Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20100988 Ver 1_More Info Received_20110121
CPT Engineering and Surveying, Inc. 10 - D 9 g g 4400 Tyning Street a High Point, NC 27265 * Phone (336) 812-8800 • Fax (336) 812-8780 To: Ian McMillan N.C. Division of Water Quality, Wetlands/401 Certification Unit 1650 Mail Service Center Raleigh, NC 27699-1650 (siq ) 80-7 - We are sending you: M Attached ❑ Under separate cover via : ❑ Plans ❑ Diskette(s) ❑ Other: LETTER OF TRANSMITTAL Date: 1/18/11 Job No: 925-09 Attention: Re: Greensboro Auto Auction — Guilford Co. Property the following items: ❑ For Approval M For Review ❑ Specifications Quantity Dw . No. Description Status I Copy of comments I 1 Response to comments Status Code: A. Approved D. Rejected - See Remarks G Approved - As noted B. Sign and Return E. For your information H. As Requested C. Amend and Resubmit F. Refer to Remarks I. Review and Comment Remarks: JqN 2 D z 2011 Nf�m- Bruce Nooe, P.E. — P.L.S. CPT ENGINEERING AND SURVEYING, INC. A 9= NCDENR North Carolina Department of Environment and Natural Resource,, Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman (,nvprnnr Director Secretary December 22, 2010 DWQ# 10-0988 Guilford County CERTIFIED MAIL: 7010 0290 00014856 4683 RETURN RECEIPT REQUESTED Dean Green, President Greensboro Auto Auction, Inc. 3907 West Wendover Ave Greensboro, NC 27409 Re: Section 401 Water Quality Certification application Dear Mr. Green: On November 23, 2010, the North Carolina Division of Water Quality (Division) received a copy of your application for a 401 General Water Quality Certification to impact 295 linear feet of an unnamed tributary to South Buffalo Creek for the 4009 West Wendover Ave Retail and Auto Auction Parking Project in Greensboro, NC in Guilford County. Additional information is required in order that we may determine your project's compliance with 15A NCAC 2H .0500. The Division will require this information in order to process your application to impact protected wetlands and/or streams on the subject property. Therefore, we will place this project on hold as incomplete until we receive this additional information, and if we do not receive the additional information requested below, we will have to move toward denial of your application as required by 15A NCAC 2H .0506. Please provide the following information so that we may continue to review your project. Please be aware that the Division is unable to issue a 401 Water Quality Certification until the USACE determines the limits of the "single and complete" project. 2. Please provide documentation that supports the requirement for the turning lane. Please provide engineering drawings which accurately show the limits of the turning lane and the minimum fill associated with the turning lane. 3. Please provide more details regarding avoidance and minimization of stream impacts for this project. This should include stream relocation, retaining walls, alternative designs and layouts of the buildings and parking areas, etc, including modifying the type of use of the property. Loss of space available for development such as a building or reduction in size of a building must also be considered in the analysis. North Carolina Division of Water Quality, Winston-Salem Regional Office Location: 585 Waughtown St. Winston-Salem, North Carolina 27107 Phone: 336-771-5000 \ FAX: 336-771-4630 \ Customer Service: 1-877-623-6748 Internet: www.ncwaterqual4.org An Equal Opportunity \ Affirmative Action Employer One NorthCarolina ;Vawrallty Dean Green DWQ# 10-0988 December 22, 2010 Page 2 of 4 4 It is the „ opinion of the Division that the approximately 45 feet of un -impacted perennial stream between the road culvert and the development culvert will lose its aquatic function due to the length of upstream and downstream culverts. The Division will require mitigation for this additional length of perennial stream at a ratio of 1:1. We suggest that you consider stabilization options such as additional pipe, or riprap to ensure that if the open section de -stabilizes that it does not impact downstream segments. Please include this stream channel length in your compensatory mitigation plan. 5. The Division requires mitigation for all permanent impacts from this project. Please correct Item number 2 in Section D of the PCN form and supply a compensatory mitigation plan. 6. Please provide an answer to item number 3 in Section F of the PCN form. 7. Please provide the exact length of stream impact measured accurately along the thalweg of the channel. 8. Please realign the culvert to ensure that the inlet and outlet are aligned with the natural stream channel to prevent streambank erosion in these areas. 9. Please indicate whether an energy dissipation measure (riprap apron, etc) will be required at the outlet of the culvert. If so, please include the length as permanent impacts and update your application and engineering drawings accordingly. 10. Please provide a detailed cross section and profile of the proposed culvert. 11. Please provide a culvert design that includes sills and/or floodplain benches which will ensure proper stream dimensions during low flow conditions. Please provide construction details for the floodplain benches. 12. Per the requirements of GC 3821, all work must be done "in the dry". Therefore, dewatering methods will be necessary to temporarily dewater the stream channel during pipe installation. Please provide a construction sequence that details the method of dewatering to be utilized at the site and the sequence of construction events to be followed to ensure compliance with this condition. 13. Per the requirements of GC 3821, please enumerate all temporary impacts to the stream channels. Temporary impacts also include areas of disturbance necessary for proper dewatering measures and any temporary erosion control measures expected to be installed within any jurisdictional areas. Please note that temporary impacts should be minimized to the maximum extent practical. 14. Please provide a construction sequence and details (plans/drawings) that detail the restoration of the temporary impact areas upon completion of the project. Dean Green DWQ# 10-0988 December 22, 2010 Page 3 of 4 Please respond in writing within 30 calendar days of the date of this letter by sending a copy of this information to Sue Homewood at the address on this letterhead, and a copy to Ian McMillan N. C. Division of Water Quality, Wetlands/401 Certification Unit, 1650 Mail Service Center, Raleigh, NC 27699-1650. If you will not be able to provide the requested information within that timeframe, please provide written confirmation that you intend to provide the requested information, and include a specific timetable delineating when the requested materials will be provided. If we do not hear from you in 30 calendar days, we will assume that you no longer want to pursue this project and we will consider the project as returned. Dean Green DWQ# 10-0988 December 22, 2010 Page 4 of 4 This letter only addresses the. application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the Division. If you have any questions, please contact me at 336-771-4964 or sue.homewood@ncdenr.gov. Sincerely, Sue Homewood DWQ Winston-Salem Regional Office cc: Andy Williams, U. S. Army Corps of Engineers, Raleigh Regulatory Field Office (via email) Bruce Nooe, PE, CPT Engineering (via email) Virginia Spillman, City of Greensboro (via email) DWQ Winston-Salem Regional Office DWQ Wetlands/401 Unit Section 401 Water Quality Certification application (Additional Information) DWQ#: 10-0988 County: Guilford Sue Homewood NC Division of Water Quality, Winston-Salem Regional Office 585 Waughtown St. Winston-Salem, NC 27107 FOR Ian McMillan N.C. Division of Water Quality, Wetlands/401 Certification Unit 1650 Mail Service Center Raleigh, NC 27699-1650 GREENSBORO AUTO AUCTION GREENSBORO - GUILFORD COUNTY MOREHEAD TOWNSHIP NORTH CAROLINA OWNER/DEVELOPER: GREENSBORO AUTO AUCTION 3907 W. WENDOVER AVE. Greensboro, North Carolina 27409 (336) 299-7777 CPT Engineering and Surveying, Inc. 4400 Tyning Street High Point, NC 27265 Phone (336) 812-8800 9 Fax (336) 812-8780 Section 401 Water Quality Certification Application (Additional Information) DWQ# 10-0988 County: Guilford FOR GREENSBORO AUTO AUCTION Comment 1: "Please be aware that the Division is unable to issue a 401 Water Quality Certification until the USACE determines the limits of the "single and complete" project." o Ftr-z� Response: Noted. Id Lcm- U W Lg OP JAN 2 1 2011 aewaraw�'�x°uu'" Comment 2: "Please provide documentation that supports the requirement for the turning lane. Please provide engineering drawings which accurately show the limits of the turning lane and the minimum fill associated with the turning lane." Response: Please see attached Transportation Impact Analysis by Davenport Transportation Consulting for documentation that supports the requirement for the turning lane. Please see attached plan (Sheet 4B) for the limits of the turning lane. See attached plan and profile for the minimum fill associated with the turning lane. Note: With the required 3:1 slope the existing stream will be impacted. CPT Engineering and Surveying, Inc. 4400 Tyning Street High Point, NC 27265 Phone (336) 812-8800 • Fax (336) 812-8780 r— �D 0 DAVENPOPT TRANSPORTATION CONSULTING Prepared for Greensboro Auto Auction, Inc. 2nd Revision Date: 07/08/2010 1St Revision Date: 07/02/2010 Original Submittal: 06/18/2010 Analysis by: Frank Amenya, P.E.,PTOE Nick Liguori, E.I. Terrell Hughes, E.I. Drafting/Grapl-ics by: Terrell Hughes, E.I. Reviewed by: John Davenport, Tr., P.E. 1, •l n, Sealed by: Frank Amenya, P.E.,PTOE This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by Davenport Transportation Consulting shall be without liability to Davenport Transportation Consulting and shall be a violation of the agreement between Davenport Transportation Consulting and the client. I Ionic office: ,05) Wcq Foin-th Street, Suitr _A (27, 101) NO1-Z I I I C, ROLIM-A P.0. lin\ .I I S1, IViuston-Snlcm, IVC27115-4 1:11 '�OL11']-I CCAN;A i1(,.74.1o3ax1,105h.V112,'IN1A F� 0 DAVENPORT TRANSPORTATION CONSULTING Greensboro Auto Auction Site - 'Transportation Impact Analysis Prepared for Greensboro Auto Auction Revised July 8, 2010 Executive Summary The proposed commercial development is located on the southwest quadrant of the intersection of Wendover Avenue West at Edwardia Drive in northwest Greensboro, NC. The proposed site plan (see Figure 1) shows two access points on Wendover Avenue West. The developer currently proposes part of the site to be used for car dealership and auto auction. Due to the uncertainty of the land use for remainder of the site, this study assumed retail development depicting the maximum land use (worst case scenario). Davenport Transportation Consulting (DTC) was retained to determine the potential traffic impacts of this development and to identify transportation improvements that may be required to accommodate the impacts of both background traffic and new development traffic. The following intersections were included in the study: • Wendover Avenue West at Edwardia Drive • Wendover Avenue West at Carnegie Place The above-mentioned intersections were analyzed for the following scenarios: • 2010 Existing Conditions • 2012 Future No Build Conditions • 2012 Future Build -Out Conditions The build -out analysis year for this project was assumed to be 2012. The AM (7-9 am) and PM (4-6 pm) peaks were analyzed. The Greensboro Department of Transportation (GDOT) was contacted to obtain background information and to ascertain the elements to be covered in this Traffic Impact Analysis (TIA). Information regarding the property was provided by the site engineer, CPT Engineering and Surveying, Inc 7/08/10 10-068 Greensboro Auto Auction Site - Executive Summary DAVENPORT TRANSPORTATION CONSULTING The following is a summary of the comments regarding our assessment of the study intersections: Wendover Avenue West at Carnegie Place/ Kendall Center (Private Drivezoay West) This unsignalized offset intersection is expected to operate at LOS F and D for the AM and PM peak hours, respectively, for existing and future no build traffic conditions. The LOS F condition is mainly due to a lack of sufficient gaps for left -turning vehicles onto Wendover Avenue West. This is a very typical condition for minor side street movements onto congested major streets like Wendover Avenue With the addition of site traffic, tl-is intersection is projected to function at LOS F for the northbound minor street movements during the AM and PM peak periods. We recommend the following improvements: • Provide separate northbound left turn lane with 100 feet of storage and through - right lane with full storage on Kendall Center (Private Driveway West) • Align Kendall Center (Private Driveway West) directly across Carnegie Place as shown on the site plan. The private driveway should be constructed according to GDOT / NCDOT standards • Based on GDOT Driveway Manual, an eastbound right turn lane on Wendover Avenue with 100 feet of storage is warranted Wendover Avenue West at Edwardia Drive/ Kendall Center (Private Driveway East) This signalized intersection is expected to operate at LOS B for both the AM and PM peak hours under existing and future no build traffic conditions. With the addition of site traffic, this intersection is projected to continue at LOS B during the AM peak hour and operate at LOS C during the PM peak hour. We recommend the following improvements: • Providing separate northbound left turn lane with 100 feet of storage and through -right lane with full storage on Kendall Center (Private Driveway East) • Based on GDOT Driveway Manual, an eastbound right turn lane on Wendover Avenue with 175 feet of storage is warranted • Modify traffic signal 7/08/10 10-068 Greensboro Auto Auction Site - Executive Summary ii DAVENPORT TRANSPORTATION CONSULnNG The following table represents the summary of the level of service analysis for existing, future no -build, future build, and future build with improvements scenarios: 7/08/10 10-068 Greensboro Auto Auction Site - Executive Summary iii Table A - Level of Service Summary �i? �'�` ^'�I 2+I �r. �Spyk n�SN✓�*Yyy 5�+7 ,o„ +1��y ���,hh 3h 4r +F asse,er�a) u t a x �) ti F (153.9) 2010 Existing B (10.8) NB Approach 2012 Future No F (214.4) Build NB Approach B (11.4) Peak F (192.2) 2012 Future Build B (15.3) NB Approach 2012 Future Build B (14.8) with Improvements D (29.4) 2010 Existing B (16.7) NB Approach 2012 Future No D (33.6) B (18.8) Build NB Approach Feat := F (57.3) 2012 Future Build C (25.4) NB Approach T 1 2012 Future Build with ImprovementsLOS C (23.6) (delay in seconds)Note for Linsignalized conditions, LOS & delay indicates only ininor street approach with longest delay 7/08/10 10-068 Greensboro Auto Auction Site - Executive Summary iii _ ; DAVENPORT TP.AN5PORTATION CONSUONG Summary and Conclusion This analysis has been conducted based on the scope given by the City of Greensboro. This study was conducted based on the maximum land use intensity (worst case scenario) for this site. Our trip generation indicates the proposed Greensboro Auto Auction Site development is projected to generate 2,600 net trips per day. This is based on a 21,500 square foot retail space, a 21,000 square foot auto dealership and 15,600 square feet of light industrial. Table B below summarizes the recommended improvements for 2012 future build scenarios. Improvements are shown in Figure 10. In conclusion, this study has determined the potential traffic impacts of this development and identified transportation improvements that will be required to accommodate the impacts of both background traffic and new development traffic. • Provide separate northbound left turn lane with 100 feet of storage and through -right lane with full storage on Kendall Center (Private Driveway West) • Align Kendall Center (Private Driveway West) directly across Carnegie Place as shown on the site plan. The private driveway should be constructed according to GDOT / NCDOT standards • Based on GDOT Driveway Manual, an eastbound right turn lane on Wendover. Avenue with 100 feet of storage is warranted • Providing separate northbound left turn lane with 100 feet of tTe�' storage and through -right lane with full storage on Kendall t Eldra Center (Private Driveway East) Drldant • Based on GDOT Driveway Manual, an eastbound right turn �y lane on Wendover Avenue with 175 feet of storage is i x warranted Modify traffic signal 7/08/10 10-068 Greensboro Auto Auction Site - Executive Summary iv DA` EP -4P SRT TRANSPORTATION CONSULTING Greensboro Auto Auction Site - 'Transportation Impact Analysis Prepared for Greensboro Auto Auction Revised July 08, 2010 Table of Contents 1.0 Introduction........................................................................................................................................2 Figure1 -Site Plan................................................................................................................................. 3 Figure2A - Site Location Map............................................................................................................ 4 Figure2B - Vicinity Map...................................................................................................................... 5 2.0 Existing Conditions...........................................................................................................................6 2.1 Inventory......................................................................................................................................... 6 2.2 Existing Traffic Volumes............................................................................................................... 6 Figure 3 - Existing Lane Geometry..................................................................................................... 7 Figure 4 - 2010 Existing Traffic Volumes........................................................................................... 8 3.0 Approved Developments and Committed Improvements........................................................9 3.1 Approved Developments.............................................................................................................. 9 3.2 Committed Improvements........................................................................................................... 9 4.0 Methodology......................................................................................................................................9 4.1 Base Assumptions and Standards............................................................................................... 9 4.2 Exceptions to NCDOT Congestion Management Standards ................................................... 9 4.3 Trip Generation............................................................................................................................10 4.4 Trip Distribution..........................................................................................................................11 4.5 Total Traffic...................................................................................................................................11 Figure 5A - Primary Site Trip Distribution.....................................................................................12 Figure 5B - Pass -by Trip Distribution..............................................................................................13 Figure6 - 2012 Future No Build.......................................................................................................14 Figure7 - Primary Site Trips.............................................................................................................15 Figure8 - Pass -by Trips.....................................................................................................................16 Figure 9 - 2012 Future Build Volumes.............................................................................................17 5.0 Capacity Analysis............................................................................................................................18 5.1 Level of Service Evaluation Criteria..........................................................................................18 5.2 Level of Service Results...............................................................................................................19 Wendover Avenue West at Carnegie Place / Kendall Center (Private Driveway West)..... 19 Wendover Avenue West at Edwardia Drive / Kendall Center (Private Driveway East) ....19 6.0 Summary and Conclusion............................................................................................................ 21 Figure 10 - Recommended Improvements...................................................................................... 22 Appendix...................................................................................................................................................23 Levelof Service Analysis ................................................................................................................... 24 Wendover Avenue West at Edwardia Drive/Kendall Center (Private Driveway East) ...... 25 Wendover Avenue West at Carnegie Place/ Kendall Center(Private Driveway West)........ 26 TripGeneration................................................................................................................................... 27 TrafficVolume Data............................................................................................................................ 28 SupportingDocumentation............................................................................................................... 