Loading...
HomeMy WebLinkAbout20100684 Ver 1_Stormwater Info_2011011871 McGiff A S S O C I A T E S January 14, 2011 Mr. Ian McMillan North Carolina Department of Environment and Natural Resources Division of Water Quality 401 Oversight/Express Review Program 1650 Mail Service Center Raleigh, North Carolina 27699-1650 0 - AV ? a ?011 H RE: Stormwater Management Plan Resubmittal Foothills Commerce Center - Phase One DWQ No. 10-0684 Cleveland County, North Carolina Dear Mr. McMillan: We are in receipt of your January 3, 2011, letter requesting additional information for the above referenced project. We have revised our Stormwater Plan to address your comments and have enclosed two (2) copies of bound stormwater calculations for Wet Detention Basins #1, #2, and #3 and Plan Sheets C-101, C-103, C-108, C-508, C-509, and C-701 for your continued review. We have only enclosed plan sheets that were revised to reflect the proposed stormwater measures to be constructed as part of Phase One of this project. Sheets C-101 and C-701 show the stormwater measures that would be constructed in the future if the conceptual plan is fully implemented. Specific revisions include the following, numbered in like manner to your review letter: 1. The calculations and supporting documentation for Wet Detention Basins #l, #2, and #3 are bound together and attached. 2a. The orifice size is now shown on the plans. 2b. Drawdown calculations for each basin indicate that the volume required for water quality will drain in no less than two (2) days and that the provided volume will drain in no more than five (5) days. 2c. Flow elongation baffles have been eliminated. The forebay weir for wet detention basin #3 has been moved. Forebay weir reinforcement is shown on the plans and calculations are provided. E n g i n e e r i n g • P l a n n i n g • F i n a n c e McGill Associates, P.A. • P.O. Box 2259, Asheville, NC 28802 • 55 Broad Street, Asheville, NC 28801 828-252-0575 • Fax: 828-252-2518 Mr. Ian McMillan January 14, 2011 Page 2 of 2 2d. Calculations now indicate that the volumes of the forebays fall in the range of 18-22 percent of the volumes of the entire ponds. 2e. Larger outlet pipes (18-inch and 24-inch) have been provided for maintenance. 2f. Calculations for the anti-flotation blocks are provided. 3. We understand that the planting plan has not yet been reviewed and may require additional information upon review. Please contact Becky Johnson, PE, Rhonda Honeycutt, PE, or me if you have any questions or concerns. Sincerely, McGILL ASSOCIATES, P.A. DALE E. PENNELL, PE, PLS Senior Project Manager Enclosures cc: Mr. Rick Howell, City of Shelby (w/ enclosures) Mr. Brad Cornwell, City of Shelby (w/ enclosures) Mr. Alan Johnson, NCDWQ Mooresville Regional Office (w/ enclosures) Mr. Joseph Gyamfi, PE, NCDWQ Central Office (w/ enclosures) P:\2009\09.00116\Letters\im 14jan 1 l .docx 1 1 1 1 1 1 1 1 1 i i i '?01119 STORMWATER MANAGEMENT PLAN FOOTHILLS COMMERCE CENTER, PHASE I DWQ No. 10-0684 CITY OF SHELBY CLEVELAND COUNTY, NORTH CAROLINA DALE E. PENNELL, PE, PLS McGill A S S O C I A T E S Engineering • Planning • Finance Asheville, North Carolina NOVEMBER 169 2010 Revised JANUARY 7, 2011 Imo` s°y ?°°?PEfeFEfrE6???'04 ml•14•?ti 1 1 1 1 1 1 1 1 1 1 WET DETENTION BASIN 1 WET DETENTION BASIN SUPPLEMENT -DESIGN SUMMARY WET DETENTION BASIN SUPPLEMENT- REQUIRED ITEMS CHECKLIST TABLE OF ELEVATIONS, AREAS, INCREMENTAL VOLUMES AND ACCUMULATED VOLUMES FOR POND AND FOREBAY CALCULATIONS • GENERAL • DRAWDOWN TIMES • HYDROCAD MODEL • CHANNEL REINFORCEMENT • ANTI-FLOTATION BLOCK OPERATION AND MAINTENANCE AGREEMENT REPORT OF GEOTECHNICAL EXPLORATION AND SOIL INFILTRATION z a m z 0 z D W 3 ' Permit No. (to be provided by DWG A = = T=A NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM ?pF W ATFR p QG y r r Storage Volume: SA Waters ' 1.5" runoff volume Pre-development 1-yr. 24-hr runoff Post-development 1-yr, 24 hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pre/post control of the 1 yr 24hr stone peak flow required? ' 1-yr, 24-hr rainfall depth Rational C, pre-development Rational C, post-development Rainfall intensity: 1-yr, 24-hr storm Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow PrelPost 1-yr, 24-hr peak flow control ' Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. Pool elevation) Top of 1 Oft vegetated shelf elevation Bottom of 10ft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout,.bottom elevation . ' Sediment storage provided Is there additional volume stored above the state-required temp. pool? Elevation of the top of the additional volume Form SW401-Wet Detention Basin-Rev.8-9117109 WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. L PROJECT INFORMATION Foothills Commerce Center -Phase One Project name Brad Cornwell - City of Shelby - Public Utilities Director Contact person (704)464-6840 Phone number Date 7-Jan-11 Drainage area number 1 IL DESIGN INFORMATION Site Characteristics 962,240 ftz Drainage area 012 ftz 201 Impervious area, post-development , % impervious 20'89 % Design rainfall depth 1.0 in 19,085 ft3 OK 33,809 ft3 OK, volume provided is equal to or in excess of volume required. Storage Volume: Non-SA Waters Minimum volume required Volume provided to ft3 ft3 ft3 ft3 Y (Y or N) 3.1 in 0.30 (unitiess) 0.43 (unitiess) 0.13 inmr OK 0.86 ft3lsec 1.24 ft3lsec 0.38 ft3lsec 809.50 fmsl 807.50 fmsl 807.50 fmsl 808.00 fmsl 807.00 fmsl 802.90 fmsl 801.90 fmsl 1.00 ft N (Y or N) 809.5 fmsl OK Parts I. & II. Design Summary, Page 1 of 2 II DESIGN iNFORMATfON ' Surface Areas Area, temporary pool 19'295 ftZ Z 12,990 ft Area REQUIRED, permanent pool 1.35 (unitless) SAIDA ratio Area PROVIDED, permanent pool, Apem,poa 13,430 e OK 072 f! 11 Area, bottom of 10ft vegetated shelf, Abd shell , ft` Area, sediment cleanout, top elevation (bottom of pond), Ab,tp.d 6,560 V olumes olume, temporary pool 33,809 ft3 OK 3 44,434 ft olume, permanent pool, Vper„pcd 284 ft3 8 Volume, forebay (sum of forebays if more than one forebay) , Forebay % of permanent pool volume 18.6% % OK ' SAIDA Table Data 90 % Design TSS removal N (Y or N) Coastal SAIDA Table Used? Mountain/Piedmont SAIDA Table Used? Y (Y or N) SAIDA ratio 1.35 (unitless) Average depth (used in SAIDA table): N (Y or N) Calculation option 1 used? (See Figure 10-2b) 434 ft' 44 ' Volume, permanent pool, VPeR„p?d , 430 f! 13 Area provided, permanent pool, A,er,,p.i , ft Need 3 ft min. Average depth calculated ft Average depth used in SAIDA, deV, (Round to nearest 0.5ft) N Calculation option 2 used? (See Figure 10-2b) ) Y (Y or 430 ft` 13 Area provided, permanent pool, Apertnpool , 072 ft` 11 Area, bottom of 10ft vegetated shelf, Abp ,heir , ' Area, sediment cleanout, top elevation (bottom of pond), Ab,,tp.d "Depth" (distance b/w bottom of 10ft shelf and top of sediment) Average depth calculated Average depth used in SAIDA, deV, (Round to nearest 0.5ft) Drawdown Calculations Drawdown through biifice? Diameter of orifice (if circular) Area of orifice (if-non-circular) Coefficient of discharge (Cl)) Driving head (Ho) Drawdown through weir? ' Weir type Coefficient of discharge (CW) Length of weir (L) Driving head (H) ' Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Storage volume discharge rate (through discharge orifice or weir) ' Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to width ratio ' Trash rack for overflow & orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build-out? Drain mechanism for maintenance or emergencies is: 6,560 ftZ 4.10 ft 3.61 ft OK 3.5 ft OK Y (Y or N) 2.30 in in2 0.60 (unitless) 1.05 ft N (Y or N) (unitless) (unitless) ft ft 0.86 ft3lsec 1.24 Wisec 0.73 ft3lsec 2.68 days 3 :1 10 :1 10.0 ft 3 :1 2.0 :1 Y (Y or N) 1.0 ft N (Y or N) Y (Y or N) Y (Y or N) Portable pump Permit No. (to be provided by DWQ) OK, draws down in 2-5 days. OK OK OK OK OK OK OK OK OK OK Parts I. & It. Design Summary, Page 2 of 2 ' Form SW407-Wet Detention Basin-Rev.8-9117/09 I?' I Permit (to be provided by DWQ) ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initi s Sheet No. C-103 1. Plans 0" - 50' or larger) of the entire site showing: C-701 - Design at ultimate build-out, - Off-site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - High flow bypass system, ' - Maintenance access, - Proposed drainage easement and public right of way (ROM, - Overflow device, and - Boundaries of drainage easement. r the wet detention basin showing: il f t d d ' " _ C-508. o s a e or larger) an = 30 2. Partial plan (1 - Outlet structure with trash rack or similar, - Maintenance access, ' - Permanent pool dimensions, - Forebay and main pond with hardened emergency spillway, - Basin cross-section, nd lf h i , a e ng s - Vegetation specification for plant - Filter strip. C-508 3. Section view of the wet detention basin (1" = 20' or larger) showing: r - Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures. ?j NIA 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. ' Attached 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. UP C-509 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. U f Attached 7. The supporting calculations. Attached 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. 1 4?'1 t N/A 9. A copy of the deed restrictions (if required). ' 1`? ?C' Attached 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW40 1 Wet Detention Basin-Rev.8-9/17/09 Part III. Required Items Checklist, Page 1 of 1 1 rn r r Ln C7 d co ?l9 aj t? LL) r N N M ti M d CA 0 tS) ?M CO N N 0 0 0 0 0 0 0 o0N1?10 -co d'i?a 00000000 O 0 O M M O In M M d' f' O I-- N 0 O CO M C10 M d^ f? N O O O O O O O O t) O N O O Lo o Lo - ?7 CT°+-?' r NCO t` 0 00 N M.1 tj M ' r N M m .:. d O Nr Yta ? m Lf)r N r-Lr)CD00 Lor)u?(6 nooooo000 o a 0 0 0 0 0 0 0 0 - O r L() CD 6 aA to M M r lf) N to 0 O ? E J. =3 ttj: O CV Lf) m 1- d' O CO O O CV to t!7 0 0 0 0 0 0 0 0 p d r M Ol O r CO d0 Ltd tO ? r N CO 0 CO I-- CD O r I? co 0) r N N - "" u u u u U o m m Lo ta)rnd'? T CO r d I? Co CO O N O O cY m 0) d CI) 3, M T M I` t` d t-- M CD o 0 0 0 0 0 0 0 m d O 00 L6 .;r CZ" O co It I,- CO M O O O L6 O N o O O O O O O O O O a N m N 00 Cvt O r N CO O co to to i- M ti ti N M O? O a? N ti O O O O O O O O O O CO M LC) CO LO CD CD 1? M ?. Q N co Lo LC) CD - - ' r M In O r N CD CO I` M CA r r r r N ai o o E o a a p a CO O d d I? d M W # ?' s Z r e O d d N r M O O m O C-> y O O O O O p o p #?tE O0 M ~ d N N O -, 00 ( 00oo0C) I'-Mt -r-- .- o -,t 00 T--0 E C cL E W E-V CD O O r r N O fl) p 0 0 0 0 0 0 r t? rn r E v aJ 't NrCDNd N Q v. r r I? r N co M d CO CO a~ca +?+ _ U F ro m o m u. 4J 0. CU E E IJJ Cl) p im vy O O C,4 't LO C) MO 0~O r o 0 F j Ln > d i c a? 0 d 0) r,- C%4 ? Zm w,.' tuO O OOOO00rr_C:) a, ? a LC -, u 0 0 0 0 O O M M 00 tS? r r 00 O ? V 0 ? IM ' (D O O O O O O (D 00 N O 1` LO 0 0 W CO CO 1- 00 't CD N r E U- L) Z4 ut= } t u Ww U77"1 ? Q LL) r- CO I? W W O O T-- M d' LO M 1` O r CD O 1,- O . tl . d. O CA Cfl 00 000000 _ 0?"' -` m a>,6Cn00000000I,- CO Cr)oroC)00?0 V ui `- O O O O O O CO In LC) M T-- O M Lf) t-: ?j U)? r L() Lo CD I, 00 Cb r r r r J Ty,, a . p0 Lo f? O 00 d' dam'' 00 1 C1) ?. d t!) r-- In N M qt m m CO E? ,^ O O N ti CO Ci L6 N Ln 6 L6 CO 4 N L-) ti O 0 V O N I? N U-) ? N Lo a) co ? 00 IT O CD 0+' O O N ti M d? M Lo r r N Ln .. ti C). ;' r r r N co Lo 1l- co O r r r M 0M0 Lo 0 d LO r N r I` N CO a. o E` - o r LO O Ln r _ 0 r I? 00 .4 N r r ? 00 CD co Lo N 0 o O N L6 O I- LO M LL y'3O 0 00 O O M r M N Ln O r N lf) M L 0... r N Ln co N 0) r r e- r my)- U.. 0) O O N 00 1? • F d s r M f? i` CO N M CD CD O CD Lo v M O M r?Q c0 ' O Co d 1,- CO CO NT O 0 j LO d' I- O M O 00 LO V i N r N 0 O W N co O CO LL) Cy) d I? CD ~ Q' o o 0 M 0 0 LO M o d ti r M CO M M V 0 N. N M LO 0 CO 1? 