY. W 1 \ ~ ~ 1 I 1 •,4y~• ~eee ~ ~ ~ 4. CULVERT ..SHALL BE INSTALLED PER. THE ~ ' • ee, \ L . ~ ~ ~ ~ "CULVERT INSTALLATION" DETAIL .THIS SHEET \ C-101. ~ ~ ~ ~ ~ ~ ~ II I I ~ 1 ` ~ ~ ~ ~ I ~ 1 II 1~ ~ 148 LF OF 84" RCP 5. ALL DISTURBED AREAS SHALL BE STABILIZED ~ ~ I I / 1 ~ v ~ t ~ 1 I I I I I`~ ~ CULVERT BURIED 1 FT \ WITH TEMPORARY AND PERMANENT SEEDING AND ~ ~ ~ ~ I I ~ . ~ \ I I I~ 1 ~ ~ ~ ~ 1~ 1 P ~ BELOW STREAM BED ~ ~ CQVEREO WITH THE APPROPRIATE EROSION ~ z ~ ~ EXISTING DIRT ROAD ` ~ ~ I I i i I < ~ ` ~ ~ ~ ~ I I ~X I I I1 ~ : ~ ~ w i ~ \ I / ~ I I ~ MATCHING EXISTING CONTROL BLANKET WITHIN 24 HRS. OF ~ ~ ~ ~ ~ ~ ~ ~ / I `1 I III ~ ~ SLOPE. ~ ~ COMPLETION OF THE RCP CULVERT. ~ Ca \ ~ ~ ~ I ~ ~ I 1 ~ ~ ~ I ~ II CULVERT SHALL ~ Q. z ~ ~ ~ ~ I ~I ~ Il 1 1 \ e BE INSTALLED PER NCOOT ~ ~ ~ ~ ~ ~ ~ ~ 1 \ ~ \ / 1 V I \ / ~ STANDARDS. , ~ ~ / ~ ~ I ~ "T ~ \ ~ ~ ~ ~ ~ ` ~ I I. / \ ~ \ ~ ~ ~ ~ \ I i i o \ ~ \ ~ , / I I ~ ~ ~ ~ ~ \ \ ` ` ~ I I ~ \ ~ i I W ~ ~ ~ \ \ \ ~ ~ I / 34.0 y I. I~. ~ ' ~i / ~ ~ ~ t t 3 ~ ~ \ ~ ~ \ ~ ~ I I I ~ t / ~ ~ ` ` ` PROPOSED ~ ~ ` •el~ i ~ ~ REINFORCED CONCRETE HEADWALL ~ ~ N ~ I I o \ ~ / 1 INSTALLED PER NCDOT STANDARDS. = ~ o 30 CURB AND GUTTER I, I. \ I ~ I ~ I h ~ ~ ~ ~ L.a DETAIL ON SHEET C-501 S Q Q w w ~ TYPICAL ~ / ~ ~ ~ /I ~1 CULVERT SHALL BE BACKFILLED ~~N ~ ~01~ ° z m ~ w w w~ N ~ \ \ \ I I / e I ~ ~ ~ / e N ~ ~ ~ \ ~ ~ ~ \ I \ I o t e- ~ ~ ~ \ \ \ ~ e I e y~ b v ~l WITH ENGINEERED FILL PLACED AND ~~a o ~ z m z ~ m T~~~ o z \ \ \ \ \ / \ ' ~ ~ ~ COMPACTED IN LIFTS 6 OR LESS ~°S z w ~ \ \ \ I I ~ ° \ \ \ / \ \ ~ \ \ / ~ ° a O \ ~ \ \ ~ ~ ~ i COMPACTED TO 95~ (ASTM D-698) o ~ o ~ o o a \ \ \ ~ \ I \ .r , A „ \ ~ 1 O \ ~ / \ \ \~!f° 84 RCP LE. 736.00 ti ~ ~ \ ,.,\r: v ~ ~ v ~ 6• v ~ I ~ .,,,v ~•e ~ ~ ~ m \ \ \ \ \ / t 1 \ \ ~ . i \ \ \ ~ ~°a. ' ~1 ~l CULVERT SHALL BE BURIED =III=I =III=I =I ~ \ \ \ \ V A \ ~ I \ I ~ ~ : Y e0O ~ 1 ~ \ V \ \ \ V A ~ / \ r ~ I i \ \ \ \ \ ~ \ I ~ I ~ ~ ~ . 