29 7/08/10 10-068 Greensboro Auto Auction Site DAVENPORT TRANSPORTATION CONSULTING Greensboro Auto Auction Site - Transportation Impact Analysis Prepared for Greensboro Auto Auction Revised July 8, 2010 1.0 Introduction The proposed commercial development is located on the southwest quadrant of the intersection of Wendover Avenue West at Edwardia Drive in northwest Greensboro, NC. The proposed site plan (see Figure 1) shows two access points on Wendover Avenue West. The developer currently proposes part of the site to be used for car dealership and auto auction. Due to the uncertainty of the land use for remainder of the site, this study assumed retail development depicting the maximum land use (worst case scenario). Davenport Transportation Consulting (DTC) was retained to determine the potential traffic impacts of this development and to identify transportation improvements that may be required to accommodate the impacts of both background traffic and new development traffic. The following intersections were included in the study: • Wendover Avenue West at Edwardia Drive • Wendover Avenue West at Carnegie Place The above-mentioned intersections were analyzed for the following scenarios: • 2010 Existing Conditions • 2012 Future No Build Conditions • 2012 Future Build -Out Conditions The build -out analysis year for this project was assumed to be 2012. The AM (7-9 am) and PM (4-6 pm) peaks were analyzed. The Greensboro Department of Transportation (GDOT) was contacted to obtain background information and to ascertain the elements to be covered in this Traffic Impact Analysis (TIA). Information regarding the property was provided by the site engineer, CPT Engineering and Surveying, Inc. 7/08/10 10-068 Greensboro Auto Auction Site 2 ,. DAVENPORT TRANSPORTATION CONSULTING 2.0 Existing Conditions 2.1 Inventory A field investigation was conducted by DTC staff to determine the existing roadway conditions in the study area. Table 2.1 represents a summary of this investigation. Figure 3 presents the existing lane geometry. It should be noted that side streets of Carnegie Place and Kendall Center are offset at their intersections with Wendover Avenue West. 2.2 ,Existing Traffic Volumes Existing traffic volumes at the two study intersections were collected by DTC staff. Table 2.2 below contains the dates these counts were conducted. It should be noted that counts were taken when school was not in session, however this development is located in a commercial district and will be affected more by commercial traffic. An effort was made to balance traffic volumes between the two study intersections along Wendover Avenue West. This effort utilized the highest through volume instead of the lowest in order to obtain more conservative results. Figure 4 presents these base volumes for AM and PM peaks. The full reports for these volumes can be found in the appendix. Table 2.2 - Traffic Volume Data Table 2.1 - Street Inventory Date Taken: Count Location: Facility Route # Cross Section Pavement Speed Maintained Name 06/15/2010 DTC Width Limit B Wendover SR 5 lane with center two Approx. Avenue West 1541/2254 way left turn lane 81' 45 MPH NCDOT Edwardia N/A 2 -lane undivided Approx. Not GDOT Drive 20' Posted Carnegie N/A 2 -lane undivided Approx. 35 MPH GDOT Place 29' 2.2 ,Existing Traffic Volumes Existing traffic volumes at the two study intersections were collected by DTC staff. Table 2.2 below contains the dates these counts were conducted. It should be noted that counts were taken when school was not in session, however this development is located in a commercial district and will be affected more by commercial traffic. An effort was made to balance traffic volumes between the two study intersections along Wendover Avenue West. This effort utilized the highest through volume instead of the lowest in order to obtain more conservative results. Figure 4 presents these base volumes for AM and PM peaks. The full reports for these volumes can be found in the appendix. Table 2.2 - Traffic Volume Data Date Taken: Count Location: Wendover Avenue West @ Edwardia 06/15/2010 DTC Drive/ Kendall Center (Private Driveway East) Wendover Avenue West @ Carnegie Place/ Kendall 06/15/2010 DTC Center (Private Driveway West) 7/08/10 10-068 Greensboro Auto Auction Site 6 4 H FW^'t`2�a� w� W xl€ C3 p W F, O N� Q W n (� W G Z O i O o aN �w o Imo-- � �' �z �w O W �� to F U W O �� w Q of F- � N II U Z is Q 1 Z .S Co f0 nCO Lu � a 0 Z, � a W � ) x O O N Edwardia Drive Kendall Center (Private 000 Driveway East) 176-4� t � 1 FULL' o M N � aciao� � _ a m `m 12 .!0; �... H'S m L d O O N Fa o N p d D y a n U _0 L v� N = o C c;a ,m W w o A C C N C Oo N p o OF C maoLo 7?W a) Q N U 0 O nd�ao v N m la0 > d O O q.0 N w n o E c E Eccoa� 0 o O y N N 9 N o oo 01 J w � Carnegie Place � Kendall Center (Private a Driveway West) J 4. 4. W J Q U U) O F- 0 0 Z � IY4 000 W mo W�p Z Z W Qg_ zSJ YQW�o. OU' Ca WW z< 0O Uco 2 yWO t_s EWWUO 000 W O m Dz LL If Q z `�.m°NW�mOycamm0� UDvy-V O � Ow , to0 : COOM WA.7/2 4-0/0 2/2 Edwardia Drive Kendall Center (Private 000 Driveway East) 32/61 J 4 r 0 / 0--* r� 30/81 ca �_U�.�cyo�amCdmptcman0m`oON1qhF, 2, _GNnc4Cmm04) LO LO y 4) 04 =4�hrvpc�LaCCmjWmmCmN'E'o °OU NoaNca E 21 Or o" a-) U a 2 mj°0 4), LcA Ot:a E° oO rvre�pr� 2/3 i®0/0 Carnegie Place Kendall Center (Private 5 3 Driveway West) 0/0®►t10/31 rM MM WUOOz S t_s 000 DAVEIVORT TRANSPORTATION CONSULTING 3.0 Approved Developments and Committed Improvements 3.1 Approved Developments Approved developments are developments that have been recently approved in the area, but not yet constructed. Per GDOT, there are no approved developments in the study area. 3.2 Committed Improvements Committed Improvements are improvements that are planned by NCDOT, GDOT, a local municipality, or a developer in the area, but not yet constructed. Per GDOT, there are no committed developments in the study area. 4.0 Methodology 4.1 Base Assumptions and Standards In general, the analysis for this project was conducted utilizing commonly accepted NCDOT and GDOT standards. The following table contains a summary of the base assumptions: Table I .1 - Assumptions Peak Hour Factor 0.90 Background Traffic Annual Growth Rate 3.0% per year for all roadways Base Signal Timing/ Phasing NCDOT Congestion Standards Analysis Software Synchro/SimTraffic Version 7.0 Lane widths 12 -feet Truck percentages 2% 4.2 Exceptions to NCDOT Congestion Management Standards This document was prepared in accordance with GDOT standards. NCDOT Congestion Management has slightly different evaluation criteria. We have attempted to make sure our analysis conforms to both, but when there was a difference, GDOT standards were applied. In the case of this project, NCDOT utilizes an older version of the ITE Trip Generation software (Version 5). We utilized ITE Trip Generation Version 6, which is the latest software available, based on the 8fl" edition of ITE Trip Generation Manual. 7/08/10 10-068 Greensboro Auto Auction Site 9 DAVENPORT TRANSPORTATION CONSULTING 4.4 Trip Distribution Site trips for this proposed development were distributed based on the existing traffic patterns and engineering judgment. The trip distribution model for this project was approved by GDOT staff and can be found in Figure 5A. The directional distributions for the primary site trips used for this study are as follows: ® 50% from the east on Wendover Avenue West ® 45% from the west on Wendover Avenue West • 4% from the north on Edwardia Drive 1 % from the north on Carnegie Place 40% of pass -by trips were assigned to and from the east on Wendover Avenue West, and 60% to and from the west on Wendover Avenue West. The pass -by trip distribution model for this project is shown in Figure 5B. 4.5 Total Traffic The 2012 build -out traffic volumes were obtained by summing the historical growth traffic volumes and the site traffic volumes due to the proposed project. Figure 6 shows 2012 future no build volumes. Figures 7 and 8 show the primary and pass -by site trips, respectively. Figure 9 presents future build -out volumes for AM and PM peaks. 7/08/10 10-068 Greensboro Auto Auction Site 11 zz _ a o a IL 15% OUT `t �4% OUT 40% OUT Edwardia Drive 000 Kendall Center (Private 4% IN Driveway East) �z Zo OLo Tcl) f F - 0Z o z0 W w zo N r z w W (� W !� J W Q W 3 p F L Z Z ZU' W N W �U W X N f" Z F- LL O 11 v IW— Z w Z 5? LL Y II 9n W II ~ w m A� z O U zz _ a o a IL 15% OUT `t �4% OUT 40% OUT Edwardia Drive 000 Kendall Center (Private 4% IN Driveway East) �z Zo OLo Tcl) f F - 0Z 00 �• 35% OUT r 4-1 % OUT r 5% OUT Carnegie Place Kendall Center (Prig r Driveway West) 1% IN ZZ 0 0 n o r M `T yS25o C m •C � m ._ •� a3L o� m N L C m O � a c �L `mV rLna M.. iscvm v O O c cm m 'yea Y GU v �o °a3o N E c cm m�-ug6 ' yv Oa CO i C N Um $ C m V O C m D O m� O o c C G m T m w tt W C H m U _ Oc v p C m mNOM a> m oEmoa $ a Eou �2Z5—E EO _a•n� a oO N•`-° v C N p 0 m FL mn b W J Q U U 0 h H 0 z W H U%co {a-�• Z 4 Z uj W Siff Z a nWio �o a W z�� O C9 � � W ¢ W 3 o F_ v� � Z U [+] 21, Q N Z �' i� 0 W Lu.� '' Q W ~ Z W � LL O rw' 11 LL I- W z F-- m 2r^ Z � W II r` ss Q Z ? �W_, �o O M o Lu m� W +"' Z Z 0 0 00 M co �° 30% OUT Edwardia Drive Kendall Center (Private 000 Driveway East) C ap •C � M.- >.- > m r no �mL. m m,.L E.G C Z3§N_m N - C 20-C a U d U N O V 7 N L O O g C ._16 rnV •m O C C V v Z °o g C m N N w m Q� d m C C N V O M 0 0 F U 0 0 v a .'3Cvroc �fmNa.m C C -Mt F �y Op >t U a C m O O m O� C> O C U U a F N ro U _ O O n m c M N N n m m M m m > CO $ O a m E m d c a m m o$ o n E'o U O �' 6 Nm�4; _Z FSam�o 0 O T 60% OUT Carnegie Place 10% OUT Kendall Center (Private Driveway West) zz 00 W J Q V 0 F- H O e Z U [+] 000 ® '' W ix s V4 J ti 1t co m�•,�. Z fps' • O P=i h p y"' y U yyri,i. Q W y;�� 7. O m"u Q�. qq pFir W# . U) O W 0 �� N N I� N 00 `M 'L7/2 .N -NM ® 4-0/0 4-212 Edwardia Drive Kendall Center (Private 000 Driveway East) 34 / 65 .J 1) 11* 0 / 0 --► co CO LO 32/86- �L� L C - C t T O N V- p C � M r a= S m N o 0 0$ ,gm£gac c3�y=10 n utVtna v� N L O O N G rn3a'FO aU -o r� v . RIM C Q 0 (p l) O O a o 0 p 3 Q c 0 ti o c > 0 cm1 y a oo moo 77 �aCmo-o N� 00 C 8 - CL �j CL T � o 7' oca�m o,c0 o�m0 tJ W 0 lap > 2 O`er O m021 y.°. E 215 15 Eco2:5 0 0, 0., v 0) 3 r £ £ m N H�KLO m`S`o _ �_ ti.2/3 LL7 N c, 0 4-010 Carnegie Place $ `► 1 / 1 Kendall Center (Private 5/3 Driveway West) 0/0� 11/33 °°� a'i —a2 M N 41 41W J Q U CO O F- F - Z O W O NO } � Ow �; W II-- ��� CO N U J U > Z I- u> >[ � Q� Z N p � �j y �- C7 W rn W O U W O �' a rn Z � Z u a - Y II ~ Uw�� � W j m U L:] W ix s V4 J ti 1t co m�•,�. Z fps' • O P=i h p y"' y U yyri,i. Q W y;�� 7. O m"u Q�. qq pFir W# . U) O W 0 �� N N I� N 00 `M 'L7/2 .N -NM ® 4-0/0 4-212 Edwardia Drive Kendall Center (Private 000 Driveway East) 34 / 65 .J 1) 11* 0 / 0 --► co CO LO 32/86- �L� L C - C t T O N V- p C � M r a= S m N o 0 0$ ,gm£gac c3�y=10 n utVtna v� N L O O N G rn3a'FO aU -o r� v . RIM C Q 0 (p l) O O a o 0 p 3 Q c 0 ti o c > 0 cm1 y a oo moo 77 �aCmo-o N� 00 C 8 - CL �j CL T � o 7' oca�m o,c0 o�m0 tJ W 0 lap > 2 O`er O m021 y.°. E 215 15 Eco2:5 0 0, 0., v 0) 3 r £ £ m N H�KLO m`S`o _ �_ ti.2/3 LL7 N c, 0 4-010 Carnegie Place $ `► 1 / 1 Kendall Center (Private 5/3 Driveway West) 0/0� 11/33 °°� a'i —a2 M N 41 41W J Q U CO O F- F - Z O W O NO } � Ow �; W II-- ��� CO W 00 Z Ll o a " �- "� Q w�'fv'. O m Yy.s# Q Z yir �r''Gtt.4' m uj 1��#r ry Z W Q Of�A 7 0 vi LO O r � M A-6!0 o®®ao m 4-1/7 a+ ,�°15l67 Edwardia Drive 000 Kendall Center (Private Driveway East) 0/0.J* 3/6•x► ouMN OIO�, d d 3 m> m L o.o mm� N N =0 5 G t N U 0 a `o. u fi c V N t 0 0 2 C mV c L v« c a me o C E A C W 0 0 F V C C N ' V O C N a 0 a d'j 00 C C $ L) �L a0~ m a�m aro L N D.m o� o r00a �°Em-m m E 0 O W N O C y 0 00 N n 13/59 1-0/2 Carnegie Place 2 / 8 Kendall Center (Private Driveway West) 0/01 � � ,y' 1/1�► 0/0'� �cav O N �A N W J Q U U) O O z F 2 p � W ZO � ❑ } W _ Cll W a � �� Z� W Y � lL W o � F '� v a ay U) Lu (7 W rn W � U_ W O O � �' N ~ Z ~ � �+- z � � ,1 a U W r� m � J � U W 00 Z Ll o a " �- "� Q w�'fv'. O m Yy.s# Q Z yir �r''Gtt.4' m uj 1��#r ry Z W Q Of�A 7 0 vi LO O r � M A-6!0 o®®ao m 4-1/7 a+ ,�°15l67 Edwardia Drive 000 Kendall Center (Private Driveway East) 0/0.J* 3/6•x► ouMN OIO�, d d 3 m> m L o.o mm� N N =0 5 G t N U 0 a `o. u fi c V N t 0 0 2 C mV c L v« c a me o C E A C W 0 0 F V C C N ' V O C N a 0 a d'j 00 C C $ L) �L a0~ m a�m aro L N D.m o� o r00a �°Em-m m E 0 O W N O C y 0 00 N n 13/59 1-0/2 Carnegie Place 2 / 8 Kendall Center (Private Driveway West) 0/01 � � ,y' 1/1�► 0/0'� �cav O N �A N W J Q U U) O O z F 2 p � W ZO � ❑ } W _ Cll W a � �� Z� W Y � lL W o � F '� v a ay U) Lu w ry z W� oz LU N� Q W 0 U W— u N z O N� rt. en . O � j Z� ~ Z ~ U � � J W W � � �G N Cl Q W Y !9 `� a �w in w Q O U wo�� 0 - Q � 000 O f�y O W cmn Z 0 � W 3 CL r Ix yh @ V �0/0 0 0 0 1 � 4-0/0 .0/11 Edwardia Drive Kendall Center (Private 000 0/OJ Driveway East) 0/0� o, -r c -2r -=d a d 3 m d aN = E V y ass i? 0 a nmaV N OR a > cE`Loovq Q .� c'O 1, Oc N 0 m C H C N$ 0 °e oma° Q o p c a Norro 3�yb°c a _m rte. m m o$Qmom rwa EW°d) Ep°Ony m m o m�-5 m C 00 L M �CR' NrSO od �r 0/23 0 1 0 `° 4-0/0 Carnegie Place � 1 r 0 / 4 Kendall Center (Private Driveway West) O/OJ �1 ®p 1 0/0� 0/0� �NCMv O � 0 O i W J Q • U W O F- F- O ~ Z ~ � � Z � Z � Y !9 `� a U Z � m U is:f 000 ❑0 Wo WF ^-!F a t J W Z W Q Z�0 Lu 0 O Z 100010 0 DAVENPORT TRANSPORTATION CONSULMNG Table 5.2 represents the sununary of the level of service analysis for . all study intersections. 7/08/10 10-068 Greensboro Auto Auction Site 20 Table 5.2 - Level of Service Summary TT '� MIRWID sr+t � V S y p ,4 � �T. f +L f �, 43 k. .{��YN ��44`'�„}erg ;i F (153.9) 2010 Existing B (10.8) NB Approach 2012 Future No F (214.4) B (11.4) p Build NB Approach F (192.2) 2012 Future Build B (15.3) NB Approach 2012 Future Build with Improvements B (14.8) D (29.4) 2010 Existing B (16.7) NB Approach 2012 Future No D (33.6) B (18.8) Build NB Approach leak ' F (57.3) 2012 Future Build C (25.4) NB Approach 2012 Future Build with Improvements C (23.6) Note for LOS (delay in secoiids) urisigiialized cotiditioiis, LOS & delay hidicates Imigest delay only mitior street a proach with 7/08/10 10-068 Greensboro Auto Auction Site 20 DAVENPORT .' TRANSPORTATION CONSULTING 6.0 Summary and Conclusion This analysis has been conducted based on the scope given by the City of Greensboro. TI -ds study was conducted based on the maximum land use intensity (worst case scenario) for this site. Our trip generation indicates the proposed Greensboro Auto Auction Site development is projected to generate 2,600 net trips per day. This is based on a 21,500 square foot retail space, a 21,000 square foot auto dealership and 15,600 square feet of light industrial. Table 6.0 below summarizes the recommended improvements for 2012 future build scenarios. Improvements are shown in Figure 10. In conclusion, this study has determined the potential traffic impacts of this development and identified transportation improvements that will be required to accommodate the impacts of both background traffic and new development traffic. • Provide separate northbound left turn lane with 100 feet of storage and through -right lane with full storage on Kendall Center (Private Driveway West) • Align Kendall Center (Private Driveway West) directly across Carnegie Place as shown on the site plan. The private driveway should be constructed according to GDOT / NCDOT standards • Based on GDOT Driveway Manual, an eastbound right turn lane on Wendover Avenue with 100 feet of storage is warranted • Providing separate northbound left turn lane with 100 feet of storage and through -right lane with full storage on Kendall Center (Private Driveway East) • Based on GDOT Driveway Manual, an eastbound right turn lane on Wendover Avenue with 175 feet of storage is warranted • Modify traffic signal 7/08/10 10-068 Greensboro Auto Auction Site 21 W xP 2 NO H H (n. c t W O�Z O >NW O tuE`-_eO�x;aa- OU � ON 00OZ4WWU � yQZaZ 0 S20 X - C.)~ rf �ti`aLyF�'oW= Z8 LL W O wd LLI"'W On 'aNv1cmE- !"i t; O yCOh Fo-o-oaj z WWcV ' 46 �•�L�.��C�'cC,003�HmOp' N I LEdwardia Drive Kendall Center (Private 000 Driveway East) 175'+mo t A '' FULL i•f;' co co '{.'LLw c,Yca'.Ha`ccC a_m�t�U3�CHO-OO5Ca>W�a��cWd oSWNCmC0acay.j0$s:p� 2�-Vodam5�-Uo�OooOy.po�W"�f� . +0. moo OR 7 CNW' m0LO 5 W O o�-V0 HvC W C oN U nr, > d j9 -. OcwC.oO°.R }s tiaap oa Or NW f `OC y i �t�� ` Pla Kendall Center LL,LtCarnegie _QQZ . _ Private DrivewaY t JFF <n W0OZ- HCM Unsignalized Intersection Capacity Analysis 100: Wendover Ave W .. Carnegie Place 6/1712010 Lane Configurations ) ++T4 ) 01� *T* Volume (vehlh) 146 2616 3 1 1231 15 1 0 2 5 0 11 Sign Control Free Free Stop Stop Grade 0% 0% 0% 0% Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Hourly flow rate (vph) 162 2907 3 1 1368 17 1 0 2 6 0 12 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type TWLTL TWLTL Median storage veh) 2 2 Upstream signal (ft) 526 pX, platoon unblocked 0.83 0.83 0.83 0.83 0.83 0.83 vC, conflicting volume 1384 2910 3703 4619 971 2674 4613 464 vC1, stage 1 conf vol 3233 3233 1378 1378 vC2, stage 2 conf vol 470 1387 1296 3234 vCu, unblocked vol 755 2910 3542 4644 971 2305 4636 0 tC, single (s) 4.1 4.1 7.5 6.5 6.9 7.5 6.5 6.9 tC, 2 stage (s) 6.5 5.5 6.5 5.5 tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 p0 queue free % 77 99 84 100 99 95 100 99 cM capacity (veh/h) 708 123 7 17 253 115 16 902 Volume Total 162 1163 1163 585 1 547 547 290 3 18 Volume Left 162 0 0 0 1 0 0 0 1 6 Volume Right 0 0 0 3. 0 0.. 0 17 2 12 cSH 708 1700 1700 1700 123 1700 1700 1700 20 288 Volume to Capacity 0.23 0.68 0.68 0.34 0.01 0.32 0.32 0.17 0.16 0.06 Queue Length 95th (ft) 22 0 0 0 1 0 0 0 12 5 Control Delay (s) 11.6 0.0 0.0 0.0 34.6 0.0 0.0 0.0 214.4 18.3 Lane LOS B D F C Approach Delay (s) 0.6 0.0 214.4 18.3 . Approach LOS F C r s Average Delay 07 Intersection Capacity Utilization 67.3% ICU Level of Service C Analysis Period (min) 15 10-068 Greensboro Auto Auction Site 2012 AM Future No Build Frank Amenya, P.E.; Nick Liguori, E. I.; Terrell Hughes, E.I. Page 1 HCM Unsignalized Intersection Capacity Analysis 100: Wendover Ave W & Carnegie Place 16/17/2010 --6- k- # Lane Configurations I M., 1096 01" 516 273 3 17 Volume Left 153 Volume (veh/h) 138 2466 3 1 1160 14 1 0 2 5 0 10 Sign Control 0 Free 2 Free cSH Stop 1700 1700 Stop 1700 Grade 27 0% Volume to Capacity 0% 0.64 0% 0.32 0.01 0.30 0.30 0% 0.12 Peak Hour Factor 0,90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Hourly flow rate (vph) 153 2740 3 1 1289 16 1 0 2 6 0 11 Pedestrians D F C Approach Delay (s) 0.6 0.0 Lane Width (ft) 153.9 17.5 Walking Speed (ft/s) C �LOS ]Approach �yp yF `.R k t k' :4r Average Delay 0.6 Percent Blockage Intersection Capacity Utilization 64.4% ICU Level of Service C Analysis Period (min) Right turn flare (veh) 15 Median type TWLTL TWLTL Median storage veh) 2 2 Upstream signal (ft) 526 pX, platoon unblocked 0,85 0.85 0.85 0.85 0.85 0.85 vC; conflicting volume 1304 2743 3491 4355 915 2521 4349 437 vC1, stage 1 conf vol 3048 3048 1299 1299 vC2, stage 2 conf vol 443 1307 1222 3050 vCu, unblocked vol 727 2743 3309 4329 915 2163 4322 0 tC, single (s) 4.1 4.1 7.5 6.5 6.9 7.5 6.5 6.9 tC, 2 stage (s) 6.5 5.5 6.5 5.5 tF (s) 2.2 2.2 3.5 4,0 3.3 3.5 4.0 3.3 p0 queue free % 79 99 89 100 99 96 100 99 cm capacity (veh/h) 739 143 10 22 275 131 21 918 Volume Total 153 1096 1096 551 1 516 516 273 3 17 Volume Left 153 0 0 0 1 0 0 0 1 6 Volume Right 0. 0. 0 3 0 0 0 16 2 11 cSH 739 1700 1700 1700 143 1700 1700 1700 27 305 Volume to Capacity 0.21 0.64 0.64 0.32 0.01 0.30 0.30 0.16 0.12 0,05 Queue Length 95th (ft) 19 0 0 0 1 0 0 0 9 4 Control Delay (s) 11.1 0.0 0.0 0.0 30.3 0.0 0.0 0.0 153.9 17.5 Lane LOS B D F C Approach Delay (s) 0.6 0.0 153.9 17.5 C �LOS ]Approach �yp yF `.R k t k' :4r Average Delay 0.6 Intersection Capacity Utilization 64.4% ICU Level of Service C Analysis Period (min) 15 10-068 Greensboro Auto Auction Site 6/15/2010 2010 AM Existing Synchro 7 - Report Frank Amenya, P.E.; Nick Liguori, E,I.; Terrell Hughes, E.I. Page 1 HCM Unsignalized Intersection Capacity Analysis 100: Wendover Ave W & Carnegie Place 71112010 7 ' Fi If AhI61 YA%RT �Mlga KIRI AIRT: LAIRD' 061 {QRT Lane Configurations tO Volume (veh/h) 146 2628 28 9 1246 15 3 0 15 5 1 11 Sign Control Free Free Stop Stop Grade 0% 0% 0% 0% Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Hourly flow rate (vph) 162 2920 31 10 1384 17 3 0 17 6 1 12 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type TWLTL TWLTL Median storage veh) 2 2 Upstream signal (ft) 482 pX, platoon unblocked 0.83 0.83 0.83 0.83 0.83 0.83 VC, conflicting volume 1401 2951 3754 4681 989 2727 4688 470 vC1, stage 1 conf vol 3260 3260 1413 1413 vC2, stage 2 conf vol 494 1421 1314 3276 vCu, unblocked vol 765 2951 3601 4718 989 2363 4727 0 tC, single (s) 4.1 4.1 7.5 6.5 6.9 7.5 6.5 6.9 tC, 2 stage (s) 6.5 5.5 6.5 5.5 tE: (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 p0 queue free % 77 92 51 100 93 94 83 99 cM capacity (veh/h) 700 118 7 16 246 98 7 900 Ott- lo6;" t; ;.EBA . WB 1 VB,21: . WB 3, W8.4 N61 Volume Total 162 1168 1168 615 10 554 554 294 20 19 Volume Left 162 0 0 0 10 0 0 0 3 6 Volume Right 0 0 0 31 0 0 0 17 17 12 cSH 700 1700 1700 1700 118 1700 1700 1700 36 79 Volume to Capacity 0.23 0.69 0.69 0.36 0.08 0.33 0.33 0.17 0.56 0.24 Queue Length 95th (ft) 22 0 0 0 7 0 0 0 48 21 Control Delay (s) 11.7 0.0 0.0 0.0 38.2 0.0 0.0 0.0 192.2 64.6 Lane LOS B E F F Approach Delay (s) 0.6 0.3 192.2 64.6 Approach LOS F F ntersec 0n,.Summary Average Delay 1.6 Intersection Capacity Utilization 68.1% ICU Level of Service C Analysis Period (min) 15 10-068 Greensboro Auto Auction Site 2012 AM Future Build Frank Amenya, P.E.; Nick Liguori, E. I.; Terrell Hughes, E. I. Page 1 HCM Unsignalized Intersection Capacity Analysis 100' Wendover Ave W & Carnegie Place 7I112o10 --*.- f Lane Configurations1'�"�` Volume (veh/h) 146 2628 28 9 1246 15 3 0 15 5 1 11 Sign Control Free Free Stop Stop Grade 0% 0% 0% 0% Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Hourly flow rate (vph) 162 2920 31 10 1384 17 3 0 17 6 1 12 Pedestrians Lane Width (ft) Walking Speed (ftls) Percent Blockage . Right turn flare (veh) Median type TWLTL TWLTL Median storage veh) 2 2 Upstream signal (ft) 482 pX, platoon unblocked 0.83 0.83 0.83 0.83 0.83 0.83 vC; conflicting volume 1401 2951 3754 4681 989 2727 4688 470 vC1, stage 1 conf vol 3260 3260 1413 1413 vC2, stage 2 conf vol 494 1421 1314 3276 vCu, unblocked vol 755 2951 3599 4719 989 2357 4728 0 tci single (s) 4.1 4.1 7.5 6.5 6.9 7.5 6.5 6.9 tC, 2 stage (s) 6.5 5.5 6.5 5.5 fF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 p0 queue free % 77 92 51 100 93 94 83 99 cM capacity (vehlh) 704 118 7 16 246 98 7 897 hirection; Late #:. EB 1, :'' EB13' Volume Total 162 1168 1168 615 10 554 554 294 3 17 19 Volume Left 162 0 0 0 10 0 0 0 3 0 6 Volume Right 0 0 0 31 0 0 0 17 0 17 12 cSH 704 1700 1700 1700 118 1700 1700 1700 7 246 79 Volume to Capacity. 