1? r. r N N N M M y cV 0 0 0 0 O O O O O O O O O O O O O a N O O O O O L0 0) O O O O O to O M li) M ti ti 00 (A O_ 0-) p r r N N CV CO %r In j CU ? ? Oo0 M Oo0 Oo0 Oo0 Oo0 OoO OoO O0 0 OoO O0 0 Oo0 Oo0 Oo0 tb ra LLI 0 a 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 R L Y R L Y C of u O O N ? m O L) U R 4- 7 W 41 z R O v W L N Y O a Y R [L r O Z U W N W Q U O W Z ~ L) O Z L Y 0 ? L) z 0 CU U O w w w I-- L C Q 0 a) C Q G Lb L Y N LA 0 41 V LLI R E o U N O 4- O C ?F-• o = 0 0 in R to U L 0 O 4- E O LL. O O C -0 R Y W U O R U tO C w 41 R L '? R .V T U q0 R U y `^ O ? U U n U U Q c 0 x * to N N y N ? ull Y U L U u 4 -. V) p M N Q O O N O Ln C) * _0 M o C14 u 4-1 cl a Ibb m > U 0 O O = R RC G 7 O (U 6 O C O Y A R 'a 00 Ln N 11 N 0 d? N N C"I M N m O OA N L Cr V, ?t Q ?F U Y Ln R L Y R L Y 1 U v- Q) m 0 x U U R L 7 N Y R U O 41 R U R 4_- O R L Y 0 .a O C v t ? Y L G uu U " 0 L 0 4- ? O 0 3 R U ? E 'p R R UA N L bA N C U .j L L QJ o -a +'' U 4- r- lD lD O O Ol O 00 m M u u \ > O 2 O C 7 O ..a R .a O O. C O Y ti T R .a Ln M N CY) (Ti M 00 M r - a) N M 0 iE N 4+ cr ?E Q .a U Y 1 1 1 J 1 11 1 1 1 D 1 z 2 Wet Basin 1 Eea Drainage Diagram for WetBasin1 uubcat Pon Link Prepared by {enter your company name here}, Printed 1/7/2011 HydroCADO 8.50 s/n 004263 0 2007 HydroCAD Software Solutions LLC WetBasin1 Type 1124-hr 1-Year Storm Rainfall=3.10" Prepared by {enter your company name here} Printed 1/7/207/2011 2 H ydroCADO 8.50 s/n 004263 © 2007 HydroCAD Software Solutions LLC Time span=0.00-160.00 hrs, dt=0.04 hrs, 4001 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: DA 1 Runoff Area=22.085 ac 20.87% Impervious Runoff Depth=1.26" Tc=5.0 min CN=79 Runoff=51.15 cfs 2.323 of Pond 2P: Wet Basin 1 Peak Elev=809.58' Storage=79,745 cf Inflow=51.15 cfs 2.323 of Outflow=0.93 cfs 1.303 of Total Runoff Area = 22.085 ac Runoff Volume = 2.323 of Average Runoff Depth =1.26" 79.13% Pervious= 17.475ac 20.87% Impervious = 4.610 ac WetBasin1 Type 1124-hr 1-Year Storm Rainfall=3.10" Prepared by {enter your company name here} Printed 1/7/207/2011 3 H ydroCAD®8 50 s/n 004263 © 2007 HydroCAD Software Solutions LLC Summary for Subcatchment IS: DA 1 ' Runoff = 51.15 cfs @ 11.96 hrs, Volume= 2.323 af, Depth= 1.26" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-160.00 hrs, dt= 0.04 hrs ' Type II 24-hr 1-Year Storm Rainfall=3.10" r Area ac CN 610 98 4 Description Paved parking & roofs . 17.475 74 >75% Grass cover, Good, HSG C 085 79 22 Weighted Average ' . 17.475 Pervious Area 4.610 Impervious Area Tc Length Slope Velocity Capacity Description ' min feet ft/ft ftfsec cfs 5.0 Direct Entry, r Subcatchment IS: DA 1 Hydrograph ---- ------------------ FE 17R u 7n, j 55 ' ' 51.15 cfs _.__y --- --- ------ --- :-- - -_-_. --------? - --- 1-Year Storm 24-hr II t 50 l . e yP _ .1 ??r- -- ------ --- - --- -------- ? -- Rainfall-3 45' - ' I I ' -- --- ---- --- ----', -------- 'I, --- ;---RUff6ff Area=22.085-ac - ' 40 - - _ I I - - -' - - - - Runoff-Volume=2. afi - - _ - - - " ^ 35 - - - - - - - ? - - .. - Runoff-Depth-26 --- ---' -- 30 ------ -- Tc=5. min-- I .. - --- - -- I M 25 20 - - -- ? II 15 I I I - -- - _. ----... -- ---- -- -------- - - 10 - _- - r 5 -- ?- __- " T 0 130 140 150 160 0 10 20 30 40 50 60 70 80 90 100 110 120 Time (hours) 1 1 1 1 1 1 I H WetBasin1 Type 11 24-hr 1-Year Storm Rainfall=3.10" Printed 1/7/2011 Prepared by {enter your company name here} Page 4 H ydroCAD®8 50 s/n 004263 0 2007 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 1S: DA 1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 no 0.07 0.00 0.00 4.00 0.15 0.00 0.00 6.00 0.25 0.00 0.00 8.00 0.37 0.00 0.00 10.00 0.56 0.00 0.04 12.00 2.06 0.56 45.09 14.00 2.54 0.87 1.79 16.00 2.73 0.99 1.14 18.00 2.86 1.08 0.90 20.00 2.95 1.15 0.66 22.00 3.03 1.21 0.61 24.00 3.10 1.26 0.56 26.00 3.10 1.26 0.00 28.00 3.10 1.26 0.00 30.00 3.10 1.26 0.00 32.00 3.10 1.26 0.00 34.00 3.10 1.26 0.00 36.00 3.10 1.26 0.00 38.00 3.10 1.26 0.00 40.00 3.10 1.26 0.00 42.00 3.10 1.26 0.00 44.00 3.10 1.26 0.00 46.00 3.10 1.26 0.00 48.00 3.10 1.26 0.00 50.00 3.10 1.26 0.00 52.00 3.10 1.26 0.00 54.00 3.10 1.26 0.00 56.00 3.10 1.26 0.00 58.00 3.10 1.26 0.00 60.00 3.10 1.26 0.00 62.00 3.10 1.26 0.00 64.00 3.10 1.26 0.00 66.00 3.10 1.26 0.00 68.00 3.10 1.26 0.00 70.00 3.10 1.26 0.00 72.00 3.10 1.26 0.00 74.00 3.10 1.26 0.00 76.00 3.10 1.26 0.00 78.00 3.10 1.26 0.00 80.00 3.10 1.26 0.00 82.00 3.10 1.26 0.00 84.00 3.10 1.26 0.00 86.00 3.10 1.26 0.00 88.00 3.10 1.26 0.00 90.00 3.10 1.26 0.00 92.00 3.10 1.26 0.00 94.00 3.10 1.26 0.00 96.00 3.10 1.26 0.00 98.00 3.10 1.26 0.00 100.00 3.10 1.26 0.00 102.00 3.10 1.26 0.00 Time Precip. Excess Runoff (hours) ( inches) ( inches) (cfs) 104.00 3.10 1.26 0.00 106.00 3.10 1.26 0.00 108.00 3.10 1.26 0.00 110.00 3.10 1.26 0.00 112.00 3.10 1.26 0.00 114.00 3.10 1.26 0.00 116.00 3.10 1.26 0.00 118.00 3.10 1.26 0.00 120.00 3.10 1.26 0.00 122.00 3.10 1.26 0.00 124.00 3.10 1.26 0.00 126.00 3.10 1.26 0.00 128.00 3.10 1.26 0.00 130.00 3.10 1.26 0.00 132.00 3.10 1.26 0.00 134.00 3.10 1.26 0.00 136.00 3.10 1.26 0.00 138.00 3.10 1.26 0.00 140.00 3.10 1.26 0.00 142.00 3.10 1.26 0.00 144.00 3.10 1.26 0.00 146.00 3.10 1.26 0.00 148.00 3.10 1.26 0.00 150.00 3.10 1.26 0.00 152.00 3.10 1.26 0.00 154.00 3.10 1.26 0.00 156.00 3.10 1.26 0.00 158.00 3.10 1.26 0.00 160.00 3.10 1.26 0.00 1 1 1 1 1 u 1 1 WetBasinl Type II 24-hr 1-Year Storm Rainfall=3.10" Prepared by {enter your company name here} Printed 117/2011 5 H ydroCADO 8.50 s/n 004263 © 2007 HvdroCAD Software Solutions LLC Summary for Pond 2P: Wet Basin 1 Inflow Area = 22.085 ac, 20.87% Impervious, Inflow Depth = 1.26" for 1-Year Storm event Inflow = 51.15 cfs @ 11.96 hrs, Volume= 2.323 of Outflow = 0.93 cfs @ 17.69 hrs, Volume= 1.303 af, Atten= 98%, Lag= 343.6 min Primary = 0.93 cfs @ 17.69 hrs, Volume= 1.303 of Routing by Stor-Ind method, Time Span= 0.00-160.00 hrs, dt= 0.04 hrs / 7 Peak Elev= 809.58' @ 17.69 hrs Surf.Area= 19,482 sf, Storage= 79,745 cf Plug-Flow detention time= 1,753.7 min calculated for 1.302 of (56% of inflow) Center-of-Mass det. time= 1,629.5 min ( 2,472.9 - 843.4) Volume Invert Avail.Stora e Storage Description calc) R e e Data (Prismatic) Listed below ( St #1 799.90' 109,705 ag cf Custom Elevation Su rf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet 799.90 0 0 .0 10 10 800.00 00 801 202 362 282 292 . 90 801 539 405 698 . 00 802 560 55 753 . 50 802 668 307 1,060 . 90 802 6,559 1,445 2,505 . 00 803 6,660 661 3,166 . 00 804 7,670 7,165 10,331 . 00 805 8,736 8,203 18,534 . 00 806 9,871 9,304 27,837 . 00 807 11,072 10,472 38,309 . 50 807 13,430 6,126 44,434 . 00 808 15,980 7,353 51,787 . 50 809 19,295 26,456 78,243 . 810.50 21,714 20,505 98,748 811.00 22,117 10,958 109,705 Device Routing Invert Outlet Devices #1 Device 3 806.00' 50' 807 24.0" Vert. Orifice/Grate C= 0.600 Orifice/Grate Limited to weir flow C= 0.600 3" Horiz 2 #2 Primary #3 Primary . 809.50' . . 36.0" Horiz. Orifice/Grate Limited to weir flow C= 0.600 #4 Primary 809.90' 40.0' long x 20.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 .1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=0.86 cfs @ 17.69 hrs HW=809.58' (Free Discharge) 2=Orifice/Grate (Orifice Controls 0.20 cfs @ 6.94 fps) 3=Orifice/Grate (Weir Controls 0.66 cfs @ 0.91 fps) t--1=Orifice/Grate (Passes 0.66 cfs of 4.21 cfs potential flow) =Broad-Crested Rectangular Weir (Controls 0.00 cfs) 1 1 Type 1124-hr 1-Year Storm Rainfall=3.10" WetBasinl Printe d 1/7/2011 1 Prepared by {enter your company name here} C Page 8 004263 02007 HydroCAD Software Solutions LL / 50 ' HydroCAD0 n s Pond 2P: Wet Basin 1 ' Hydrograph ----------- plnflow - . -------- - ? Primary 55 , Inflow A ___ --------------- 51.15 cfs . ------- - _ - _ _ _ _-_ - - - -- rea=22.08 ac --- Peak Elev=809.58 45 , - - - 745..cf _ 9 Storage=7 40 " ., . ___ _ --- --- -- 30 E`, ------- --- - 0 25 ME: - r _- -- 'i ------- --- - ----- ---'-------- --- -------- --- - 20 - ------- --- ---- - - --- ---- - - - ---- --- --- - - --- `5 .s ' i+a 0.93 cfs 0 0 0 100 1 12D 130 140 150 10 20 30 40 5D 60 ? 10160 Time (hours) 1 1 1 c 0 o a d w 1 Pond 2P: Wet Basin 1 Stage-Discharge 811 - --- . _ -'--- ?tl-Grest?d Re?fan9?a(ar ?,r: , s ' 801 1 riIw Ufa - --- - a----- ---- ------- ------- -- --- --- - OriiCelOra(e - --- ----=---- - -- -- ---- ---- ---- --------- ----- --------- ---- -- --- ---?----'--- - --- ---- - ---- - - ---- ---- ---- ---- ---- - ---- ---- ---- ---- ---- --- ............. 90 100 40 110 120 130 1 0 10 20 30 40 50 60 70 80 (cfs) Discharge ? Primary 1 ' Type 1124-hr 1-Year Storm Rainfall=3.10" WetBasinl 1/7/2011 Printed 1 Prepared by {enter your company name here} Page P ' HydroCAD D 8.50 s/n 004263 0 2007 HydroCAD Software Solutions L Pond 2P: Wet Basin 1 Stage-Area-Storage ' Surface/HorizontaiNgetted Area (sq-ft) 000 16,000 18,000 20,000 000 14 OD0 12 OD0 10 8 22,OD0 ? Surface 0 , , , , 2,000 4,000 6,000 Storage _-------- 811 ----- -- 810 809 -- --- ---- , /.? i r i _ ---- y --- -- - soy ------------ --- t ---- --- -- C O _ - _ - _ _? _ _ _ _-______ _ _ 805 - > ---- ----- - ----- -----1----- ----------- -- " --- W 804 - ----- - - 802 - - -`-- -----'--------- --------, ---- - 801- ---------- ; - --- 800' p , 100,000 20,000 40,000 60,000 80,000 Storage (cubic-feet) 1 0 WetBasinl Type II 24-hr 1-Year Storm Rainfall=3.10" Printed 1/712011 Prepared by {enter your company name here} Page 8 H ydroCADG) 8.50 ;In 004263 0 2007 HydroCAD Software Solutions LLC HYdrograph for Pond 2P: Wet Basin 1 1 Time Inflow Storage Elevation Primary (hours) (cfs) (cubic-fee) 9 90 ( 00 0 0.00 79 0.00 . 00 4 0.00 0 799.90 0.00 . 00 8 0.00 0 799.90 0.00 . 00 12 45.09 35,081 806.70 0.00 . 00 16 1.14 77,131 809.44 0.19 . 00 20 0.66 79,454 809.56 0.70 . 00 24 0.56 79,248 809.55 0.58 . 00 28 0.00 76,057 809.39 0.19 . 00 32 0.00 73,363 809.24 0.18 . 00 36 0.00 70,775 809.10 0.18 . 00 40 0.00 68,297 808.97 0.17 . 00 44 0.00 65,929 808.84 0.16 . 00 48 0.00 63,673 808.71 0.15 . 00 52 0.00 61,531 808.59 0.14 . 00 56 0.00 59,505 808.47 0.14 . 00 60 0.00 57,597 808.35 0.13 . 00 64 0.00 55,808 808.25 0.12 . 00 68 0.00 54,140 808.15 0.11 . 00 72 0.00 52,595 808.05 0.10 . 00 76 0.00 51,175 807.96 0.09 . 00 80 0.00 49,882 807.88 0.09 . 00 84 0.00 48,721 807.80 0.08 . 00 88 0.00 47,693 807.73 0.07 . 00 92 0.00 46,803 807.67 0.06 . 00 96 0.00 46,077 807.62 0.04 . 00 100 0.00 45,522 807.58 0.03 . 00 104 0.00 45,104 807.55 0.02 . 00 108 0.00 44,838 807.53 0.01 . 00 112 0.00 44,677 807.52 0.01 . 00 116 0.00 44,581 807.51 0.01 . 00 120 0.00 44,522 807.51 0.00 . 00 124 0.00 44,487 807.50 0.00 . 00 128 0.00 44,466 807.50 0.00 . 00 132 0.00 44,454 807.50 0.00 . 00 136 0.00 44,446 807.50 0.00 . 00 140 0.00 44,441 807.50 0.00 . 00 144 0.00 44,439 807.50 0.00 . 00 148 0.00 44,437 807.50 0.00 . 00 152 0.00 44,436 807.50 0.00 . 00 156 0.00 44,435 807.50 0.00 . 160.00 0.00 44,435 807.50 0.00 1 1 1 1 WetBasinl Type 1124-hr 1-Year Storm Rainfall=3.10" Prepared by {enter your company name here} Printed 1/7/2011 Pa e 9 H ydroCAD®8 50 s/n 004263 © 2007 HydroCAD Software Solutions LLC Elevation Primary (feet) (cfs) 799.90 0.00 799.96 0.00 800.02 0.00 800.08 0.00 800.14 0.00 800.20 0.00 800.26 0.00 800.32 0.00 800.38 0.00 800.44 0.00 800.50 0.00 800.56 0.00 800.62 0.00 800.68 0.00 800.74 0.00 800.80 0.00 800.86 0.00 800.92 0.00 800.98 0.00 801.04 0.00 801.10 0.00 801.16 0.00 801.22 . 