HomeMy WebLinkAbout20010833 Ver 1_Stormwater Info_20020507FR Michael F. Easley
'O? IQ Governor
William G. Ross, Jr., Secretary
Department of Environment and Natural Resources
O '< Gregory J. Thorpe, Ph.D., Acting Director
Division of Water Quality
May 7, 2002
Mr. Harold Yelle, PE
Aiken and Yelle Associates
3755 Benson Drive
Raleigh, NC 27609
Subject: Stonehaven Subdivision
DWQ Project No. 010833
Wake County
Dear Mr. Yelle:
The Wetlands Unit staff reviewed the stormwater management plans for the subject project and determined that additional
information is necessary to complete the technical review process. The required additional information is as follows:
1. Stormwater From Individual Lots
The 401 Water Quality Certification and Neuse Buffer Rule Approval. dated October 31, 2001 requires that
stormwater from the lots must be provided. If no house or grading plans are available at this time, a verbal
description of the measures to be taken to ensure that diffuse flow shall be provided will be acceptable.
Division wetlands unit staff will strive to complete a final technical review within 10 working days of receipt of the
requested information. If you have any questions or would like to discuss this project, please contact me at (919) 733-
9584.
Sincerely,
Todd t. John, PE
Environmental Engineer
cc: Raleigh Regional Office
Bob Zarzecki
File
North Carolina Division of Water Quality, 401 Wetlands Certification Unit,
1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address)
2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location)
919-733-1786 (phone), 919-733-6893 (fax), http://h2o.enr.state.nc.us/ncwetlanE