0.23 0.69 0,69 0.36 0.08 0.33 0.33 0.17 0.49 0.07 0._24 Queue Length 95th (ft) 22 0 0 0 7 0 0 0 23 5 21 Control Delay (s) 11.6 0.0 0.0 0.0 38.2 0.0 0.0 0.0 774.1 20.7 64.3 Lane LOS B E F C F Approach Delay (s) 0.6 0.3 146.3 64.3 Approach LOS F F �nter'se`ctiori 5ummarV x � r f- , Average Delay 1.4 Intersection Capacity Utilization 70.3% ICU Level of Service C Analysis Period (min) 15 10-068 Greensboro Auto Auction Site 2012 AM Future Build Mitigation Frank Amenya, P.E.; Nick Liguori, E.I.; Terrell Hughes, E.I. Page 1 HCM Unsignalized Intersection Capacity Analysis 100: Wendover Ave W & Carnegie Place 611712010 ,A - 'r Lane Configurations ) tO ) tO 44� Volume (vehlh) 37 1745 1 0 2164 14 1 0 3 3 10 31 Sign Control Free Free Stop Stop Grade 0% 0% 0% 0% Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Hourly flow rate (vph) 41 1939 1 0 2404 16 1 0 3 3 0 34 Pedestrians Lane Width (ft) Walking Speed (ftls) Percent Blockage Right turn flare (veh) Median type TWLTL TWLTL Median storage veh) 2 2 Upstream signal (ft) 526 pX, platoon unblocked 0.59 0.59 0.59 0.59 0.59 0.59 vC, conflicting volume 2420 1940 2858 4442 647. 3144 4434 809 vC1, stage 1 conf vol 2022 2022 2412 2412 vC2, stage 2 conf vol 836 2420 732 2022 vCu, unblocked vol 962 1940 1706 4401 647 2194 4388 0 td, single (s) 4.1 4.1 7.5 6.5 6.9 7.5 6.5 6.9 tC, 2 stage (s) 6.5 5.5 6.5 5.5 tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 p0 queue free % 90 100 98 100 99 98 100 95 cM capacity (vehlh) 418 299 52 73 414 142 78 637 Volume Total 41 776 776 389 0 962 962 496 4 38 Volume Left 41 0 0 0 0 0 0 0 1 3 Volume Right 0 0 0 1 0 0 0 16 3 34 cSH 418 1700 1700 1700 1700 1700 1700 1700 152 487 Volume to Capacity 0.10 0.46 0.46 0.23 0.00 0.57 0.57 0.29 0.03 0.08 Queue Length 95th (ft) 8 0 0 0 0 0 0 0 2 6 Control Delay (s) 14.5 0.0 OA 0.0 0.0 0.0. 0.0 0.0 29.4 13.0 Lane LOS B D B Approach Delay (s) 0.3 0.0 29.4 13.0 Approach LOS D B ntersectipn Sumria* , MX _ Average Delay 0.3 Intersection Capacity Utilization 52.1% ICU Level of Service A Analysis Period (min) 15 10-068 Greensboro Auto Auction Site 2010 PM Existing Frank Amenya, P.E.; Nick Liguori, E.I.; Terrell Hughes, E.I. Page 2 HCM Unsignalized Intersection Capacity Analysis 100: Wendover Ave W & Carne ie Place 611712010 Lane Configurations ) +0 Vi tO Volume (vehlh) 39 1851 1 0 2296 15 1 0 3 3 0 33 Sign Control Free Free Stop Stop Grade 0% 0% 0% 0% Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Hourly flow rate (vph) 43 2057 1 0 2551 17 1 0 3 3 0 37 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type TWLTL TWLTL Median storage veh) 2 2 Upstream signal (ft) 526 pX, platoon unblocked 0.53 0.53 0.53 0.53 0.53 0.53 vC; conflicting volume 2568 2058 3031 4712 686 3335 4704 859 vC1, stage 1 conf vol 2144 2144 2559 2559 vC2, stage 2 conf vol 887 2568 776- 2144 vCu, unblocked vol 834 2058 1713 4902 686 2290 4887 0 tC, single (s) 4.1 4.1 7.5 6.5 6.9 7.5 6.5 6.9 tC, 2 stage (s) 6.5 5.5 6.5 5.5 tF (s) - 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 p0 queue free % 90 100 97 100 99 98 100 94 cM capacity (vehlh) 419 269 44 66 390 147 69 571 Volume Total 43 823 823 412 0 1020 1020 527 4 40 Volume Left 43 0 0 0 0 0 0 0 1 3 Volume Right 0 0 0 1 0 0 0 17 3 37 cSH 419 1700 1700 1700 1700 1700 1700 1700 130 460 Volume to Capacity 0.10 0.48 0.48 0.24 0.00 0.60 0.60 0.31 0.03 0.09 Queue Length 95th (ft) 9 0 0 0 0 0 0 0 3 7 Control Delay (s) 14.6 0.0 0.0 0.0 0.0 0.0- 0.0 0.0 33.6 13.6 Lane LOS B D B Approach Delay (s) 0.3 0.0 33.6 13.6 Approach LOS D B Average Delay 0.3 Intersection Capacity Utilization 54.7% ICU Level of Service A Analysis Period (min) 15 10-068 Greensboro Auto Auction Site 2012 PM Future No Build Frank Amenya, P.E.; Nick Liguori, E.I.; Terrell Hughes, E.I. Page 2 HCM Unsignalized Intersection Capacity Analysis 100: Wendover Ave W & Carnegie Place 611712010 Lane Configurations Vi W." ) ttT 4 Volume (vehm) 39 1849 65 18 2359 15 13 2 85 3 1 33 Sign Control Free Free Stop Stop Grade 0% 0% 0% 0% Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Hourly flow rate (vph) 43 2054 72 20 2621 17 14 2 94 3 1 37 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type TWLTL TWLTL Median storage veh) 2 2 Upstream signal (ft) 482 pX, platoon unblocked 0.51 0.51 0.51 0.51 0.51 0.51 vC, conflicting volume 2638 2127 3128 4855 721 3536 4883 882 vC1, stage 1 cont vol 2177 2177 2669 2669 vC2, stage 2 conf vol 951 2678 867 2213 vCu, unblocked vol 820 2127 1789 5202 721 2596 5257 0 tC, single (s) 4.1 4.1 7.5 6.5 6.9 7.5 6.5 6.9 tC, 2 stage (s) 6.5 5.5 6.5 5.5 tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 p0 queue free % 89 92 65 96 74 97 98 93 cM capacity (veh/h) 407 252 41 59 370 105 47 549 6iree�lon �La erva�` S ih < -rit"i � R{ Yl`i f y,t V .R' �'�^i i; Q� Ak i ✓ry 4 h � i � k� - JS: rad �..:rr4 �:.� �.���.�� ��; 1N,I�.�t,���'�V��n �, �►:t;t��,x� ���:, , , r ..���..�> �I~B�!�� . �`W� e ,. a��1.. .;:� Volume Total 43 822 822 483 20 1048 1048 541 111 41 Volume Left 43 0 0 0 20 0 0 0 14 3 Volume Right 0 0 0 72 0 0 0 17 94 37 cSH 407 1700 1700 1700 252 1700 1700 1700 173 337 Volume to Capacity 0.11 0.48 0.48 0.28 0.08 0.62 0.62 0.32 0.64 0.12 Queue Length 95th (ft) 9 0 0 0 6 0 0 0 92 10 Control Delay (s) 14.9 0.0 0.0 0.0 20.5 0.0 0.0 0.0 57.3 17.2 Lane LOS B C F C Approach Delay (s) 0.3 0.2 57.3 17.2 Approach LOS F C Average Delay 1.6 Intersection Capacity Utilization 61.8% ICU Level of Service B Analysis Period (min) 15 10-068 Greensboro Auto Auction Site 2012 PM Future Build Frank Amenya, P.E,; Nick Liguori, E.I.; Terrell Hughes, E.I. Page 1 HCM Unsignalized Intersection Capacity Analysis 100: Wendover Ave W & Carnegie Place 611712010 - *- Lane Configurations Volume (vehlh) 39 1849 65 18 2359 15 13 2 85 3 1 33 Sign Control Free Free Stop Stop Grade 0% 0% 0% 0% Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Hourly flow rate (vph) 43 2054 72 20 2621 17 14 2 94 3 1 37 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type TWLTL TWLTL Median storage veh) 2 2 Upstream signal (ft) 482 pX, platoon unblocked 0.51 0.51 0.51 0.51 0.51 0.51 vC; conflicting volume 2638 2127 3128 4855 721 3536 4883 882 vC1, stage 1 conf vol 2177 2177 2669 2669 vC2, stage 2 conf vol 951 2678 867 2213 vCu, unblocked vol 820 2127 1789 5202 721 2596 5257 0 tC, single (s) 4.1 4.1 7.5 6.5 6.9 7.5 6.5 6.9 tC, 2 stage (s) 6.5 5.5 6.5 5.5 tF, (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3:3 p0 queue free % 89 92 65 96 74 97 98 93 cM capacity (vehlh) 407 25(2ly�yy41 59 370 105 549 {]47 ''G QQ CC �I tptzR'�( ,yi ,.�1.1 tl:v IIrMA4QrR�Y i7;taf, s.�aek,,x., 04" 454•'�� - "Ci4. wza1t.+5.n1..f�f "M 1�"F�6 "nG� "'W a Volume Total 43 822 822 483 20 1048 1048 541 14 97 41 Volume Left 43 0 0 0 20 0 0 0 14 0 3 Volume Right 0 0 0 72 0 0` 0 17 6 94 37' cSH 407 1700 1700 1700 252 1700 1700 1700 41 330 337 Volume to Capacity 0.11 0.48 0.48 0.28 0.08 0.62 0.62 0.32 0.35 0.29 0.12 Queue Length 95th (ft) 9 0 0 0 6 0 0 0 30 30 10 Control Delay (s) 14.9 0.0 0.0 0.0 20.5 0.0 0.0 0.0 133.6 20.4 17.2' Lane LOS B C F C C Approach Delay (s) 0.3 0.2 - 35.1 17.2 Approach LOS E C f Average Delay 1.1 Intersection Capacity Utilization 57.9% ICU Level of Service` B Analysis Period (min) 15 10-068 Greensboro Auto Auction Site 2012 PM Future Build Mitigation Frank Amenya, P.E.; Nick Liguori, E.I.; Terrell Hughes, E.I. Page 1 Lanes, Volumes, Timings 200: Wendover Ave W & Edwardia Drive 6/17/2010 *-' Lane Configurations ) t0l ) M111 4# 4 r Volume (vph) 161 2255 57 12 1143 106 2 0 7 32 0 30 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 350 0 200 0 0 0 175 0 Storage Lanes 1 0 1 0 0 0 1 1 Taper Length (ft) 0 100 0 100 100 100 100 100 Lane Util. Factor 1.00 0.91 0.91 1.00 0.91 0.91 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0,996 0.987 0.892 0.850 Flt Protected 0.950 0.950 0.990 0.950 Satd. Flow (prot) 1770 5065 0 1770 5019 0 0 1645 0 0 1770 1583 Flt Permitted 0.950 0.950 0.921 0.751 Satd. Flow (perm) 1770 5065 0 1770 5019 0 0 1530 0 0 1399 1583 Right Turn on Red No No No No Satd. Flow (RTOR) Link Speed (mph) 45 45 35 35 Link Distance (ft) 526 1001 361 487 Travel Time (s) 8.0 15.2 7.0 9.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 179 2506 63 13 1270 118 2 0 8 36 0 33 Shared Lane Traffic (%) Lane Group Flow (vph) 179 2569 0 13 1388 0 0 10 0 0 36 33 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 12 12 0 0 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Yes Yes Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 2 1 2 1 2 1 2 1 Detector Template Left Thru Left Thru Left Thru Left Thru Right Leading Detector (ft) 20 100 20 100 20 100 20 100 20 Trailing Detector (ft) 0 0 0 0 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 0 0 0 0 Detector 1 Size(ft) 20 6 20 6 20 6 20 6 20 Detector 1 Type CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 .0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 94 94 94 94 Detector 2 Size(ft) 6 6 6 6 Detector 2 Type CI+Ex CI+Ex CI+Ex CI+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 0.0 Turn Type Prot Prot Perm Perm pm+ov Protected Phases 5 2 1 6 8 4 5 Permitted Phases 8 4 4 Detector Phase 5 2 1 6 8 8 4 4 5 10-068 Greensboro Auto Auction Site 6115/2010 2010 AM Existing Synchro 7 - Report Frank Amenya, P.E.; Nick Liguori, E.I.; Terrell Hughes, E.I. Page 2 Lanes, Volumes, Timings 200: Wendover Ave W & Edwardia Drive bane Groin: X11-'rhx 7.0 12.0 .f t 1.,`•*r5rrk , f:,G a t,, , _ 7.0 12.0 7.0 6/17/2010 05 7.0 7.0 7.0 Minimum Split (s) 14.0 20.0 14.0 T.FN Switch Phase Minimum Initial (s) 7.0 12.0 .f t 1.,`•*r5rrk , f:,G a t,, , _ 7.0 12.0 7.0 7.0 05 7.0 7.0 7.0 Minimum Split (s) 14.0 20.0 14.0 20.0 20.0 20.0 20.0 20.0 14.0 Total Split (s) 26.0 32.0 0.0 26.0 32.0 0.0 32.0 32,0 0.0 32.0 32.0 26.0 Total Split (%) 28.9% 35.6% 0.0% 28.9% 35.6% 0.0% 35.6% 35.6% 0.0% 35.6% 35.6% 28.9% Maximum Green (s) 19.0 25.0 19.0 25.0 25.0 25.0 25.0 25.0 19.0 Yellow Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 All -Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 Total Lost Time (s) 5.0 5.0 2.0 5.0 5.0 2.0 5.0 5.0 2.0 5.0 5.0 5.0 Lead/Lag Lead Lag Lead Lag Lead Lead -Lag Optimize? Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None C -Max None C -Max None None None None None Act Effct Green (s) 16.3 74.4 9.1 54.0 10.3 10.3 26.0 Actuated g/C Ratio 0.18 0.83 0.10 0.60 0.11 0.11 0.29 vlc Ratio 0.56 0.61 0.07 0.46 0.06 0.22 0.07 Control Delay 39.7 7.1 37.7 12.7 35.2 39.1 18.3 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 39.7 7.1 37.7 12.7 35.2 39.1 18.3 LOS D A D B D D B Approach Delay 9.2 13.0 35.2 29.2 Approach LOS A B D C Area Type: Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 0 (0%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 80 Control Type: Actuated -Coordinated Maximum v/c Ratio: 0.61 Intersection Signal Delay: 10.8 Intersection LOS: B Intersection Capacity Utilization 69.3% ICU Level of Service C Analysis Period (min)15 Sollts and Phases: 200: WendnvPr Ava W R Friwnrriin nriva 01 ""M" o2 e4 .f t 1.,`•*r5rrk , f:,G a t,, , _ :� 2�q .r+Y *3.< "', G.x:. � V'�,:�4 y ??�+y'k' -4 Z I-, . ® 05 06 08 !!yy� � Pel....', 10-068 Greensboro Auto Auction Site 6/15/2010 2010 AM Existing Synchro 7 - Report Frank Amenya, P.E.: Nick Liguori, E.I.; Terrell Hughes, E.I. Page 3 Lanes, Volumes, Timings 200; Wendover Ave W & Edwardia Drive 6/17/2010 -.4 -- *- f Lane Configurations ) ffi� ) tti� 4 r Volume (vph) 171 2392 60 13 1213 112 2 0 7 34 0 32 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 350 0 200 0 0 0 175 0 Storage Lanes 1 0 1 0 0 0 1 1 Taper Length (ft) 0 100 0 100 100 100 100 100 Lane Util. Factor 1.00 0.91 0.91 1.00 0.91 0.91 1.00 1.00 1.00 1.00 1.00 1.00 Frt. 0.996 0.987 0.892 0.850 Flt Protected 0.950 0.950 0.990 0.950 Satd. Flow (prot) 1770 5065 0 1770 5019 0 0 1645 0 0 1770 1583 Flt Permitted 0.950 0.950 0.920 0.751 Satd. Flow (perm) 1770 5065 0 1770 5019 0 0 1529 0 0 1399 1583 Right Turn on Red No No No No Satd. Flow (RTOR) Link Speed (mph) 45 45 35 35 Link Distance (ft) 526 1001 361 487 Travel Time (s) 8.0 15.2 7.0 9.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 190 2658 67 14 1348 124 2 0 8 38 0 36 Shared Lane Traffic (%) Lane Group Flow (vph) 190 2725 0 14 1472 0 0 10 0 0 38 36 Turn Type Prot Prot Perm Perm pm+ov Protected Phases 5 2 1 6 8 4 5 Permitted Phases 8 4 4 Detector Phase 5 2 1 6 8 8 4 4 5 Switch Phase Minimum Initial (s) 7.0 12.0 5.0 12.0 7.0 7.0 7.0 7.0 7.0 Minimum Split (s) 14.0 20.0 12.0 22.0 20.0 20.0 20.0 20.0 14.0 Total Split (s) 22.0 58.0 0.0 12.0 48.0 0.0 20.0 20.0 0.0 20.0 20.0 22.0 Total Split (%) 24.4% 64.4% 0.0% 13.3% 53.3% 0.0% 22.2% 22.2% 0.0% 22.2% 22.2% 24.4% Maximum Green (s) 15.0 51.0 5.0 41.0 13.0 13.0 13.0 13.0 15.0 Yellow Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 All -Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 Total Lost Time (s) 5.0 5.0 2.0 5.0 5.0 2.0 5.0 5.0 2.0 5.0 5.0 5.0 Lead/Lag Lead Lag Lead Lag Lead Lead -Lag Optimize? Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None C -Max None C -Max None None None None None Act Effct Green (s) 16.2 74.4 8.2 54.1 10.4 10.4 25.9 Actuated g/C Ratio 0.18 0.83 0.09 0.60 0.12 0.12 0.29 v/c Ratio 0.60 0.65 0.09 0.49 0.06 0.24 0.08 Control Delay 41.6 7.7 38.4 12.8 35.1 39.3 18.9 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 41.6 7.7 38.4 12.8 35.1 39.3 18.9 LOS D A D B D D B Approach Delay 10.0 13.1 35.1 29.4 Approach LOS A B D C Queue Length 50th (ft) 99 207 7 188 5 20 13 10-068 Greensboro Auto Auction Site 2012 AM Future No Build Frank Amenya, P.E.; Nick Liguori, E. L; Terrell Hughes, E.1. Page 2 Lanes, Volumes, Timings 200: Wendover Ave W & Edwardia Drive 611712010 W Al..g-.-�.,,.. i""..; ",l,Nl:, B, °,, �H�,.-.. �E�R� r. V�l�� �'�wl-R,.��� Queue Length 95th (ft) 163 553 26, 264 20 49 31 Internal Link Dist (ft) 446 t 921 281 407 Turn Bay Length (ft) 350 200 Base Capacity (vph) 350 4188 161 3016 255 233 485 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced vlc Ratio 0.54 0.65 0,09 0.49 0.04 0.16 0.07 lntecsecbo[ Summary Splits and Phases: 200: Wendover Ave W & Edwardia Drive 01 "' 02 'W- 04 k�7At _ 05 06y t 08 y� 66 10-068 Greensboro Auto Auction Site 2012 AM Future No Build Frank Amenya, P,E.; Nick Liguori, E.I.; Terrell Hughes, E.I. Page 3 Lanes, Volumes, Timings 200: Wendover Ave W & Edwardia Drive 711/2010 Lane Configurations' ++TO Volume (vph) 171 2405 72 46 1221 112 17 1 13 34 3 32 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 350 0 200 0 0 0 175 0 Storage Lanes 1 0 1 0 0 0 1 1 Taper Length (ft) 0 100 0 100 100 100 100 100 Lane Util. Factor 1.00 0.91 0.91 1.00 0.91 0.91 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.996 0.987 0.944 0.850 At Protected 0.950 0.950 0.973 0.956 Satda Flow (prot) 1769 5064 0 1769 5019 0 0 1710 0 0 1780 1583 Flt Permitted 0.950 0.950 0.803 0.716 Satd. Flow (perm) 1769 5064 0 1769 5019 0 0 1412 0 0 1333 1583 Right Turn on Red No No No No Said. Flow (RTOR) Link Speed (mph) 45 45 35 35 Link Distance (ft) 482 1001 361 487 Travel Time (s) 7.3 15.2 7.0 9.5 Peak Hour Factor 0.90 0,90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 190 2672 80 51 1357 124 19 1 14 38 3 36 8h. red Lane Traffic (%) Lane Group Flow (vph) 190 2752 0 51 1481 0 0 34 0 0 41 36 Turn Type Prot Prot Perm Perm pm+ov Protected Phases 5 2 1 6 8 4 5 Permitted Phases 8 4 4 Detector Phase 5 2 1 6 8 8 4 4 5 Switch Phase Minimum Initial (s) 7.0 12.0 7.0 12.0 7.0 7.0 7.0 7.0 7.0 Minimum Split (s) 14.0 20.0 14.0 20.0 20.0 20.0 20.0 20.0 14.0 Total Split (s) 22.0 56.0 0.0 14.0 48.0 0.0 20.0 20.0 0.0 20.0 20.0 22.0 Total Split (%) 24.4% 62.2% 0.0% 15.6% 53.3% 0.0% 22.2% 22.2% 0.0% 22.2% 22.2% 24.4% Maximum Green (s) 15.0 49.0 7.0 41.0 13.0 13.0 13.0 13.0 15.0 Yellow Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 All -Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 Total Lost Time (s) 5.0 5.0 2.0 5.0 5.0 2.0 5.0 5.0 2.0 5.0 5.0 5.0 Lead/Lag Lead Lag Lead Lag Lead Lead -Lag Optimize? Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None C -Max None C -Max None None None None None Act Effct Green (s) 16.1 67.7 9.9 54.0 10.6 10.6 26.0 Actuated g/C Ratio 0.18 0.75 0.11 0.60 0.12 0.12 0.29 v/c Ratio 0.60 0.72 0.26 0.49 0.20 0.26 0.08 Control Delay 41.9 13.6 40.0 13.0 38.2 39.8 18.8 Quei e'Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 41.9 13.6 40.0 13.0 38.2 39.8 18.8 LOS D B D B D D B Approach Delay 15.4 13.9 38.2 30.0 Approach LOS B B D C Queue Length 50th (ft) 99 446 27 191 18 22 13 10-068 Greensboro Auto Auction Site 2012 AM Future Build Frank Amenya, P.E.; Nick Liguori, E.I.; Terrell Hughes, E,I, Page 1 Lanes, Volumes, Timings 200: Wendover Ave W & Edwardia Drive 1--J> o2 4�. o4 7/11/20110 Ro ®5 o6 I 08 WM Apyl�'%I 1s1 Queue Length 95th (ft) 164 #671 62 266 45 51 31 Internal Link Dist (ft) 402 921 281 407 Turn Bay Length (ft) 350 200 Base Capacity (vph) 348 3808 195 3009 235 222 487 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.55 0.72 0.26 0.49 0.14 0.18 0.07 Area Type: Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 0 (0%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 90 donirio'itype: Actuated -Coordinated Maximum v1c Ratio: 0.72 intersection Signal Delay: 15.3 Intersection LOS: B Intersection Capacity Utilization 74.9% ICU Level of Service D Analysis Period (min) 15 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles, Splits and Phases: 200: Wendover Ave W & Edwardia Drive 4,01 1--J> o2 4�. o4 Ro ®5 o6 I 08 WM Apyl�'%I 1s1 10-068 Greensboro Auto Auction Site 2012 AM Future Build Frank Arnenya, P.E.; Nick Liguori, E. I.; Terrell Hughes, E. 1. Page 2 Lanes, Volumes, Timings 200: Wendover Ave W & Edwardia Drive 719/2010 -- k - Lane Configurations ) +++ r +0 T 4 if Volume (vph) 171 2405 72 46 1221 112 17 1 13 34 3 32 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 350 175 200 0 100 0 175 0 Storage Lanes 1 1 1 0 1 0 1 1 Taper Length (ft) 0 100 0 100 100 100 100 100 Lane Util. Factor 1.00 0.91 1.00 1.00 0.91 0.91 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.850 0.987 0.860 0.850 Flt Protected 0.950 0.950 0.950 0.956 Satd. Flow (prot) 1769 5085 1583 1769 5019 0 1769 1601 0 0 1780 1583 Flt Permitted 0.950 0.950 0.730 0.730 Satd. Flow (perm) 1769 5085 1583 1769 5019 0 1359 1601 0 0 1359 1583 Right Turn on Red No No No No Satd. Flow (RTOR) Link Speed (mph) 45 45 35 35 Link Distance (ft) 482 1001 361 487 Travel Time (s) 7.3 15.2 7.0 9.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 190 2672 80 51 1357 124 19 1 14 38 3 36 Shared Lane Traffic (%) Lane Group Flow (vph) 190 2672 80 51 1481 0 19 15 0 0 41 36 Turn Type Prot Perm Prot Perm Perm pm+ov Protected Phases 5 2 1 6 8 4 5 Permitted Phases 2 8 4 4 Detector Phase 5 2 2 1 6 8 8 4 4 5 Switch Phase Minimum Initial (s) 7.0 12.0 12.0 7.0 12.0 7.0 7.0 7.0 7.0 7.0 Minimum Split (s) 14.0 20.0 20.0 14.0 20.0 20.0 20.0 20.0 20.0 14.0 Total Split (s) 22.0 56.0 56.0 14.0 48.0 0.0 20.0 20.0 0.0 20.0 20.0 22.0 Total Split (%) 24.4% 62.2% 62.2% 15.6% 53.3% 0.0% 22.2% 22,2% 0.0% 22.2% 22.2% 24.4% Maximum Green (s) 15.0 49.0 49.0 7.0 41.0 13.0 13.0 13.0 13.0 15.0 Yellow Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 All -Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 2.0 5.0 5.0 2.0 5.0 5.0 5.0 Lead/Lag Lead Lag Lag Lead Lag Lead Lead -Lag Optimize? Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None C -Max C -Max None C -Max None None None None None Act.Effet Green (s) 16.1 67.7 67.7 10.0 54.0 10.5 10.5 10.5 26.0 Actuated g/C Ratio 0.18 0.75 0.75 0.11 0.60 0.12 0.12 0.12 0.29 v/c,Ratio 0.60 0.70 0.07 0.26 0.49 0.12 0.08 0.26 0.08 Control Delay 41.9 12.9 7.4 40.0 13.0 36.4 35.3 39.7 18.8 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 41.9 12.9 7.4 40.0 13.0 36.4 35.3 39.7 18.8 LOS D B A D B D D D B Approach Delay 14.6 13.9 35.9 29.9 Approach LOS B B D C Queue Length 50th (ft) 99 415 17 27 191 10 8 22 13 10-068 Greensboro Auto Auction Site 2012 AM Future Build Mitigation Frank Amenya, P.E.; Nick Liguori, E.I.; Terrell Hughes, E.I. Page 1 Lanes, Volumes, Timings 200: Wendover Ave W & Edwardia Drive 719/2010 :ani GrEEL , ..EBT .:.EBR WBL . -VVBT . WBR NBL :,, .idBT . NBR' 'SQL, SBT: SBR Queue Length 95th (ft) 164 #566 40 62 266 30 25 51 31 Internal Link Dist (ft) 402 921 281 407 Turn Bay Length (ft) 350 175 200 100 Base Capacity (vph) 349 3825 1191 196 3010 227 267 227 487 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.54 0.70 0.07 0.26 0.49 0.08 0.06 0.18 0.07 )iteFsection Sutnm`ary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 0 (0%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 80 Control Type: Actuated -Coordinated Maximum v/c Ratio: 0.70 Intersection Signal Delay: 14.8 Intersection LOS: B Intersection Capacity Utilization 73.5% ICU Level of Service D Analysis Period (min)15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles, Splits and Phases: 200: Wendover Ave W & Edwardia Drive 01 " m2 m4 m5 m6 08 „ .. '.:�J_ y e4C 10-068 Greensboro Auto Auction Site 2012 AM Future Build Mitigation Frank Amenya, P.E.; Nick Liguori, E.I.; Terrell Hughes, E.I. Page 2 Lanes, Volumes, Timings 200: Wendover Ave W & Edwardia Drive 6/1712010 'r Lane Configurations ) +tTo ) +0 4 4 F Volume (vph) 128 1486 137 8 2095 63 2 0 2 61 0 81 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 350 0 200 0 0 0 175 0 Storage Lanes 1 0 1 0 0 0 1 1 Taper Length (ft) 0 100 0 100 100 100 100 100 Lane Util. Factor 1.00 0.91 0.91 1.00 0.91 0.91 1.00 1.00 1.00 1.00 1.00 1.00 Fri: 0.987 0.996 0.932 0.850 Flt Protected 0.950 0.950 0.976 0.950 Satd. Flow (prot) 1770 5019 0 1770 5065 0 0 1694 0 0 1770 1583 Flt Permitted 0.950 0.950 0.853 0.755 Satd. Flow (perm) 1770 5019 0 1770 5065 0 0 1481 0 0 1406 1583 Right Tum on Red No No No No Satd. Flow (RTOR) Link Speed (mph) 45 45 35 35 Link Distance (ft) 526 1001 361 487 Travel Time (s) 8.0 15.2 7.0 9.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0,90 0.90 0.90 0,90 0.90 0,90 0.90 0,90 Adj. Flow (vph) 142 1651 152 9 2328 70 2 0 2 68 0 90 Shared Lane Traffic (%) Lane Group Flow (vph) 142 1803 0 9 2398 0 0 4 0 0 68 90 Turn Type Prot Prot Perm Perm pm+ov Protected Phases 5 2 1 6 8 4 5 Permitted Phases 8 4 4 Detector Phase 5 2 1 6 8 8 4 4 5 Switch Phase Minimum Initial (s) 7.0 12.0 7.0 12.0 7.0 7.0 7.0 7.0 7.0 Minimum Split (s) 14.0 20.0 14.0 20.0 20.0 20.0 20.0. 20.0 14.0 Total Split (s) 26.0 32.0 0.0 26.0 32.0 0.0 32.0 32.0 0.0 32.0 32.0 26.0 Total Split (%) 28.9% 35.6% 0.0% 28.9% 35.6% 0,0% 35,6% 35.6% 0.0% 35.6% 35,6% 28.9% Maximum Green (s) 19.0 25.0 19.0 25.0 25.0 25.0 25.0 25.0 19.0 Yellow Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 A!! -R --d • • v i.iv �v1 On �,v 2. c.V nn L.V nn Zn nn L.V nn L.V nn LV nn L.V nn L.V Lost Time Adjust (s) -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 Total Lost Time (s) 5.0 5.0 2.0 5.0 5.0 2.0 5.0 5.0 2.0 5.0 5.0 5.0 Lead/Lag Lead Lag Lead Lag Lead Lead -Lag Optimize? Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3,0 3.0 3.0 3.0 3.0 3.0 Recall Mode None C -Max None C -Max None None None None None Act Effct Green (s) 14.5 69.0 9.0 51,3 12.0 12.0 28.7 Actuated g/C Ratio 0.16 0.77 0.10 0.57 0.13 0.13 0.32 v/c Ratio 0.50 0.47 0.05 0.83 0.02 0.36 0.18 Control Delay 39.8 6.6 37.5 22.1 32.0 40.2 19,5 Queue Delay 0,0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 39.8 6.6 37.5 22.1 32.0 40.2 19.5 LOS D A D C C D B Approach Delay 9.0 22.1 32.0 28,4 Approach LOS A C C C Queue Length 50th (ft) 75 112 5 408 2 36 35 10-068 Greensboro Auto Auction Site 2010 PM Existing Frank Amenya, P.E.; Nick Liguori, E.I.; Terrell Hughes, E.I. Page 2 Lanes, Volumes, Timings 200: Wendover Ave W & Edwardia Drive 6/17/2010 'IF-- 4._ t f Queue Length 95th (ft) 124 292 19 #654 11 73 58 Internal Link Dist (ft) 446 921 281 407 06 Turn Bay Length (ft) 350 200 ry 2ta s .,i�, e U N' Base Capacity (vph) 413 3847 413 2887 444 422 619 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced vlc Ratio 0.34 0.47 0.02 0.83 0.01 0.16 0.15 tri#rsec6ari Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 90 Offset:0 (0%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 75 Control Type: Actuated -Coordinated Maximum v/c Ratio: 0.83 Intersection Signal Delay: 16.7 Intersection LOS: B Intersection Capacity Utilization 67.4% ICU Level of Service C Analysis Period (min)15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Solits and Phases: 200: Wendover Ave W R Fr1wArdia nriva 01 — o2 ,r...: 04 h� iG4�4 rlll%,r`' . a.,. 05 06 081 ry 2ta s .,i�, e U N' 10-068 Greensboro Auto Auction Site 2010 PM Existing Frank Amenya, P.E.; Nick Liguori, E.I.; Terrell Hughes, E.I. Page 3 Lanes, Volumes, Timings 200: Wendover Ave W & Edwardia Drive 611712010 4-4, 4\r Lane Configurations ) ttT ) tO c& 4 F Volume (vph) 136 1576 145 8 2223 67 2 0 2 65 0 86 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 350 0 200 0 0 0 175 0 Storage Lanes 1 0 1 0 0 0 1 1 Taper Length (ft) 0 100 0 100 100 100 100 100 Lane Util. Factor 1.00 0.91 0.91 1.00 0.91 0.91 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.987 0.996 0.932 0.850 Flt Protected 0.950 0.950 0.976 0.950 Said. Flow (prot) 1770 5019 0 1770 5065 0 0 1694 0 0 1770 1583 At Permitted 0.950 0.950 0.854 0.755 Satd. Flow (perm) 1770 5019 0 1770 5065 0 0 1483 0 0 1406 1583 Right Turn on Red No No No No Satd. Flow (RTOR) Link Speed (mph) 45 45 35 35 Link Distance (ft) 526 1001 361 487 Travel Time (s) 8.0 15.2 7.0 9.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0,90 0.90 0.90 Adj. Flow (vph) 151 1751 161 9 2470 74 2 0 2 72 0 96 Shared Lane Traffic (%) Lane Group Flow (vph) 151 1912 0 9 2544 0 0 4 0 0 72 96 Turn Type Prot Prot Perm Perm pm+ov Protected Phases 5 2 1 6 8 4 5 Permitted Phases 8 4 4 Detector Phase 5 2 1 6 8 8 4 4 5 Switch Phase Minimum Initial (s) 7.0 12.0 7.0 12.0 7.0 7.0 7.0 7.0 7.0 Minimum Split (s) 14.0 20.0 14.0 20.0 20.0 20.0 20.0 20.0 14.0 Total Split (s) 26.0 32.0 0.0 26.0 32.0 0.0 32.0 32.0 - 0.0 32.0 32.0 26.0 Total Split (%) 28.9% 35.6% 0.0% 28.9% 35.6% 0.0% 35.6% 35.6% 0.0% 35.6% 35.6% 28.9% Maximum Green (s) 19.0 25.0 19.0 25.0 25.0 25.0 25.0 25.0 19.0 Yellow Time (s) 5.0 5.0 5.0. 5.0 5.0 5.0 5.0 5.0 5.0 All -Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 Total Lost Time (s) 5.0 5.0 2.0 5.0 5.0 2.0 5.0 5.0 2.0 5.0 5.0 5.0 Lead/Lag Lead Lag Lead Lag Lead Lead -Lag Optimize? Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None C -Max None C -Max None None None None None Act Effct Green (s) 14.9 68.7 9.0 50.6 12.2 12.2 29.4 Actuated g/C Ratio 0.17 0.76 0.10 0.56 0.14 0.14 0.33 v/c Ratio 0.52 0.50 0.05 0.89 0.02 0.38 0.19 Control Delay 39.8 7.0 37.5 25.7 31.8 40.3 19.2 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 39.8 7.0 37.5 25.7 31.8 40.3 19.2 LOS D A D C C D B Approach Delay 9.4 25.7 31.8 28.2 Approach LOS A C C C Queue Length 50th (ft) 79 125 5 467 2 38 37 10-068 Greensboro Auto Auction Site 2012 PM Future No Build Frank Amenya, P.E.; Nick Liguori, E.I.; Terrell Hughes, E.I. Page 2 Lanes, Volumes, Timings 200. Wendover Ave W & Edwardia Drive 6/1712010 bane„G"rbip `" _ `..>rl�l.': I=B;T� ..1BRr .,�V�). n.4�B�'«.����i��. `.�1I�1,_. ,PJB7",.., 1�16�..�,'�SBL ,,�;SBi"`k,.•�SBR Queue Length 95th (ft) 130 323 19 #730 11 75 60 Internal Link Dist (ft) 446 921 281 407 Turn Bay Length (ft) 350 200 Base Capacity (vph) 413 3833 413 2850 445 422 623 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced vlc Ratio 0.37 0.50 0.02 0,89 0.01 0.17 0.15 1terSPGlo SUiJlmary .S Pti N4 Area Type: Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 0 (0%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 80 Control Type: Actuated -Coordinated Maximum vlc Ratio: 0.89 Intersection Signal Delay: 18.8 Intersection LOS: B Intersection Capacity Utilization 70.8% ICU Level of Service C Analysis Period (min)15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. lits and Phases: 200: Wendover Ave W & Edwardia Drive e 01 o2 o4 o5 06 .. o$ 10-068 Greensboro Auto Auction Site 2012 PM Future No Build Frank Amenya, P.E.; Nick Liguori, E.I.; Terrell Hughes, E.I. Page 3 Lanes, Volumes, Timings 200: Wendover Ave W & Edwardia Drive ane*Group, .. f EBL. EBT . -'EBR,. WBL, 7/212010 Lane Configurations tO ' Wo chi 4 � Volume (vph) 136 1624 177 74 2226 67 80 7 2 65 6 86 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 350 - 0 200 0 0 0 175 0 Storage Lanes 1 0 1 0 0 0 1 1 Taper Length (ft) 0 100 0 100 100 100 100 100 Lane Util. Factor 1.00 0.91 0.91 1.00 0.91 0.91 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.985 0.996 0.997 0.850 Flt Protected 0.950 0.950 0.957 0.956 Satd. Flow (prot) 1769 5009 0 1769 5064 0 0 1777 0 0 1780 1583 Flt Permitted 0.950 0.950 0.691 0.740 Satd. Flow (perm) 1769 5009 0 1769 5064 0 0 1283 0 0 1378 1583 Right Turn on Red No No No No Satd Flow (RTOR) Link Speed (mph) 45 45 35 35 Link Distance (ft) 482 1001 361 487 Travel Time (s) 7.3 15.2 7.0 9.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 151 1804 197 82 2473 74 89 8 2 72 7 96 Shared Lane Traffic (%) Lane Group Flow (vph) 151 2001 0 82 2547 0 0 99 0 0 79 96 Turn Type Prot Prot Perm Perm pm+ov Protected Phases 5 2 1 6 8 4 5 Permitted Phases 8 4 4 Detector Phase 5 2 1 6 8 8 4 4 5 Switch Phase Minimum Initial (s) 7.0 12.0 7.0 12.0 7.0 7.0 7.0 7.0 7.0 Minimum Split (s) 14.0 20.0 14.0 20.0 20.0 20.0 20.0 20.0 14.0 Total Split (s) 26.0 32.0 0.0 26.0 32.0 0.0 32.0 32.0 0.0 32.0 32.0 26.0 Total Split (%) 28.9% 35.6% 0.0% 28,9% 35.6% 0.0% 35.6% 35.6% 0.0% 35.6% 35.6%u 28.9% Maximum Green (s) 19.0 25.0 19.0 25.0 25.0 25.0 25.0 25.0 19.0 Yellow Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 All -Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 40 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 Total Lost Time (s) 5.0 5.0 2.0 5.0 5.0 2.0 5.0 5.0 2.0 5.0 5.0 5.0 Lead/Lag Lead Lag Lead Lag Lead Lead -Lag Optimize? Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 3,0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None C -Max None C -Max None None None None None Act Effct Green (s) 14.9 55.7 11.7 .48.7 14.2 14.2 31.3 Actuated g1C Ratio 0.17 0.62 0.13 0.54 0.16 0.16 0.35 v/c Ratio 0.52 0.65 0.35 0.93 0.49 0.36 0.17 Control Delay 39.8 16.7 39.4 30.2 41.8 37.3 17.5 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 39.8 16.7 39.4 30.2 41.8 37.3 17.5 LOS D B D C D D B Approach Delay 18.4 30.4 41.8 26.4 Approach LOS . B C D C Queue Length 50th (ft) 79 293 43 495 52 41 36 10-068 Greensboro Auto Auction Site 2012 PM Future Build Frank Amenya, P.E.; Nick Liguori, E.I.; Terrell Hughes, E.I. Page 1 Lanes, Volumes, Timings 200: Wendover Ave W & Edwardia Drive 7/212010 Lane Group. ' . •;:..... EBL .• . 'EBT EBR WBL, " tIVBT.NBT NBRI.='; . •SBL . SB,T; SBR Queue Length 95th (ft) 130 443 83 #772 96 78 55 Internal Link Dist (ft) 402 921 281 407 Turn Bay Length (ft) 350 200 �— 06 T 0s Base Capacity (vph) 413 3099 413 2739 385 413 658 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.37 0.65 0.20 0.93 0.26 0.19 0.15 )htersctlop Summary ,'` Area Type: Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 0 (0%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 80 Control Type: Actuated -Coordinated Maximum v/c Ratio: 0.93 Intersection Signal Delay: 25.4 Intersection LOS: C Intersection Capacity Utilization 76.1% ICU Level of Service D Analysis Period (min)15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles, Splits and Phases: 200: Wendover Ave W & Edwardia Drive 01 02 04 m5 �— 06 T 0s •' T , F.,.,i -Y .. �• f,. �L� F rr k a°. r •?' rs (( �r 10-068 Greensboro Auto Auction Site 2012 PM Future Build Frank Amenya, P.E.; Nick Liguori, E.I.; Terrell Hughes, E.I. Page 2 Lanes, Volumes, Timings 200: Wendover Ave W & Edwardia Drive 7/9/2010 WBT .. WBR Lane Configurations +++ r ) tO T-3. *T r Volume (vph) 136 1624 177 74 2226 67 80 7 2 65 6 86 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 350 175 200 0 100 0 175 0 Storage Lanes 1 1 1 0 1 0 1 1 Taper Length (ft) 0 100 0 100 100 100 100 100 Lane Util. Factor 1.00 0.91 1.00 1.00 0.91 0.91 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.850 0.996 0.970 0.850 Flt Protected 0.950 0.950 0.950 0.956 Satd. Flow (prot) 1769 5085 1583 1769 5064 0 1769 1806 0 0 1780 1583 Flt Permitted 0.950 0.950 0.705 0.737 Satd. Flow (perm) 1769 5085 1583 1769 5064 0 1313 1806 0 0 1372 1583 Right Turn on Red No No No No Satd. Flow (RTOR) Link Speed (mph) 45 45 35 35 Link Distance (ft) 482 1001 361 487 Travel Time (s) 7.3 15.2 7.0 9.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 151 1804 197 82 2473 74 89 8 2 72 7 96 Shared Lane Traffic (%) Lane Group Flow (vph) 151 1804 197 82 2547 0 89 10 0 0 79 96 Turn Type Prot Perm Prot Perm Perm pm+ov Protected Phases 5 2 1 6 8 4 5 Permitted Phases 2 8 4 4 Detector Phase 5 2 2 1 6 8 8 4 4 5 Switch Phase Minimum Initial (s) 7.0 12.0 12.0 7.0 12.0 7.0 7.0 7.0 7.0 7.0 Minimum Split (s) 14.0 20.0 20.0 14.0 20.0 20.0 20.0 20.0 20.0 14,0 Total Split (s) 26.0 32.0 32.0 26.0 32.0 0.0 32.0 32.0 0.0 32.0 32.0 26.0 Total Split (%) 28,9% 35.6% 35.6% 28.9% 35.6% 0.0% 35.6% 35.6% 0.0% 35.6% 35.6% 28.9% Maximum Green (s) 19.0 25.0 25.0 19.0 25.0 25.0 25.0 25.0 25.0 19.0 Yellow Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 All -Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 2.0 5.0 5.0 2.0 5.0 5.0 5.0 Lead/Lag Lead Lag Lag Lead Lag Lead Lead -Lag Optimize? Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3,0 Recall Mode None C -Max C -Max None C -Max None None None None None Act Effct Green (s) 14.9 56.3 56.3 11.7 49.3 13.6 13.6 13.6 30.7 Actuated g/C Ratio 0.17 0.63 0.63 0.13 0.55 0.15 0.15 0.15 0.34 v/c Ratio 0.52 0.57 0.20 0.35 0.92 0.45 0.04 0.38 0.18 Control Delay 39.8 14.6 11.9 39.4 28.6 41.2 30.4 38.7 18.0 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 39.8 14,6 11.9 39.4 28.6 41.2 30.4 38.7 18.0 LOS D B B D C D C D B Approach Delay 16.1 28.9 40.1 27.3 Approach LOS B C D C Queue Length 50th (ft) 79 241 53 43 486 47 5 41 36 10-068 Greensboro Auto Auction Site 2012 PM Future Build Mitigation Frank Amenya, P.E.; Nick Liguori, E.I.; Terrell Hughes, E.I. Page 1 Lanes, Volumes, Timings 200: Wendover Ave W & Edwardia Drive 71912010 OR . WOt , x Wlt,.. WE3hZ NBL,w NOT ..Bft Queue Length 95th (ft) 130 364 114 83 #759 87 18 79 57 Internal Link Dist (ft) 402 921 281 407 Turn Bay Length (ft) 350 175 200 100 Base Capacity(vph) 413 3182 991 413 2775 394 542 412 646 Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 Reduced vlc Ratio 0.37 0.57 0.20 0.20 0.92 0.23 0.02 0.19 0.15 lntersectiat Summary. Area Type: Other Cycle. Length: 90 Actuated Cycle Length: 90 Offset: 0 (0%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 80 Control Type: Actuated -Coordinated Maximum vlc Ratio: 0.92 Intersection Signal Delay: 23.6 Intersection LOS: C Intersection Capacity Utilization 75.6% ICU Level of Service D Analysis Period (min)15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 200: Wendover Ave W & Edwardia Drive 10-068 Greensboro Auto Auction Site 2012 PM Future Build Mitigation Frank Amenya, P.E.; Nick Liguori, E.I.; Terrell Hughes, E.I. Page 2 Summary of Trip Generation Calculation For 21 Th.Sq.Ft. GFA of New Car Sales July 01, 2010 Average Standard Adjustment Driveway Rate Deviation Factor Volume Avg. Weekday 2 -Way Volume 0.00 0.00 1.00 0 7-9 AM Peak Hour Enter 0.00 0.00 1.00 0 7-9 AM Peak Hour Exit 0.00 0.00 1.00 0 7-9 AM Peak Hour Total 0.00 0.00 1.00 0 4-6 PM Peak Hour Enter 1.18 0.00 1.00 25 4-6 PM Peak Hour Exit 1.84 0.00 1.00 39 4-6 PM Peak Hour Total 3.02 0.00 1.00 63 Saturday 2 -Way Volume 0.00 0.00 1.00 0 Saturday Peak Hour Enter 0.00 0.00 1.00 0 Saturday Peak Hour Exit 0.00 0.00 1.00 0 Saturday Peak Hour Total 0.00 0.00 1.00 0 Note: A zero indicates no data available. The above rates were calculated from these equations: 24 -Hr. 2 -Way Volume: 0, R^2 = 0 7-9 AM Peak Hr. Total: 0 R^2 = 0 , 0 Enter, 0 Exit 4-6 PM Peak Hr. Total: T = 1.74(X) + 26.91 R^2 = 0.51 , 0.39 Enter, 0.61 Exit AM Gen Pk Hr. Total: T = 2.27(X) + -1.92 R^2 = 0.6 , 0.56 Enter, 0.44 Exit PM Gen Pk Hr. Total: T = 2.64(X) + 2.09 R^2 = 0.64 , 0.45 Enter, 0.55 Exit Sat. 2 -Way Volume: 0, R^2 = 0 Sat. Pk Hr. Total: 0 R^2 = 0 , 0 Enter, 0 Exit Sun. 2 -Way Volume: 0, R^2 = 0 Sun. Pk Hr. Total: 0 R^2 = 0 , 0 Enter, 0 Exit Source: Institute of Transportation Engineers Trip Generation, 8th Edition, 2008. TRIP GENERATION BY MICROTRANS Summary of Trip Generation Calculation For 21 Th.Sq.Ft. GFA of New Car Sales July 01, 2010 Average Standard Adjustment Driveway Rate Deviation Factor Volume Avg. Weekday 2 -Way Volume 33.34 18.88 1.00 700 7-9 AM Peak Hour Enter 1.50 0.00 1.00 32 7-9 AM Peak Hour Exit 0.53 0.00 1.00 11 7-9 AM Peak Hour Total 2.03 1.79 1.00 43 4-6 PM Peak Hour Enter 1.01 0.00 1.00 21 4-6 PM Peak Hour Exit 1.58 0.00 1.00 33 4-6 PM Peak Hour Total 2.59 1.93 1.00 54 Saturday 2 -Way Volume 21.03 9.38 1.00 442 Saturday Peak Hour Enter 1.51 0.00 1.00 32 Saturday Peak Hour Exit 1.46 0.00 1.00 31 Saturday Peak Hour Total 2.97 2.15 1.00 62 Note: A zero indicates no data available. Source: Institute of Transportation Engineers Trip Generation, 8th Edition, 2008. TRIP GENERATION BY MICROTRANS Greensboro Auto Auction Summary of Multi -Use Trip Generation Average Weekday Driveway Volumes June 17, 2010 Note: A zero indicates no data available. TRIP GENERATION BY MICROTRANS 24 Hour AM Pk Hour PM Pk Hour Two -Way Land Use Size Volume Enter Exit Enter Exit General Light Industrial 15.6 Th.Sq.Ft. GFA 109 13 2 2 13 Shopping Center 21.5 Th.Sq.Ft. GLA 2500 38 24 111 116 New Car Sales 21.5 Th.Sq.Ft. GFA 0 0 0 25 39 Total Driveway Volume 2609 51 26 138 168 Total Peak Hour Pass -By Trips 0 0 68 71 Total Peak Hour Vol. Added to Adjacent Streets 51 26 70 97 Note: A zero indicates no data available. TRIP GENERATION BY MICROTRANS (Zrmiinc Printar-Turn inn Rfinvamon4(�mnn4c 08:00 AM 0 0 0 0 08:15 AM 0 0 0 0 08:30 AM 0 0 0 0 08:45 AM 0 0 0 0 0 0 0 1 0 5 0 0 1 0 0 0 0 4 0 2 0 0 2 0 3 0 0 8 0 10 0 6 32 Kendall Place 0 0 Carnegla Place 0 Wendover Avenue West Wendover Avenue West 0 277 738 Northbound 32 433 0 Southbound 465 0 Eastbound 3 0 Westbound 765 6 Start Time Left Thru Right I Peds I App. TOW Left I Thru I Right I Peds I App. Tnrl Left I Thru I Right Peds ppp. Tor, Left I Thru I Right Peds I App. Tori Int. Tolal 07:00 AM 0 0 0 0 0 1 0 0 0 1 34 295 0 0 329 0 155 1 0 156 486 07:15 AM 0 0 0 0 0 2 0 0 0 2 38 428 0 0 466 2 202 2 0 206 674 07:30 AM 0 0 1 0 1 3 0 2 0 5 29 495 2 0 526 0 275 2 0 277 809 07:45 AM 1 0 1 0 2 0 0 3 0 3 45 514 1 0 560 1 318 5 0 324 889 Total 1 0 2 0 3 6 0 5 0 11 146 1732 3 0 1881 3 950 10 0 963 2858 08:00 AM 0 0 0 0 08:15 AM 0 0 0 0 08:30 AM 0 0 0 0 08:45 AM 0 0 0 0 0 0 0 1 0 5 0 0 1 0 0 0 0 4 0 2 0 0 2 0 3 0 0 8 0 10 0 6 32 423 0 0 455 0 273 4 0 277 738 1 32 433 0 0 465 0 296 3 0 299 765 6 13 390 0 0 403 0 252 3 0 255 664 5 27 451 0 0 478 0 246 1 0 247 730 18 104 1697 0 0 1801 0 1067 11 0 1078 2897 04:00 PM 04:15 PM 04:30 PM 04:45 PM 0 0 1 1 0 0 0 0 1 1 0 0 0 0 0 0 1 1 1 1 0 1 0 2 0 0 0 0 6 3 3 10 0 0 0 0 6 4 3 12 7 7 13 16 360 355 305 372 3 0 0 0 0 0 0 0 370 362 318 388 0 0 1 0 442 475 465 417 3 4 3 2 0 0 0 0 445 479 469 419 822 846 791 820 Total 2 0 2 0 4 3 0 22 0 251 43 1392 3 0 1438 1 1799 12 0 1812 3279 05.00 PM 0 0 2 0 2 0 0 12 0 12 8 358 0 0 3660 527 5 0 532 912 05:15 PM 0 0 1 0 1 1 0 2 0 3 8 388 1 0 397 0 531 5 0 536 937 05:30 PM 0 0 0 0 0 0 0 7 0 7 5 477 0 0 482 0 431 2 0 433 922 05:45 PM 0 0 0 0 0 0 0 6 0 6 5 400 0 0 405 0 399 1 0 400 811 Total 0 0 3 0 3 1 0 27 0 28 26 1623 1 0 1650 0 i m 13 0 1901 3582 Grand Total 3 0 7 0 10 18 0 64 0 82 319 6444 7 0 6770 4 5704 46 0 5754 12616 A %o I 30 0 Tota 0 0.10 0 0.1 0.1 0 0.5 0 0.61 2.5 51.1 0.1 0 53.7 0 45.2 0.4 0 45.6 If aue" cud Tuwm p 305 W. Fourth Street Winston-Salem, NC Counted By: Darian Davenport 336-744-1636 File Name :Carnegie Place 061510 Conditions: Sunny Site Code : 00000100 Start Date : 6/15/2010 Page No :2 amegia ace Out In Total 365 82 447 641 01 181 0 Right Thru Lel ft Peds m v �- > 9? El 2 North tO o ami FL --`-2 0 ¢' O 6/1512010 07:00 AM ' `m L 6!15/2010 05:45 PM r '{ Oa�om d Tumin Movement s a w°iN 41 F* Left Thru Ri ht Peds 3 01 71 0 11 10 21 Out InTotal CAN 305 W. Fourth Street Winston-Salem, NC Counted By: Darian Davenport 336-74=1-1636 File Name : Carnegie Place 061510 Conditions: Sunny Site Code : 00000100 Start Date : 6/15/2010 Page No : 3 veaK Hour Analysis t-rom ut:uv AM to uo:45 AM - t-eaK l OT 'I o,,.,L- u s =,f;— 0—;— �+ n7 -'In Ann Ind. Toted 07:30 AM Kendall Place Northbound Carnegla PlaceWendover I Southbound Avenue West Eastbound Wendover Avenue West Westbound Start Time I Left I Thru I Right I Peds I App, Toml I Left I Thru I Right I Peds I App, Total I Left I Thru I Right I PedsI App. Tome Left I Thru I Right I Peds I App, T— veaK Hour Analysis t-rom ut:uv AM to uo:45 AM - t-eaK l OT 'I o,,.,L- u s =,f;— 0—;— �+ n7 -'In Ann Ind. Toted 07:30 AM 0 0 1 - 3 Out In Total 152 15 167 2 101 01 51 0 07:45 AM 1 0 1 0 2 0 0 3 0 3 45 514 1 0 560 1 318 5 0 324 889 08:00 AM 0 0 0 0 0 1 0 5 6 32 423 0 0 455 0 273 4 0 277 738 08:15 AM 0 0 0 0 0 1 0 0 0 1 32 433 0 0 465 0 296 3 0 299 765 Total volume 1 0 2 0 3 5 0 10 0 15 138 1865 3 0 2006 1 1162 14 0 1177 3201 App. Total 33.3 0 66.7 0 33.3 0 66.7 0 6.9 93 0.1 0 0.1 98.7 1.2 0 PHF .250 .000 .500 .000 .375 .417 .000 .500 .000 .625 F767 .907 .375 .000 .896 1 .250 .914 .700 .000 .908 .900 Carnegie Place Out In Total 152 15 167 101 01 51 0 Right Thru Left Peds Peak Hour Data ID to North �' o o 51 �om =—b ~ d--� 2 N m < — N Peak Hour Begins at 07:30 A - S c Turning Movement Counts m r_ 00 v ' A N, 0 a� I r Left Thru Ri ht Peds 1 0 21 0 ® 3 0 Out In Total . 305 W. Fourth Street Winston-Salem, NC Counted By: Darian Davenport 336-744-1636 File Name : Carnegie Place 061510 Conditions: Sunny Site Code : 00000100 Start Date : 6/15/2010 Page No : 4 kSt-ari-T—ime Kendall Place Northbound Carnegia Place Southbound Wendover Avenue West I Eastbound Wendover Avenue West I Westbound 11 Left I Thru I Righ I Peds I A,,. 1.1 Left I Thru I Right I Peds I qpp. T1W I Left I Thru I Right I Peds I qpp. Tpe Left I Thru I Right I Peds I qpp, UW i-eaK rlour Hnajysls t-rOm U4:UU t-IVI 1.0 05:45 YM - NeaK l Or 1 Peak Hour for Entire Intersection Begins at 04.45 PM Int. Total 04:45 PM 1 amegla Place 2 Out In Total 12 16 51 3 1 85 311 01 31 0 05:00 PM 0 0 2 0 2 0 0 12 0 12 8 358 0 0 366 0 527 5 0 532 912 05:15 PM 0 0 1 0 1 1 0 2 0 3 8 388 1 0 397 0 531 5 0 536 937 05:30 PM 0 0 0 0 0 0 0 7 0 7 5 477 0 0 482 0 431 2 0 433 922 Total Volume 1 0 3 0 4 3 0 31 0 34 37 1595 1 0 1633 0 1906 14 0 1920 3591 . Total 25 0 75 0 8.8 0 91.2 0 2.3 97.7 0.1 0 0 99.3 0.7 0 PHF .250 .000 .375 .000 .500 .375 .000 .646 .000 .708 .578 .836 .250 .000 .847 .000 .897 .700 .000 .896 .958 amegla Place Out In Total 51 3 1 85 311 01 31 0 Right Thru Left Peds 4-f 1 '-> Peak Hour Data mn m� j 4 tea' O N C u� North C F_ 2 <' — Peak Hour Begins at 04:45 P < o Fol Turning Movement Counts ,� o car v0 o '^ N v a Wom �I N N y T I Left Thru Right Peds 11 Ol 3 0 0 4 0 Out InTotal d: t6 u } U 1� x 305 W. Fourth Street Winston-Salem, NC Counted By: Frank Stowe 336-744-1636 File Name : Edwardia Drive 061510 Conditions: Sunny Site Code : 00000200 Start Date :6/15/2010 Page No : 1 Grrmns Printprt- Turninn Mnvpmpnt Crntnts 08:00 AM 0 Kendall Place 2 0 Edwardia Drive 12 Wendover Avenue West Wendover Avenue West 0 19 11 Northbound 3 0 Southbound 4 284 15 0 Eastbound 902 08:15 AM Westbound 0 1 Start Time Left I Thru I Right I Peds I App, Tpml Left I Thru I Right I Peds I App. Tome Left I Thru I Right f Peds Ap . Tom, Left I Thru I Right I Peds I App. Total Int. Total 07:00 AM 0 0 0 0 0 4 0 5 0 9 5 312 3 0 320 1 138 12 0 151 480 07:15 AM 1 0 2 0 3 3 0 5 0 8 33 418 29 0 480 1 150 54 0 205 696 07:30 AM 0 0 3 0 3 3 0 8 0 11 86 480 51 0 617 1 232 70 0 303 934 07:45 AM 1 0 1 0 2 15 0 5 0 20 17 654 3 0 674 5 329 10 0 344 1040 Total 2 0 6 0 8 25 0 23 0 48 141 1864 86 0 2091 8 849 146 0 1003 3150 08:00 AM 0 0 2 0 2 12 0 7 0 19 11 564 3 0 578 4 284 15 0 303 902 08:15 AM 1 0 1 0 2 2 0 10 0 12 47 557 0 0 604 2 298 11 0 311 929 08:30 AM 0 0 1 0 1 10 0 9 0 19 22 507 28 0 557 0 294 13 0 307 884 08:45 AM 0 0 0 0 0 12 0 9 0 21 58 546 6 0 610 1 244 64 0 309 940 Total 1 0 4 0 5 36 0 35 0 71 1 138 2174 37 0 2349 7 1120 103 0 1230 3655 04:00 PM 1 0 1 0 2 8 0 14 0 22 45 465 1 0 511 2 598 6 0 606 1141 04:15 PM 1 0 1 0 2 14 0 34 0 48 27 351 29 0 407 0 495 37 0 532 989 04:30 PM 0 0 0 0 0 18 0 16 0 34 36 334 30 0 400 0 488 6 0 494 928 04:45 PM 0 0 0 0 0 21 0 17 0 38 20 336 77 0 433 6 514 14 0 534 1005 Total 2 0 2 0 4 61 0 81 0 142 1 128 1486 137 0 1751 8 2095 63 0 2166 4063 05:00 PM 1 0 3 0 4 15 0 37 0 52 21 310 1 0 332 0 431 4 0 435 823 05:15 PM 0 1 0 0 1 6 0 11 0 17 37 300 39 0 376 12 525 32 0 569 963 05:30 PM 0 0 3 0 3 5 0 16 0 21 43 424 5 0 472 3 537 24 0 564 1060 05:45 PM 0 0 1 0 1 5 0 28 0 33 41 275 11 0 327 1 572 16 0 589 950 Total 1 1 7 0 9 31 0 92 0 123 1 142 1309 56 0 1507 16 2065 76 0 2157 3796 Grand Total 6 1 19 0 26 153 0 231 0 384 549 6833 316 0 7698 39 6129 388 0 6556 14664 Apprch /0 23.1 I 3.8 73.1 0 39.8 0 60.2 0 7.1 88.8 4.1 0 ( 0.6 93.5 5.9 0 ( Total % 0 0 0.1 0 0.2 1 0 1.6 0 2.6 3.7 46.6 2.2 0 52.5 0.3 41.8 2.6 0 44.7 CA 305 W. Fourth Street Winston-Salem, NC Counted By: Frank Stowe 336-744-1636 File Name : Edwardia Drive 061510 Conditions: Sunny Site Code : 00000200 Start Date : 6/15/2010 Page No : 2 war is Drive Out In Total 938 1 384 1 1322 2311 01 1531 0 Right Thru Left Peds -RiFctoN O— mmac vVJ �m Hs'�. North m aO W i �2ED 6/15/2010 07:00 AM N 3 0 m = 6!1512010 05:45 PM m j c m 5 o Tuming Movement Cou s W �Om N N O ht Left Thr Ri Peds 61 11 191 0 355 26 361 Out nTotal I Kendall Place Dave"M gwwpawaKoa 305 W. Fourth Street Winston-Salem, NC Counted By: Frank Stowe 336-744-1636 File Name : Edwardia Drive 061510 Conditions: Sunny Site Code : 00000200 Start Date : 6/15/2010 Page No :3 menaan dace Edwardia Drive Wendover Avenue West Wendover Avenue West Northbound Southbound Eastbound Westbound Start Time Left Thru Right Peds App Told Left Thru Right Peds App T „i Le$ Thru Right Peds qpp T ei Left Thru Right Peds App Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 Paak Hnur fnr Pntira Infarcontinn R—;— + m•qn Ann 07:30 AM 0 0 3 3 3 0 8 0 11 86 267F ---62F-53729 51 301 01 321 0 70 07:45 AM 1 0 1 0 2 15 0 5 0 20 17 654 3 0 674 5 329 10 0 344 1040 08:00 AM 0 0 2 0 2 12 0 7 0 19 11 564 3 0 578 4 284 15 0 303 902 08:15 AM 1 0 1 0 2 2 0 10 69 9 76 Out InTotal Lendall Place Total Volume 2 0 7 0 9 32 0 30 0 62 161 2255 57 0 2473 12 1143 106 0 1261 3805 % App. Total 22.2 0 77.8 0 51.6 0 48.4 0 6.5 91.2 2.3 0 1 90.6 8.4 0 PHF .500 .000 .583 .000 .750 .533 .000 .750 .000 .775 .468 .862 .279 .000 .917 .600 .869 .379 .000 .916 .915 war to Drive Out In Total 267F ---62F-53729 301 01 321 0 Right Thru Left Peds a 1 � Peak Hour Data - m N0 c r N �-1 North 4—ter A m `m en 15 Peak Hour Begins at 07:30 A c " n °i .'oo �� n o o+-- tY d- o m Turning Movement Counts „I�� NL m o N N �1 cn W !a o m c, u — Z I Left Thru Ri ht Peds 21 01 71 0 69 9 76 Out InTotal Lendall Place CA pe eon eow a ag 305 W. Fourth Street Winston-Salem, NC Counted By: Frank Stowe 336-744-1636 File Name : Edwardia Drive 061510 Conditions: Sunny Site Code : 00000200 Start Date : 6/15/2010 Page No : 4 mencian dace Edwardia Drive Wendover Avenue West Wendover Avenue West Northbound Southt I Eastbound Westbound Start Time I Left I Thru I Right I Peds I App. Teva I Leff I Thru I Right I PedsI eft Thru Ring! Pndc Left 5h oedS __ __ 'pF �_ - tl APV Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Renins st n4•nn Pm 04:00 PM 1 Edwardia nve 1 2 8 0 14 0 22 45 465 1 0 511 2 598 6 0 606 1141 04:15 PM 1 0 1 0 2 14 0 34 48 27 351 29 0 407 0 495 37 o North 04:30 PM 0 0 0 0 0 18 0 16 0 34 36 334 30 0 400 0 488 6 0 494 928 04:45 PM 0 0 0 0 0 21 0 17 0 38 20 336 77 0 433 6 514 14 0 534 1005 Total Volume 2 0 2 0 4 61 0 81 0 142 128 1486 137 0 1751 8 2095 63 0 2166 4063 . Total 50 0 50 0 43 0 57 0 7.3 84.9 7.8 0 0.4 96.7 2.9 0 PHF 1 .500 .000 .500 .000 .50:01.726 .000 .596 -.000.740 .711 .799 .445 .000 .857 .333 .876 .426 .000 .894 .890 Edwardia nve Out In Total 191142 1 333 I all 61 0 Right Thru Left Peds 1 4 Peak Hour Data vFm � �w o aS.R o North C N c T L —� 4.. — S p 2 G ¢' ~ L Peak Hour Beglns at 04:00 P N > > o m '- n: b Turnin Movement Counts CD CD c�� how o a a jo `N° 0 o F' Left Thru Right Peds 2 0 21 0 145 4 149 Out InTotal da ace Kendall �r .2 ill pz ' 4 d, x i , Q � k 17 r r 101 f F p•,y l ri z �� 1R 1^ �r .2 ill pz ' 4 d, x i , Q � k 17 r r 101 f F p•,y l ri z �� 1R F� � H Gk vk Cc r y�7' 41��` � •.t �ti S ja �4a$it ] as. �r .2 ill pz ' 4 d, x i , Q � k 17 r r 101 f F p•,y l ri z 1 p , - Sts° _—�i�r{ .