0.00 801.28 0.00 801.34 0.00 801.40 0.00 801.46 0.00 801.52 0.00 801.58 0.00 801.64 0.00 801.70 0.00 801.76 0.00 801.82 0.00 801.88 0.00 801.94 0.00 802.00 0.00 802.06 0.00 802.12 0.00 802.18 0.00 802.24 0.00 802.30 0.00 802.36 0.00 802.42 0.00 802.48 0.00 802.54 0.00 802.60 0.00 802.66 0.00 802.72 0.00 802.78 0.00 802.84 0.00 802.90 0.00 802.96 0.00 Stage-Discharge for Pond 2P: Wet Basin 1 Elevation Primary (feet) (cfs) 803.02 0.00 803.08 0.00 803.14 0.00 803.20 0.00 803.26 0.00 803.32 0.00 803.38 0.00 803.44 0.00 803.50 0.00 803.56 0.00 803.62 0.00 803.68 0.00 803.74 0.00 803.80 0.00 803.86 0.00 803.92 0.00 803.98 0.00 804.04 0.00 804.10 0.00 804.16 0.00 804.22 0.00 804.28 0.00 804.34 0.00 804.40 0.00 804.46 0.00 804.52 0.00 804.58 0.00 804.64 0.00 804.70 0.00 804.76 0.00 804.82 0.00 804.88 0.00 804.94 0.00 805.00 0.00 805.06 0.00 805.12 0.00 805.18 0.00 805.24 0.00 805.30 0.00 805.36 0.00 805.42 0.00 805.48 0.00 805.54 0.00 805.60 0.00 805.66 0.00 805.72 0.00 805.78 0.00 805.84 0.00 805.90 0.00 805.96 0.00 8b6.02 0.00 806.08 0.00 Elevation Primary (feet) (cfs) 806.14 0.00 806.20 0.00 806.26 0.00 806.32 0.00 806.38 0.00 806.44 0.00 806.50 0.00 806.56 0.00 806.62 0.00 806.68 0.00 806.74 0.00 806.80 0.00 806.86 0.00 806.92 0.00 806.98 0.00 807.04 0.00 807.10 0.00 807.16 0.00 807.22 0.00 807.28 0.00 807.34 0.00 807.40 0.00 807.46 0.00 807.52 0.01 807.58 0.04 807.64 0.05 807.70 0.06 807.76 0.07 807.82 0.08 807.88 0.09 807.94 0.09 808.00 0.10 808.06 0.10 808.12 0.11 808.18 0.11 808.24 0.12 808.30 0.12 808.36 0.13 808.42 0.13 808.48 0.14 808.54 0.14 808.60 0.15 808.66 0.15 808.72 0.15 808.78 0.16 808.84 0.16 808.90 0.16 808.96 0.17 809.02 0.17 809.08 0.17 809.14 0.18 809.20 0.18 Elevation Primary (feet) (cfs) 809.26 0.18 809.32 0.19 809.38 0.19 809.44 0.19 809.50 0.20 809.56 0.65 809.62 1.48 809.68 2.56 809.74 3.83 809.80 5.27 809.86 6.87 809.92 8.91 809.98 12.89 810.04 16.95 810.10 21.53 810.16 26.76 810.22 32.56 810.28 38.87 810.34 45.62 810.40 52.77 810.46 60.32 810.52 68.13 810.58 75.99 810.64 84.08 810.70 92.38 810.76 101.35 810.82 110.61 810.88 120.12 810.94 130.07 811.00 140.39 r 1 1 Fj LI 1 WetBasinl Type 1124-hr 1-Year Storm Rainfall=3.10" Prepared by {enter your company name here} Printed 1/7/2011 H ydroCADO 8.50 s/n 004263 0 2007 HydroCAD Software Solutions LLC Pane 10 Stage-Area-Storage for Pond 2P: Wet Basin 1 Elevation Surface Storage (feet) (sq-ft) (cubic-feet) 799.90 0 0 800.05 210 20 800.20 234 54 800.35 258 91 800.50 282 131 800.65 306 175 800.80 330 223 800.95 354 274 801.10 382 329 801.25 411 389 801.40 441 453 801.55 470 521 801.70 500 594 801.85 529 671 802.00 560 753 802.15 592 839 802.30 625 930 802.45 657 1,026 802.60 2,141 1,200 802.75 4,350 1,687 802.90 6,559 2,505 803.05 6,710 3,500 803.20 6,862 4,518 803.35 7,014 5,559 803.50 7,165 6,622 803.65 7,316 7,708 803.80 7,468 8,817 803.95 7,619 9,949 804.10 7,777 11,103 804.25 7,937 12,282 804.40 8,096 13,484 804.55 8,256 14,711 804.70 8,416 15,961 804.85 8,576 17,235 805.00 8,736 18,534 805.15 8,906 19,857 805.30 9,076 21,206 805.45 9,247 22,580 805.60 9,417 23,980 805.75 9,587 25,405 805.90 9,757 26,856 806.05 9,931 28,332 806.20 10,111 29,836 806.35 10,291 31,366 806.50 10,472 32,923 806.65 10,652 34,507 806.80 10,832 36,118 806.95 11,012 37,757 807.10 11,544 39,440 807.25 12,251 41,224 807.40 12,958 43,115 807.55 13,685 45,112 Elevation Surface Storage (feet) (sq-ft) (cubic-feet) 807.70 14,450 47,222 807.85 15,215 49,447 808.00 15,980 51,787 808.15 16,311 54,209 808.30 16,643 56,680 808.45 16,974 59,202 808.60 17,306 61,773 808.75 171638 64,393 808.90 17,969 67,064 809.05 18,300 69,784 809.20 18,632 72,554 809.35 18,964 75,374 809.50 19,295 78,243 809.65 19,658 81,165 809.80 20,021 84,140 809.95 20,384 87,171 810.10 20,746 90,256 810.25 21,109 93,395 810.40 21,472 96,588 810.55 21,754 99,834 810.70 21,875 103,107 810.85 21,996 106,397 811.00 22,117 109,705 WetBasinl Prepared by {enter your company name here} t4vHmr.AD(@ 8.50 s/n 004263 © 2007 HydroCAD Soi Type 1124-hr 10-Year Storm Rainfall=5.41 " Printed 117/2011 lions LLC Page 11 Time span=0.00-160.00 hrs, dt=0.04 hrs, 4001 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: DA 1 Runoff Area=22.085 ac 20.87% Impervious Runoff Depth=3.16" Tc=5.0 min CN=79 Runoff=125.89 cfs 5.812 of Pond 2P: Wet Basin 1 Peak Elev=810.62' Storage=101,330 cf Outfl =181.23 cfs 4.792 of Total Runoff Area = 22.085 ac Runoff Volume = 5.812 of Average Runoff Depth = 3.16" 79.13% Pervious =17.475 ac 20.87% Impervious = 4.610 ac r WetBasin1 Type 1124-hr 10-Year Storm Rainfall=5.41" Printed 11712011 Pa a 12 Prepared by {enter your company name here) H droCADO 8.50 s/n 004263 © 20H QAD Software Solutions LLC bcatchment IS: DA 1 Summary for Su Runoff 125.89 cfs @ 11.96 hrs, Volume= 5.812 af, Depth= 3.16" I _ Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-160.00 hrs, dt= 0.04 hrs r Type II 24-hr 10-Year Storm Rainfall=5.41" Area ac CN Description ' 4.610 98 Paved HSG C d , 75 % Grrass cover, Goo ° 22.085 79 Weighted Average 17.475 Pervious Area. 4.610 Impervious Area Tc Length Slope Velocity Capacity Description min feet ftlft ft/sec cfs Direct Entry, 5.0 r Subcatchment IS: DA 1 Hydrograph 140 7 130 12589 cfs Storm Type It2-4=hr 10= 120 ---- --- Rairtfll=5:41 _, - r 110 : -- - ----;---- ------- ---Runoff Area=22:085-ac- -- ---,---- - - 100 -- Ru __...---'- noff V0 l ----- ume--- -----a-f--- -- ---;---- ------- --.._ --- ---- =5.812 1 go- ---- -------- - - epth'=3.16•• Runoff D --- --- -- - - - - - - - - 1 - ------- --- -1------- ---- Tc=5.0 min ' 70 -- ---.,--- ---- N=79 60 50 .' -------- r 40 I _- I - --------- ----- - -----°-- -- 30 ---------____-- --- .. - ----------- r 20 10 -- r p,.. „'. 0 10 100 110 120 130 140 150 16 20 30 40 50 60 70 80 (hours) Time n 1 ' WetBasin1 Type// 24-hr 10-Year Storm Rainfall=5.41 " Printed 1/7/2011 Prepared by {enter your company name here} Pa a 13 ' H droCADO 8.50 s/n 004263 © 2007 H droCAD Software Solutions LLC Hydrograph for Subcatchment 1 S: DA 1 F 1 1 1 1 1 1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.00 0.12 0.00 0.00 4.00 0.26 0.00 0.00 6.00 0.43 0.00 0.00 8.00 0.65 0.00 0.20 10.00 0.98 0.06 1.21 12.00 3.59 1.63 107.93 14.00 4.44 2.32 3.88 16.00 4.76 2.60 2.41 18.00 4.98 2.79 1.88 20.00 5.15 2.93 1.38 22.00 5.29 3.05 1.26 24.00 5.41 3.16 1.16 26.00 5.41 3.16 0.00 28.00 5.41 3.16 0.00 30.00 5.41 3.16 0.00 32.00 5.41 3.16 0.00 34.00 5.41 3.16 0.00 36.00 5.41 3.16 0.00 38.00 5.41 3.16 0.00 40.00 5.41 3.16 0.00 42.00 5.41 3.16 0.00 44.00 5.41 3.16 0.00 46.00 5.41 3.16 0.00 48.00 5.41 3.16 0.00 50.00 5.41 3.16 0.00 52.00 5.41 3.16 0.00 54.00 5.41 3.16 0.00 56.00 5.41 3.16 0.00 58.00 5.41 3.16 0.00 60.00 5.41 3.16 0.00 62.00 5.41 3.16 0.00 64.00 5.41 3.16 0.00 66.00 5.41 3.16 0.00. 68.00 5.41 3.16 0.00 70.00 5.41 3.16 0.00 72.00 5.41 3.16 0.00 74.00 5.41 3.16 0.00 76.00 5.41 3.16 0.00 78.00 5.41 3.16 0.00 80.00 5.41 3.16 0.00 82.00 5.41 3.16 0.00 84.00 5.41 3.16 0.00 86.00 5.41 3.16 0.00 88.00 5.41 3.16 0.00 90.00 5.41 3.16 0.00 92.00 5.41 3.16 0.00 94.00 5.41 3.16 0.00 96.00 5.41 3.16 0.00 98.00 5.41 3.16 0.00 100.00 5.41 3.16 0.00 102.00 5.41 3.16 0.00 Time Precip. Excess Runoff (hours) (in ches) ( inches) (cfs) 104.00 5.41 3.16 0.00 106.00 5.41 3.16 0.00 108.00 5.41 3.16 0.00 110.00 5.41 3.16 0.00 112.00 5.41 3.16 0.00 114.00 5.41 3.16 0.00 116.00 5.41 3.16 0.00 118.00 5.41 3.16 0.00 120.00 5.41 3.16 0.00 122.00 5.41 3.16 0.00 124.00 5.41 3.16 0.00 126.00 5.41 3.16 0.00 128.00 5.41 3.16 0.00 130.00 5.41 3.16 0.00 132.00 5.41 3.16 0.00 134.00 5.41 3.16 0.00 136.00 5.41 3.16 0.00 138.00 5.41 3.16 0.00 140.00 5.41 3.16 0.00 142.00 5.41 3.16 0.00 144.00 5.41 3.16 0.00 146.00 5.41 3.16 0.00 148.00 5.41 3.16 0.00 150.00 5.41 3.16 0.00 152.00 5.41 3.16 0.00 154.00 5.41 3.16 0.00 156.00 5.41 3.16 0.00 158.00 5.41 3.16 0.00 160.00 5.41 3.16 0.00 t 1 1 1 1 1 1 1 WetBasin1 Type 1124-hr 10-Year Storm Rainfall=5.41" Printed 117/2011 Prepared by {enter your company name here} Page 14 Hwirr)CAD® 8.50 s/n 004263 © 2007 HydroCAD Software Solutions LLC Summary for Pond 2P: Wet Basin 1 Inflow Area = 22.085 ac, 20.87% Impervious, Inflow Depth = 3.16" for 10-Year Storm event Inflow = 125.89 cfs @ 11.96 hrs, Volume= 5.812 of Outflow = 81.23 cfs @ 12.03 hrs, Volume= 4.792 af, Atten= 35%, Lag= 4.3 min Primary = 81.23 cfs @ 12.03 hrs, Volume= 4.792 of Routing by Stor-Ind method, Time Span= 0.00-160.00 hrs, dt= 0.04 hrs / 7 Peak Elev= 810.62' @ 12.03 hrs Surf-Area= 21,810 sf Storage= 101,330 cf Plug-Flow detention time= 551.5 min calculated for 4.792 of (82% of inflow) Center-of-Mass det. time= 474.9 min ( 1,291.9 - 817.0) Volume Invert Avail.Stora a Storage Description #1 799.90' 109,705 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sg-ft) ( cubic-feet) cubic-feet 799.90 0 0 0 10 10 800.00 00 801 202 362 282 292 . 801.90 539 405 698 753 802.00 560 668 55 307 1,060 802.50 90 802 6,559 1,445 2,505 . 803.00 6,660 661 3,166 165 10,331 7 804.00 00 805 7,670 8,736 , 8,203 18,534 . 00 806 9,871 9,304 27,837 . 00 807 11,072 10,472 38,309 . 50 807 13,430 6,126 44,434 . 00 808 15,980 7,353 51,787 . 809.50 19,295 26,456 78,243 505 98,748 20 810.50 811.00 21,714 22,117 , 10,958 109,705 Device Routing Invert Outlet Devices #1 Device 3 806.00' ' 24.0" Vert. Orifice/Grate C= 0.600 Orifice/Grate Limited to weir flow C= 0.600 3" Horiz 2 #2 Primary #3 Primary 807.50 809.50' . . 36.0" Horiz. Orifice/Grate Limited to weir flow C= 0.600 dth Broad-Crested Rectangular Weir ' ' #4 Primary 809.90' brea long x 20.0 40.0 Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=78.94 cfs @ 12.03 hrs HW=810.60' (Free Discharge) 2=Orifice/Grate (Orifice Controls 0.24 cfs @ 8.48 fps) L3=Or1fice1G r ate (Passes 15.88 cfs of 35.66 cfs potential flow) -1=Orifice/Grate (Orifice Controls 15.88 cfs @ 5.05 fps) =Broad-Crested Rectangular Weir (Weir Controls 62.81 cfs @ 2.24 fps) r 1 1 1 1 FI 1 1 WetBasin1 Prepared by {enter your company name here) WxArnCADn 8.50 s/n 004263 © 2007 HydroCAD Sol Type II 24-hr 10-Year Storm Rainfall=5.41 " Printed 1/7/2011 Solutions LLC Page 15 Pond 2P: Wet Basin 1 Hydrograph . I FE Inflow ------- ----------- ------- ..--- ----=--- 0 Primary 140 e - -- I nfiowArea-22.08-64C- 130 - _ -- ----------. =__i_= - _-'---- ---- 0 -81 l 120 .__ , ev __ Peak_E 110 ------ ---- ---------- ---- -- - - ____ ----- Stor-age=1-O4;330-cf- - 100 --,-------- --- I - -? - 81.23 tfs 4 w o 80 -' --- -- - ------- ---' --- ------- -------- 70 - - - --- y., 60 40 --- - --- --- --- ------- 30 - - --- - ------- 20 iji? - - 10 Q , .. ,.. ,?,.. .. 40 50 60 70 BO 90 100 110 120 130 140 150 160 0 10 20 30 Time (hours) Pond 2P: Wet Basin 1 Stage-Discharge _ - 27- ? Primary 811 --------!---- - - Bra— rested RettaAgufar Weir 810 OrilidetGrate - - - - - - - + - - ... _ ? I I 809 i I _ - - - ' - - I I _ ---- ---- --- ---- ----r... -------------- ---- - 808 807 - --- } ---- + ---- d - - - - -1 Orificet6rete - - - - - ? - - I - - I 806 --- 0 805 --- ------- ' - --- - -- _ '-- _ - ----'---------- ---- y _ _ _ _ --- _ _ _ _ _ _ _ - w 804 - --- --`- -- ---- 803 ---- ---- 802 I -------------- -- - - - 801 - - -- ---- --------- ---- --- 800 , 90 100 110 120 130 14C 0 0 30 40 10 2 50 6 cfs) Discharge ( Type 1124-hr 10-Year Storm Rainfall=5.41 " WetBasinl Printed 1/7/2011 1 Prepared by {enter your company name here} 4263 02007 H droCAD Software Solutions LLC Pa a 1 ' H droCADG)8.50 s/n 00 Pond 2P: Wet Basin 1 Stage-AreaStorage ' Surface/HorizortalAtietted Area (sq-ft) 000 18,000 20,000 000 16 0 14 22,OD0 ? Surface 0 , , 2,000 4,000 6,000 8000 10,000 12,00 0 Storage 811 -- _. _ _ _ _ _ i. _ _ _ _ _ _I- ------- --- --- "-- -- -- - _ _ _ _ _ _. _ _ _ 810 .__ ___. I I ---- -- ' 809 ___ ---------- ! 1 ____ ? I - ---- --- 808 -- -- --- B07 - a? ' I ---- - ------ ----------- -------- ---r----- ---- --- ?- 80 6 - - - 2 - " - - - - 805- " - - - _ - - - - - - - - - - ' w 604 I I I 803 ' -- --- 802 - - - ? -------------- 801 ;? - -----------...----------- ---- - ----- 800 0 20,000 401'000' 60,000 80,000 100,000 et) f bi . e c- Storage (cu 1 1 1 1 1 1 1 C 1 1 1 F 1 1 I 1 WetBasin1 Type 11 24-hr 10-Year Storm Rainfall=5.41" 1/7/2011 Prepared by {enter your company name here} Printed page 1 1 H ydroCAD®8 50 sln 004263 0 2007 HYdroCAD Software Solutions LLC Hydrograph for Pond 2P: Wet Basin 1 Time Inflow Storage Elevation Primary (hours) (cfs) (cubic-feet) (feet) (cfs) 00 0 0.00 0 799.90 0.00 . 