1.0 MIN BELOW EXISTING III=III I I=I ~ I C \ ~ I / \ ~ ~ \ i i ~i STREAM BED ELEVATION ( I (=I \ / \ \ ` III z r / ~ v v I II\ ~ \ a ~ 84 RCP ~ \ ~ \ ~ ~ ~ \ \ I \I \ \ \ / g \ \ ~ r V~°l ~i t ~ ~ CULVERT ~ \ \ \ \ \ \ 1~ \ ~ \t , o ~ \ ~ °~V A ~ 1.0 MIN. I I I _ ~ s.o H' 1 \ I I 1 \ \ ~ I ~ I 1 \ ~ I \ ~ , ~ I ( I-I W c ~ \ I I 1 1 \ ° \ . 1 ~ \ \ \ 1 1 \ \ I \ ` ~ \ I I I \ ~ 9 \ i 1 \ I/ \ i \ ,,1` ~ ~1 ~1 8" MIN. - = 8" MIN. ~ ~ t 1 1 \ \ ~ \ I \ I B 1 1 I 1 1 V ~ ~ ~ \ \ / / \ P\ ~ ~ p a ` 1 / I ~ 1 \ I 5 i 1 \ I \ \ ~ m I 1 1 ~ I \ V 1 1 ~ \ I A .N \ 1 / ~ ' ~ ~ ~i 1 8" Mln. o \ \ I I I \ \ I \ 1 1 \ \ \ ~ N~ \ \ I 1 I 1 / \ I { \ 14 ~ Q o ` 1 I / \ 1 1 1 1 1 1 ~ ~ I ! ' ` A \ 1 1 1 1 1 ~ i \ ~ ! \ I m ~ \ \ . . l \ I 1 I I 1 1 ~ , I ° \ I\ ~ \ 1 1 \ I\ ~ I; ~ f ~ 1 ~ 1 /I \ ~ ~ I 1 1 V I\ / ~ ~ i i ~ ~ : \1 #57 STONE WRAPPED ~ I I I I I I 1 1 1 1 1 I\ ~ i I I 1 ~I \ I \ ~ a l I I I 1 ~ \ I \ ` i ~ ; ~ ~ ~ ~ ~ ~ IN MIRAFI 140N OR m l I I I I i 1 1 \ \ I\ ~ ~ ~ I 1 ~ i ; ~ i' EQUIVALENT . l I I I 1 1 ~ \ I \ ` I I I I ( 1 1 \ I \ ~ ( I z I 1 I I I t ~ \ ~ 1 I I i 1 1 \ I ~ r ~ ; CULVERT INSTALLATION . ~ ~ P i ~ N.T.S. $ I I I I I 1 I ~ ~ . ~ I i ~ ~ 1 ~ ~I i i ~ ~ i I ° z I + I ~ ~ ' '1 1 1 ~ ~ ~ I I I I 1 1 1 I` \ \ z i I I I I 1 1 I \ \ i \ \ I I I I I 1 I \I r I r , \ \ a l I I I I I 1 \ I ~ \ o I I I I 1 \ ! I\ • ) I I \ 1 o ~ I 1 l I \ 00,01 l ) I I 1 I\ ~ ! I ! I I 1 1 ! 1 i I 1~ \ ! I i I 1 I 1 I I \ 1 ! I I I, I ! 1 1 \ ! t \ f I I I 1 1 \ ~ i I NO. DATE BY REVISION DESCRIPTION