•.��i,, —(9 i CD June 14, 2010 Ms. Carrie Reeves, PE City of Greensboro Department of Transportation 300 W. Washington Street Greensboro, NC 27402-3136 RE: Pre -Submission conference checklist for Greensboro Auto Auction Site (DTC Project Number 10-068) Dear Ms. Reeves: I ant pleased to submit this Pre -Submission conference checklist for the proposed project in Greensboro. The transportation impact analysis will be prepared in accordance with GDOT and NCDOT guidelines for traffic impact studies and the following proposed scoping items. Please advise if any of these items should be adjusted: ® Site Location - (See location map attached) To be located on south side of West Wendover Avenue between Carnegie Place and Edwwardia Drive ® Site Layout - (See attached site plan) ® Trip Generation - (See attached table) a Proposed analysis software - Synchro Traffic Modeling Software (Version 7) a Proposed Study Intersections - o West Wendover Avenue at Carnegie Place / Kendall Center o West Wendover Avenue at Edwardia Drive / Kendall Center ® Proposed build -out year - 2012 ® Proposed annual growth rate - 3% ® Proposed Study Scenarios: AM (7-9 am) and PM (4-6 pm) peaks for the following: o 2010 Existing o 2012 Future No Build o 2012 Build (with nnitigation as necessary) ® Proposed site trip directional distribution - (See attached sketch) ® Approved developments - To be deternnined by GDOT and NCDOT ® Committed improvements - To be determined by GDOT and NCDOT Please feel free to contact me with any questions at 336-744-1636. Thank you for your earlier conununication, and we look forward to working with you in completing this study. Sincerely, Frank Ainenya, P.E Triad Office: Cape Fear Regional Office: 305 West Fourth Sheet, Suite 2A (27101) P.O. Box 15997 P.O. Box 4131, Winston-Salem, NC 27115-4131 Wilmington, NC 28408 Office: 336.744.1636 Fax: 336.458.9377 Office: 910.251.8912 Fax: 910.401.1592 � r ; ; - *�` . IyhA'A +�a)• � ,3J o .I.wf�sx ep#'�{,_.i`rtt,, AiZ Fwir�''""'t a {ti a fi m9 5 Y w k E'(end$1�h4IEi e i arts ! p LU t ,P tC, � s�.g i s• Q! y� � i.Ke 1A' 3"t$,n� ��" V'7 t1 a . a.F AGF spaxe m+l tr * N�N9 } '`. #a tl '~_,! y Rd�x ''1'S` M 1 W A Olt, � qg�,,$:. 'Et.�vti- �a ,v e LLL444... vv }; pm qz +34 Fj y'�-; �r y •r , ��� a' � , ��'� s t "�ta{ 1 t h^ ti �T ! �"a r a ^` y ' y a ,06 9 s ; "✓ "^ v "S wet -tom. aiY ro 'o�dt�'SB''°�'�y fi ' j ,si • Y! E 8 f - j�iNj7k � r N t � t 4 � x � a Y ,P tC, � s�.g i s• Q! y� � i.Ke 1A' 3"t$,n� ��" V'7 t1 a . a.F AGF spaxe m+l tr * N�N9 } '`. #a tl '~_,! y Rd�x ''1'S` M 1 W A Olt, � qg�,,$:. 'Et.�vti- �a ,v e LLL444... vv }; pm qz +34 Fj y'�-; �r y •r , ��� a' � , ��'� s t "�ta{ 1 t h^ ti �T ! �"a r a ^` y ' y a ,06 9 s ; "✓ "^ v "S wet -tom. aiY ro CvREEN5BORO AUTO AUGTION 1`00,NfIt AVOM e—Wee" IIME-EhDTMCEHIP &,..LFORO Cm lL-.IYI c_I:r+re, _�cr.•.:I. cc!ler•_rv:s ( �7 O MIRTH C&RMIUA r s is -JIM J4 pi r r` 'bet, AQ { � ifi � . `� G S k � } 4 lei "iF•Wyy'" � . '��, �.�'�,$ � �� 7y..�t � I � i r� �'�t �' 4 t s ✓ �Iy�� Z ti ` :.fir �_ we•w �y yeti '°k -v �'? SY� � - ': 417l.CIllt/.:, rf ¢'d r•- L' qpr ^� a r I .x r s, �, ,,n,�+�-.,,*-� 'Yn �i'} [vd � �yc� u `v � '-�t �' �5 rf t k>; � g s� -.�� 4$eY a r x Xr. � ek [ a'�Y dA1����, �e�`'� Ti`�'tG� r43�>•ti{ rLi �,�CR 'r ^, � � �� t q s � . �•'k +7 spY" Ns.'"�sFt ry r MIR a, � � 1 Ali 1: k ri ayTY� d t i a{� c t l'F`t ry, ; �, s< ' ° t " It 1 p d tr e ,+r3f YM '�', } i O _:i +.: S io" '� y1 A� ��d]�+ •: � '� y ��y�rih ,,F t •rile `rte �x�a,. ,'��¢',��w ,� ,, k y'�' � � �'1 ,»a��r ��'� ���4,.ty ` � � .,�{I} .: kn W 1 x an v� a a sw r 1 n y t A��� � .tee. {`" >",>ie �Pq 1 'o ern �t > �j 'S{ F � ry t �, � �1p I �7 ,kw &' �tw Sa�y�i + �•kxy'` a° R-. F y p"',',�,y. ¢MpjAn y.. o77�rtx �;3rtle4 y,,, a«�+is c• 'rtic A r, ,�.; a d. ey t:ry 4 Yi At x° } t� �'� {4edt'7� ,�'' 'r" �r p a � u a 1 r +4.ik'.. '�•.,t� qY ' Z vv� y s 3 w 7y7�, J`' ti K y a„ M 1Y eta E"D r t+- tiler � e Z z i N 04 ' •. � r 'i �a tai t �,��. 1�' �t+ �' L »��i ; S > > r � `+ Ra j� y,,,,{i �✓ rC. a t ''. 3 «,. yg7 � .� '� i v ✓ i $.� to ti� � t 1 t z �`s�d tk t�yF' Irt r 01(Y h iad�`' h`rrfrP s d yy a's "Y rr7,'"r. v ° I 2' •s't'G'a+G ',C,p 4, Z o z z W (n O O N W O J Q O Z <b U v > Z 'n (9 C7 O O aw zw p 0 2 i=5 zz F �= o zw L3M Q U X O � 5 r- + F- Z H W W W11 Q 0 Lu Yu Q z z m O F O w 000 o Z w Q_ W x' V � z z 15% OUT 0 v a®4% OUT r 40% OUT Edwardia Drive Kendall Center 000 NF7 r 4% IN ---► �z o 0 DY �y O�OC u') O a L 0 0 L O O P> L O L Cm L y U m OL O C j u! O t C m O OC C N N H U: 1DU 7 00� .VO.CoC C N C. y > C y L C f ry '- Q acmno ? N!s Oa C C �y C L z.9 3�3guarp 0 m` a m m c N N $�Qmp ar o E c c a EcO_oam o m V V O N "= OI a w 'ii 0 . h �° mm�tL_r O z m H CCC O o ' oho 35% OUT 4-1 % OUT Carnegie Place �° (<' 5% OUT Kendall Center 1% IN —10 ZZ o e To CQ w J Q. U O O O z f Policy On Street And Driveway Access to North Carolina Highways Page 80 0 o N • 0'■■■■■■■■ NONE ■■■■■■■■,l WOMEN MINION MEMO '■■■■ ■■■■ I N ■ NONE ■■■E■■■■■E■E■■■■l . ■SEEM NONE SOME ;NONE ONE • AM No NONE ■■■■.■■■■.■■►K 0 In ■■■■t II f ■■■■■■■■■' MEMO ■■■■■■YAF.. • ■■■■■■■■■■■■■,■■■■■II FAY Eoa a� ■■■■ ONES ■■■■ MEMO ■L//'/■%■� RE■MMEMO ONES ■■■■ ■■■■,■■■■'■■■■ MEMO ■%I%OIIN Oman SII - ■■■■■■■■■■■■ NONE %/%■5110■■'1 M m o Emus NUNNG■1011111. .000■m■■ NONE K M_ ipu 13 ■�■■■■■■��■II%%r.1r.■W.9swoop ■■■■■■■■■■■■■MirDEAN ■■■■M■■ N ■■■■,■■■■■■■■ viii MEMORIES ���. ■�■t■�� ' ;00■■�■M��%%//%Lid%O%■Igo o So N ■■■■ ■■■■!■P%'/.11aPIF ■ P"a►.91.0■■ Gi■■ 1 '. `OMEN ■PAF■I■IIIIRISE,■ME■• ''' ,NONE �/%%%NP ,.I,■1,,11,■III����.�i�. ��.I,�.1,� Page 80 July 2003 0 o N N 3 4 N 9 O O O N 0 In ; O II f ma m � Eoa a� L baa mm �_.... o c E � a aa) M m o -dV4 go 'a K M_ ipu 13 N C. C o N - T. N t , f I W W �4 o 3a 6a 9 eo• j 5 c� Ln 7 a �- •----.-.,.�." F� WL9 i 0 ??Ct v � S July 2003 c7 5 GEN R • L NOTES: i. BOUNDARY INFORMATION FROM SURVEY FOR GUILFORD ENGINEERING, INC. AND SIGNED AND SEALED BY CRAIG S. FLEMING, PLS DATED 12==. GIS AND INFORMATION PROVIDED BY OWNER. 3. ALL DEVELOPMENT $HALL CONFORMH THE CITY O GREENSBORO D' I• P ORDINANCE. 4. WATER AND SEWER SHALL BE INSTALLED AND OR ABANDONED IN ACCORDANCE WITH THE REQUIREMENTS OF THE CITY OF i "OO 5. ANY DISCREPANCIES FOUND IN THE FIELD SHALL BE CALLED TO THE ATTENTION OF THE OWNER AND ENGINEER PRIOR TO PROCEEDING ,. H THE WORK. S. THE I i CONTRACTOR SHALL CONTACT ALL OWNE OF EASEMENTS, I. D RIGHT-OF-WAYS,OR �I I •- • •,MPUIVOLTHESE AREAS, 7. DO NOT SCALE DRAWING FOR ACTUAL DIMENSIONS, AS IT IS A REPRODUCTION AND SUBJECT TO DISTORTION. a. ALL DAMAGED OR NON-COMPLUANT EXISTING CURB, GUTTER - AND SIDEWALK $HALL BE REPLACED. 9. ALL SODEWALKS AT DRIVEWAYS SHALL HAVE . f CHAIR- RAMPS.T 10. ALL DRIVES TO BE CONSTRUCTED PER CITY OF GREENSBORO STDS #418 & 04118 F GA CONTROLLED ACCESS CONC, EXISTING CONCRETE G GAS PIPE LINE W WATERLINE G ARMNO SUMMARY: 1. ADDITIONAL 81A SPACES FOR CAR STORAGE ONLY. 2. ADDITIONAL 967 SPACES FOR CAR STORAGE (OCCASIONALLY USED I EMPLOYEE (SHUTTLE SERVICE) AND OVERFLOW CUSTOMER PARKING) ADD 20 ACCESSIBLE SPACES AT THE AUTO AUCTION BUILDING. Note: NO NEW BUILDINGS PROPOSED. DEMOLITION OF THE EXISTING EVERGREENS BUILDING. ONWO: I CD -C -M (CondMonal Dlstdct-Commerclai-Madlum) 1. Uses: Llrnitad 4o ail uses allowed In the C -M zoning district except sexually odentsd bu sinars m. CD -LI (Ccnditnal District -Light Induate Q. I 1. Uses: LImftd to all urea allowed In the LI zoning dlWot except land dearing and Inert debris Iandfil, minor. 1 2 200 COG 163 N. Z'T 56,587.365 m E: 30,072.010 m SCALE FACT R: 0.999919 PROPOSED 12' wv TURN LANE EX. G h G TO BE REMOVED J EX. SIDEWALK ((TAPPER) 112 +/- ((12' TURN LANE) rn PROPOSED PROPOSED 5' 51DEWALK 5GRASS STRIP PROPOSED EXI BTIN6G� , FARK9G L 6 NO E.I.P. EXISTING IRON PIN 1.P.S, IRON PIN SET CONIC, MON. CONCRETE MONUMENT PT, POINT R/W RIGHT-OF-WAY E/P EDGE OF PAVEMENT C & G CURB & GUTTER T/C TOP OF CURB PP POWER POLE PIV POST INDICATOR VALVE - E -- OVERHEAD UTILITY PK NAIL MASONRY NAIL WV WATER VALVE CO CLEAN OUT GM GAS METER GV GAS VALVE MH MANHOLE FES FLARED END SECTION FH FIRE HYDRANT LP LIGHT POLE N/F NOW OR FORMERLY ©0WM WATER METER & BACKFLOW PREVENTER o WM WATER METER UG UNDERGROUND SERVICE BOLLARD C. 1. CURB INLET G.1. GRATE INLET GA CONTROLLED ACCESS CONC, EXISTING CONCRETE G GAS PIPE LINE W WATERLINE G ARMNO SUMMARY: 1. ADDITIONAL 81A SPACES FOR CAR STORAGE ONLY. 2. ADDITIONAL 967 SPACES FOR CAR STORAGE (OCCASIONALLY USED I EMPLOYEE (SHUTTLE SERVICE) AND OVERFLOW CUSTOMER PARKING) ADD 20 ACCESSIBLE SPACES AT THE AUTO AUCTION BUILDING. Note: NO NEW BUILDINGS PROPOSED. DEMOLITION OF THE EXISTING EVERGREENS BUILDING. ONWO: I CD -C -M (CondMonal Dlstdct-Commerclai-Madlum) 1. Uses: Llrnitad 4o ail uses allowed In the C -M zoning district except sexually odentsd bu sinars m. CD -LI (Ccnditnal District -Light Induate Q. I 1. Uses: LImftd to all urea allowed In the LI zoning dlWot except land dearing and Inert debris Iandfil, minor. 1 2 200 COG 163 N. Z'T 56,587.365 m E: 30,072.010 m SCALE FACT R: 0.999919 PROPOSED 12' wv TURN LANE EX. G h G TO BE REMOVED J EX. SIDEWALK ((TAPPER) 112 +/- ((12' TURN LANE) rn PROPOSED PROPOSED 5' 51DEWALK 5GRASS STRIP PROPOSED EXI BTIN6G� , FARK9G EXISTING ENTRANGE o TO BE REN I 'I 1 � I m 1 i ° 11 s1 "' It 1 II II 11 Qli 11 7� EX 15T1 NG Xii BUILDING W}� L � o� II-\\ III \\. �11 \ l4 \\ i O \1 11 11 \ 11 2/S 0 r� (�LJ�7G v� SIGNAL p - P- P P METAL P P BOX D _ --- EX. BUB HBOVEF � %��� 4 STQP FEDAPfZOPOSED CONSTRUCTION SEQUENCE: _ O-�����-�� CONSTRUCTION oa BU5 5TOP 4 z - 1. CONTRACTOR SHALL ENSURE THATALL APPLICABLE PERMITS AND APPROVALS - -- - EX. G C '� PROPO5ED 12- - - - - EASEMENT W HAVE BEEN OBTAINED PRIOR TO PROCEEDING NTH WORK ASSOCIATED WITH w e BE REMOVED TURN LANE o GOO STD.#�52 �� _ -- THESE DOCUMENTS. EXISTING UTIL IES TD BE RELOGA D I - - - 1�5' +/- (TURN LANE) - 2. SCHEDULE A PRE CONSTRUCTION CONFERENCE WITH OWNER, ALL 2OO `+/- TAPPER -_ _= TSB E - s FOR DISTURBANCE AN fQ EROSION CONTROL, AND - CQNTRACYOR ° R LAND D15 R E D R O - EROSIONCONTi ROL AUTIiQRl71l PERSONNEL TO DISCUSS THE EROSION CONTROL E N T PLAN. E -- E E t1GF/7 - - E P05ED 5 BIDEWA K I L.I 3. FLAG THE NEW CONSTRUCTION LIMITS AS INDICATED ON THE PLAN, DO NOT ------- -rr+AFrc EXCEED PROPERTY BOUNDARIES WITHOUT WRITTEN APPROVAL OF ADJACENT -a 8' SIGNFc PROPERTY OWNERS. FLAG THE CLEARING LIMITS AND VERIFY WITH THE OWNER istiAP sB I eo seT) 1 G PRIOR TO CLEARING. �r f O Ln i f 0 O \. 4 INSTALL TEMPORARY LLT FENCE AND STONE OUTLETS. INSTALL TEMPORARY PRO OSED+ + CONSTRUCTION ENTRANCE ONCE EXISTING ASPHALT IS REMOVED.n v MoER _.I2' TURN 0x R C] LANE 0 OWN S BEGIN CLEARING ONLY ENOUGH TO INSTALL EROSION CONTROL MEASURES _ THE ENTIRE LIMITS OF DISTURBANCE MAY BE CLEARED AND GRUBBED AS 3H EXIST, .4_'_... _ • - - - - '�~---� Q Iv11 X\ 1 0 S VfR MAPtf } ON PLAN ONLY AFTER ALL THE EROSION CONTROL MEASURES HAVE BEEN INSTALLED AROUND THE SITE PERIMETER. � - S '� _~ MH O J ` 1 14,J 1 1 6. INSTALL THE PORTION OF THE STORM DRAINAGE SYSTEM THAT IS USED AS �=832.x5' a��z\ 00 '`� u 1 1 PART OF THE EROSION CONTROL. CN E X I S T I N G7 7. INSTALL TEMPORARY DIVERSION DITCHES AS SHOWN ON PLANS. BEGIN TO O �� CONSTRUCTIOiNB OF DITCHES FROM THE EXCAVATED DROP INLET PROTECTION SO A N K Q MAINT. E"S,t 1'T. THAT ANY EROSION THAT OCCURS DURING THE CONSTRUCTION OF THE DTfCH EXISTING -L_ 6. 4576 Pc_. 83 > WILL BE CAPTURED BY THE BASIN. SEED AND STABILIZE THE BERM IMMEDIATELY AFTER CONSTRUCTION UNLESS IT WILL REMAIN IN PLACE LESS THAN 21 DAYS. EXISTING TEMPORARY DIVERSION DITCHES SHALL. BE MAINTAINED TO THE EXCAVATED DROP RIP -RAP �� � GENTERL I NE -- \ I INLET PROTECTION SINCE THE EXCAVATED DROP INLET PROTECTION WILL SERVE S \ , AS THE MAJOR EROSION CONTROL DEVICES DURING CONSTRUCTION AND DEMOLITION. P \\ TO - 82J. 82 \ \ \ \ , 8. GENERAL CONTRACTOR SHALL ENSURE THAT EROSION CONTROL DEVICES ARE 812.91 IN PLACE AND FUNCTIONING PRIOR TO GRUBBING / DEMOLITION OF THE SITE. 8. COMPLETE THE CLEARING, DEMOLITION AND GRUBBING OPERATIONS. \\ !}{(I ( /D J ` HR 10. STORM DRAINAGE WITH INLET PROTECTION SHALL BE INSTALLED AS SOON AS -1----- ��0/// �-�,/. ,,,{{{iii /` EX/ T, ..,�-- � GRADING OPERATIONS DICTATE. OUTLET PROTECTION SHALL BE INSTALLED AS \\ \ 9 SHOWN AT EACH STORM PIPE OUTLET. \;\ yi `i 11. STABILIZATION IS THE BEST FORM OF EROSION CONTROL, TEMPORARY N ZONE A ti` ` s _ SEEDING IS NECESSARY TO ACHIEVE EROSION CONTROL ON LARGE DENUDED AREAS AND ESPECIALLY WHEN SPECIFICALLY REQUIRED AS PART OF THE t , CONSTRUCTION SEQUENCE. ALL GRADED SLOPES MUST BE SEEDED AND MULCHED WITI-LIN 21 DAYS. 12. CONTRACTOR SHALL ADJUST EXISTING EROSION CONTROL MEASURES AS \\�1 \ �` s\ , REQUIRED DURING THE CONSTRUCTION PROCESS. CONTRACTOR SHALL INSTALL ANY ADDITIONAL EROSION CONTROL MEASURES AS DEEMED NECESSARY BY THE EROSION CONTROL INSPECTOR. 13. GROUND COVER SHALL BE ESTABLISHED ON EXPOSED AREAS WITHIN 21 DAYS FOLLOWING ANY PHASE OF GRADING. ALL EROSION AND SEDIMENT CONTROL PRACTICES SHALL. BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY STORM EVENT, BUT IN NO CASE LESS THAN ONCE EVERY WEEK. ANY (I `P REPAIRS OR CLEANING NECESSARY TO MAINTAIN EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE COMPLETED IMMEDIATELY. 18. ALL SEEDED AREAS SHALL BE REFERTILIZED. RESEEDED AS NECESSARY, AND \\\ \ SIP suM �, MULCHED ACCORDING TO THE SEEDING SCHEDULE. 16. REMOVE TEMP CONSTRUCTION ENTRANCE PRIOR TO PAVING. �?i \ E X ` \ } 17. REMOVE TEMP SILT FENCE AND TEMP TREE PROTECTION FENCE AFTER THE Ph I SITE HAS BEEN PERMANENTLY STABILIZED. V RGP II 11 �� II \ ---EXISTING I EX15TING\v111 BUILDING I Eel 0 1 EXIST(( 06 BUILDING 1 5 t` i t 1 l i 1 N TOP= 3.q' TO / \ INV = 810. �� ROPOSE 2 Z IN AB VE �� `\, C U D ENC7L SUFE PE 650-12 //Vv 810 EXISTING BUI LD I t Y(_� COG 27047 ` SAN/7ARY MH 12 EX./' F 1j�( O ' ",:R ` OWNER/DEVELOPER: G1REEN50BOR AUTO AUCTION 3g0-7 W. INENDOVER AVE. 6REEN5BORO, NC 2-140-7 CONTACT: DEAN GREEN OFFICE: (336) 2qq-"7-1-71 CELL: (33(b) 202-3326 CIVIL ENGINEER. RE/15I ON5 1, Z C) Z Z�� l9 � Q vLuZ it1OX �} Ly- LL Z to 7- < <LCL°o Z } Z (y Iry L) ul C � W Z � a LLL SITE PLAN CPT ENOINEERINO 4 5URVEYIN5, INC 4400 TYNIN6 STREET HIGH POINT, NC 2?265 CONTACT: BRUCE NOOE, P.E. (336) 512-88OO ext 315 SCALE: 1" = 40' GRAPHIC SCALE 40 0 20 40 80 ( IPI FEET ) I inch = 40 ft. DATE: 2/01/2010 4'a 10 -- 0�� 4 F N n N • A i �.. I .� _.. _,1 1 1 EXISTING ENTRANGE o TO BE REN I 'I 1 � I m 1 i ° 11 s1 "' It 1 II II 11 Qli 11 7� EX 15T1 NG Xii BUILDING W}� L � o� II-\\ III \\. �11 \ l4 \\ i O \1 11 11 \ 11 2/S 0 r� (�LJ�7G v� SIGNAL p - P- P P METAL P P BOX D _ --- EX. BUB HBOVEF � %��� 4 STQP FEDAPfZOPOSED CONSTRUCTION SEQUENCE: _ O-�����-�� CONSTRUCTION oa BU5 5TOP 4 z - 1. CONTRACTOR SHALL ENSURE THATALL APPLICABLE PERMITS AND APPROVALS - -- - EX. G C '� PROPO5ED 12- - - - - EASEMENT W HAVE BEEN OBTAINED PRIOR TO PROCEEDING NTH WORK ASSOCIATED WITH w e BE REMOVED TURN LANE o GOO STD.#�52 �� _ -- THESE DOCUMENTS. EXISTING UTIL IES TD BE RELOGA D I - - - 1�5' +/- (TURN LANE) - 2. SCHEDULE A PRE CONSTRUCTION CONFERENCE WITH OWNER, ALL 2OO `+/- TAPPER -_ _= TSB E - s FOR DISTURBANCE AN fQ EROSION CONTROL, AND - CQNTRACYOR ° R LAND D15 R E D R O - EROSIONCONTi ROL AUTIiQRl71l PERSONNEL TO DISCUSS THE EROSION CONTROL E N T PLAN. E -- E E t1GF/7 - - E P05ED 5 BIDEWA K I L.I 3. FLAG THE NEW CONSTRUCTION LIMITS AS INDICATED ON THE PLAN, DO NOT ------- -rr+AFrc EXCEED PROPERTY BOUNDARIES WITHOUT WRITTEN APPROVAL OF ADJACENT -a 8' SIGNFc PROPERTY OWNERS. FLAG THE CLEARING LIMITS AND VERIFY WITH THE OWNER istiAP sB I eo seT) 1 G PRIOR TO CLEARING. �r f O Ln i f 0 O \. 4 INSTALL TEMPORARY LLT FENCE AND STONE OUTLETS. INSTALL TEMPORARY PRO OSED+ + CONSTRUCTION ENTRANCE ONCE EXISTING ASPHALT IS REMOVED.n v MoER _.I2' TURN 0x R C] LANE 0 OWN S BEGIN CLEARING ONLY ENOUGH TO INSTALL EROSION CONTROL MEASURES _ THE ENTIRE LIMITS OF DISTURBANCE MAY BE CLEARED AND GRUBBED AS 3H EXIST, .4_'_... _ • - - - - '�~---� Q Iv11 X\ 1 0 S VfR MAPtf } ON PLAN ONLY AFTER ALL THE EROSION CONTROL MEASURES HAVE BEEN INSTALLED AROUND THE SITE PERIMETER. � - S '� _~ MH O J ` 1 14,J 1 1 6. INSTALL THE PORTION OF THE STORM DRAINAGE SYSTEM THAT IS USED AS �=832.x5' a��z\ 00 '`� u 1 1 PART OF THE EROSION CONTROL. CN E X I S T I N G7 7. INSTALL TEMPORARY DIVERSION DITCHES AS SHOWN ON PLANS. BEGIN TO O �� CONSTRUCTIOiNB OF DITCHES FROM THE EXCAVATED DROP INLET PROTECTION SO A N K Q MAINT. E"S,t 1'T. THAT ANY EROSION THAT OCCURS DURING THE CONSTRUCTION OF THE DTfCH EXISTING -L_ 6. 4576 Pc_. 83 > WILL BE CAPTURED BY THE BASIN. SEED AND STABILIZE THE BERM IMMEDIATELY AFTER CONSTRUCTION UNLESS IT WILL REMAIN IN PLACE LESS THAN 21 DAYS. EXISTING TEMPORARY DIVERSION DITCHES SHALL. BE MAINTAINED TO THE EXCAVATED DROP RIP -RAP �� � GENTERL I NE -- \ I INLET PROTECTION SINCE THE EXCAVATED DROP INLET PROTECTION WILL SERVE S \ , AS THE MAJOR EROSION CONTROL DEVICES DURING CONSTRUCTION AND DEMOLITION. P \\ TO - 82J. 82 \ \ \ \ , 8. GENERAL CONTRACTOR SHALL ENSURE THAT EROSION CONTROL DEVICES ARE 812.91 IN PLACE AND FUNCTIONING PRIOR TO GRUBBING / DEMOLITION OF THE SITE. 8. COMPLETE THE CLEARING, DEMOLITION AND GRUBBING OPERATIONS. \\ !}{(I ( /D J ` HR 10. STORM DRAINAGE WITH INLET PROTECTION SHALL BE INSTALLED AS SOON AS -1----- ��0/// �-�,/. ,,,{{{iii /` EX/ T, ..,�-- � GRADING OPERATIONS DICTATE. OUTLET PROTECTION SHALL BE INSTALLED AS \\ \ 9 SHOWN AT EACH STORM PIPE OUTLET. \;\ yi `i 11. STABILIZATION IS THE BEST FORM OF EROSION CONTROL, TEMPORARY N ZONE A ti` ` s _ SEEDING IS NECESSARY TO ACHIEVE EROSION CONTROL ON LARGE DENUDED AREAS AND ESPECIALLY WHEN SPECIFICALLY REQUIRED AS PART OF THE t , CONSTRUCTION SEQUENCE. ALL GRADED SLOPES MUST BE SEEDED AND MULCHED WITI-LIN 21 DAYS. 12. CONTRACTOR SHALL ADJUST EXISTING EROSION CONTROL MEASURES AS \\�1 \ �` s\ , REQUIRED DURING THE CONSTRUCTION PROCESS. CONTRACTOR SHALL INSTALL ANY ADDITIONAL EROSION CONTROL MEASURES AS DEEMED NECESSARY BY THE EROSION CONTROL INSPECTOR. 13. GROUND COVER SHALL BE ESTABLISHED ON EXPOSED AREAS WITHIN 21 DAYS FOLLOWING ANY PHASE OF GRADING. ALL EROSION AND SEDIMENT CONTROL PRACTICES SHALL. BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY STORM EVENT, BUT IN NO CASE LESS THAN ONCE EVERY WEEK. ANY (I `P REPAIRS OR CLEANING NECESSARY TO MAINTAIN EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE COMPLETED IMMEDIATELY. 18. ALL SEEDED AREAS SHALL BE REFERTILIZED. RESEEDED AS NECESSARY, AND \\\ \ SIP suM �, MULCHED ACCORDING TO THE SEEDING SCHEDULE. 16. REMOVE TEMP CONSTRUCTION ENTRANCE PRIOR TO PAVING. �?i \ E X ` \ } 17. REMOVE TEMP SILT FENCE AND TEMP TREE PROTECTION FENCE AFTER THE Ph I SITE HAS BEEN PERMANENTLY STABILIZED. V RGP II 11 �� II \ ---EXISTING I EX15TING\v111 BUILDING I Eel 0 1 EXIST(( 06 BUILDING 1 5 t` i t 1 l i 1 N TOP= 3.q' TO / \ INV = 810. �� ROPOSE 2 Z IN AB VE �� `\, C U D ENC7L SUFE PE 650-12 //Vv 810 EXISTING BUI LD I t Y(_� COG 27047 ` SAN/7ARY MH 12 EX./' F 1j�( O ' ",:R ` OWNER/DEVELOPER: G1REEN50BOR AUTO AUCTION 3g0-7 W. INENDOVER AVE. 6REEN5BORO, NC 2-140-7 CONTACT: DEAN GREEN OFFICE: (336) 2qq-"7-1-71 CELL: (33(b) 202-3326 CIVIL ENGINEER. RE/15I ON5 1, Z C) Z Z�� l9 � Q vLuZ it1OX �} Ly- LL Z to 7- < <LCL°o Z } Z (y Iry L) ul C � W Z � a LLL SITE PLAN CPT ENOINEERINO 4 5URVEYIN5, INC 4400 TYNIN6 STREET HIGH POINT, NC 2?265 CONTACT: BRUCE NOOE, P.E. (336) 512-88OO ext 315 SCALE: 1" = 40' GRAPHIC SCALE 40 0 20 40 80 ( IPI FEET ) I inch = 40 ft. DATE: 2/01/2010 4'a 10 -- 0�� 4 F N n N 0 \ 1-800-632-4949 EX. TG GRAPHIC SCALE 40 0 20 40 8o ( IN FEET ) 1 inch = 40 ft. E REMOVED X32 iso TGF - 4+ 0 f' P . PotE X Z i W � TRAFFIC — SIGNAL soX 1-- I EXIS TSB-- " A1L )�EXIST 4..' 