00 4 0.00 0 799.90 0.00 . 00 8 0.20 341 801.13 0.00 . 00 12 107.93 100,185 810.57 74.18 . 00 16 2.41 81,757 809.68 2.59 . 00 20 1.38 801426 809.61 1.47 . 00 24 1.16 80,063 809.59 1.18 . 00 28 0.00 76,247 809.40 0.19 . 00 32 0.00 73,546 809.25 0.18 . 00 36 0.00 70,951 809.11 0.18 . 00 40 0.00 68,465 808.98 0.17 . 00 44 0.00 66,089 808.85 0.16 . 00 48 0.00 63,825 808.72 0.15 . 00 52 0.00 61,675 808.59 0.15 . 00 56 0.00 59,641 808.48 0.14 . 00 60 0.00 57,725 808.36 0.13 . 00 64 0.00 55,928 808.25 0.12 . 00 68 0.00 54,252 808.15 0.11 . 00 72 0.00 52,698 808.06 0.10 . 00 76 0.00 51,269 807.97 0.09 . 00 80 0.00 49,968 807.88 0.09 . 00 84 0.00 48,797 807.81 0.08 . 00 88 0.00 47,760 807.74 0.07 . 00 92 0.00 46,861 807.67 0.06 . 00 96 0.00 46,122 807.62 0.04 . 00 100 0.00 45,556 807.58 0.03 . 00 104 0.00 45,128 807.55 0.02 . 00 108 0.00 44,852 807.53 0.01 . 00 112 0.00 44,686 807.52 0.01 . 00 116 0.00 44,586 807.51 0.01 . 00 120 0.00 44,526 807.51 0.00 . 124.00 0.00 44,489 807.50 0.00 00 128 0.00 44,467 807.50 0.00 . 00 132 0.00 44,454 807.50 0.00 . 00 136 0.00 44,446 807.50 0.00 . 00 140 0.00 44,442 807.50 0.00 . 00 144 0.00 44,439 807.50 0.00 . 00 148 0.00 44,437 807.50 0.00 . 152.00 0.00 44,436 807.50 0.00 00 156 0.00 44,435 807.50 0.00 . 160.00 0.00 44,435 807.50 0.00. l 1 H I J U 1 WetBasin1 Type// 24-hr 10-Year Storm Rainfall=5.41 " Printed 1/712011 Prepared by {enter your company name here} Page 18 Hvrirn(;AD® 8.50 s/n 004263 © 2007 HydroCAD Software Solutions LLC Elevation Primary (feet) (cfs) 799.90 0.00 799.96 0.00 800.02 0.00 800.08 0.00 800.14 0.00 800.20 0.00 800.26 0.00 800.32 0.00 800.38 0.00 800.44 0.00 800.50 0.00 800.56 0.00 800.62 0.00 800.68 0.00 800.74 0.00 800.80 0.00 800.86 0.00 800.92 0.00 800.98 0.00 801.04 0.00 801.10 0.00 801.16 0.00 801.22 0.00 801.28 0.00 801.34 0.00 801.40 0.00 801.46 0.00 801.52 0.00 801.58 0.00 801.64 0.00 801.70 0.00 801.76 0.00 801.82 0.00 801.88 0.00 801.94 0.00 802.00 0.00 802.06 0.00 802.12 0.00 802.18 0.00 802.24 0.00 802.30 0.00 802.36 0.00 802.42 0.00 802.48 0.00 802.54 0.00 802.60 0.00 802.66 0.00 802.72 0.00 802.78 0.00 802.84 0.00 802.90 0.00 802.96 0.00 Stage-Discharge for Pond 2P: Wet Basin 1 Elevation Primary (feet) (cfs) 803.02 0.00 803.08 0.00 803.14 0.00 803.20 0.00 803.26 0.00 803.32 0.00 803.38 0.00 803.44 0.00 803.50 0.00 803.56 0.00 803.62 0.00 803.68 0.00 803.74 0.00 803.80 0.00 803.86 0.00 803.92 0.00 803.98 0.00 804.04 0.00 804.10 0.00 804.16 0.00 804.22 0.00 804.28 0.00 804.34 0.00 804.40 0.00 804.46 0.00 804.52 0.00 804.58 0.00 804.64 0.00 804.70 0.00 804.76 0.00 804.82 0.00 804.88 0.00 804.94 0.00 805.00 0.00. 805.06 0.00 805.12 0.00 805.18 0.00 805.24 0.00 805.30 0.00 805.36 0.00 805.42 0.00 805.48 0.00 805.54 0.00 805.60 0.00 805.66 0.00 805.72 0.00 805.78 0.00 805.84 0.00 805.90 0.00 805.96 0.00 806.02 0.00 806.08 0.00 Elevation Primary (feet) cfs) 806.14 0.00 806.20 0.00 806.26 0.00 806.32 0.00 806.38 0.00 806.44 0.00 806.50 0.00 806.56 0.00 806.62 0.00 806.68 0.00 806.74 0.00 806.80 0.00 806.86 0.00 806.92 0.00 806.98 0.00 807.04 0.00 807.10 0.00 807.16 0.00 807.22 0.00 807.28 0.00 807.34 0.00 807.40 0.00 807.46 0.00 807.52 0.01 807.58 0.04 807.64 0.05 807.70 0.06 807.76 0.07 807.82 0.08 807.88 0.09 807.94 0.09 808.00 0.10 808.06 0.10 808.12 0.11 808.18 0.11 808.24 0.12 808.30 0.12 808.36 0.13 808.42 0.13 808.48 0.14 808.54 0.14 808.60 0.15 808.66 0.15 808.72 0.15 808.78 0.16 808.84 0.16 808.90 0.16 808.96 0.17 809.02 0.17 809.08 0.17 809.14 0.18 809.20 0.18 Elevation Primary (feet) cfs 809.26 0.18 809.32 0.19 809.38 0.19 809.44 0.19 809.50 0.20 809.56 0.65 809.62 1.48 809.68 2.56 809.74 3.83 809.80 5.27 809.86 6.87 809.92 8.91 809.98 12.89 810.04 16.95 810.10 21.53 810.16 26.76 810.22 32.56 810.28 38.87 810.34 45.62 810.40 52.77 810.46 60.32 810.52 68.13 810.58 75.99 810.64 84.08 810.70 92.38 810.76 101.35 810.82 110.61 810.88 120.12 810.94 130.07 811.00 140.39 n I I 1 ?I 1 1 1 WetBasin1 Type 1124-hr 10-Year Storm Rainfall=5.41" Printed 1/7/2011 Prepared by {enter your company name here} Page 19 HvdroCAD(D 8.50 s/n_004263 © 2007 HydroCAD Software Solutions LLC Stage-Area-Storage for Pond 2P: Wet Basin 1 Elevation Surface Storage Elevation Surface (sq-ft) Storage (cubic-feet) (feet) s -ft) (g (cubic-feet) 0 (feet) 70 807 14,450 47,222 799.90 0 210 20 . 807.85 15,215 49,447 800.05 234 54 808.00 15,980 51,787 800.20 258 91 808.15 161311 54,209 800.35 282 131 808.30 16,643 56,680 800.50 306 175 808.45 16,974 59,202 800.65 330 223 808.60 17,306 61,773 800.80 354 274 808.75 17,638 64,393 800.95 382 329 808.90 17,969 67,064 801.10 411 389 809.05 18,300 69,784 801.25 441 453 809.20 18,632 72,554 801.40 470 521 809.35 18,964 75,374 801.55 500 594 809.50 19,295 78,243 801.70 529 671 809.65 19,658 81,165 801.85 560 753 809.80 20,021 84,140 802.00 592 839 809.95 20,384 87,171 802.15 802.30 625 930 810.10 5 20,746 109 21 90,256 93,395 802.45 657 1 1,026 200 1 810.2 810.40 , 21,472 96,588 802.60 5 2,14 350 4 , 687 1 810.55 21,754 99,834 802.7 802.90 , 6,559 , 2,505 810.70 21,875 996 21 103,107 106,397 803.05 6,710 2 3,500 518 4 810.85 811.00 , 22,117 109,705 803.20 6,86 , 803.35 7,014 5,559 803.50 7,165 6,622 803.65 7,316 7,708 803.80 7,468 8,817 803.95 7,619 9,949 804.10 7,777 11,103 804.25 7,937 12,282 804.40 8,096 13,484 804.55 8,256 14,711 804.70 8,416 15,961 804.85 8,576 17,235 805.00 8,736 18,534 805.15 8,906" 19,857 805.30 9,076 21,206 805.45 9,247 22,580 805.60 9,417 23,980 805.75 9,587 25,405 805.90 9,757 26,856 806.05 9,931 28,332 806.20 10,111 29,836 806.35 10;291 31,366 806.50 10,472 32,923 806.65 10,652 34,507 806.80 10,832 36,118 806.95 11,012 37,757 807.10 11,544 39,440 807.25 12,251 41,224 807.40 12,958 43,115 807.55 13,685 45,112 WetBasinl Type 1124-hr 25-Year Storm Rainfall=6.46" Printed 117!2011 Prepared by {enter your company name here} Paae 20 H ydroCAD®8 50 sin 004263 ©2007 HydroCAD Software Solutions LLC Time span=0.00-160.00 hrs, dt=0.04 hrs, 4001 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: DA 1 Runoff Area=22.085 ac 20.87% Impervious Runoff Depth=4.09" Tc=5.0 min CN=79 Runoff=161.37 cfs 7.533 of Pond 2P: Wet Basin 1 Peak Elev=810.99' Storage=109,449 cf Inflow=161.37 cfs 7.533 of Outflow=138.41 cfs 6.510 of Total Runoff Area = 22.085 ac Runoff Volume = 7.533 of Average Runoff Depth = 4.09" 79.13% Pervious= 17.475ac 20.87% Impervious= 4.610 ac ' Wet6asinl Type 1124-hr 25-Year Storm Rainfall=6.46" Printed 1/7/2011 Prepared by {enter your company name here} Pa a 21 H droCAD® 8.50 ;/n004263 02007 H droCAD Software Solutions LLC Summary for Subcatchment 1 S: DA 1 ' 7.533 af, Depth= 4.09" Runoff 161.37 cfs @ 11.96 hrs, Volume= Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-160.00 hrs, dt= 0.04 hrs Type II 24-hr 25-Year Storm Rainfall=6.46" Area ac CN Description 1 610 98 4 Paved parking & roofs . 17.475 74 >75% Grass cover, Good, HSG C 22.085 79 Weighted Average ' 17.475 Pervious Area 4.610 Impervious Area Tc Length Slope Velocity Capacity Description min feet ftlft ft/sec (cfs 5.0 Direct Entry, Subcatchment 1 S: DA 1 Hydrograph -- ?RUn01, -- __ ---- - ? 180 ------- - ,--------- - - - _ ---- -- --- 170 ,6, 3, cf5 - _- - - - - - - - - - - - - - 25-Yeax Storm T e it 24-hr ? ? ,so " -- "50 - ---- - Rainfa11=6:46"_ - - - - - -- -_ - ---- -- 140 - _ - -- --'- -------- ------- -- _- -- -1---- --- - 22. -08__ac _ rea, ff Runo 130 ,--- - _ _ _ - - -- --- ?,---- --- --- ;---- -------- -- 513-af - Rur?of?V?oiur>?e=7 120 ,1D "?,. , ; -;---- -,---- --Runoff-Dep?h=A?:O?'f- --------- y 100 - - - - - - - - 1 - - - -- c=5Qmin_ --- -- T so -- 80 _ -------- _ --- ----'---- -------- --- --- --- --- ---CN=7- ------ --- ---- -------- ---. - --- ---- --- r -------- -- 7D -- ----- 60- - - - - - - - - - - - - - - - - - - - - - - - - - - - - -------- ----'---- --- ----'---- ---- - --- ---- 40 --- 30- - _- - 1 20 - _-- --_ __ __- -' -_ -- - - - _- / / 10 f r 0,,.".. ,, ,. 0 1 0 0 2D 30 40 50 60 70 100 110 120 130 140 150 160 1 Time (hours) 1 1 1 WetBasin1 Type 1124-hr 25-Year Storm Rainfall=6.46" Printed 117/2011 Prepared by {enter your company name here} Page 22 HvdroCAD(D 8.50 s/n 004263 © 2007 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 1S: DA 1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.00 0.14 0.00 0.00 4.00 0.31 0.00 0.00 6.00 0.52 0.00 0.00 8.00 0.78 0.02 0.49 10.00 1.17 0.12 1.91 12.00 4.28 2.20 137.45 14.00 5.30 3.06 4.83 16.00 5.68 3.40 2.99 18.00 5.95 3.63 2.33 20.00 6.15 3.81 1.70 22.00 6.31 3.96 1.56 24.00 6.46 4.09 1.43 26.00 6.46 4.09 0.00 28.00 6.46 4.09 0.00 30.00 6.46 4.09 0.00 32.00 6.46 4.09 0.00 34.00 6.46 4.09 0.00 36.00 6.46 4.09 0.00 38.00 6.46 4.09 0.00 40.00 6.46 4.09 0.00 42.00 6.46 4.09 0.00 44.00 6.46 4.09 0.00 46.00 6.46 4.09 0.00 48.00 6.46 4.09 0.00 50.00 6.46 4.09 0.00 52.00 6.46 4.09 0.00 54.00 6.46 4.09 0.00 56.00 6.46 4.09 0.00 58.00 6.46 4.09 0.00 60.00 6.46 4.09 0.00 62.00 6.46 4.09 0.00 64.00 6.46 4.09 0.00 66.00 6.46 4.09 0.00 68.00 6.46 4.09 0.00 70.00 6.46 4.09 0.00 72.00 6.46 4.09 0.00 74.00 6.46 4.09 0.00 76.00 6.46 4.09 0.00 78.00 6.46 4.09 0.00 80.00 6.46 4.09 0.00 82.00 6.46 4.09 0.00 84.00 6.46 4.09 0.00 86.00 6.46 4.09 0.00 88.00 6.46 4.09 0.00 90.00 6.46 4.09 0.00 92.00 6.46 4.09 0.00 94.00 6.46 4.09 0.00 96.00 6.46 4.09 0.00 98.00 6.46 4.09 0.00 100.00 6.46 4.09 0.00 102.00 6.46 4.09 0.00 Time Precip. Excess Runoff (hours) ( inches) (inches) cfs 104.00 6.46 4.09 0.00 106.00 6.46 4.09 0.00 108.00 6.46 4.09 0.00 110.00 6.46 4.09 0.00 112.00 6.46 4.09 0.00 114.00 6.46 4.09 0.00 116.00 6.46 4.09 0.00 118.00 6.46 4.09 0.00 120.00 6.46 4.09 0.00 122.00 6.46 4.09 0.00 124.00 6.46 4.09 0.00 126.00 6.46 4.09 0.00 128.00 6.46 4.09 0.00 130.00 6.46 4.09 0.00 132.00 6.46 4.09 0.00 134.00 6.46 4.09 0.00 136.00 6.46 4.09 0.00 138.00 6.46 4.09 0.00 140.00 6.46 4.09 0.00. 142.00 6.46 4.09 0.00 144.00 6.46 4.09 0.00 146.00 6.46 4.09 0.00 148.00 6.46 4.09 0.00 150.00 6.46 4.09 0.00 152.00 6.46 4.09 0.00 154.00 6.46 4.09 0.00 156.00 6.46 4.09 0.00 158.00 6.46 4.09 0.00 160.00 6.46 4.09 0.00 1 1 1 1 1 1 1 WetBasin1 Type 1124-hr 25-Year Storm Rainfall=6.46" Prepared by {enter your company name here} Printed 1/7/2011 H ydroCAD0 8 50 s/n 004263 @2007 HydroCAD Software Solutions LLC Page 23 Summary for Pond 213: Wet Basin 1 Inflow Area = 22.085 ac, 20.87% Impervious, Inflow Depth = 4.09" for 25-Year Storm event Inflow = 161.37 cfs @ 11.96 hrs, Volume= 7.533 of Outflow = 138.41 cfs @ 12.00 hrs, Volume= 6.510 af, Atten= 14%, Lag= 2.4 min Primary = 138.41 cfs. @ 12.00 hrs, Volume= 6.510 of Routing by Stor-Ind method, Time Span= 0.00-160.00 hrs, dt= 0.04 hrs / 7 Peak Elev= 810.99' @ 12.00 hrs Surf.Area= 22,108 sf Storage= 109,449 cf Plug-Flow detention time= 420.0 min calculated for 6.510 of (86% of inflow) Center-of-Mass det. time= 355.9 min ( 1,165.5 - 809.6) Volume Invert Avail.Stora a Storage Description #1 799.90' 109,705 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Su rf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 799.90 0 0 0 800.00 202 10 10 801.00 362 282 292 801.90 539 405 698 802.00 560 55 753 802.50 668 307 1,060 802.90 6,559 1,445 2,505 803.00 6,660 661 3,166 804.00 7,670 7,165 10,331 805.00 8,736 8,203 18,534 806.00 9,871 9,304 27,837 807.00 11,072 10,472 38,309 807.50 13,430 6,126 44,434 808.00 15,980 7,353 51,787 809.50 19,295 26,456 78,243 810.50 21,714 20,505 98,748 811.00 22,117 10,958 109,705 Device Routing Invert Outlet Devices #1 Device 3 806.00' 24.0" Vert. Orifice/Grate C= 0.600 #2 Primary 807.50' 2.3" Horiz. Orifice/Grate Limited to weir flow C= 0.600 #3 Primary 809.50' 36.0" Horiz. Orifice/Grate Limited to weir flow C= 0.600 #4 Primary 809.90' 40.0' long x 20.