Loading...
HomeMy WebLinkAbout20081754 Ver 1_Information Letter_20101008 ©?? . D'? w NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary December 8, 2010 Mr. J. B. Setzer, P.E. Division 14 Engineer N.C. Department of Transportation 253 Webster Road Sylva, North Carolina 28779 Subject: Stormwater Inspection Upward Road NCSR 1783 DWQ Project No. 081754 TIP No. R-4430 Henderson County Dear Mr. Setzer: On December 2, 2010, 1 conducted a stormwater inspection for TIP Project No. R-4430, NCSR 1783, Upward Road construction project in Henderson County. Recent heavy rains resulted in the loss of sediment all along the project. The rainfall data and inspection data appeared to be incompliance with the stormwater monitoring requirements. Continue to ensure that these records are maintained during the life of the project. Please refer to the attached inspection report for additional comments and/or recommendations. If you have questions, please call me at 828-296-4500. ?Sincerely, Michael R. Parker Environmental Senior Specialist Attachment cc: Aaron Powell, P.E. Mark Davis, Division 14, DEO Ed Ingle, Roadside Environmental tT`ansportation Permitting Unit Mike Parker, Asheville Regional Office (Setzer) R4430 December 2010 Stormwater Inspection Location: 2090 U.S. Highway 70, Swannanoa, North Carolina 28778 Phone: 828-296-45001 FAX: 828-299-70431 Customer Service: 1-877623-6748 Internet www,nmaterquality.org An Equal Opportunity 1 Affirmative Action Employer J NorthCarolina Natural!' FQrm A June 2005 Site inspection form- Construction Storrntwater Permit NPDES NCGO10000 Site Name: e +';:.;/1?CSG 3: jl DWQ R0:. Inspector: 1. DWQ Inspection date: (A-1155W Location: 2. County: (A2) Leii((f 3. Basin: (A3) `si 4. Location description: (A4) 7. Land disturbance due to construction/ development? 8. On-site 5. Stream: (Topographical vid-pity map of site is aNached for case file] (A7) r_ N. 9 Erosion and Sedimentation Control Plan (Part I. Section A: No. 2.) Is a copy of the approved plan on site and available for review? 10. Rain Gauge ( Part I. Section B. No. 1.) Is a rain gauge present on the site at the time of inspection? 11. Rain Gauge Data ( Part I. Section B. No. 1.) Is rain gauge data measured and recorded? Data from past 14 da s: Week 1 Date Amount (Week 2 Date Amount „. v I 7ZO fi ?" k-,1 0 :':`?2 LYd , Q l ` • ?-^l r: 12 Minimum Monitoring & Record Keeping (Part 1. Section B. No. 11) Are inspection records of erosion & sedimentation control facilities complete & available on re uest? Jt- Vee { e'I- No '? Not Inspected' Dates of the oast 14 Week 1 w?`.w`.a...,.. Week 2: 13. Sedimentation impacts to waters 14. Linear ft of stream ire acts Typical range of sediment depth: (A13a) ras„),,al '?. Ito +1 (A14) ; x + Maximum depth of sediment: (Al 3b) 15. Photo Documentation: Were photos taken? (A15) F r Yes ?T No =^ Photos (1. impacted water, 2. sedimentation depths, 3. sediment control measures, ands. un-impacted upstream waters) and skstch/map of whzre photos were taken are arached for case file 16. Notes: Project personnel not available during DV'/Q site inspection (A9) s' . Ye si No ::p Not Inspected' N (A10) Ya L yid No '? Not 1E Inspected' E (A11) Ye ay !T Nod-?<I_- nspected' 1-4