5 V@R MAPLE ci KOTTI NO—HEA . l - C. D. l0' MAINT. ESM'T. (Q.'3 - 4576 PG 83 1 - EXISTING \ RIP -RAP tfR \ I HOTE-0 3907, 3911, 3915 AND 3917 W. WENDOVER AVE. ARE NOT PART OF THIS DEVELOPMENT. DEED EMEN NCS: DS 2530 PO 434 DE 2390 PO 525 DE 794 FG 305 DIE 2457 PO 527 OTTE PH OIRMIrOOH-0 i, TOTAL SITE: 26.4ft AC Z EXMTINO ZONING: LI & P1 3. SOILS: (EnD, 'ice, M&E, iEnC, CrB 4. WATERSHED: NOT LOCATED IN A WATER SUPPLY WATERSHED 5, (FLOOD: LOCATED IN A FLOOD ZONE AS SHOWN( ON FIRM AAAI 6. MAP NO. 3710783400 J PANEL 7834 DATED JUNE 18, 2007 7. BOUNDARY INFORMATION TAKEN FROM A SURVEY BY FLEMING ENGINEERING, INC. FOR GUILFORD COUNTY KENDALL CENTER/ EVERGREENS DATED 12-22-09. S. TOPOGRAPHIC INFORMATION: COMBINATION OF GREENSBORO GIS, INFORMATION) PROVIDED BY OWNED AND FIELD LOCATIONS BY CPT ENGINEERING AND SURVEYING, INC. OWHER § DEWELOO I ER0. GUILFORD COUNTY 301 WEST MARKET STREIET GREENSBORO, NIC 27402 C LT. 3+00 LT 2+00 LT 1+00 LT 0+00 1+00 RT 2+00 RT 3+00 Scale = Hor. 1"=40' Vert.; 1"=4' ' f. .......... _ Q J I �j _ 1 zf I L. - : � , I _ W J 840.00 k . I I I I •', . EX GAG OrEX. ORN/E f ( f 830,00 s� I . — Ii ; , :> r 820.M 820.00. , f EXISTING GAG 5 Y _ . � SEW R 810'oo i RT APR@ :- me IN G}j Y 0 11, r � REVI5ION5 51 z (3 � r Z z l,— u) c�1 } z m m Lu � X ts) IL Q W Z kb v ? ZOLzz Ci Qqo ki) —'oQ Lu Lu QLu ° zz3 113 Z < O W a_ sq s � �01 p Ck�Rp�4/��; y`L✓n 223 OL lSi C) Lu < Q)W Lu > y Ro O= Q O� C) CoZ W CL Stream X-Sec,tion 5CALE: IIt = 40' DATE: 2/0a/2010 FRO.JEGT: '125—OG DRAWN BY: BBN 5HEET 0 e \ Response to Incomplete Application Notification Action ID: SAW -2010-00636 County: Guilford FOR GREENSBORO AUTO AUCTION GREENSBORO - GUILFORD COUNTY �1 MOREHEAD TOWNSHIP NORTH CAROLINA OWNER/DEVELOPER: GREENSBORO AUTO AUCTION 3907 W. WENDOVER AVE. Greensboro, North Carolina 27409 (336) 299-7777 CPT Engineering and Surveying, Inc. 4400 Tyning Street High Point, NC 27265 Phone (336) 812-8800 • Fax (336) 812-8780 Response to Incomplete Application Notification Action ID: SAW -2010-00636 County: Guilford FOR GREENSBORO AUTO AUCTION Remark 1: -Copy of Action ID: SAW -2002-20470 and SAW -2002-20858 provided. -Location of impacts (Plans submitted with the PCN) CPT Engineering and Surveying, Inc. 4400 Tyning Street High Point, NC 27265 Phone (336) 812-8800 • Fax (336) 812-8780 U.S. ARMY CORPS OF ENGINEERS Wilmington District Action ID: 200220470 & 200220858 County: Guilford GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Property Owner Greensboro Auto Auction. Inc. Attn: Dean Green Address 3802 West Wendover Avenue Greensboro, NC 27407 Telephone Number 336-299-7777 Authorized Agent Mitcham & Associates, P.A. Attn: Bruce Nooe .Address Post Office Box 7267_ Greensboro; NC 27417 Telephone Number 336-292-2770 Size and Location of Property (waterbody, Highway name/number, town, etc.): The property is located northeast of the intersection of Wendover Avenue and U.S. I-40, in Greensboro, Guilford County, North Carolina. The site contains wetlands and stream channels with indicators of ordinary high water marks, located adjacent to South Buffalo Creek in the Cape Fear River Basin. Description of Activity: This permit authorizes mechanized landclearing, excavation, the installation of culverts, and the placement of fill associated with the installation of one temporary and one permanent stream crossing, and construction of a parking lot for the Greensboro Auto Auction site. Impacts to wetlands and waters authorized by this permit include 0.1 acre of wetland under NWP 39 and 115 linear feet of stream channel (40 linear feet of temporary impact under NWP 39, 75 linear feet of permanent impact under NWP 14). Applicable Law: X Section 40.4 (Clean Water Act, 33 USC 1344) only. Section 10 (River and Harbor Act of 1899) only. Authorization: Regional General Permit Number 14 & 39 Nationwide Permit Number Any violation of the conditions of the Regional General or Nationwide Permit referenced above may subject the permittee to a stop work order, a restoration order, and/or appropriate legal action. This Department of the Army Regional General Permit or Nationwide Permit verification does not relieve the permittee of the responsibility to obtain any other required Federal, State, or local approvals/permits. The permittee may need to contact appropriate State and local agencies before beginning work. If you have any questions regarding the Corps of Engineers regulatory program, please contact Todd Tugwell at telephone number_ (919) 876 - 8441 extension 26 Regulatory Project Manager Signature Authorization Date May 21 2002Expiration hate May 21, 2007 SURVEY PLATS, FIELD SKETCH, WETLAND DELINEATION FORM, ETC., MUST BE ATTACHED TO THE YELLOW (FILE) COPY OF THIS, FORM, IF REQUIRED OR AVAILABLE. CF: �," Oise -, rarn ro aur }au•i;uiQwogojlw TDW-3 vNI owo H160N - 0608SN3380 ,00M=.L:9100S Nae :X8 pa�oa40 qn5-3ovsn-9Zt9:'a�lj 96Z9-Z6Z (9££) XVJ OLLZ-Z6Z (9££) llNnoo OMOdllfl0 - dIHSNM01 Ob3H380W ° ' -' T13MUM 3 KYMVA L9ZO-LLtiLZ 'O'N '0808SN3380 3nN3AH 283AOON3M 1S3M Z08£ WI aiojiino) (KIS SI WI x08 •p•d � ZO-6-a :9400 N88'MOM o48 UMDJQ 9ZL9 :'ON qop Va Wr-1 aoo"3anea�a CIV08 1NIOd HOIH 9L69 'O'NONS `NOIlOfld Olfld Ozi08SN33zi� x �" ""L � SN3NNVld - SMO.l3ANns - S833NION3 'O•" LMI - I "VIOLIn .M OMVQ Yd `S31`dI30SSV V V4VHOlI IN 133HS 83A00 a cn �:) �4 o o r— 8 z I) U O Q O Q J o O Wn D � _ �O 0n,- �- � o m 00 Q W � W O U 8 o o r— 8 z I) U U 8 O z 0 --I O Z IL711 � m GU��F0 a, coLLECE y ROAD FT]= O r� D 00 � : o G7 C� zoo C � FT] .� O Fn Z $ I I V J O z ? -7G O o � o �� o o z o N mQ Cn D n m > z z C C z 0 0 O z Z z ! �: r` COVER SHEET MITCHAM & ASSOCIATES, P.A. DANK W. MRCNAM L - 1=7 N.C. $ x ENGINEERS — SURVEYORS — PLANNERS GREENSBORO AUTO AUCTION, INC. BRUCE NOOE L - ]4113 N.C. 5915 WIGH POINT ROAD Job No.: 6128 Drawn By. W0W,80N Date: 4-9.02 � (f�Q (GUILFORD MILLS SITE) P.O. Box 7267 W,L1 C MnCNEU PE 7480 N.C. (f 3802 WEST WENDOVER AVENUE GREENSBORO, N.C. 27417-0267 u - M2® &C. File.: 6128—USnCE—Sub Checked By: BBN Scale: 1•_1000' MOREHEAD TOWNSHIP — GUILFORD COUNTY (336) 292-2770 FAX (336) 292-6295 GREENSBORO — NORTH CAROLINA E—Mail; mitchom®infi.net JMLY a 4M u - 3410 N.G *v 'I-, /Ji A W N O W �cn nnso rctppaaz oxNvm QgSi� $ioFa�z t1sA;m �aic7oa-sa a�ormT62 v W� yzitm*zt�$�mzi z yam,n-CpZ1;u Z TOn ]fZZ ON�n —W, -=C do g ao.. D��No'tp d0mu�>WT Co .. ON PC vn��pp- D mp 33 �vpp cg�z-�Z-11g m 2 A �7D pz Drop IACto 2 - m >N -0 Z II 1 D 0mg �x�r0irn"5 1�pp� vor'�"`z�.!` '.�mov'AazFmPN�+0�v Z�$ 0 ,,,zrn m Z-�rn DD C� AyzUl ft m.� �0� V fpOm in Z 490� 02q 29�-<gi a-+ cn,;T 112mv grn�jmz6n;A� 'a mz ��gg� °o`z �?m-yiDr�+ff ^'zj�w� Cn XDVfo f,mr�m--II �mrZjm �rn� Dn ogI"nyD OnO C I z mZ < -7 0ym vrK gm °gc> / a n� ij► F z B o� �61 IL 0 ® ° m n / C EXISTING LOT NE ---- - _ LOT 1 PB 13 PG 132 / ! P I i i O � mow`" • ` � �-, :_ ♦ 1y� dr I ./4 [aka / m / D / ® a D �y"b ♦® a �� / r+�_b' Oom ® D of O ♦♦ MASFER PLAN v' GREENSBORO AUTO AUCTION, INC. ` (GUILFORD MILLS SITE) 3802 WEST WENDOVER AVENUE MOREHEAD TOWNSHIP - GUILFORD COUNTY GREENSBORO - NORTH CAROLINA MITCHAM & ASSOCIATES, P.A. ENGINEERS - SURVEYORS - PLANNERS 5915 HIGH POINT ROAD P.O. Box 7267 GREENSBORO, N.C. 27417-0267 (336) 292-2770 FAX (336) 292-6295 E -Mail: mitcham0infi.net 0 rn0D . NS m m Z �1�tmo�0' ZOD� _ CO 0 3�o O m 'D % D !rI rZ n % N N 0 z t-zm Z /€ n -i —1 z r x i tlPal f �s Ie° SX i s°d � e s �v : l 1 tlI♦ / �y�I wRo;0y M +�N 0 , ® 1NpmmW O s B RmI rrI 4iz�1c r f - Ln .J4 / m e p �00 D I i C) D A • m m 910 A cg 4 t��aw � o s m + - � e 5 e i , ein 5 1 1 V, _ N e e m O .. _ / ® e m m D rCA r _ a�, 0 6 Y a n� ij► F z B o� �61 IL 0 ® ° m n / C EXISTING LOT NE ---- - _ LOT 1 PB 13 PG 132 / ! P I i i O � mow`" • ` � �-, :_ ♦ 1y� dr I ./4 [aka / m / D / ® a D �y"b ♦® a �� / r+�_b' Oom ® D of O ♦♦ MASFER PLAN v' GREENSBORO AUTO AUCTION, INC. ` (GUILFORD MILLS SITE) 3802 WEST WENDOVER AVENUE MOREHEAD TOWNSHIP - GUILFORD COUNTY GREENSBORO - NORTH CAROLINA MITCHAM & ASSOCIATES, P.A. ENGINEERS - SURVEYORS - PLANNERS 5915 HIGH POINT ROAD P.O. Box 7267 GREENSBORO, N.C. 27417-0267 (336) 292-2770 FAX (336) 292-6295 E -Mail: mitcham0infi.net 0 a 0 m Z _ CO 0 3�o O m D !rI 1 N N 0 ! ,za , Z /€ n z r x i tlPal f �s SX I I I ! I I ' / r f - I V F_ 910 A > t��aw � o my m + - � , ein 5 1 1 V, _ N � - f✓J m ►i .. _ OO m D rCA r _ D m W m D _ / P a EXISTING LOT LINE LOT 1 PB 134 PG 132 k' X in z 0 W b m m m PLAT NORTH PS 134 PG 132 205.17' DAwD WK MITCHAM L - 1617 NA. B. BRUCE NODE ` "SO4 tLC Job No.: L - ma N.C. 6128 Drawn By. WGW.BBN IMWAM E MITCNFiL � 7480 N.C. L 13SB Ka File.: 6128-USACE-Sub Checked By. BBN ascan c Ai(pY L - 3810 N.0 0 m Z _ CO 0 3�o O m D !rI 1 N N 0 ! ,za , Z /€ n z EXISTING LOT LINE LOT 1 PB 134 PG 132 k' X in z 0 W b m m m PLAT NORTH PS 134 PG 132 205.17' DAwD WK MITCHAM L - 1617 NA. B. BRUCE NODE ` "SO4 tLC Job No.: L - ma N.C. 6128 Drawn By. WGW.BBN IMWAM E MITCNFiL � 7480 N.C. L 13SB Ka File.: 6128-USACE-Sub Checked By. BBN ascan c Ai(pY L - 3810 N.0 �'w _.. -� I- _� -� �� _' i - I,If _I_ J ILI— I I — — - — �_� ! I tl r J II { � I _' I e �i_�q� '— I T 0 1 —T — 1— �_ y J - —�- Y 1 —{--i -- —I — — �^ m I I I� � _ Z a It 0 I _ ou — m — i, _ rn rn SII, Lr �y —_ - — — _ 1 IX Ln ��� - --- N m $ - ri ^' > Li - - _ LL —� — ` - I_LJ_ � - —,- �• � I �j-� _— _ p ® Yet ti �i � � r� 4 � -- a � - - _ a 44' r.' �i _1 _— -- --- — — _ _ - - a T I- " l —�T o � �I�I { cD- t Fz � a I , --- rt, I _ o- ppy� tk Zj z — - _ J , T I- Of -- -I — 1 _ I I _I �_ I �— I� � T I I _ i ® ® p ' I r � I� o fi < z � I� a 14 Kz --i N v Z tl 0 V $ O 00 i 5 - 114" CMP CULVERT $ GREENSBORO AUTO AUCTION, INC. (GUILFORD MILLS SITE) 3802 WEST WENDOVER AVENUE MOREHEAD TOWNSHIP - GUILFORD COUNTY GREENSBORO - NORTH CAROLINA 20'f/- gad m � lil n III _ — o T MITCHAM & ASSOCIATES, P.A. 0AVf0 % MMXAM L- 1527 N.0 ENGINEERS - SURVEYORS - PLANNERS 5915 HIGH POINT ROAD PE sva G 23544N, a eau N0� L - 3M N.0 Job No.: ctZe Drawn By. WGW,BBN Date: 4-9-02 P.O. Box 7267 GREENSBORO, N.C. 2741 7-026 7 VaU M L MrrcNtt& W 74M C. (336) 292-2770 FAX (336) 292-6295 NN. - rszs N.c C. File.: 11X770UTPIPE.DWG Checked By. BBN Scale: SEE SCALE E -Mail: mitchamVinfi.nettneer a ulFrr L - 3mo N,c 0 — -- 1 1 Mde 00 1) 51 .)0 _ 0 L I 00c; 05000 Feet 01 Scale 1:20000 O s SOIL SURVEY MAP w GREENSBORO AUTO AUCTION, INC. (GUILFORD MILLS SITE) 3802 WEST WENDOVER AVENUE MOREHEAD TOWNSHIP - GUILFORD COUNTY GREENSBORO - NORTH CAROLINA MITCHAM & ASSOCIATES, P.A. ENGINEERS - SURVEYORS - PLANNERS 5915 HIGH POINT ROAD P.O, Box 7267 GREENSBORO, N.C. 27417-0267 (336) 292-2770 FAX (336) 292-6295 E -Mail: mitcham®infi.net 0010 W. MRONAM L - 1571 N.O. B- e111KE N00E Pe 2M"KC. Job No.: L - 3213 N.Q 6128 Drawn By. x Date: 4-9-02 WIwAM c MITCM� PF 74W KP_ L - 1828 N.0 File.: X Checked By. x Scale: AS SHOWN JUWREY C AWN L - 3810 N.C. '+ Nh i ��O � I I�� ti- / 95E � � i •,. • r �r0 �� �. �• ' . —_�� / f . � io`'" I ;/.,fir.- ��" • � �r'� WIL:! � .. o IV Af �•��-,:�.�...�._ �� .� , �. �i �"�a� sic ��_�'��\ _ � t--�'<� 12 o�' �� ��.. 11 � �i �� \•r• , 0 _ I - j �C O � {� 11n�/ m -�" �^�- \ `-� gyp , `J(�� \ ` �•/�. � \ rJ � ' v\��. . a� � fir, '^I � �_ i ��-�-• � �• � 1 �I � '.d m i� �� �-._�, ��/ �I • •. �^�""___"__ ' r22 ' > ' 6 r — ,4-a v ;T _ fb 'J • '.� -�� I .���, r {�1 F �0 -. - ;---tom• :mss Y , 1 J ' / l.� �, _� k •��. - � .,��,. i_ nom, _ �� .. � �� �. � i ,�• ~I a•'ep^-� O-".� 1• Sb. i iS Q. R i ! -' n .4 ® " �..••� 01 00 v` . - ♦� � gam^ `...,.-,✓ ','�� � ,f, - �; ��I� s... I ' - ,•/n �!%`7-�.��... .---, - _\ I �. -. �t� �1X''; ® .� � = i �-r _� �l �. �,.. -.fly(; _ ,. �� —. �.1L i:• U.S.G.S. MAP MITCHAM & ASSOCIATES, P.A. DAVID W MIT04AM L - 1627 M.C. s GREENSBORO AUTO AUCTION, INC. ENGINEERS — SURVEYORS — PLANNERS PE 2350 N.C. �' 5915 HIGH POINT ROAD e' '� N0°E L - 3X13 N.a Job No.: size Drawn By. x Date: 4-9-02 (GUILFORD MILLS SITE) P.O. Box 7267 3802 WEST WENDOVER AVENUE GREENSBORO, N.C. 27417-0267 MLLI M c MMak ' PE "6D N.C. - 1628 N.C.File.: x Checked Byx Scale: As SHOWN MOREHEAD TOWNSHIP -GUILFORD COUNTY (336) 292-2770 FAX (336) 292-6295 . GREENSBORO - NORTH CAROLINA E -Mail: mitchamOinfi.net JUMMr 1 ALFA L - 3eto M.D. •'J•N Ow - i Nrm •a IMAM }au•au.10WD40}IW :IIDw-3 VNIlOWO HINON - 0808SN338C) De=,t :aIDDg Nee �g paXDayO ass-30vsn-et t9 : ell3 96Z9-Z6Z (9££) XV3 OLLZ-Z6Z (9££) U.Nnoo odo- Ino - dIHSNM01 OV3H380M A 0'N e` - I raNum 3 rrynreN L9Z0-LLt LZ 'O'N `ONOeSN33a0 3nN3AV iJWONU 1S3M Z09£ dtt 7N OM (31lS siiiw aao3nlno) L9ZL xD8 '0'd � WN CIU OV08 1NIOd HOIH 4169 ZO-6-b ;e}DQ N96'MJM Xe UMDJa eats ;'ON qDp 7N *"= i90N378U 0N1Noii:Dny Oiny 0808SN3380 Sa3NNVld - SMOA3�anS - S2l33NI9N3 '3 �N Zm, -, MWMIW VAaIAVG Yd 'S31VI30SS`d V MHOEVI ,,8„ V V. IIVAG M od ti�I ed H18ON lYld 0 a N a. I ,i z �-y�' L_ c� r C w_Ili i lI'-Ii II= ISI i 4-y�-d' ' {1 _ III I JII III"11= Y` {• 0 00 a. '- I II z �-y�' L_ c� r C w_Ili i lI'-Ii II= ISI i 4-y�-d' ' {1 _ III I JII III"11= a. c� 0 0 00 Z O w J W p W W Z a U Response to Incomplete Application Notification Action ID: SAW -2010-00636 County: Guilford FOR GREENSBORO AUTO AUCTION Remark 2: -Please see attached drawing showing the proposed pipe, rip rap apron and the location of the end of the proposed stream impact. CPT Engineering and surveying, Inc. 4400 Tyning Street High Point, NC 27265 Phone (336) 812-8800 • Fax (336) 812-8780 NOk_N a Z ¢¢ON a! � O � a 'I 33rv:5 'r _ice_ ;-- -�_ or Ocv�v VNIlO-,WO HINON , 0 �s�✓� ���,atan CK; ,9EF_) -XVH -- '1099 LIR (9£t) 3NOH.J z N m y � �Q caul VN-Oav� HId0N'LNI0urnll L3aa' S ��IN,LL _'�Obb'�y sL£I-9 �( g rt=CY' @; :; dIHGNMOi QV3H3bOW 0d095N33b9 -�N3nV [�3nOQN3M d J d u _ = W - �`i W m i� �o n LLSSrLa o£J �Q� a 0 a39W% 35N39113L"Oaa0'J 9 j } � a ozz 9P LL I'ISNU'J 1N-]Wd0 IIA_G 0,1 '9N1,�3/�Jt15 �� Ny �2N 11 191t7N3:LL Z ':)NI 4NV 9NI?�3�N19N3 �-% � _ NOu xv ol�nv o Jo95N�]�9 C� w a � I I I o t p I � I d l9 N�I I L v H Q I I - W)C d X-1 -- z� a a Z ¢¢ON a! � O � a 'I 33rv:5 'r _ice_ ;-- -�_ or Ocv�v F �• , �0. �s�✓� ���,atan Ip TI 1 m y � �Q I p3m - z �SN yam' ���nq0<� 12!j W i� �o n LLSSrLa o£J �Q� a 0 lu tyn z p � a ozz z II' I 1-•/ �� � gF.N�QZ�WL2�ry �O Ny �2N 11 191t7N3:LL Z I I I I Cr7I r Nm YYI .G I� W W �U C� L 0 I L v H Q I I - W)C d X-1 -- z� a i Lu � a a or Ocv�v o \ , �0. �s�✓� ���,atan i Lu w U � 0 I p3m - z �SN W °zo � a I I I I a � I I I o t p I � I d l9 N�I O X�/ / m o� ogg� wNo yw C] �zU O 8- ' ° m -- -- — — — — I I I Response to Incomplete Application Notification Action ID: SAW -2010-00636 County: Guilford FOR GREENSBORO AUTO AUCTION Remark 3: -Please see attached drawing showing the layout and location of the proposed turn lane. CPT Engineering and Surveying, Inc. 4400 Tyning Street High Point, NC 27265 Phone (336) 812-8800 • Fax (336) 812-8780 N z > ) I Z \ L y " 59 "� a. 4; - r . - - VNIIO'MV�) HiNON )dmo0 JNoAlin,) JIHSNM01 OV3H3bOW OJ095N33?113 3f1N3/vV AhD4N3M a 0 O III o m 6 v y Q a p W r I, oel_e z e (ss) -zv�Ooee ZW (9£tO ANO -d s z 1Nno?JV IiL"N 1NI/ 19IM 133?Jl� nNINi� GOab )m -inG� io7 1N3Wd0�3/\-Q CNV- SNI 9NU �/ Zl(S aN d 9NI?J33N19N3 NOT)nd oinv O iOGGN:32 9w NVIJ 3116 — Q I( J MIR ' ppI ``� m Q v• �_=r----ice ate! �> n.�`�\\ /_. C Ll i fV i ti k v In SS � Iia / ' - - ----- . - - ) I Z \ L y N m d Iv � Q — Q I( J GN ) I Z \ w W y N m d Iv GN -- Response to Incomplete Application Notification Action ID: SAW -2010-00636 County: Guilford FOR GREENSBORO AUTO AUCTION Remark 4: -Please see attached cross section and profile for the proposed culvert. CPT Engineering and Surveying, Inc. 4400 Tyning Street High Point, NC 27265 Phone (336) 812-8800 • Fax (336) 812-8780 VNI7ObV9 H1bON oeLe-ele rays) Xv� Ooee-zl4 e s/ NOHd " ,11N(100 a2ibdiif19 m z .I r VMnO: V HINON iN Od N9 n t. f� gyp9 dIHSNM01 (NIHI2iON O'd095NTIN9 o m 3fIN3/\V 213/\06N3M 6 ":, ' N cl m s Fl aaawN NSNa�nvaodam a v F > 9N11 hl'NO' SNI '9NIJ �! J(IS aN d 9N1?J3�N19N3 °�) x Li w S F�. Noil�nd olnd o'Noesr]26-D Q w o Q W z_avepW�Kno Mix Z oLL ILI o z W c�o��Wl-OYOW� oQ b dLL� C9 iy�p�j JZ��ON 3/�IYIJ blrJayM43 ' � N� Zp33 � Z IwQJ- � � Z � U_ ©Z I�RIf � yl U 3931Va�,d i CI.® G Uaim � •J J / "gN�Z�o 46 ID s. NJIS �z t �I �I - a ACT ijzrl I Q 4 C. 00. �0")"I w K NN /,0, i,v m J �i I I tl Q 4 U X x w w w 13 z 0 ly O \ I U � I g fiun7^91�1 aullua7ua7 � / ' ---- - - � 8 fiJn�l10�IJ1 aulluaa a7 — — W I U � I K� Q IP Iw X w X / i1 L yC_ '�2U > i�J� / JF1QU1 J � X n l� / w I I flg 9NIlSIX3 a / d a U I / V. I x �j d i i m J �i I w 4 � w 13 z 0 ly O U � I ---- - - � 8 fiJn�l10�IJ1 aulluaa a7 — — I Iw L yC_ '�2U > i�J� / JF1QU1 � X n l� / w / I / I I i i M e VNIIONV'� Hl?10N O �,`v Z oe�a ale ace) x�e Does -L19 (ase) �rtcHd „r kF J.LNf100 J'60A rK) v N p 0) Z s uz VN ioav ruaoN'i lo. nsul a� dIHGNMOi QV]H3bOW 0?10 15N]1?0 w w m :.'Obb ry N siEl-o a3aHxN asNaon 3lvaodam t �(_ r"� s �" 1 9 _nNIAV b3nOCNIM d ry 6 JNLLIfISNO'J HA -u CNb ci,; — nl 1 Ii \7 SNI �9NI.13A,2Jn5 ON'd 9N2l33N19N3 °-' = N NO 1'�(1'd Olilti OZ1095NI:Z19 a "' w Q — J ' NOd NV78 o 0m - m o 15 W J w ° w � a � o���°�z d o �ga� awo zd OC 4gd lu CU o'^ < Foo iv Ell mr,mm �} <7� R'z J� Ll ❑Doo � �uj A j ZR a � zw w 2 i �om lwZ w p3UZlu? o46161ZZu6 3~°CO) oi C5 ooJ7. ��qS"u1 C0.rmn tl rH` "oN ACI L v I DT / _ i V >,p l I� II�,jQ yv� 71 p� I}}I tl rH` "oN ACI L v I DT / _ ql li tl rH` "oN ACI DT / ild V Response to Incomplete Application Notification Action ID: SAW -2010-00636 County: Guilford FOR GREENSBORO AUTO AUCTION Rem -ark 5: - Rip rap apron will not be required on the inlet end of the culvert (Proposed reinforced concrete junction box). - Rip rap apron will be required o culvert. See attached design base Carolina Erosion and Sediment Design Manual. - Rip rap apron length = 36' - Rip rap apron thickness = 24" n the outlet end of the d on the current North Control Planning and - Install rip rap with liner: line with synthetic filter fabric (As per NCDOT Spec. # 1056 Type 2) _CPT Engineering and Surveying, Inc. 4400 Tyning Street High Point, NC 27265 Phone (336) 812-8800 • Fax (336) 812-8780 CILA55 I RIP RAP APRON OUTLET END OF 108" GMP 0' 5' 10' 15' 20' 25' DIAMETER (Ft.) Figure 8.06.b.1 (NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DE -516N MANUAL) ZONE 4 W Z �11RI��1. LlEr443TH QF &JnZQN TO PROTECT CULVERT TO PREVENT SCOUR HOLE USE L2 ALWAYS L1 L2 1 STONE FILLING (FINE) CL. A 3 x Do 4 x Do 2 STONE FILLING (LIGHT) CL. B 3 x Do 6 x Do 3 STONE FILLING (MEDIUM) CL. 1 4 x Do 8 x Do 4 STONE FILLING (HEAVY) CL. 1 4 x Do 8 x Do 5 STONE FILLING (HEAVY) CL. 2 5 x Do 10 x Do 6 STONE FILLING (HEAVY) CL. 2 6 x Do 10 x Do 7 SPECIAL STUDY REQUIRED (ENERGY DISSIPATORS, STILLING BASIN OR LARGER SIZE STONE). Fig. 8.06.b.2 MENT CONTROL PLANRTH INA NING ANDIODE5A6N16N MANUAL) ACCEPTANCE CRITERIA FOR RIP RAP AND STONE FOR EROSION CONTROL LENGTH = 36' APRON THICKNESS dMAx_ = 1.5 * d so = 15" APRON THIGKNE55 = 1.5 0 dmAx. APRON THI6KNE55 = 1.5 * 15" = 22.5" U5E 24" THICKNE55 NGDOT REQUIRED STONE SIZES - INCHES CLASS MINIMUM MIDRANGE MAXIMUM A 2 4 6 B 5 8 12 1 5 10 17 2 9 14 23 APRON THICKNESS dMAx_ = 1.5 * d so = 15" APRON THIGKNE55 = 1.5 0 dmAx. APRON THI6KNE55 = 1.5 * 15" = 22.5" U5E 24" THICKNE55 NGDOT Response to Incomplete Application Notification Action ID SAW -2010-00636 County: Guilford FOR GREENSBORO AUTO AUCTION Remark 6: - Compensatory mitigation proposal - Dedicate to the City of Greensboro 3.0 acres of land along South Buffalo Creek - 16.867 acres previously dedicated to the City of Greensboro for drainageway and open space along South Buffalo Creek and South Buffalo Creek Tributary A CPT Engineering and Surveying, Inc. 4400 Tyning Street High Point, NC 27265 Phone (336) 812-8800 • Fax (336) 812-8780 Photo # 1 •Near the west property line of Greensboro Auto Location. stream Auction looking up CPT � .�ineerinu and Survevin�, Inc. CPT Lll lllry 4400 Tyning Street High Point, NC 27265 Phone (336) 812-8800 • Fax (336) 812-8780 Photo #2 Location: Near the west property line of Greensboro Auto Auction looking downstream Enhancement: Clean trash and debris from South Buffalo Creek and surrounding area. CPT Engineering and Surveying, Inc. 4400 Tyning Street High Point, NC 27265 Phone (336) 812-8800 • Fax (336) 812-8780 Photo #4 Location: South Buffalo Creek looking upstream Restoration: Remove existing concrete structure and restore stream channel (Note: Checking with the City of Greensboro to determine if this is a required structure) Photo #5 Location: South Buffalo Creek Restoration: Repair stream bank CPT Engineering and Surveying, Inc. 4400 Tyning Street High Point, NC 27265 Phone (336) 812-8800 • Fax (336) 812-8780 - -_-- VNIlO?JV'J HLdON z O w m oma! H M (ecsl =Avg- unye-cle la�E) aNONa ).1NnO') 6l ! O,i-M9 O 0 I z er_ vNIION ANON'1NIod New p dIHSNM01 aV3H3?]OW 02095N3329 0 Q ry m -- I��cll )NINAI OCTib I a `.' - W Q z II ry 6 n si0- a3ewma asN37n 3JVa0dam \ 3nNIAV d]AO(]N3M W > Q W 9tvIJ '1tiV0� J V�ndO��/�dCl r'Nb I ('Ct ` N ,�-/ W Q SNI '9NIJ 3/ ZI(IS aNb 9NI62:]N19N3 �'4 w �i 41 NOIlO�b Ol�b 0�4095N33�l9 bOd NVid o g oN zOil z 17, z iG ,.- zLL -x 6wo $ 3 "o o ! L j ao o r N U z U a PAx zA �l W Y r a rC,� 9� v coca� �=- Q�wza In c7 �- d,� wcO Z�I T- 1-4 / L '26 WR 00 ° ilt w P w r UPI 92 uwj J \46 bN '� N_ ww�X Owa LL Z I LL� d ?y Irmf�LID� / � a K I - I I` I T':�_ _� aa. avrl '><, L -'"l I a.1 � `" "' n / ,/ / I / /. ✓ / /// j. pi o— p� 11\IIj� 1�J 4?a`¢/`,jiauC//I OmU 84oz z �se t ncREs a �, � �E; e r- o I v - i Q JI f t`I ti --aaOn IJ P4' III // 3 Qry W,�O 0.�� H ��fo�� X/1 o X K0 dry ,6 T,X/1I VIII f f r . � r - 1 - al II� 0 ry — di U,/0 m �h Isi Q QaF�� �dfo� o LL p / ;F % UI UI Il (() I tll Q �m Q y Fy \ O Jw p* I W � z O O QQ 4u j Quly" QQ�O`N Q W Q Z },a Q Q LL`�re ill ILLL%-<�a Lu W '.z°r K d°OW Q ° =oleo oUj�1 o�Y oII ✓z o�wYKZ () v JS' � t� LL p / ;F % qac �aY �m q y O \ �m -r- .. rf�- _.