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=137.68 cfs @ 12.00 hrs HW=810.98' (Free Discharge) 2=Orifice/Grate (Orifice Controls 0.26 cfs @ 8.99 fps) 3=Orifice/Grate (Passes 18.43 cfs of 41.47 cfs potential flow) t1=Orifice/Grate (Orifice Controls 18.43 cfs @ 5.87 fps) =Broad-Crested Rectangular Weir (Weir Controls 118.99 cfs @ 2.74 fps) 1 1 1 1 1 1 1 11 1 1 WetBasinl Type 1124-hr 25-Year Storm Rainfall=6.46" Prepared by {enter your company name here} Printed 1/7/2011 H ydroCAD0 8 50 s/n 004263 02007 HydroCAD Software Solutions LLC Page 24 Pond 2P: Wet Basin 1 Hydrograph -- --- --- --- -- Inflow ------- I D Primary 180 170 : - . - -- ---- -- - - - - - - - - - ----; --- - --- ---- -------- -- --- Intow Area=22.08-5 ac - - 160 , -- --'---- --- -- ------ ------- ------------ --- 15D : . 140 :" 138.41 cis --r- ------- -- - --------I--- - - - - - - e=1-OJ-449-cf- - -Stora 30 g I 120 -- _..------ - 110 _ • .___.______-_ _ ___ -------- I v 90 - I ° 80 -- - --- - : 70 " ----...-- -- - - 60 " . -- - --------'---- --- ----------- --- --- 50 --- - - - - - - ------ ------- 30 _ -. I - - -' -- - 20- I f- '7 1 ? 10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 16 Time (hours) Pond 2P: Wet Basin 1 Stage-Discharge 811. I,- .-- -T-. _ G--- -- --__ --- _ ' ? Primary - - - BriYaf#?a$ d'ReEtat'g r Weir 810 ritice((XriaCe 809 I 1 I 808 Oriic?10rate I I I 807 I -- - - OnficeiGrate - - - - - 806 p ---r ---r- -- ---- - -- - - - -- 1" - - - - i 805 _ _ _ _ L _ _ _ _ _ _ _ _ L w 804 I I ' _ ---- --- 803 I ---- ---- ---- r ----- ---- ---- ---- ---- ---- --- ---- I I I 1 802 i ?? _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -i---- - ---- ----- ---- -------- I 801 ' ? 1 800 ,. ...,' .. 20 30 40 50 60 70 80 90 100 110 120 130 140 0 10 Discharge (cfs) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 WetBasin1 Type Il 24-hr 25-Year Storm Rainfall=6.46" Printed 1/7/2011 Prepared by {enter your company name here} Page 25 HvriroCAD(D 8.50 s/n 004263 © 2007 HydroCAD Software Solutions LLC Pond 2P: Wet Basin 1 Stage-Area-Sto rage Surface/HorizontalMletted Area (sq-ft) OOD ODO 16 00 14 Surface 18,000 20,000 22,000 ? 0 , , 2,000 4,000 6,000 8,000 10,000 12,0 D Storage ------- I ------ ------ ___-_1.______i 811 -- ---- - ----- 810 - - - ----- -- - - - - - - - - - - - - - - -- - - - - -- - - - - - - - - - - ---- 608 - - ---- ----------- 807 - -? - - - i I I I ----- - --- , - ------------- M ..' 606 - - - - - - - - - - I o ---- ----- - ----- - - - - - - - - - - - ----- - -- - - 805 - - - ---- I ? SR! - ----- ------'----- '----- - - - - - 1 - ---------- w 804 - " --------- . ? j - - - - - - - - - - - - - - - 803 802 ?• - " " - I --- -" ------ . 801 - ---- ----- ; - ----------- ? .tQm Stage data - " 800 ao,ooo 000 40,000 60,000 20 100,000 0 , Storage (cubic-feet) I 1 1 1 1 1 1 1 WetBasin1 Type IF 24-hr 25-Year Storm Rainfall=6.46" Printed 1/7/2011 Prepared by {enter your company name here} Page 26 ?-vHm('AD® 8.50 sin 004263 0 2007 HydroCAD Software Solutions LLC Hydrograph for Pond 2P: Wet Basin 1 Time Inflow Storage Elevation Primary c (hours) (cfs) (cubic-feet) 7(f?e9) o o 0.00 00 4 0.00 0.00 0 799.90 0.00 . 8.00 0.49 1,501 1 802.70 0.00 13 . 9 12.00 00 16 137.45 2.99 82,3 809.79 3 2 . 20.00 1.70 80,867 809.63 1.81 46 1 24.00 1.43 80,414 298 76 809.61 809.40 . 0.19 28.00 00 32 0.00 0.00 , 73,595 809.26 0.18 . 36.00 0.00 70,998 809.12 0.18 17 0 40.00 0.00 68,510 132 66 808.98 808.85 . 0.16 44.00 00 48 0.00 0.00 , 63,866 808.72 0.15 . 52.00 0.00 61,714 808.60 0.15 14 0 56.00 0.00 59,678 759 57 808.48 808.36 . 0.13 60.00 00 64 0.00 0.00 , 55,960 808.26 0.12 . 00 68 0.00 54,282 808.15 0.11 . 72.00 0.00 52,726 808.06 0.10 09 0 76.00 0.00 51,295 990 49 807.97 807.89 . 0.09 80.00 00 84 0.00 0.00 , 48,818 807.81 0.08 . 88.00 0.00 47,778 807.74 0.07 06 0 92.00 0.00 0 46,876 133 46 807.68 807.62 . 0.04 96.00 00 100 0.0 0.00 , 45,565 807.58 0.03 . 104.00 0.00 45,135 807.55 0.02 01 0 108.00 0.00 44,856 807.53 . 01 0 112.00 0.00 0 44,688 587 44 807.52 807.51 . 0.01 116.00 00 120 0.0 0.00 , 44,526 807.51 0.00 . 124.00 0.00 44,490 807.50 0.00 00 0 128.00 0.00 44,468 454 44 807.50 807.50 . 0.00 132.00 00 136 0.00 0.00 , 44,446 807.50 0.00 . 140.00 0.00 44,442 807.50 0.00 00 0 144.00 0.00 44,439 437 44 807.50 807.50 . 0.00 148.00 00 152 0.00 0.00 , 44,436 807.50 0.00 . 156.00 0.00 44,435 807.50 0.00 00 0 160.00 0.00 44,435 807.50 . 1 1 1 1 1 1 1 WetBasin1 Type 1124-hr 25-Year Storm Rainfall=6.46" Prepared by {enter your company name here} Printed Pa a 1/7/2011 11 H ydroCAD®8 8,50 s/n 004263 0•2007 HydroCAD Software Solutions LLC 9 Elevation Primary (feet) (cfs) 799.90 0.00 799.96 0.00 800.02 0.00 800.08 0.00 800.14 0.00 800.20 0.00 800.26 0.00 800.32 0.00 800.38 0.00 800.44 0.00 800.50 0.00 800.56 0.00 800.62 0.00 800.68 0.00 800.74 0.00 800.80 0.00 800.86 0.00 800.92 0.00 800.98 0.00 801.04 0.00 801.10 0.00 801.16 0.00 801.22 0.00 801.28 0.00 801.34 0.00 801.40 0.00 801.46 0.00 801.52 0.00 801.58 0.00 801.64 0.00 801.70 0.00 801.76 0.00 801.82 0.00 801.88 0.00 801.94 0.00 802.00 0.00 802.06 0.00 802.12 0.00 802'.18 0.00 802.24 0.00 802.30 0.00 802.36 0.00 802.42 0.00 802.48 0.00 802.54 0.00 802.60 0.00 802.66 0.00 802.72 0.00 802.78 0.00 802.84 0.00 802.90 0.00 802.96 0.00 Stage-Discharge for Pond 2P: Wet Basin 1 Elevation Primary (feet) (cfs) 803.02 0.00 803.08 0.00 803.14 0.00 803.20 0.00 803.26 0.00 803.32 0.00 803.38 0.00 803.44 0.00 803.50 0.00 803.56 0.00 803.62 0.00 803.68 0.00 803.74 0.00 803.80 0.00 803.86 0.00 803.92 0.00 803.98 0.00 804.04 0.00 804.10 0.00 804.16 0.00 804.22 0.00 804.28 0.00 804.34 0.00 804.40 0.00 804.46 0.00 804.52 0.00 804.58 0.00 804.64 0.00 804.70 0.00 804.76 0.00 804.82 0.00 804.88 0.00 804.94 0.00 805.00 0.00 805.06 0.00 805.12 0.00 805.18 0.00 805.24 0.00 805.30 0.00 805.36 0.00 805.42 0.00 805.48 0.00 805.54 0.00 805.60 0.00 805.66 0.00 805.72 0.00 805.78 0.00 805.84 0.00 805.90 0.00 805.96 0.00 806.02 0.00 806.08 0.00 Elevation Primary (feet) (cfs) 806.14 0.00 806.20 0.00 806.26 0.00 806.32 0.00 806.38 0.00 806.44 0.00 806.50 0.00 806.56 0.00 806.62 0.00 806.68 0.00 806.74 0.00 806.80 0.00 806.86 0.00 806.92 0.00 806.98 0.00 807.04 0.00 807.10 0.00 807.16 0.00 807.22 0.00 807.28 0.00 807.34 0.00 807.40 0.00 807.46 0.00 807.52 0.01 807.58 0:04 807.64 0.05 807.70 0.06 807.76 0.07 807.82 0.08 807.88 0.09 807.94 0.09 808.00 0.10 808.06 0.10 808.12 0.11 808.18 0.11 808.24 0.12 808.30 0.12 808.36 0.13 808.42 0.13 808.48 0.14 808.54 0.14 808.60 0.15 808.66 0.15 808.72 0.15 808.78 0.16 808.84 0.16 808.90 0.16 808.96 0.17 809.02 0.17 809.08 0.17 809.14 0.18 809.20 0.18 Elevation Primary (feet) (cfs) 809.26 0.18 809.32 0.19 809.38 0.19 809.44 0.19 809.50 0.20 809.56 0.65 809.62 1.48 809.68 2.56 809.74 3.83 809.80 5.27 809.86 6.87 809.92 8.91 809.98 12.89 810.04 16.95 810.10 21.53 810.16 26.76 810.22 32.56 810.28 38.87 810.34 45.62 810.40 52.77 810.46 60.32 810.52 68.13 810.58 75.99 810.64 84.08 810.70 92.38 810.76 101.35 810.82 110.61 810.88 120.12 810.94 130.07 811.00 140.39 r 1 ?I 1 1 1 1 11 1 WetBasinl Type 1124-hr 25-Year Storm Rainfall=6.46" Printed 1/7/2011 Prepared by {enter your company name here} Page 11 HvdroCAD®8 50 s/n 004263 © 2007 HydroCAD Software Solutions LLC Stage-Area-Storage for Pond 2P: Wet Basin 1 Elevation Surface Storage (feet) (sq-ft) (cubic-fee 799.90 0 o 800.05 210 20 800.20 234 54 800.35 258 91 800.50 282 131 800.65 306 175 800.80 330 223 800.95 354 274 801.10 382 329 801.25 411 389 801.40 441 453 801.55 470 521 801.70 500 594 801.85 529 671 802.00 560 753 802.15 592 839 802.30 625 930 802.45 657 1,026 802.60 2,141 1,200 802.75 4,350 1,687 802.90 6,559 2,505 803.05 6,710 3,500 803.20 6,862 4,518 803.35 7,014 5,559 803.50 7,165 6,622 803.65 7,316 7,708 803.80 7,468 8,817 803.95 7,619 9,949 804.10 7,777 11,103 804.25 7,937 12,282 804.40 8,096 13,484 804.55 8,256 14,711 804.70 8,416 15,961 804.85 8,576 17,235 805.00 8,736 18,534 805.15 8,906 19,857 805.30 9,076 21,206 805.45 9,247 22,580 805.60 9,417 23,980 805.75 9,587 25,405 805.90 9,757 26,856 806.05 9,931 28,332 806.20 10,111 29,836 806.35 10,291 31,366 806.50 10,472 32,923 806.65 10,652 34,507 806.80 10,832 36,118 806.95 11,012 371757 807.10 11,544 39,440 807.25 12,251 41,224 807.40 12,958 43,115 807.55 13,685, 45,112 Elevation Surface Storage (feet) (sq-ft) (cubic-feet) 807.70 14,450 47,222 807.85 15,215 49,447 808.00 15,980 51,787 808.15 16,311 54,209 808.30 16,643 56,680 808.45 16,974 59,202 808.60 17,306 61,773 808.75 17,638 64,393 808.90 17,969 67,064 809.05 18,300 69,784 809.20 18,632 72,554 809.35 18,964 75,374 809.50 19,295 78,243 809.65 19,658 81,165 809.80 20,021 84,140 809.95 20,384 87,171 810.10 20,746 90,256 810.25 21,109 93,395 810.40 21,472 96,588 810.55 21,754 99,834 810.70 21,875 103,107 810.85. 21,996 106,397 811.00 22,117 109,705 1 n 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 NmNMed:an Sinn CADS V. 4.3 i?1?92D10I PMfDAPUiED BY: RHH ?ROJECi W4ME: Fedla: Commnas CeNVPh1 i'RWEC7 N0.: 09.?n6 0 Rom 51ATILPQf CK 9ain1 RD 6TATIONlHEAOf: Fvebw WE :59WNaGE A.9EA tESpves ;DE516N FfiE11E HYDR4ULIC RESULTS P95D In-D.MoI - Dedvlpr FW Fhxr Vebily llB: 4me lae.lil Netieu5a NamN IJc Fed:d lh:dRcSo+sBB Dedh11B ?Bg D.9 7719 3.21 0.39 D<9 T \ tl J1 LL 'WiOIh??DO P3.B 0 Nd m Bcela ^ r• J V MMIm; TYie _ Vcpeativn Civi -k:¢lo Famcs6b CeL iWed 5elery ie:iv firmed:: Reey: IebAu An a Derau T Cl BMe: Blip 5hes 5bev Blapie Peuun an yP Phew SVegN P50 veP?adrn 3 C M'n 755 11.00 I?-BB 1.C9 STAB IE BTI BLE 51a0ieE Si F Bend S2a25:9 1.28 . D.J. to 1-1 $vc: ???=?_XXXXX?XXX?XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX RTH AMERICAN GREEN EROSION CONTROL MATERIALS DESIGN SOFTWARE VERSION 4.3 t RTH AMERICAN GREEN CHANNEL PROTECTION ENGLLIS/S.I. USER SPECIFIED CHANNEL LINING BACK-UP COMPUTATIONS OJECT NO.: 09.00116 ROJECT NAME: Foothills Commerce Center - 1119/2010 ?OMPUTED BY: RHH DATE: Forebay NE FROM STATION/REACH: Basin 1 DESOGN _FREQUENCY' .1 Yeah Storm ?RA{NAGE AREA: 15.5 Acres INPUT PARAMETERS 'Y X ? X XX ?. X X XX X X'.. X .'. XX* n X .'...y.-..'. X'. X .1. .'?. X.? X'.:: R ]ty. X.'. ): .'...'.'`. X X .'...'.. ?.'..-. 5:::.-. .. .y..?• .-.'.. ?.'..'r. hannel Discharge : 35.9 cfs (1.02 m^3/s) eak Flow Period : 0.5 hours Channel Slope : 0.417 ft/ft (0.417 m/m) hannel Bottom Width : 5.0 ft (1.52 m) ElLeft Side Slope :3:1 Right Side Slope :3:1 ,Channel Lining : P550 Staple E Mix 75-95% Permi. Shear(Tp) :14.00 psf (670.3 Pa) ' Phase = 3 Class = C Vegetation Soil =Fine Sand Allowable Soil Shear(Ta):3.25 psf (155.61 Pa) ' -.t - .t.'.:...'.X.'i..'..f..i.tE.'t.C)..?*?.'C.ii:.'.'.*'?•i.?..•u.K?????'.i.'...'i..i...'u.?y.F.?1..'.'.j:'i.i: ?.'..'. .?. .a.?..'. .'.'.. CALCULATIONS ::??????????????????:XXXXXXXXXXXXXXXXXXX?X?XXXXXXXXXXXXX*???XXXXXXXXXXXXXXXXX Initial Depth Estimate = 0.16 X (35.9 /(0.417"0.5))^0.375 = 0.72 ft (.22 m) ' Final Channel Depth (after 6 iterations) =.49 ft (0.15 m) Flow Area = (5.0 X 0.5)+(0.5 X0.49"2 X (3.0+3.0)) = 3.2 sq.ft (0.3 m^2) Wet Per. =5.0 +(0.5X(((3.0"2)+1)^.5 +((3.0^2)+1)".5)) = 8.1 ft (2.5 m) Hydraulic Radius = (3.2 / 8.1) = 0.4 ft (0.1 m) Channel Velocity =(1.486/0.046)(0.4^0.667)X(0.417^.5) = 11.2 fps (3.4 rn/s) I Channel Effective Manning's Roughness = 0.046 Calculated Shear (Td) = 62.4 X 0.49 ° 0.417 = 12.88 psf (616.6 Pa) Safety Factor = (Tp/Td) = (14.00 112.88) = 1.09 Effective Stress on B{anket(? - e) - - 12.9°(1 -0.75)X(10.046)^2 = 2.54 psf (121.6 Pa) Safety Factor = (Ta/Te) = (3.25 /2.539) 1.28 1 11 1 1 1 Nmlh Amedun SrzenECNDS Veeaon 4.3 111/7:D10''J3ti12MIC01APU i ED BY: RHN , mx +N0IECT NAME: FeodA: Cemm Cerem PNt b 5 IMUECI W0: Oi001T6 1 Amc RMAGE AREA: 4 gESIGN FREOIIENCt: i•Yeu Slam av RO STATION/REA6i Faa ROMSTATIONk1FAru. Berm t . IiypRAULIC RESULTS 0oeheipe PneA Fbw decry Iip: Am Ix.IU Hydeufic Noinid 1c1s1 pyad Aa:1 Reiu0ll Demh IIII PSO Irn00.41 9.5 DS 431 220 O.ID C.36 \ S • B?0 e.0 Bollem WWIh-°.0011 3. Nol 1. 5cde "ER RESULTS ' Mal4np Type Yepyielion Cnmekic Rush I6ley v Func:ole CdoMled e Denny Shea Slma 3heu She= T 0 Ph Solely Faam Fenmk: - - yp Slepie PAC, ShawN F50 Vep-l*, 3 C Wie 755:: 14.00 512 273 S-LE StepkE SW Fme fiend ..SO 0?°a Bea SiASL 1 1 1 1 1 1 1 1 B , w lnw s- 1 PORTH AMERICAN GREEN EROSION CONTROL MATERIALS DESIGN SOFTWARE VERSION 4.3 ORTH AMERICAN GREEN CHANNEL PROTECTION - ENGLISH/S.I. SER SPECIFIED CHANNEL LINING BACK-UP COMPUTATIONS IROJECT NAME: Foothills Commerce Center - Ph.1 PROJECT NO.: 09.00116 OMPUTED BY: RHH DATE: 11119/2010 ROM STATION/REACH: Basin 1 TO STATION/REACH: Forebay S RAINAGE AREA: 4.1 Acres DESIGN FREQUENCY: 1-Year Storm INPUT PARAMETERS khannel Discharge : 9.5 cfs (.27 MA 31s) Flow Period 0.5 hours feak hannel Slope : 0.227 ft/ft (0.227 m/m) Channel Bottom Width : 5.0 ft (1.52 m) Left Side,Slope :31 'Right Side Slope : 3:1 Lining : P550 Staple E Mix 75-95% ,Channel Permi. Shear(Tp) :14.00 psf (670.3 Pa) Phase = 3 Class= C Vegetation ' Soil =Fine Sand Allowable Soil Shear(Ta):3.25 psf (155.61 Pa) CALCULATIONS Initial Depth Estimate = 0.16 * 9.5 1(0.227 A0 .5))Ao .375 = 0.49 ft (.15 m) Final Channel Depth (after 8 iterations) =.36 ft (0.11 m) ' Flow Area = (5.0 * 0.4)+(0.5 *0.36"2 * (3.0+3.0)) = 2.2 sq.ft (0.2 m^2) Wet Per. =5.0 +(0.4*(((3.0^2)+1)^.5 +((3.0^2)+1)^.5)) = 7.3 ft (2.2 m) Hydraulic Radius = (2.217.3) = 0.3 ft (0.1 m) ' Channel Velocity =(1.486/0.074)*(0.3"0.667)*(0.227^.5) = 4.3 fps (1.3 m/s) Channel Effective Manning's Roughness = 0.074 ' Calculated Shear (Td) = 62.4 * 0.36 * 0.227 = 5.12 psf (245.2 Pa) Safety Factor = (Tp/ c d) = (14.0015.12) = 2.73 ' Effective Stress on Blanket(Te) = 5.1*(1-0.75)*(10.074)^2 = 0.39 psf (18.9 Pa) Safety Factor = (Ta/Te) = (3.25 /0.395) = 8.23 II T. f CCMU,.`V a3 .. Pf ( 1.1 NAMC FadhN Cemm f m1 ' """ Ir I AT 1011/FlCALH ION/ FFlDM ?i A1 . Wn E .. F11/011 M1907 AM LOMFhJl C1 BY HHH ..... .... FRIUJELi NO 0 . 1016 .. .. en,lam llRNNAGE AREA 156Aaet DCSIGN fRCOUENC? 1 ? I , o.F?.cc h••••••A.?? .U TS PackPpao lr.o 8801 Di.charpe I. Peak Fbw Pwbd da VekchY Ib. .aea 1.6111 HYdMc Radu Il Namal De Ih BI ' 95.0 0.5 1.13 x0.29 0.52 0.n 0050 9.0 . 1 1 `358 w B dn oll:$.oon ?So Nol m 9cak I? I? 1 1 V V MNtnp Type Ve9eblkm Chnaanistia Pnmdeude LakLLated Sdery Facia Remnk: Reach Slahittg'alynt Sheen Shea Shen She.. 91aok Patlem Phan Lb.. Type Dmsb P.U 1.9 S,,, Rock R'pw Un+eir-d 1.00 0.22 449 STABLE 3'n Beck w hqe Scram . . . . . . . . . . . . . ...... 1 if**************************************************************************** NORTH AMERICAN GREEN EROSION CONTROL MATERIALS DESIGN SOFTWARE VERSION 4.3 J RTH AMERICAN GREEN CHANNEL PROTECTION - ENGLISH/S.I. ER SPECIFIED CHANNEL LINING BACK-UP COMPUTATIONS ***************************************************************************** PROJECT NAME: Foothills Commerce Center MPUTED BY: RHH OM STATION/REACH: Wet Detention Basin INAGE AREA: 19.6 Acres - Ph .1 PROJECT NO.: 09.00116 DATE: 1/11/2011 1 - Forebay Weir DESIGN FREQUENCY: TO STATION/REACH: 1-Year Storm *************************************************************************** INPUT PARAMETERS ***************************************************************************** annel Discharge l ak Flow Period annel Slope annel Bottom Width ft Side Slope Right Side Slope 45.4 cfs (1 0.5 hours 0.005 ft/ft 35.0 ft (10. 25:1 35:1 28 m^3/s) (0.005 m/m) 67 m) Riprap 3in psf (47.9 Pa) 0 Wannel Lining : Rock Permi. Shear(Tp) :1.00 Phase = CALCULATIONS *************************************************************************** Initial Depth Estimate = 0.16 * (45.4 /(0.005A0.5))A0.375 = 1.81 ft (.55 m) 'final Channel Depth (after 11 iterations) _ .71 ft (0.22 m) low Area = (35.0 * 0.7)+(0.5 *0.71A2 * (25.0+35.0)) = 40.3 sq.ft (3.7 MA2) Wet Per. =35.0 + (0 . 7* (((25 . 0A2) +1) A .5 + ((35. 0A2) +1) A . 5) ) = 77.9 ft (23.7 m) fh draulic Radius = (40.3 / 77.9) = 0.5 ft (0.2 m) annel Velocity =(1.486/0.060)*(0.5A0.667)*(0.005A.5) = 1.1 fps (0.3 m/s) Channel Effective Manning's Roughness = 0.060 alculated Shear (Td) = 62.4 * 0.71 * 0.005 = 0.22 psf (10.7 Pa) ?afety Factor = (Tp/Td) _ (1.00 /0.22) = 4.49 1 C 11 ?I 4 cG& A.S S-0 C l A T E. S. Engineering • Planning • Finance wi_aa7 A....,,.'-f.o PA PO- Box 2259. Asheville, NC 28802 r 1 PROJECT: ?oTH IIJ?S ?UMME t IZ?T 'r PROJECT NO.: MPP. 1i0 N?-? DESCRIPTION: CALCULATED BY CHECKED BY: n ATC• 1,1,11 SHEET NO. L OF? ' Permit Number. (to be provided by DW0) ' Drainage Area.Number: Wet Detention Base Operation and Maintenance Agreement I will. keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BN4P elements noted in the inspection will be ' corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. ' The wet detention basin system is defined as the vet detention basin, pretreatment includu1g forebays and the vegetated filter if one is provided. ' This system (check one): ? does ® does not incorporate a vegetated filter at the outlet. This system (clieck one): ? does ® does not incorporate pretreatment other than a forebay. ' Important maintenance procedures: Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). ' - No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. - Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. - If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practicaL - Office a year, a dam safety expert should inspect the embankment. ' After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. 1 BMP element: The entire BAP Potential roblem: Trash debris is resent. How I will remediate the problem: Remove the trash/debris. The perimeter of the wet Areas of bare soil and/or Regra le the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. rVegettVegetation is too short or too Maintain vegetation at a height of long. approximately six inches. ' Form S\71401-Wet Detention Basin O&M-Rev.4 Page 1 of 4 1 1 1 1 1 Permit Number: (to be provided by DKO) Drainage Area Number: BMP element: Potential problem: d Plow I will remediate the problem: Unclog the pipe. Dispose of the The inlet device: pipe or . The pipe is clogge sediment off-site. Swale TI-Le pipe is cracked or Replace the pipe. otherwise dams ed. Erosion is occurring in the Regrade the Swale if necessary to swale smooth it over and provide erosion . control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the diment and remedy the problem if a depth greater than the original design depth for se possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion roblems. Weeds are present. Remove the weeds, preferably by hand.. If pesticide is used, wipe it on the plants rather than --tring. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necess Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the lants rather than s ra ' The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over nsult a professional to remove 50% of the area. d control the a owth. +rRemove Cattails, phragmites or oththe plants by wiping them invasive plants cover 50 a th pesticide (do not spray). the basin surface. Page 2 of 4 Form SW401-Wet Detention Basin O&M-Rev.4 1 1 1 1 1 1 1 1 1 1 1 1 1 1 The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 4L6 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 4.0. feet in the £orebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) Pennanent Pool Elevation 807.5 Sediment Removal 803.5 Pe- nanen Pool _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ Volume Sediment Removal Elevation 802.9 Volmne --------------------------- BottomElevatio 802.5 -ft Min. Bottom Elevation 801.9 1-ft Sediment Sedunei Storage Storage FOREBAY MAIN POND Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 of 4 Permit Number: (to be provided by DlfjO) Drainage Area Number: 1 1 1 1 1 Permit Number: (to be provided by D1f7Q) I acknowledge and agree by my signature below that I am responsible for the of any performance of the maintenance procedures listed above. I agree to notify DWQ problems with the system or prior to any changes to the system or responsible party. Project naMe:Foothills Commerce Center BMP drainage area number: print nanie:Brad Cornwell Title:Public Utilities Director - .. ?, r? T cm Address: Phone Signatur Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. , a Notary Public for the State of ?Y'OII k , County of do hereby certify that b personally appeared before me this 1 2 day of Wm m Y- , Al 10, and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, KAREN DILLEMUTH WILKINS Notary Public, North Carolina Cleveland County My Commission Expires. September 21, 201 3 SEAL Je tai fr aI ' XIb My commission expires Page 4 of 4 ' Form SW40I-Wet Detention Basin o&M-ltev.4 19LIBINC. November 16, 2010 BUNNELL-LAMMONS ENGINEERING, INC. ' GcDTEaimahL, ENV RwaGAL AND C0h5T!a1G70N M&' =MA's CM'SULTAWrS ' McGill Associates, P.A. 55 Broad Street Asheville, Noah Carolina 28801 . ' Attention: Mr. Dale Pennell, P.E., P.L.S. Senior Project Manager ' Subject: Report of Geotechnieal Exploration and Soil Inf oration Testing Foothills Commerce Center ' Phase I Wet Detention Basins Shelby, North Carolina BLE Project No: S10-6667-02 Dear Mr. Pennell: Bunnell-Lammons Engineering, Incorporated (BLE) is pleased to present the geotechnical exploration and infiltration test results for the proposed Phase I Wet Detention Basins for the Foothills Commerce Center project. The - geotechnical exploration and infiltration testing.. was performed generally as described in BLE Proposal No. P10-0672 dated October 21, 2010. The exploration was authorized by your signing our Proposal Acceptance Sheet on November 5, 2010. SITE AND PROJECT DESCRIPTION ' We previously prepared a Report of Preliminary Geotechnical Exploration (BLE Project No. 109- 6667-01) dated September 24, 2009. The preliminary report should be read in conjunction with this report. We have been provided with a drawing titled "Overall Plan," by McGill Associates, P.A. dated July, 2010 showing the planned development, location of wet detention basins and the existing ' topographic contours: The site consists of a 145-acre tract of land generally located within the southeast quadrant of the intersection of Artee and Plato Lee Roads on the west side of Shelby, North Carolina (reference Figure 1). We understand that the property is planned to be an industrial business park. The geotechnical exploration. and infiltration testing for this report are specific to the Phase I Wet Detention Basins, which consists of three basin locations. The basins range' in plan size from 11,926 to 35,625 square feet with maximum depths of 8 to 11 feet. A north-south trending creek divides the property with approximately % of the property located east of the creek. The property east of the creek is used as farmland. The remaining 1/4 of the site located west of the creek was formerly a pine forest that was cleared some time ago and has since become overgrown with brush. The site topography slopes down from the north/northeast to the south/southwest to Little Beaver Dam Creek and then slopes up to the west to Plato Lee Road. The ground surface elevations range from about 800 to 000 feet. 1 Report of Geotechnical Exploration and Soil Infiltration Testing November 16,201 0 B? Project No. November Foothills Commerce Center-Phase I Wet Detention Basins Shelby, North Carolina SB-BSIRFACE EXPLORATION Ten soil test borings (B-1 to B-10) were previously performed as part of the Report of Preliminary Geotechnical Exploration dated September 24, 2009 (reference Figure 1). Three soil test borings (B- 11 to B-13) were performed specific to the Phase I Wet Detention Basins (reference Figure 2) with a Soil Sentry track-mounted drill rig with 21/4-inch inside diameter hollow stem augers for the proposed project. One test boring was drilled near the center of each proposed