� _ Li¢ r IrOxaa -5 � t� Response to Incomplete Application Notification Action ID: SAW -2010-00636 County: Guilford FOR GREENSBORO AUTO AUCTION Remark 7: - Provide documentation that Greensboro Auto Auction, Inc. is the owner of the properties where the proposed project is located. - See attached Deed Book 7139 Page 2269 CPT Engineering and Surveying, Inc. 4400 Tyning Street High Point, NC 27265 Phone (336) 812-8800 • Fax (336) 812-8780 Book 7139 Page 2269 �Illtll I�Iulllll�l (III II I lu I III In 2010033681 GUILFORD CO, NC FEE $25.00 EXEMPT 07-01-201010:02:26 AM JEFF L. THIGPEN NlWBTPA OF Olm6 V. MARCELLE FOWLER DER _Qa BK: R 7139 PG: 2269-2271 GENERAL WARRANTY DEED Prepared by: J. Mark Payne, Guilford County Attorney's Office 301 West Market Street, 3' Floor, Greensboro, N.C. 27401 (without tide examination) Mail to: Grantee @ 3907 West Wendover Avenue, Greensboro, N.C. 27409 Excise Tax: jcG i., pf Pl, OL Brief Description for Index: 3919, 3921 & 4015 W. Wendover Avenue THIS DEED made this the O day of u�2 , 2010, by and between GUILFORD COUNTY, a body politic and corporate, Grantor, and GREENSBORO AUTO AUCTION, INC., a North Carolina corporation, Grantee. WITNESSETH: That for a valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged, the Grantor has and by these presents does bargain, sell and convey unto the Grantee in fee simple, all that certain lot or parcel of land in the County of Guilford and State of North Carolina in Morehead Township, and more particularly described as follows: SEE ATTACHED "EXHIBIT A" TO HAVE AND TO HOLD the aforesaid tract or parcel of land and all privileges and appurtenances thereunto belonging to the said Grantee forever. And the said Grantor does covenant that Grantor is seized of said premises in fee simple and will warrant and defend the said title to the same against the claims of all persons whatsoever. Subject to easements, restrictions, and rights of way of record, in any, and ad valorem taxes for current and subsequent years. In Testimony Whereof the said Grantor has hereunto set its hand and seal the day and year fust above written. By: Melvin L. Alston Chairman to the Board of County Commissioners Me . on Book 7139 Page 2270 �......... ` r STATE OF NORTH CAROLINA COUNTY OF GUILFORD I, Nnna. S. f 5i nz—r , the undersigned Notary Public, do hereby certify that asonally came before me this day and acknowledged that (s)he is the Clerk to the Board of County Commissioners of Guilford County, a body politic and corporate and that, by authority duly given and as the act of the said county, the foregoing instrument was signed in its name by Melvin L. Alston, Chairman to the Board of County Commissioners of said county, and attested by Mkmia 17. - V'a $$+midis as the Clerk to said Board and that the instrument is the act and deed of Guilford County. 1 Witness my hand and official seal, this day of 2010. 4-rvn0� �• Minna S n2( , Notary Public DONNAS. RINER NOTARY PUBLIC ROCKINGHAM COUNTY, N MY Commission Expi .lres_0-_L--go I Z My commission Expires: )0-2-90/a 2 Book 7139 Page 2271 Exhibit "A" 4015 W. Wendover Avenue, Greensboro, NC. Tax Map # 539-1-11A; PIN # 7844000811 and 3919 3921 W. Wendover Avenue, Greensboro, NC. Tax Map # 539-1-12; PIN # 7834917364 BEGINNING at a found iron pipe in the southern right -of way of West Wendover Avenue, the northwestemline ofthetractherein conveyed and the northeastemcomerofLot 2 as shown onthat "Final Plat Subdivision Lots 1-5, Plus Lot "A", the Shoppes at Wendover Village" recorded at Plat Book 150, Pages 147,148,149 and 150 Guilford County Public Registry, said found iron pipe being located South 14 degrees 53 minutes 27 seconds West 116.48 feet (ground distance, 116.47 feet grid bearing distance); thence from said Beginning Point along the eastern line ofthe said Lot 2, South 00 degrees 55 minutes 29 seconds East 1,036.30 feet to a found iron pipe, the southeastern corner ofthe said Lot 2, a common corner with New Lot 1 ofthe Final Plat of Greensboro Auto Auction, Inc, recorded at Plat Book 147, Pages 84 and 85, Guilford County Public Registry; thence with the saidNew Lot 1 the following nine courses and distances: (1) continuing South 00 degrees 55 minutes 29 seconds East 205.12 feet to a set iron pipe; (2) North 86 degrees 06 minutes 53 seconds East 353.97 feet to a set iron pipe; (3) along a curve to the right having achord bearing of South 56 degrees 19 minutes 29 seconds East chord distance of 2 93.6 5 feet and having a radius of 249.16 feet to a set iron pipe; (4) North 87 degrees 33 minutes 28 seconds East 184.77 feet to a set iron pipe; (5) North 12 degrees 30 minutes 16 seconds East 36.04 feet to a found iron pipe; (6) continuing North 12 degrees 30 minutes 16 seconds East 79.05 feet to a set iron pipe; (7) North 20 degrees 00 minutes 35 seconds East 432.67 feet to a found iron pipe; (8) North 86 degrees 27 minutes 52 seconds West 16.20 feet to a found iron pipe; and (9) North 01 degrees 58 minutes 05 seconds West 163.13 feet to a point, the southwestern corner of that tract conveyed to Robert C. Dunn, Sr. at Book 4398, Page 830, Guilford CountyPublic Registry, thence with the western line ofthe said Dunn tract, continuing North 01 degrees 58 minutes 05 seconds West 160.99 feetto the southeastem corner of Tract I conveyed to Kotting-Heath, LLC at Book 6792, Page 2296; thence with the southern line ofthe said Tract I, South 87 degrees 43 minutes 31 seconds West 75.11 feet to a found iron pipe; thence with the westemline ofTract II conveyed to Kotting-Heath, LLC atBook 6792, Page 2296,North 01 degrees 53 minutes 43 seconds West 201.67 feet to apoint; thence with the southern line ofthe said Tract H North 75 degrees 36 minutes 04 seconds West 25.96 feet to a point in the eastern margin of a private drive located on the property conveyedherein; thence withthe eastern line ofthe said private drive and the western line ofthe said TmetUthe followingnine courses and distances: (1) North 00 degrees 22 minutes 46 seconds East 49.83 feet to a point; (2) North 06 degrees 59 minutes 34 seconds West 50.02 feet to a point; (3) North 12 degrees 28 minutes 37 seconds West 49.88 feet to a point, (4) North 14 degrees 44 minutes 09 seconds West 32.71 feet to apoint; (5) thence North 16 degrees 05 minutes 23 seconds West 29.45 feet to a point; (6) North 14 degrees 31 minutes 47 seconds West 49.88 feet to a point; (7) North 10 degrees 27 minutes 40 seconds West 49.84 feet to apoint; (8) North 06 degrees 52 minutes 07 seconds West 48.89 feet to apoint; and (9) North 03 degrees 53 minutes 43 seconds West 11.03 feet to apoint in the southern right-ofway of West Wendover Avenue; thence with the southern right -of way of West Wendover Avenue South 86 degrees 56 minutes 51 seconds West 780.91 feet to the point andplace ofBeginning, containing26.48 acres, moreorless, andshownonthat boundary survey forGuilford CountyKendall Center/Evergreenspreparedby Craig S. Fleming ofFlemmgEngmeenng, Inc. dated December 15, 2009, Project / Reference # 700-18. Togetherwith (1) all right, tide and interestofthe grantor inandto thatperpeuW easementten feetinwidth along the western boundary of Tract Il of the said Kotting-Heath, LLC property for the purpose of maintaining, construction and/or repairing the above described private drive (see Book 4576, Page 837, Guilford County Public Registry) and (2) all the right, title and interest ofthe landowner defendant in and to any streets, roads, alleys, sidewalks and overlaps or gaps or gores by record or occupancy by reason of ownership of the above property. Response to Incomplete Application Notification Action ID: SAW -2010-00636 County: Guilford FOR GREENSBORO AUTO AUCTION Remark 8: - Provide documentation that the City of Greensboro has changed the zoning and that the city is requiring the proposed roadway improvements - See attached Zoning information - See attached Transportation Impact Analysis CPT Engineering and Surveying, Inc. 4400 Tyning Street High Point, NC 27265 Phone (336) 812-8800 • Fax (336) 812-8780 �.REp . I s ej .%ow. ME= \ K �.REp . I s .%ow. ME= � .. - �\� � N " - i�v✓ f i r 6 O� ` "' c i`^ ,� v .,xM:: • - -_ i_> �r+Y's¥,. 4� tN,�'�, i a 'i��.x z' y _ a •rs"'s. . s 4 +� >a 3 LEi ..t� ;1 � � y�y `w \ C, � 3y ��i k ��pv,ytt �i, "'"�'S ,yr} L'�1P �Ys s'� � le•. r t .` j gm`!- s.. r 44 "i ^l _ 1 _ J' 1 y 1 a�rR RM - IL IV Section 401 Water Quality Certification Application (Additional Informatio DWQ# 10-0988 County: Guilforcq D AN 2 1 2011 FOR UFA -wATEt QWjn GREENSBORO AUTO AUCTION Comment 3: "Please provide more details regarding avoidance and minimization of stream impacts for this project. This should include stream relocation, retaining walls, alternative designs and layouts of the buildings and parking areas, etc, including modifying the type of use of the property. Loss of space available for development such as building or reduction in size of a building must also be considered in the analysis." Response: Note: The building is an existing building and we are showing no increase in the building footprint. However, the Owner is in negotiations with Kaplan University for the long term leasing of the building at 4009 West Wendover Avenue. The University will employee over sixty people and have over two hundred students. This will require the addition of over two hundred and fifty parking spaces for faculty, staff and students. We have minimized the length of pipe to that needed to install the turn lane and align the outlet with the natural stream channel as request as part of comment 8. CPT Engineering and Surveying. Inc. 4400 Tyning Street High Point, NC 27265 Phone (336) 812-8800 @ Fax (336) 812-8780 Section 401 Water Quality Certification Application (Additional Information) DWQ# 10-0988 County: Guilford FOR GREENSBORO AUTO AUCTION Comment 4: "It is the opinion of the Division that the approximately 45 feet of un -impacted perennial stream between the road culvert and the development culvert will lose its aquatic function due to the length of upstream and downstream culverts. The Division will require mitigation for this additional length of perennial stream at a ratio of 1:l. We suggest that you consider stabilization options such as additional pipe, or riprap to ensure that if the open section de -stabilizes that it does not impact downstream segments. Please include this stream channel length in your compensatory mitigation plan." Response: The area in question will be a concrete junction box connecting the existing box culvert to our proposed piping. Please see attached response to the USACE Action Id: SAW -2010-00636. CPT Enaineerine and Surveyina, Inc. 4400 Tyning Street High Point, NC 27265 Phone (336) 812-8800 9 Fax (336) 812-8780 Section 401 Water Quality Certification Application (Additional Information) DWQ# 10-0988 County: Guilford FOR GREENSBORO AUTO AUCTION Comment 5: "The Division requires mitigation for all permanent impacts from this project. Please correct Item number 2 in Section D of the PCN form and supply a compensatory mitigation plan." Response: PCN form corrected. Comment 6: "Please provide an answer to item number 3 in Section F of the PCN form." Response: PCN form corrected. CPT Engineering and SurveyinLF, Inc. 4400 Tyning Street High Point, NC 27265 Phone (336) 812-8800 • Fax (336) 812-8780 W A Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Page 1 of 11 PCN Form — Version 1.3 December 10, 2008 Version Pre -Construction Notification PC Form A. Appkant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ®Section 404 Permit El Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 14 & 39 or General Permit (GP) number: 1 c. Has the NWP or GP number been verified by the Corps? ❑ Yes ® No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization le. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ® No For the record only for Corps Permit: ❑ Yes ® No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ® No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes ® No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? I ❑ Yes ❑ No 2. Project Information 2a. Name of project: 2b. County: 4009 West Wendover Ave. Guilford ' A `- �- fin 2c. Nearest municipality / town: Greensboro JAN 2d. Subdivision name: N/A 2e. NCDOT only, T.I.P. or state project no: N/AtAI�SANptER 3. Owner Information 3a. Name(s) on Recorded Deed: Greensboro Auto Auction, Inc. 3b. Deed Book and Page No. DB 7139 Pg 2269 3c. Responsible Party (for LLC if applicable): Dean Green, President 3d. Street address: 3907 West Wendover Ave. 3e. City, state, zip: Greensboro, NC, 27409 3f. Telephone no.: 336-202-3326 3g. Fax no.: 336-478-2228 3h. Email address: dean@greensboroaa.com Page 1 of 11 PCN Form — Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑ Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: Page 2 of 11 PCN Form — Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 7844000811 & 7834917634 1 b. Site coordinates (in decimal degrees): Latitude: 36.0594 Longitude: - 79.8810 (DD.DDDDDD) (-DD.DDDDDD) 1c. Property size: 26.48 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to Tributary B of South Buffalo Creek proposed project: 2b. Water Quality Classification of nearest receiving water: WS -V; NSW 2c. River basin: Cape Fear 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: On Site: Former Guilford County Property (Nursing Home and Light Industrial), General land use in vicinity (Commercial) 3b. List the total estimated acreage of all existing wetlands on the property: 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 715 linear feet 3d. Explain the purpose of the proposed project: Change in ownership from public (Guilford County) to private (Dean Green) and change in use and zoning that requires public and private roadway improvements at the intersection of W. Wendover Ave. and private drive. 3e. Describe the overall project in detail, including the type of equipment to be used: The required installation of a right tum lane on West Wendover Ave. apponcimately 200 I.f. of full width (12 feet) and another 200 I.f. of tapper. The addition of a left tum lane as part of the private drive required improvements. The demolition of the existing nursing home and the construction of a parking lot and a wet detention pond (BMP). 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ®Yes ❑ No El Unknown project (including all prior phases) in the past? Comments: By ECS Carolinas, LLP 4b. If the Corps made the jurisdictional determination, what type ❑ Preliminary ❑ Final of determination was made. 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: ECS Carolinas, LLP Name (if known): Michael T. Brame, Senior Environmental Other: Scientist 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for ❑ Yes ❑ No ® Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. Page 3 of 11 PCN Form — Version 1.3 December 10, 2008 Version 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ® No 6b. If yes, explain. Page 4 of 11 PCN Form — Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑ Wetlands ® Streams - tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non -404, other) (acres) Temporary W1 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W2 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g. Total wetland impacts 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ — non -404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ®P ❑ T Culvert Tributary B South ® PER ® Corps 8 295 Buffalo Creek ❑ INT ❑ DWQ S2 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S3 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S4 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S5 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S6 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h. Total stream and tributary impacts 295 3i. Comments: Page 5 of 11 PCN Form — Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number — (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary 01 ❑P❑T 02 ❑P❑T 03 ❑P❑T 04 ❑P❑T 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5E Total 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete. the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. ❑ Neuse ❑ Tar -Pamlico ❑ Other: Project is in which protected basin? ❑ Catawba ❑ Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number — Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary im act required? 61 ❑P❑T El Yes ❑ No B2 ❑ P ❑ T ❑ Yes ❑ No B3 ❑P❑T El Yes ❑ No 6h. Total buffer impacts 6i. Comments: Page 6 of 11 PCN Form —Version 1.3 December 10, 2008 Version D. Impact Justification and Mitigation 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Piped stream only in area where the City of Greensboro required public roadway and sidewalk and private drive improvements. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Use of retaining walls to avoid other stream and wetland impacts. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ® Yes ❑ No 2b. If yes, mitigation is required by (check all that apply): ® DWQ ® Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank El Payment to in -lieu fee program ® Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool ❑cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non -riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. See attached plan Page 7 of 11 PCN Form — Version 1.3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ❑ No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 8 of 11 PCN Form — Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ® No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. El Yes E] No Comments: 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 67.8% 2b. Does this project require a Stormwater Management Plan? ® Yes ❑ No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: Installation of a stormwater piping system and a permanent wet detention pond to collect and treat runoff. ® Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? Greensboro ® Phase II 3b. Which of the following locally -implemented stormwater management programs ❑ NSW ❑ USMP apply (check all that apply): ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ® No attached? 4. DWQ Stormwater Program Review ❑ Coastal counties 4a. Which of the following state -implemented stormwater management programs apply ❑ HQW ❑ ORW (check all that apply): ❑ Session Law 2006-246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 9 of 11 PCN Form — Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ❑ Yes ® No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ❑ Yes ❑ No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 21-1.0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after -the -fact permit application? ❑ Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ®No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. City of Greensboro currently provides sanitary sewer service to this site. Page 10 of 11 PCN Form — Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? ❑ Yes No 5b. Have you checked with the USFWS concerning Endangered Species Act [ Yes ❑ No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted_ ® Raleigh ❑ Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Raleigh FWS Field Office 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? http:f/ocean.floridamarine.orgiefh—coraliims/viewer.htm 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation F] Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? Google Earth - NC National Register Points 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ® Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: No rise certification being reviewed. 8c. What source(s) did you use to make the floodplain determination? FEMA Flood Maps Dean Green 10/28/10 Applicant/Agent's Printed Name Date Applicant/Agent's Signature (Agent's signature is valid only if an authorization letter from the applicant is nrovidpil. Page 11 of 11 PCN Form — Version 1.3 December 10, 2008 Version Section 401 Water Quality Certification Application (Additional Information) DWQ# 10-0988 County: Guilford FOR GREENSBORO AUTO AUCTION Comment 7: "Please provide the exact length of stream impact measured accurately along the thalweg of the channel." Comment 8: "Please realign the culvert to ensure that the inlet and outlet are aligned with the natural stream channel to prevent streambank erosion in these areas." Comment 9: "Please indicate whether an energy dissipation measure (riprap apron, etc) will be required at the outlet of the culvert. If so, please include the length as permanent impacts and update your application and engineering drawings accordingly." Comment 10: "Please provide a detailed cross section and profile of the proposed culvert." Comment 11: "Please provide a culvert design that includes sills and or floodplain benches which will ensure proper stream dimensions during low flow conditions." Response: Please see attached plans. CPT Enzineerine and Surveying, Inc. 4400 Tyning Street High Point, NC 27265 Phone (336) 812-8800 • Fax (336) 812-8780 Section 401 Water Quality Certification Application (Additional Information) DWQ# 10-0988 County: Guilford FOR GREENSBORO AUTO AUCTION Comment 12: "Per the requirements of GC 3821, all work must be done "in the dry". Therefore, dewatering methods will be necessary to temporarily dewater the stream channel during pipe installation. Please provide a construction sequence that details the method of dewatering to be utilized at the site and the sequence of construction events to be followed to ensure compliance with this condition." Response: Please see attached plans EC 3 and EC 3A. CPT Engineering and Surveying, Inc. 4400 Typing Street High Point, NC 27265 Phone (336) 812-8800 • Fax (336) 812-8780 Section 401 Water Quality Certification Application (Additional Information) DWQ# 10-0988 County: Guilford FOR GREENSBORO AUTO AUCTION Comment 13: "Per the requirements of GC 3821, please enumerate all temporary impacts to the stream channels. Temporary impacts also include areas of disturbance necessary for proper dewatering measures and any temporary erosion control measures expected to be installed within any jurisdictional areas. Please note that temporary impacts should be minimized to the maximum extent practical." Comment 14: "Please provide a construction sequence and details (plans/drawings) that detail the restoration of the temporary impact areas upon completion of the project." Response: No temporary impacts proposed. CPT Engineering and Surveying, Inc. 4400 Tyning Street High Point, NC 27265 Phone (336) 812-8800 • Fax (336) 812-8780 0 5 0 CONT, 840.00 OTE: aEQ REFER1041E:':', DS 2530 VBG 434 D(3 2390 RG 525 DE 794 ISG 3065 DQE 2457 RG 527 SITE INFORMATIaN: 1. TOTAL SITE: 20.431 AO 2. (E)ISTING ZONING: Ll &ISI 3. SOILS. EnD, Wh, MsE, EnC, CrB 4. WATERSHED: NOT LOCATED IN A WATER SUPPLY WATERSHED 5. FL D: LOCATED IN A FLOOD ZONE AS SHOWN ON FIRM MAP 0. MAP NO. 3710783400 J PANEL 7334 DATED JUNE 13, 2007 7. BOUNDARY INFORMATION TAKEN FROM A SURA BY FLEMING ENGINEERING, INC. FOR GUILFORD COUNTY KENDALL CENTER EVERGREENS DATED 12-22-09. 3. TOPOGRAPHIC INFORMATION: OOMBONATION OF GREENSBORO GS, INFORMATION PROVIDED BY OWNER AND FIELD LOCATIONS BY OBIT ENGINEERING AND SURVEYING, INC. QVVUVIERI DEVELOPIEFn GUILFORD COUNTY 301 WEST MARKET STREET GREENSBORO, NO 27402 i' 20jj REQ/ 1510NS SEAL 2354d 1 tel,"I" I �z/Ico/ IC:) O uj r oO W Lu v } O� Q J O � z Lu W 08" PIPE PROFILE SCALE: I It = 40' DATE: 12/16/2010 PROJECT: 925 -OG 17RAWN BY: E35N SHEET t 4 A { _ ADE PROP©5ED 830.Ofl -- — ` Scale Ho 0 ,Vert 1'=4" f I PROP05ED L REINFORGED GONG. JUNGTION BOX L.. (TO DE5(GNE) Lf I. . _ ,BE OTHERS) D _ GONG TE HEADWALL TO BE E5►CANED BY OT R5 1 _ - EXISTING 820.40• -- — -- ..r v -- - --- — . I i _ � I INV... .814 0' y 810.00' -- --- — yy 3 00 2+00 - 1+00 0 00 GRAPHIC SCALE 20 40 80 180 IN FEET ) 1 racks = 40 ft. OTE: aEQ REFER1041E:':', DS 2530 VBG 434 D(3 2390 RG 525 DE 794 ISG 3065 DQE 2457 RG 527 SITE INFORMATIaN: 1. TOTAL SITE: 20.431 AO 2. (E)ISTING ZONING: Ll &ISI 3. SOILS. EnD, Wh, MsE, EnC, CrB 4. WATERSHED: NOT LOCATED IN A WATER SUPPLY WATERSHED 5. FL D: LOCATED IN A FLOOD ZONE AS SHOWN ON FIRM MAP 0. MAP NO. 3710783400 J PANEL 7334 DATED JUNE 13, 2007 7. BOUNDARY INFORMATION TAKEN FROM A SURA BY FLEMING ENGINEERING, INC. FOR GUILFORD COUNTY KENDALL CENTER EVERGREENS DATED 12-22-09. 