wet detention basin to depths of 17 to 20 feet. The test boring depth was extended to a minimum of four feet below the proposed bottom at each wet detention basin. >n addition, fourteen infiltration test borings (reference Figure 2). ' were drilled within the footprint of the wet detention basins. Three infiltration test borings (I-1 to I-3) were performed in Basin No. 1, three infiltration test borings (I-4 to I-6) were performed in Basin No. 2 and eight infiltration test borings (I-7 to I-14) were performed in Basin No. 3. Wet Detention Basin No.1 ' Soil Conditions (B-11) - The surface consisted of approximately 5 inches of silty fine sand topsoil. The subsurface soils generally consisted of loose to firm, moist to wet, slightly micaceous silty fine to medium sand to a depth of about 4 feet. The loose to firm sand appeared to be alluvial (water ' deposited) soils. A chemical odor was noted in the soil sample obtained from 41/Z to 6 feet. Beneath the alluvial sand, boring B-11 encountered residual soils that consisted of firm to dense, moist, slightly micaceous silty fine to medium sand to auger refusal at IS feet. Residual soils are soils weathered in- place from the parent rock. Auger refusal likely occurred on partially weathered rock (PWR). Groundwater Conditions - Groundwater was not encountered during the drilling operations. ' Groundwater was encountered at a depth of about 5 feet after 4 days. Based on sample coloration, soil moisture content and observed water levels, the hydrostatic water table was estimated to be at a depth of approximately 5 feet during the observation period. Wet Detention Basin No. 2 ' Sail Conditions (B-12) - The surface consisted of approximately 5 inches of slightly clayey, silty sandy topsoil. The subsurface soils generally consisted of loose to firm, moist, slightly clayey sandy silt to moist, silty fine to medium sand to the boring termination depth of 20 feet. This silty fine to medium sand is residual soil. Residual soils are soils weathered in-place from the parent rock. Groundwater Condition - Groundwater was not encountered during the drilling operations or 4 ' days after the drilling operations. Based on sample coloration, soil moisture content and lack of water, the hydrostatic water table was estimated to be below the test boring depth of 20 feet. Wet Detention Basin No. 3 Soil Conditions (B-13) - The surface consisted of approximately 5 inches of slightly clayey, silty ' sand topsoil. The subsurface soils generally consisted of loose to firm, moist, slightly micaceous, slightly clayey, silty fine sand to a depth of about 14 feet. These soils are residual soils which are weathered in place from the parent rock. Partially weathered rock or boulders were encountered from 14 to 17 feet. Auger refusal material was encountered at 17 feet. ARLIM. November 16, 2©10 Report of Geotechnical Exploration and soil Infiltration Tesdng BLE project No. it 0-6667-02 ' Foothills Commerce Center-Phase I Wet Detention Basins ,Shelby, North Carolina Groundwater Conditions - Groundwater was encountered at a depth of S feet during the drilling of moisture ' operations and at a depth of 6 `/? feet after 4 days. B was amestimated to be at coloration, soil feet during and observed water levels, the hydrostatic water table the observation period. Groundater Considerations Groundwater levels may fluctuate several feet with seasonal eando? rainfall veanoccur in d changes late winter water level in adjacent drainage features. Formally, water table ate wi tis and spring and the lowest levels occur in late summer and fall. The seasonal high estimated to exist at a depth of 5 feet in thevicinity of Wet Detention Basins No. 1 and 3 and below a depth of 20 feet in Wd Detention Basin No. 1. LABORATORY TESTING xT_*-__A Moivhire Content cc, with L The natural moisture content of select soil samples was expressed determined a n e accordan the we fight of? term a The moisture content of the soil is the ratio, P oven mass of soil to the weight of the soil particles. The results are shown on the table below. Percent Piner than 1`e Q. 200 Sieve fines A percent finer than a No. 200 Sieve test was performed ormed on was Washed amover yl a U.S. t dine he ? 00 content of these materials. After initial drying, sample sieve to remove the fines (particles finer than a No. 200 mesh sieve). This testwas performed in a manner similar to that described by ASTM D1140.' The results are shown on table 1 below. TABLE 1- LABORATORY TEST RESULTS Test Depth Natural Moisture Percent Finer than Pdo. 200 C ASS S Soil Sieve (%} Boring No. (feet) Content (%} 24 SM ' B-11 13.5-15.0 12.5 26.7 37 SM B-12 13.5-15.0 38.7 B-13 8.5-10.0 24 SM FILTRATION TEST PROCEDURE AND RESULTS A borehole was drilled and converted to a monitoring well utilizing solid 2-inch diameter PVC casing to a depth of 2 feet below the proposed pond bottom. The infiltration testing was performed in general accordance with Appendix C - Testing Requirements for Subsoils for Infiltration, which is a Volume 2, Vegetative Biofilters part of the Stormwater Best Management Practice. Design Guide, dated September 2004 prepared by the U.S. Environmental Protection Agency. ' Upon completion of the infiltration (monitoring) well, and in accordance with the above referenced testing requirements, the well was then filled with clean water to a depth of 24 inches and allowed to pre- soak for 24 hours. 3 1 1 1 1 1 1 1 1 ?? LIS1NG November I6, 2010 Report of Geotechnical £zploration and Soillnfiltration Testing BLE Project No. J10-6667-02 Foothills Commerce Center-Phase I Wet Detention Basins Shelby, North Carolina Upon 24 hours later, the casing was refilled with clean water to the top of the casing and the water level was monitored (measured) from the top of the casino for 1 hour. This test procedure was repeated 3 additional times for a total of four times. The PVC pipe was left in place for additional testing if required.. BLE can remove the PVC pipe and baclill the borehole with soil if no additi onal testing is required. The average infiltration rate far each wet detention basin is presented in the following tables. CONCLUSIONS AND ALTERNATE LINER REC0>E2YM-' ND'ATIONS The average infiltration test results of 0.55 and 0.46 inch per hour for proposed Basins No. 1 and 3, respectively are in the range of expected values for firm silty sand residual soil encountered by the test borings. The infiltration test result of nearly 60 inches per hour for Basin No. 2 is typical for loose sands. If these infiltration rates are higher than allowable for the basins, a low permeability liner would be ' required. Based on the sandy soils encountered by the test borings, a bentonite clay amended liner is recommended. 4 1 IIL wm November 16, 2010 Report of Geotechnicai Exploraton and Soil Infiltraton Testing BLE project No. JIO-6667-02 1 Foothills Commerce Center - Phase I Wet Detention Basins Shelby, North Carolina iner should be free-flowing, powdered, high-sweIlmg, sodium The bentonite for a low permeability l montmorillonite clay that is free of additives. The bentonite amendment should likely be in the range of 1 3 to 6 Percent by dry weight. The soil used with the bentonrte should be. a silty sand with 100 percent posing the NO. 4 sieve and a maximum of 3 5 percent (preferably 25 percent) passing the Na. 200 sieve. 1 The bentonite should be thoroughly mixed with the native soil using a tiller before adding sufficient water to promote compaction. All f ill used for replacement of material that is undercut or liner should be uniformly compacted in 6-inch lifts to at least 95 percent of the standard Proctor maximum dry density 1 (ASTM D 698) at 2 to 5 percent above the optimum moisture content of the bentonite soil mixture. We recommend laboratory tests be performed with samples of the bentonitelsoil mixture to confirm the required bentonite to achieve the required permeability. At the start of construction, a test pad should be 1 performed at the proposed finished grade within the basin.. The test pad should be performed using the same equipment and construction methods as the actual liner. 'We recommend that the lift thickness be 8 to 10 inches, loose measure before compaction. Infiltration tests should be performed on the test pad to 1 verify acceptable permeability rates. All existing topsoil, vegetation, disturbed soils, and soils containing organic matter or other deleterious 1 materials should be stripped from within the proposed basins. After stripping and rough excavation grading, we recommend that areas to provide support for the liner be carefully inspected for soft surficial soils and proofrolled with a 25-ton, four-wheeled, rubber-tired roller or similar approved equipment. We recommend a visual inspection rather than proofrolling basin areas that are within 2 feet of the 1 groundwater level. The proofroller should make at least four passes over each location, with the last two passes perpendicular to the first two. Any areas which wave, rut, or deflect excessively and continue to do so after several passes of the proofroller should be excavated to firmer soils. The excavated areas ' should be backfilled in thin lifts with suitable compacted fill materials. The proofrolling and excavating operations should be carefully monitored by an experienced engineering technician working under the 1 direct supervision of the geotechnical engineer. We appreciate the opportunity to provide our professional services on this project. If you have any questions regarding this report, please contact us at (828)277-0100. 1 1 Sincerely, BUNNF,LL-L mmONS ENGINEERING, CAI I fr/`,/ E/,?, rte` 1 -_ SAt _ 07 a d _ William T. Gentry III, Gary L. Weekley, P.E. 0330 - P.E. ;F :zz Senior Geotechnical Engineer 1 Senior Engineer ?? ? •. ? ?,? e? ` NC Registration No. 33927 NC Registration No. 8251 NG 1 +'l 7,H C) NS 1 Attachments: Figure 1-Boring Location Plan for Preliminary Geotechnical Exploration Figure 2 - Boring and Infiltration Location Plan for Phase I Wet Detention Basins 1 Field Exploration Procedures Soil Test Boring Logs (3) Key to Soil Classifications and Consistency Descriptions 1 5 1 1 I 1 1 1 1 1 i i i C-1) a C> 0 z m o ? o F- omo C? so o k' k? ?N a? %p ¢DO 0 i a- CM 0 V) ? z m zomz 0 Q W m J o u = R J EJL ZULU uz FB5 ? cc 0 Q Ur ?d ¢o<cn cDpc Z 0 m G o? d < CF--. 0 r o ?Z? ?y r ® ?a Cli m O 1 CV Z O U O p LO i co t O O o ? r 0 Z 0 U o N w a a 6. U O ? Ln p v w O O Q W ? U p < I IRL11. Field Exploration Procedures ' Soil Test Borings The borings were made by mechanically twisting a continuous flight steel auger into the soil. Soil sampling and penetration testing were performed in general accordance with ASTIM D 1586. At ' assigned intervals, soil samples were obtained with a standard 1.4-inch I. D., 2-inch O. D., split-tube sampler. The sampler was first seated 6 inches to penetrate any loose cuttings, and then driven an additional 12 inches with blows of a 140-pound hammer falling 30 inches. The number of hammer ' blows required to drive the sampler the final 12 inches was recorded and is designated the "standard penetration resistance:' The penetration resistance, when properly evaluated, is an index to the strength of the soil and foundation supporting capability. Representative portions of the soil samples, thus obtained, were placed in glass jars and transported ' engineer to verify to the laboratory. In the laboratory, o f ?elthe ler. samples Test were examined Boring ?ced, hg the soil are aita ' the field classifications descriptions and penetration resistance. C 1 1 1 1 1 1 1 1 1 1 1 UL,IBINc. MMEL ENMEEitElG, IMCo uev c COkSFiLTikR'fs ELEVATIDW DEPTH (FT) SOIL TEST BORING NO. R-11 PROJECT: FDOthiils Commerce Center Phase I Viet Detentlan Basins PROJECT No.: J10-6567-02 CLIENT: McGill Associates DATESTART: i0-22-iD END: 10-22-10 ELEVATION: B12.5 LOCATION: Shelby, Worth Carolina DRILLER: Fdretro LOGGED BY: W. Gent- Drill, fnc., R. Frye DRILLING METHOD- Soil Sentry Truck mount; 2-114 inch ID holloW stem auger DEPTH To -WATER> INITIAL, ? dry AFT ER 4 DAYS: ? 