3. TOPOGRAPHIC INFORMATION: OOMBONATION OF GREENSBORO GS, INFORMATION PROVIDED BY OWNER AND FIELD LOCATIONS BY OBIT ENGINEERING AND SURVEYING, INC. QVVUVIERI DEVELOPIEFn GUILFORD COUNTY 301 WEST MARKET STREET GREENSBORO, NO 27402 i' 20jj REQ/ 1510NS SEAL 2354d 1 tel,"I" I �z/Ico/ IC:) O uj r oO W Lu v } O� Q J O � z Lu W 08" PIPE PROFILE SCALE: I It = 40' DATE: 12/16/2010 PROJECT: 925 -OG 17RAWN BY: E35N SHEET t 4 A N 0 f EX. TG E PROPOSED 12' I . TURN LINE E .Ot OV 7ED 17/Y\. =P --P METAL. I LIGHT POLF Z l fTJ W U � rRAPF/C i/GNAL 3DX`( I EX15 TSP-' "' PROPOSED ! A 12' TURN _LANE Sv£R-MAPLE <.0TTIN3--HEA b7ciP F( 6... 10 MAINT. FSM T EXISTING l RIP -RAP 1 EX,r_ 1 1 1+aa LT I 1 X N TE: WINE EFE'ENCE: ®E 2530 PG 434 ®E 2390 PC 625 ®E 794 PC 306 ®[E 2457 PO 527 SS E I FOR A *N: 1. TOTAL SITE: 23.43 AC 2. EXISTING ZONING: LI & PI 3. SOILS: Ego®, Wh, MSE, EnC, CTB 4. WATERSHED: NOT LOCATE® IN A WATER SUPPLY WATERSHED S. FLOOD: LOCATED 9N A FLOOD ZONE AS SHOWN ON FIRM MAP S. MAP NO. 3710783400 J PANEL 7334 ®ATE® JUNE 13, 2007 7. BOUNDARY INFORMATION TAKEN FROM A SURVEY BY FLEMING ENGINEER�NO, INC. FOR GUILFORD COUNTY KENDALL CENTER/ EVERGREENS DATED 12-22-09, 3. TOPOGRAPHIC INFORMATION.* COMBINATION OF GREENSBORO GDS, INFORMATION PROVIDED BY OWNER AND FIEF.® LOCATIONS BY CPT ENGINEERING AND SURVEYING, INC. OWNER I ©EWELOPER-0 GUILFORD COUNTY 301 WEST MARKET STREET GREENSBORO, NC 27402 REV151ON5 z o r- u� m m O vLuz LU lu �z(I/°LL Z v Z :E:0) n i z�, jU 0 D � Iu 0. Qom u., UL o W Q Lt� M/z V. o a. O W < < w °° w�CY0 o C) c) Z W L2W ''D GRAPHIC SCALE 40 0 20 40 80 ( IN FEET ) 1 inch = 40 ft. 160 rt SHEET u NOTE: TREE FFESERVATION SEE SHEET 5B FOR TREE PERSERVATION. SEE DETAIL. 1. CULVERT ARE TO BE INSTALLED WITH THE USE OF COFFER DAMS/SANDBAG DAMS. 2. KEEP CLEARING AND EXGAVATION OF THE STREAM BANKS AND BED TO A MINIMUM. 5. INSTALL TEMP. GOFFER/SANDBAG DAM ABOVE GULVERT INSTALLATION. RE—ROUTE A PORTION OF THE STREAM AS SHOWN ON PLAN. INSTALL THE TWO NORTHERN M05T 108" GMP'S FIRST (PIPE A � B). INSTALL THE RIP—RAP APRON AND THEN DIVERT STREAM FLOW THROUGH PIPE B. 4. ENSURE GULVERT OUTLET 15 5TA13LE PRIOR TO DIVERTING FLOW. S. INSTALL THE SOUTHERN MOST 108 GMP (PIPE C) ALONG WITH THE HEADWALL AND JUNGTION BOX. 6. REINSTALL ALL NECE55AR-r SILT FENGING. 7A. UPON COMPLETION OF THE GULVERTS , DIVERT FLOW TO THE CENTER PIPE (LOW FLOW GONDITION). INSTALL SEDIMENT FENG I NG ABOVE THE INLET AND OUTLET, FILL, GOMPAGT AND STAE31 L I ZE ANY PART OF THE STREAM THAT 15 UNSTABLE APPROPRIATELY. 7B. TEMPORARY COFFER DAMS SHALL REMAIN INTACT AND FUNCTIONAL UNTIL ALL STREAM WORK/STABILIZATION HAS BEEN COMPLETED. 8. CHECK AND REINSTALL ANY SILT FENCING THAT NEEDS TO BE REPAIRED REGULARLY DURING GONSTRUGTION. E.1.P. I.P.S. CONC. MON PT. R/W E/P C & G T/C PP PIV E -- PK NAIL WV CO GM GV MH FES FH LP N/F aoW M C� WM UG C. 1. G.I. �A. CONC. G W @5)I PROPOSED JUNGTION Rr'1Y Tn RF T')FGI/f<I1=� _ SKIMMER BASIN #41 1 ---- _ OWE — _..._ / / n L E 6 E N D ®sPI6eF9F� PROF05E EXISTING IRON PIN IRON PIN SET o c CONCRETE MONUMENTS OUTRJ7: , POINT _ RIGHT—OF—WAY oPO-IG EDGE OF PAVEMENT PR \ CURB & GUTTER TOP OF CURB { ` ,,` ,�� MUS / _ .. :.. TINGE` POWER POLE \0 COs T� GUTTER .T : ONVEFZT L I Y I ,/ , R�Mo� . E)4- .[. TO POST INDICATOR VALVE 7 OVERHEAD UTILITY 4 ; ; TOT"' 82 � MASONRY NAIL �� OJT c� I WATER VALVE V CLEAN OUT, GAS METER ._j LJ :: , II II - GAS VALVE GA A F0�� ; MANHOLE _._. e ... h sem. /( 4 A FLARED END SECTION FIRE HYDRANT LIGHT POLE NOW OR FORMERLY WATER METER & BACKFLOW PREVENTER WATER METER UNDERGROUND SERVICE BOLLARD CURB INLET GRATE INLET CONTROLLED ACCESS EXISTING CONCRETE GAS PIPE LINE WATERLINE \47 Y , Y \ \ \ Y 1. C�lN TR TION 5E �UFN :;E 'I. CONTRACTOR SHALL ENSURE THAT ALL APPLICABLE PERMITS AND APPROVALS HAVE BEEN OBTAINED PRIOR TO PROCEEDING WITH WORK ASSOCIATED WITH THESE DOCUMENTS. 2. SCHEDULE A PRE -CONSTRUCTION CONFERENCE WITH OWNER, ALL CONTRACTORS FOR LAND DISTURBANCE ANDAOR EROSION CONTROL, AND EROSION CONTROL AUTHORITY PERSONNEL TO DISCUSS THE EROSION CONTROL PLAN. 3. FLAG THE NEW CONSTRUCTION LIMITS AS INDICATED ON THE PLAN, DO NOT EXCEED PROPERTY BOUNDARIES WITHOUT WRITTEN APPROVAL OF ADJACENT PROPERTY OWNERS. FLAG THE CLEARING LIMITS AND VERIFY WITH THE OWNER PRIOR TO CLEARING. 4. INSTALL THE EROSION CONTROL MEASURES AND GRADE SITE PER PHASED EROSION CONTROL PLANS. PO HAZ- E 3 EROMON CONTROL: 'I. SILT FENCE AND SKIMMER BASIN #i4. 2. INSTALL REMAINDER OF STORM DRAINAGE WITH INLET PROTECTION AS SOON AS GRADING OPERATIONS ALLOW. INSTALL TEMPORARY DIVERSIONS TO THE EXCAVATED INLET PROTECTION. 3. CONTRACTOR TO REMOVE EXISTING WATER AND SEWER LINES AS SHOWN ON THE UTILITY PLAN. 4. GRADE AND INSTALL STONE BASE IN THE UPPER PARKING LOT ADDITION. REMOVE SKIMMER BASIN ##3 ONCE LOT IS STABILIZED AND WITH APPROVAL OF THE EROSION CONTROL INSPECTOR. 5. GRADE AND INSTALL STONE BASE AND PAVEMENT FOR WENDOVER AVE. ROAD WIDENING. PAVE PARKJNG LOTS, 6. GENERAL. CONTRACTOR SHALL ENSURE THAT EROSION CONTROL DEVICES ARE IN PLACE AND FUNCTIONING DURING ALL PHASES OF CONSTRUCTION. Y. STABILIZATION IS THE BEST FORM OF EROSION CONTROL. TEMPORARY SEEDING IS NECESSARY TO ACHIEVE EROSION CONTROL ON LARGE DENUDED AREAS AND ESPECIALLY WHEN SPECIFICALLY REQUIRED AS PART OF THE CONSTRUCTION SEQUENCE. ALL GRADED SLOPES MUST BE SEEDED AND MULCHED WITHIN 21 DAYS. 8. COFLTRACTOR SHALL ADJUST EXISTING EROSION CONTROL MEASURES AS REQUIRED DURING THE CONSTRUCTION PROCESS. CONTRACTOR SHALL INSTALL ANY ADDITIONAL EROSION CONTROL MEASURES AS DEEMED NECESSARY BY THE EROSION CONTROL INSPECTOR. 9. GROUND COVER SHALL BE ESTABLISHED ON EXPOSED AREAS WITHIN 29 DAYS FOLLOWING ANY PHASE OF GRADING. ALL EROSION AND SEDIMENT CONTROL PRACTICES SHALL. BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY STORM EVENT, BUT IN NO CASE LESS THAN ONCE EVERY WEEK. ANY REPAIR$ OR CLEANING NECESSARY TO MAINTAIN EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE COMPLETED IMMEDIATELY. 10. ALL SEEDED AREAS SHALL BE REFERTILIZED, RESEEDED AS NECESSARY, AND MULCHED ACCORDING TO THE SEEDING SCHEDULE. EROSION CONTROL LEGEND TEMPORARY 51 LT FENCE TD> TD> TEMPORARY DIVERSION TEMPORARY INLET PROTECTION im mm ma mm m P15TURBF-D LIMITS � a r `I14 N 20 a� EROSION " CONTROL PLAN FOR. PHASE 3 aCALE : I" = 100' DATE: 2/01/2010 PROJECT:1 f25—OQ GRAPHIC SCALE 100 0 50 100 200 ( IN FEET ) 1 inch = 100 ft. REV I51 ON5 z zz UA 0) ; cv m Q J uj Z m Z < Qw Z0� z Z 7�z� O CL z } z N jv W O Lu Q a 9 LU Q z z� o iJ--t 0� e Q 51 mi I_ m O Lu Q z III LU <Lury 00 LU Q LL - o= CD Lu U-� QD aao DRAWN BY'BSN SHEET EC 3 El 0 1 PUMP � I EARTH DFFiA' P• 1 7E ✓.^. CONRION r0: i O O - --^ STREAM DROSSIOSSRNff aAss �NIN. Fi.OlV— AIA irAP SEDIMENT rH.t? \ /� D 2 1 SfOf SL0•1 \ / cn snT OAT. i 24' TO-- 1--{ 42, CHR '------ —/ 1 —— —_—_/ 2CLe55 'A' CROSSING/ fROB!01/ LYWIROL /�— `\ 1JF0,'T'Aie{ONr..usry L'LA55' 'r' PIPs BrLWf WETR P?:) r 5�dF' RIP RAP OD SILrDAD. • f0'_. 2R PROPOSED EARTH BERM 50CTAUCrI ON EASEMENT rrR. d 'ONS � xo>F PRornsED AfrtN OER.M PLAN /TYP.I nen�r,arcrc me Ficf / rnrm� rO H N TOP OF 1 RROM PU -------_ 4rL1' ------- y,y .816 __._.,.._..e •WA• i�}1 �'� TAN 7EMP, FiCu 24' TO C. 4?- CHP HIM. - - EX, INV. f TCYPOHARY• CRUK STUNG DA}rPOL YfiTTlYL E,. NE FARR/C ON FACE lB ML. r80CIAC �LAGSJING + PIPt B1% A INSTALL SAhOAAG9 IN PIKE INVERT 6 FAHRIC WHILE PUMPING AROG4VU GUAING CONSIRUCTdON IN STREAK, '� tK. rerxnf>t FABRIC nN Fa Cf [e NL, rMTCA'1 B REN04L SANG&'GS 6 FAORIC TO ALLOT[ FLON TiiRO'1GN PIPE H/2N NDT PUAfPIh'G AROliNO, SECTION A -A OF H s C P r Y ® F 0 R HENSOORO S777. NO. REV. SrANDARo TEMPORARY CREC( a-Rr - CROSSINs PRIN6 CONBTRUCrrON =213 G3-05 NOTF;S: i) FFOSION STONE TO RF 'CLASS I' RTP -FAP UM F5,5 R65r6NA 7F0 nTFFFRI'NTJ.Y ON CON.STAlILrfON PLAN, PIPE SWANO AMO(/NT N.:FAFO TO riF. GErE mmo Ry E•VGrN 0•V CONS TAIICTION PLAN. AR7,JECr 31 N7FTLALJ 1,47/ONAYRNP/. FTlONIH fOFOR ON Thr ffiNSTAIN,TrONAPL AfVS.. C STRN 4) PUMP ANO I INF .5r7F TO 5F AFIERMINEO RY T.MF, .LONTRACrO.R I/Rf� TNF 945F FLON .5.'lONN (1:N r, cw;TRUL'rin, PLANS. S IFXf. FEOING 40 NAY FEOUAE ADOITTO!rAI.DfId TFA 01/A/.7TYOPF.R.frrTTN4 ANYTRTSTNAfiAM:FI[.5T OR NI TISATION. CONSTRUCTION SEQUENCE FOR STREAM CROSSrNG AANRSTREAM ✓ CR(I,SSi AM1?PJTOPAREA DIikNSTAEP F OM4 TRIIf,T1ONA 76ArRRMMI PIMPfNGOF f,(WTPNIlJNR PJJMPTNf WHILE WORMr C N17ifIN TIIF .STREAM. R/ IN.£TALt IM.STREAM ORALO FTG TFA FAARTC, A✓✓0 TF•MPOAARY CMP. COVER Pr.°F. IN'16 ML'T NI!"7N Al f.OhFSTRFAAI PROWATNRnilfrX CANSASrrS'XJHVffN IVSFT NTrEN NOj�N'[1R.YJ THF .STREAM. .SJ INSTALLOOW'N9'REAM TEMPORARY STONE DAM ANO FIC TFR FAARIC TO PREVENT 6ACK FG UH INTO CONSTAIN_'YION AREA. 4J INSTALL PROPOSEO EARTH YFRVf ALONG TOP OF BANK ON EACH ST05 OF THF. CONSTR(/L TTON AREA. 5! INSTALL OENATERING 5ASIN OR STLT 1746 AT TOP OF BANA'. aev TER CONSrRUCTrON AREA BETWEEN TEMPORARY GAN IJSINS rNT5 BASIN. G/ INSTALL rhE IU' X ro' SEDINENr TRAP OA SfL r OAS. 7s' UPON P,ONSTAUCT70N COMPLETION REN(rVF TEMPORARY DAM$ FIL To? FAHRIC. Am T£MPDAAAY LHP. Dc'PRE55 TEMPORARY'DAN 6OFTO14 INTO STREAM REO UNTIL TOP OF CALLED AIP RAP IS LEVEL WrTM STREA/I OOTTON. CONVERT TO CGS SrANOARO /214 rF FOR 7N THE CONS rRUCTrOV PLANS. NI JNON STARPI. WA MN [N" CLEARED AREAS REMOVF TEMPORARY FARTH AFRI, .SFOIMENT TRAP, A:NR OFMATFAM 8A.4IN. 2 or 2 � I Y O F 0 R E E N 5 B 0 R 0 STD. No. REV. STANDARD TEMPORARY CREEK 2Q3 09 9709 05 cRossrw WRING coNsrwcrroN os o5 E.1.P. I.P.S. CONC. MON PT. R/W E/P C & G T/C PP PIV E -- PK NAIL WV CO GM GV MH FES FH LP N/F aoW M C� WM UG C. 1. G.I. �A. CONC. G W @5)I PROPOSED JUNGTION Rr'1Y Tn RF T')FGI/f<I1=� _ SKIMMER BASIN #41 1 ---- _ OWE — _..._ / / n L E 6 E N D ®sPI6eF9F� PROF05E EXISTING IRON PIN IRON PIN SET o c CONCRETE MONUMENTS OUTRJ7: , POINT _ RIGHT—OF—WAY oPO-IG EDGE OF PAVEMENT PR \ CURB & GUTTER TOP OF CURB { ` ,,` ,�� MUS / _ .. :.. TINGE` POWER POLE \0 COs T� GUTTER .T : ONVEFZT L I Y I ,/ , R�Mo� . E)4- .[. TO POST INDICATOR VALVE 7 OVERHEAD UTILITY 4 ; ; TOT"' 82 � MASONRY NAIL �� OJT c� I WATER VALVE V CLEAN OUT, GAS METER ._j LJ :: , II II - GAS VALVE GA A F0�� ; MANHOLE _._. e ... h sem. /( 4 A FLARED END SECTION FIRE HYDRANT LIGHT POLE NOW OR FORMERLY WATER METER & BACKFLOW PREVENTER WATER METER UNDERGROUND SERVICE BOLLARD CURB INLET GRATE INLET CONTROLLED ACCESS EXISTING CONCRETE GAS PIPE LINE WATERLINE \47 Y , Y \ \ \ Y 1. C�lN TR TION 5E �UFN :;E 'I. CONTRACTOR SHALL ENSURE THAT ALL APPLICABLE PERMITS AND APPROVALS HAVE BEEN OBTAINED PRIOR TO PROCEEDING WITH WORK ASSOCIATED WITH THESE DOCUMENTS. 2. SCHEDULE A PRE -CONSTRUCTION CONFERENCE WITH OWNER, ALL CONTRACTORS FOR LAND DISTURBANCE ANDAOR EROSION CONTROL, AND EROSION CONTROL AUTHORITY PERSONNEL TO DISCUSS THE EROSION CONTROL PLAN. 3. FLAG THE NEW CONSTRUCTION LIMITS AS INDICATED ON THE PLAN, DO NOT EXCEED PROPERTY BOUNDARIES WITHOUT WRITTEN APPROVAL OF ADJACENT PROPERTY OWNERS. FLAG THE CLEARING LIMITS AND VERIFY WITH THE OWNER PRIOR TO CLEARING. 4. INSTALL THE EROSION CONTROL MEASURES AND GRADE SITE PER PHASED EROSION CONTROL PLANS. PO HAZ- E 3 EROMON CONTROL: 'I. SILT FENCE AND SKIMMER BASIN #i4. 2. INSTALL REMAINDER OF STORM DRAINAGE WITH INLET PROTECTION AS SOON AS GRADING OPERATIONS ALLOW. INSTALL TEMPORARY DIVERSIONS TO THE EXCAVATED INLET PROTECTION. 3. CONTRACTOR TO REMOVE EXISTING WATER AND SEWER LINES AS SHOWN ON THE UTILITY PLAN. 4. GRADE AND INSTALL STONE BASE IN THE UPPER PARKING LOT ADDITION. REMOVE SKIMMER BASIN ##3 ONCE LOT IS STABILIZED AND WITH APPROVAL OF THE EROSION CONTROL INSPECTOR. 5. GRADE AND INSTALL STONE BASE AND PAVEMENT FOR WENDOVER AVE. ROAD WIDENING. PAVE PARKJNG LOTS, 6. GENERAL. CONTRACTOR SHALL ENSURE THAT EROSION CONTROL DEVICES ARE IN PLACE AND FUNCTIONING DURING ALL PHASES OF CONSTRUCTION. Y. STABILIZATION IS THE BEST FORM OF EROSION CONTROL. TEMPORARY SEEDING IS NECESSARY TO ACHIEVE EROSION CONTROL ON LARGE DENUDED AREAS AND ESPECIALLY WHEN SPECIFICALLY REQUIRED AS PART OF THE CONSTRUCTION SEQUENCE. ALL GRADED SLOPES MUST BE SEEDED AND MULCHED WITHIN 21 DAYS. 8. COFLTRACTOR SHALL ADJUST EXISTING EROSION CONTROL MEASURES AS REQUIRED DURING THE CONSTRUCTION PROCESS. CONTRACTOR SHALL INSTALL ANY ADDITIONAL EROSION CONTROL MEASURES AS DEEMED NECESSARY BY THE EROSION CONTROL INSPECTOR. 9. GROUND COVER SHALL BE ESTABLISHED ON EXPOSED AREAS WITHIN 29 DAYS FOLLOWING ANY PHASE OF GRADING. ALL EROSION AND SEDIMENT CONTROL PRACTICES SHALL. BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY STORM EVENT, BUT IN NO CASE LESS THAN ONCE EVERY WEEK. ANY REPAIR$ OR CLEANING NECESSARY TO MAINTAIN EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE COMPLETED IMMEDIATELY. 10. ALL SEEDED AREAS SHALL BE REFERTILIZED, RESEEDED AS NECESSARY, AND MULCHED ACCORDING TO THE SEEDING SCHEDULE. EROSION CONTROL LEGEND TEMPORARY 51 LT FENCE TD> TD> TEMPORARY DIVERSION TEMPORARY INLET PROTECTION im mm ma mm m P15TURBF-D LIMITS � a r `I14 N 20 a� EROSION " CONTROL PLAN FOR. PHASE 3 aCALE : I" = 100' DATE: 2/01/2010 PROJECT:1 f25—OQ GRAPHIC SCALE 100 0 50 100 200 ( IN FEET ) 1 inch = 100 ft. REV I51 ON5 z zz UA 0) ; cv m Q J uj Z m Z < Qw Z0� z Z 7�z� O CL z } z N jv W O Lu Q a 9 LU Q z z� o iJ--t 0� e Q 51 mi I_ m O Lu Q z III LU <Lury 00 LU Q LL - o= CD Lu U-� QD aao DRAWN BY'BSN SHEET EC 3 El 0 1 u lqL 0 NOTE: TREE PRESERVATION SEE SHEET 5B FoR TREE F'ERSERVATION. SEE DETAIL. 1. CULVERT ARE TO BE INSTALLED WITH THE USE OF COFFER DAM5/5ANDBAG DAMS, 2. KEEP GLEARINC7 AND EXCAVATION OF THE STREAM BANKS AND BED TO A MINIMUM. 5. INSTALL TEMP. GOFFER/SANDBAG DAM ABOVE GULVERT INSTALLATION. RE-ROUTE A PORTION OF THE STREAM A5 SHOWN ON PLAN. INSTALL THE TWO NORTHERN MOST 108" GMP'S FIRST (PIPE A � B). INSTALL THE RIP -RAF APRON AND THEN DIVERT STREAM FLOW THROUGH PIPE B. 4. ENSURE GULVERT OUTLET 15 STABLE PRIOR TO DIVERTING FLOW. 5. INSTALL THE SOUTHERN MOST 108 GMP (PIPE G) ALONG WITH THE HEADWALL AND JUNCTION BOX. 6. REINSTALL ALL NEGE55ARY SILT FENGING. 7A. UPON COMPLETION OF THE GULVERTS , DIVERT FLOW TO THE CENTER PIPE (LOW FLOW CONDITION). INSTALL SEDIMENT FENGING ABOVE THE INLET AND OUTLET, FILL, GOMPAGT AND STABILIZE ANY PART OF THE STREAM THAT 15 UNSTABLE APPROPRIATELY, 7B. TEMPORARY GOFFER DAM5 SHALL REMAIN INTACT AND FUNGTIONAL UNTIL ALL STREAM WORK/STABILIZATION HAS BEEN GOMPLETED. b. GHEGK AND REINSTALL ANY SILT FENGING THAT NEEDS TO BE REPAIRED REGULARLY DURING GONSTRUGTION. t-, f', �INb E.I.P. I.P.S. CONC, MON PT. R/W E/P C & G T/C PP PIV _- E PK NAIL WV CO G 1v1 GV MH FES FH LP N/F ooW M ® WM UG C. 1. G, 1. CA CONIC, G W EX15T1 N& ENTRANCE E 'REMOVED 7� 0\ \1 \03 LEONE EXISTING IRON PIN ,\ IRON PIN SET \\ CONCRETE MONUMENT POINT \\ RIGHT-OF-WAY \ \\ EDGE OF PAVEMENT CURB & GUTTER TOP OF CURB POWER POLE POST INDICATOR VALVE OVERHEAD UTILITY MASONRY NAIL WATER VALVE CLEAN OUT GAS METER GAS VALVE MANHOLE FLARED END SECTION FIRE HYDRANT LIGHT POLE NOW OR FORMERLY WATER METER & BACKFLOW PREVENTER WATER METER UNDERGROUND SERVICE BOLLARD CURB INLET GRATE INLET CONTROLLED ACCESS EXISTING CONCRETE GAS PIPE LINE WATERLINE EXISTING Ii1,111 F)INt-�, 1i1 I t : ( 1-800-632-4949 r_AI'� 1 1IV(:�7 BUILDING nTAR e UH EX -HY1 I C.c -i: POLE X Q z 11 PROPCSEO 'RAFFLC r"' BERN PUMP II I !t rnJ O 01 Tor. rows RPJC7'SON { I STREA(f CROSSING / CLASS 'I"rNINtO . I E_Xll PA V I FLOW •-a*- RIP RAP a0' x fe' 5e0rMfN; TRAP I _ A, A 2MIN. ^ _ ^ ^ ^ '7j7- 2' TURN MIN.MIN z LANE EXIST. 4" 5'VER MAPLE iJ do ` c4 Sf`46AN f rt OK Fli - MEW,5' C. O:� 10' Ti'!AINT, FS'<7'T, 42 42" CNP -'-"-'- i a' tXA55 ' CA055INGS FROSItlN LPYiPOG Xr�{\ pi•HAlERfNO PAIN CLASS 'I' PIPs' StG'k" IiGTA P 2: f SfflE SL Me RIP AAP a4 sltt RAc. PrOPCSCG EARTIfOERN 5O' CONSTRUCTION EASEMENT (0, 8, 4526 EG 83 ; C� PROPOSED cARnJ DCN PLAN FXISTING RIP RAP (� (TYP.J GrerNrGe.c F<axl�' 'mi FAce !. w.. rxrc i f`P FP,ON To TCP OF PUMP _ala• x a.A. its adc __..._ata +Is- \ m mrAN TEMP FLDK Y24 TO .A -01 COY r. pi \ !D' 7 C EX. IAV.I ,,:r T(.kPORARY"� _ CAEEK STONG OAN PDLYETNYllell FABRIC hL ON FACE !B ML. TNZCK! ENR\ \ �✓ "`CRGaSINC PIPE g \ A INSTALL SANORAGS IN PIPE IN/ERT 6 FABRIC WILE PUMPING l ,. AROUND DfJRING L'ON.STRUCTTON 114 STREAM. ' .. rGMt §101 AA PAr Cx N t& x09. TNr"K! B REMOVE SANDBAGS S FADRIC TO ALLOW FLOH THROUGH AN C PIPE NIfEN NOT PU+rPfNG ARDUND. SECTION A -A f OF a C!7 s` OF GREENSBORO STA NDARD TEASP wr CREEK STD. NO. REV. CROSSING VWrNG CONSrRUCTrt�V 309-00 22 wB- ., 1'0'33:095;' MD res_ IJ FN(LSION STONE TR AF 'CLASS !' AIP^RAP -.E.S.A DESIGNA TO OIFrER£NTt.Y ON 7.dVS7AUCTflW FLAN. ,?J PIPE ST7E AND AMO(7NT NF"EGFR TO RF. DFrERNINED BY.ENGINEER CN T"ONB PRUC rION PLAN. .9J CGNSTPf/CfILWRf.ONLL FTTON TFT CAO FTJ MRRnNrTF ..' GGNSI L`TtON PLA, Safi aJ FRMTNEn R✓ rW CnNTRA(.•TO.R 1151NG D+E BAS[ FLOW F TO. ATF SN(JR N TMF C.nr P 5J N701"f OF t"ONSTgIJf"TT DN EASEMENT BHALL 6F MIN7NI7FD RA.SFr J/FON FIf1.D f.PNPTT70N5. ANY DT.STf/RAAJ-MF (SJ EXCFF.OING AO' NqY RFRUlRE AfiRTTraw Nd TFR of/A(. rTY PERMITTING OR 97 urA r/DN. CONSTRUCTION SEQUENCE FOR STREAM CROSSING 7J rMSTAI.L Pf/MP ANO L INF TO %,HP FLOW FROM AREA UPSTAFA,V OF rrNPrARAAY STREAM CAO,SSTf✓:i TO ARTA RDWN.STRFAA( !iF f.(T7RfJr F70N AREA, BEGIN PUMPING ANO CCNr7N()tNR AMANPINfr h'Nf/.E WORYIk, NI THIN THE STREAM" N �E"T 21 rM5'T444 UP.5TR,FAN Od,N FIL TFR FA7AR If., Al' TF..MP0.4ARY C.4P. COVER PIPE "' K1TN FABRIC AVP .SANfi RAR.S dS BH:NN 'N TN.Sf7 4" N'fIL.. WDAK7Nfi TN THF 7RFAN. ALLO4' .SrREAN F LOW THRoUrH CI4P AS' KININ fN INSET 6• N'HEN N.Di NORKTNr XITHIN TNF .STREAM. 3j INSTALL OOFNSTRCAN T£NWRAR'( STDNF RAM ANO FILTER FAaRIC TO PREVENT BACK FL CN INTO CONSTRIF_rroN AREA. </ TPL5rALL.PROPOSED EARTH BERMS ALONG TOP OF BANK ON EACH SIDE OF THE CONSTRUCTION AREA. 5) IN5rALL OFWATERM6 5A511Y GR SILT BAG AT TOP OF RANY. O£NATEP COMSTRUCMIV AREA BETWEEN TEH•POPARY DAM U51Na" rHrS BASIN. 6J INSTALL Tr(£ 10 X f0' 5£0INENr TRAP 8.9 SILT BAG. 7J (A>ON CO•NSTRUf. LION f, O,NP_FT7nN, REMOTE 7Eff,"017ARY GAMS. FILTER FASRIL: A16 7ENPOAAR>' GAP. OEI'RES5 PEMr'+DRAR✓ OAN BOTTON5 INTO STREAM BED JNTIL TOP DF RIP RAF 7S LE'A£L h'ZTH STREAM OCTTOM. .-PNVFHT TC LPG ,rl'ANLJA.40 1214 If CALLED FOR 7N 7l(E COM^r TRUGTION PLANS. Bj UPnN .SrARrl TIATfON GF CLFAREO ARFAR. REMOVE TWGRARY EARTH BERM. SEOL4:TNr TRAP. ANO T,FKATfRTH' RA,SIN, znF2 O r Y O E O R E E N S E O R O STD. ND. REV. STANDARD TEMPORARY CREEK 223C Sf 06-05 OS -970905 CROSSrr* ORrMS CONST WCKTON US -OS E.I.P. I.P.S. CONC, MON PT. R/W E/P C & G T/C PP PIV _- E PK NAIL WV CO G 1v1 GV MH FES FH LP N/F ooW M ® WM UG C. 1. G, 1. CA CONIC, G W EX15T1 N& ENTRANCE E 'REMOVED 7� 0\ \1 \03 LEONE EXISTING IRON PIN ,\ IRON PIN SET \\ CONCRETE MONUMENT POINT \\ RIGHT-OF-WAY \ \\ EDGE OF PAVEMENT CURB & GUTTER TOP OF CURB POWER POLE POST INDICATOR VALVE OVERHEAD UTILITY MASONRY NAIL WATER VALVE CLEAN OUT GAS METER GAS VALVE MANHOLE FLARED END SECTION FIRE HYDRANT LIGHT POLE NOW OR FORMERLY WATER METER & BACKFLOW PREVENTER WATER METER UNDERGROUND SERVICE BOLLARD CURB INLET GRATE INLET CONTROLLED ACCESS EXISTING CONCRETE GAS PIPE LINE WATERLINE EXISTING Ii1,111 F)INt-�, 1i1 I t : ( 1-800-632-4949 r_AI'� 1 1IV(:�7 BUILDING nTAR e UH EX -HY1 I C.c -i: POLE X Q z 'RAFFLC JGNAL IDX l rP, TSH I E_Xll PA V F�Ropo�ED I _ A, A T 2' TURN - z LANE EXIST. 4" 5'VER MAPLE Fli C. O:� 10' Ti'!AINT, FS'<7'T, (0, 8, 4526 EG 83 ; C� FXISTING RIP RAP (� 1 m \ > C ENR\ \ I. �X.C/.I. OP 1 2 /l?c TOP: --a25. 1% \ ko TO \ TF 6LA5 lr7,4' X 8 \ _ i lNITH L 0 -� . TF ;TION SEQUENCE: 1. CONTRACTOR SHALL ENSURE THAT ALL APPLICABLE PERMITS AND APPROVALS HAVE BEEN OBTAINED PRIOR TO PROCEEDING WITH WORK ASSOCIATED WITH THESE DOCUMENTS. 2. SCHEDULE A PRE -CONSTRUCTION CONFERENCE WITH OWNER, ALL CONTRACTORS FOR LAND DISTURBANCE AND/OR EROSION CONTROL, AND EROSION CONTROL AUTHORITY PERSONNEL TO DISCUSS THE EROSION CONTROL PLAN. 3. FLAG THE NEW CONSTRUCTION LIMITS AS INDICATED ON THE PLAN, DO NOT EXCEED PROPERTY BOUNDARIES WITHOUT WRITTEN APPROVAL OF ADJACENT PROPERTY OWNERS, FLAG THE CLEAPJNG LIMITS AND VERIFY WITH THE OWNER PRIOR TO CLEARING;. 4. INSTALL TFE EROSION CONTROL MEASURES AND GRADE SITE PER PHASED EROSION CONTROL PIANS. G'HA; E 3, EROMON CONTROL: 1. SILT FENCE AND SKIMMER BASIN #4. 2. INSTALL REMAINDER OF STORM DRAINAGE WITH INLET PROTECTION AS SOON AS GRADING OPERATIONS ALLOW. INSTALL TEMPORARY DIVERSIONS TO THE EXCAVATED INLET PROTECTION. 3. CONTRACTOR TO REMOVE EXISTING WATER AND SEWER LINES AS SHOWN ON THE UTILITY FLAN. 4. GRADE AND INSTALL STONE BASE IN THE UPPER PARKING LOT ADDITION. REMOVE SKIMMER BASIN 03 ONCE LOT IS STABILIZED AND WITH APPROVAL OF THE EROSION CONTROL INSPECTOR. S. GRADE AND INSTALL STONE BASE AND PAVEMENT FOR WENDOVER AVE. ROAD WIDENING. PAVE PARKING LOTS. S. GENERAL CONTRACTOR SHALL ENSURE THAT EROSION CONTROL DEVICES ARE IN PLACE AND FUNCTIONING DURING ALL PHASES OF CONSTRUCTION. 7. STABILIZATION IS THE BEST FORM OF EROSION CONTROL. TEMPORARY SEEDING IS NECESSARY TO ACHIEVE EROSION CONTROL ON LARGE DENUDED AREAS AND ESPECIALLY WHEN SPECIFICALLY REQUIRED AS PART OF THE CONSTRUCTfON SEQUENCE. ALL GRADED SLOPES MUST BE SEEDED AND MULCHED WITHIN 21 DAYS. 8. CONTRACTOR SHALL ADJUST EXISTING EROSION CONTROL MEASURES AS REQUIRED DURING THE CONSTRUCTION PROCESS. CONTRACTOR SHALL INSTALL ANYADDITIONAL EROSION CONTROL MEASURES AS DEEMED NECESSARY BY THE EROSION CONTROL INSPECTOR. 9. GROUND COVER SHALL BE ESTABLISHED ON EXPOSED AREAS WITHIN 21 DAYS FOLLOWING ANY PHASE OF GRADING. ALL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE CHECKED FOR STABILITY AND OPERATION FOLLOWINO EVERY STORM EVENT, BUT IN NO CASE LESS THAN ONCE EVERY WEEK. ANY REPAIRS OR CLEANING NECESSARY TO MAINTAIN EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE COMPLETED IMMEDIATELY. 10. ALL SEEDED AREAS SHALL BE REFERTILIZED, RESEEDED AS NECESSARY, AND MULCHED ACCORDING TO THE SEEDING SCHEDULE. EROSION CONTROL LEGEND TEMPORARY SILT FENCE TD> TD> TEMPORARY DIVERSION TEMPORARY INLET PROTECTION mm m DISTURBED LIMITS GRAPHIC SCALE 40 0 20 40 80 ( IN FEET ) 1 inch = 40 ft. 160 REV151ONS \1j Z p r Z a tLl � m N m } 7 Q � uj 4 i- LL Q W Z z V Z CL z z p p ll1 � t3 0 dJ z F2, NN Q ° n., LLI 71 tl..I Z d t� SII Lin V I Lu O :z < ZZ Lu < U4 UaCz w Cv Do U-1 zO L W ER05ION CONTROL PLAN FOR PHA5E 5 5GALE: 131 = 40' PATE: 2/0'1/2010 FROJEGT:125-01 DRAWN 5YBBN SHEET E; C 3A G N a N J