5 CAV114G> SOIL DESCRIP 110H w STANDARD PERE iRAT10N RESULTS SOIL ? TYPE BLO14'SIFOOT 2 5 10 20 30 40 50 70 9D 4 7 i 3 9 ., s s .,_...._....:..:...:..:..:.:.. 11 _.......:._.. 16 _ 32 _.._...:..:..:._.. SOIL TEST ECR114GNO. S-1i Sheet i of i 54riches of tan and gray, silty 5Ai U -ktops Laase, moist, silty, rlne tD medium SAND - Bi0 Firm, brown, tan, gray and tuhite, vet, slightly m silty, fine to medium SAND - (alluvium) 5 Chemical odor noted in sample Fto 805 , tan and White, moist, slightly micaceous, um SAND - (residuum) se, black, brown and tan, moist, siightly y, fine to medium SAND - (residuum) silt 10 Boo 15 Boring terminated at 18 feet due to auger refusal. No groundwater encountered attune of drilling, butwas encountered at 5 feet after 4 days. 7B5 30 0 N = 780, 1 1 1 1 1 r J ELIHINC. MMEL"AMMS f.'4F.'.4tlLTkEtTS ELEVATION! DEPTH (Fi) SOIL TEST BORING NO. B42 PROJECT: Foothills Commerce Center Phase 1 Wet Detention Basins PROJECT ND: J14-6667-02 CLIENT: McGill Assoclates DATE START: 10-2240 END: 10-22-10 LOCATION: Shelby, North Carolina ELENIA-11ON: 86610 DRILLER: Metro Drill, inc., R. Frye LOGGED BY: W. GentrY DRILLING METHOD: Soil Sentry Truck mount; 2-114 inch ID hollow stem auger DEPTH TO -WATERS INITIAL: dry AFTER 4 DAYS: dry CAVING? SOIL DESCRIPTION SOIL TYPE yey, silty SAND - ayey, fine to medium STANDARD PENETRATION RESULTS BLOW ISIFOOT 2 5 10 2D 30 4D 50 70 90 ......:........._ 5 ................. $. 5 7 ... 10 :..: ............:..:..:.. :..............:.. ................ ...... .... .... 5 e z................................ a 3 :.....:...:..:..._. 4 :...:.. ®..:..:. :..:.._....:.....:...:..:..:._.. 5 ............ 4 7 7, 7, 7 7 7 7 SOIL TEST BORING NO. B-12 Sheet I of 1 sandy SILT - (residuum) 5 Firm to loose; reddish-brown and tan, moist, slignuy clayey, fine to (medium sandy SILT (residuum) a s55 Loose to firm, tan and white, moist, s SAND -(residuum) 15 B50 2D Boring terminated at 20 feet. No groundwater encountered at time of drilling. 25 640 30 B35 N 35 N 630 i J u ? Z? 0 uj ? 1 SOIL TEST BOFUNG NO. B-13 ?L11INC. NO.: J10?6B7'03 PROJECT: Foothilks Conmerca Center Phase l14'et Detention Basins PROJECT ' L4AMONS CLIENT: R4cGill Associates DATE START: 10-22.10 END: 10-22-10 gMMEL ELEVATION[: 907.0 Gnaaw?EEMC% 01C LOCAL ION: Shelby, Morin inc., . i LOGGED BY- W. Gentry - ' . DRILLER: Metro Drill, ., R. Frrye DRILLING METHOD: Soil Sentry Truck mount; 2-114 finch ID ho[{ow stem auger I;DMLTEKTS 6.5 CAVINU> DEPTH TO - VdATER> Ihn1AL: ? B AFTER 4 DAYS: m SOIL" a' SLDVdS7rO0T ELEVATION! SOIL DESCRtFT I014 STANDARD PayETRRTIDNI RESULTS T DEITi Fi ( (FT) E vi 2 5 i D 2D 30 40 50 70 90 : : : : : ;. : 5-inches of reddish-brown, slightly clayey, silty SAID - :...:......._.._.... ;...._ 3 - 905 Loose to firm, reddish-brown, moist, slightly clayey, silty, 3 fine to medium SAID 5 4 . 5 2 .. - • - - Loose to fl'rrl, reddish-brown and black, moist, micaceous, ? .....:.... ... - ' 900 j silty, fine BAND _ 6 :.....:..:..:.:.. 7 .. ' 1 D Trace rock fragments at 10 feet - 795 ' .or . 72 .. • 5015" • FART[ALLY WEATHERED ROCK which sampled as wet rack 15 fragments with silty sand `:...'..................................... 790 Boring terminated at V feet due to auger refusal. ............ Groundwater encountered at 8 feet at time of drilling and at ............ _ ......:..:..:..:.. 6.5 feet after 4 days. ............... ZD :: ..:...:..:..:.:.. ' 785 • 790 .... ... ................. 30 ... - j 775 o . r 0 T70i ...... :.....'.. . .............. F J SOIL TEST BORING 140. B-13 0 F, Sheet 1 of 1 0 w 1 ECEY TO SOIL CLASSIFICATIONS AND CONSISTENCY DESCRIPTIONS ' BUNNELL-LAfdMONS ENGINEERING, INC. ASHEVILLE, NORTH CAROLINA Penetration Resistance* Relative Particle Size Identmcatlon Biotic per Foot Density aould_r. Greater than h 3D0 min SANDS Cobb)a: 75 to 300 mm ' Very Loose GraveC 4 Coarse - IS to 75 mm D to 5 #010 Loose Firm Fine - 4.75 to 19 mm 51 to 20 Firm 21 to 3D Very Firm Sand: Coarse - 2 to 4.75 mm 31 50 Dense Medium - 0.425 to 2 mn ' avaer r SD Vary Dense Fine - 0.075 to 0,425 mm Slit $ Clay: Less than 0.075 mm Penetration Resistance Consistency Blowsper Foot SILTS d CLAYS 0 to 2 Very SO;t 12 t?uml-r of blows in fist 5 lochs soft 3 to 4 15 Hunber of blows in second 6-inches 5 to a F Fr>rm 16 S0 Number of blows in third 6 fiches 9 to 15 1S6 to to 30 very Hard ff 31 to SD over 50 Very Hard °ASTbh D i5B6 Gr=b Sample Groundwater Table at Time of Dnll'mg _ ® Split Spoon Sample ' GroundwaterTable 24 Hour after Completionaf Drilling ® Undlenurbed Sample KEY TO SOIL CLASSIFICATIONS ° Low Plasticity Clay C1Hyey Silt Silty Sand . SM Well graded Gravel CL M - ® ? GW p 1' - a Q? Poorly-graded Gravel C Sandy Clay MLS Sandy Silt Topsoil TOPSOIL O o GP Partially Weathera:d Rock Silky Clay Sand Bedrock 13Lb12CBBL CL-ML SW BEDROCK J T L: High Plasticity Clay Silt Clayey Sand r <? Concrete CH 5C 1` L A5 ML : < , WET DETENTION BASIN 2 WET DETENTION BASIN SUPPLEMENT- DESIGN SUMMARY WET DETENTION BASIN SUPPLEMENT -REQUIRED ITEMS CHECKLIST TABLE OF ELEVATIONS, AREAS, INCREMENTAL VOLUMES AND ACCUMULATED VOLUMES FOR POND AND FOREBAY CALCULATIONS • GENERAL • DRAWDOWN TIMES • HYDROCAD MODEL • CHANNEL REINFORCEMENT • ANTI-FLOTATION BLOCK OPERATION AND MAINTENANCE AGREEMENT REPORT OF GEOTECHNICAL EXPLORATION AND SOIL INFILTRATION Permit No. (to be provided by DWQ) NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part fit) must be printed, filled out and submitted along with all of the required information. O?O? W ATF9QG y p _ t 11. PROJECT INFORMATION _ °. Project name Foothills Commerce Center - Phase One Contact person Brad Cornwell - City of Shelby - Public Utilities Director Phone number (704) 464-6840 Date 7-Jan-11 Drainage area number 2 II: DESIGN INFORMATION .: Site Characteristics Drainage area 330,165 ft Impervious area, post-development 146,700 ftz % impervious 44.43 % Design rainfall depth 1.0 in Storage Volume: Non-SA Waters Minimum volume required 12,378 ff3 OK Volume provided 30,348 .ff3 OK, volume provided is equal to or in excess of volume required. Storage Volume: SA Waters 1.5" runoff volume ft3 Pre-development 1-yr, 24-hr runoff ff3 Post-development 1-yr, 24-hr runoff it3 Minimum volume required ft3 Volume provided ft3 Peak Flow Calculations Is the pre/post control of the 1 yr 24hr storm peak flow required? Y (Y or N) 1-yr, 24-hr rainfall depth 3.1 in Rational C. pre-development 0.30 (unitless) Rational C, post-development 0.57 (unitless) Rainfall intensity: 1-yr, 24-hr storm 0.13 in/hr OK Pre-development 1-yr, 24-hr peak flow 0.30 ff3/sec Post-development 1-yr, 24-hr peak flow 0.56 ft3/sec Pre/Post 1-yr, 24-hr peak flow control 0.26 ft3/sec Elevations Temporary pool elevation 865.50 fmsl Permanent pool elevation 863.50 fmsl SHWT elevation (approx. at the perm. Pool elevation) fmsl Top of 1 Oft vegetated shelf elevation 864.00 fmsl Bottom of 1 Oft vegetated shelf elevation 863.00 fmsl Sediment cleanout, top elevation (bottom of pond) 858.10 fmsl Sediment cleanout, bottom elevation 857.10 fmsl Sediment storage provided 1.001 Is there additional volume stored above the state-required temp. pool? N (Y or N) Elevation of the top of the additional volume fmsl ' Form SW401-Wet Detention Basin-Rev.8-9/17/09 Parts 1.8 II. Design Summary, Page 1 of 2 ' Permit No. (to be provided by DWr) '? 1f DESIGN 1NFORMA77ON Surface Areas f Z Area, temporary pool t 17,318 264 e 7 ' Area REQUIRED, permanent pool , SAIDA ratio 2.20 (unitless) Area PROVIDED, permanent pool, Apenjool 11,926 ft` OK Area, bottom of 10ft vegetated shelf, Abd Shelf 9,669 ftc Area, sediment cleanout, top elevation (bottom of pond), Abotyo,a 3,539 e Volumes Volume, temporary pool 30,348 ft3 OK Volume, permanent pool, Vpeomyod 37,145 ft3 Volume, forebay (sum of forebays if more than one forebay) 7,124 ft3 Forebay % of permanent pool volume 19.2% % OK ' SAIDA Table Data 90 % Design TSS removal Coastal SAIDA Table Used? N (Y or N) MountainlPiedmont SAIDA Table Used? SAIDA ratio Y (Y or N) 2.20 (unitiess) Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) N (Y or N) Volume, permanent pool, Vperm_pool 37,145 e ' Area provided, permanent pool, A,,,,,od 11,926 ft` Average depth calculated ft Need 3 ft min. Average depth used in SAIDA, d.„ (Round to nearest 0.5ft) ft Calculation option 2 used? (See Figure 10-2b) Y (Y or N) ' Area provided, permanent pool, Aperm-Pod 11,926 fti Area, bottom of 1 Oft vegetated shelf, Abot-SheB 9,669 ft Area, sediment cleanout, top elevation (bottom of pond), Abot pmd 3,539 ft2 ' "Depth" (distance blw bottom of 1Oft shelf and top of sediment) 4.90 It Average depth calculated 3.80 ft OK Average depth used in SAIDA, d,,, (Round to nearest 0.5ft) 4.0 ft OK Drawdown Calculations N Drawdown through orifice? ) Y (Y or Diameter of orifice (if circular) 2.00 in Area of orifice (if-non-circular) in2 ' Coefficient of discharge (CD) 0.60 (unitless) Driving head (Ho) 0.74 ft Drawdown through weir? N (Y or N) Weir type (unitless) ' Coefficient of discharge (CW) (unitless) Length of weir (L) ft Driving head (H) ft ' Pre-development 1-yr, 24-hr peak flow 0.30 ft3lsec Post-development 1-yr, 24-hr peak flow 0.56 ft3lsec Storage volume discharge rate (through discharge orifice or weir) 0.09 ft3lsec Storage volume drawdown time 2.74 days OK, draws down in 2-5 days. Additional Information Vegetated side slopes 3 :1 OK Vegetated shelf slope 10 :1 OK ' Vegetated shelf width 10.0 ft OK Length of flowpath to width ratio 3 :1 OK Length to width ratio 2.0 :1 OK Trash rack for overflow & orifice? Y (Y or N) OK Freeboard provided 1.0 ft OK Vegetated filter provided? N (Y or N) OK Recorded drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build-out? Y (Y or N) OK Drain mechanism for maintenance or emergencies is: Portable pump Form SW401-Wet Detention Basin-Rev.8-9/17/09 Parts 1.8 II. Design Summary, Page 2 of 2 Permit No (to be provided by DWQ) III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. 1 Pagel Plan Ini 'als Sheet No. C-108 1. Plans (1" - 50' or larger) of the entire site showing: C-701 - Design at ultimate build-out, - Off-site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), ' - Basin dimensions, - Pretreatment system, - High flow bypass system, ' - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overflow device, and - Boundaries of drainage easement. ' C-508 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: - Outlet structure with trash rack or similar, - Maintenance access, - Permanent pool dimensions, - Forebay and main pond with hardened emergency spillway, - Basin cross-section, - Vegetation specification for planting shelf, and t - Filter strip. C-508 3. Section view of the wet detention basin (1" = 20' or larger) showing: - Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures. ' NIA 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. p Attached A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, 5 . to verify volume provided. C-509 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the ' entire drainage area is stabilized. Attached 7. The supporting calculations. ' Attached 8. A copy of the signed and notarized operation and maintenance (O&M) agreement. NIA 9. A copy of the deed restrictions (if required): ' Attached 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. ' Form SW401-Wet Detention B asin-Rev.8-9/17/09 Part III. Required Items Checklist, Page 1 of 1 1 1 1 1 1 1 1 1 1 1 1 W Z W N 2 CL CV W F- a m L) 0 W F- W W 0 01-- u W U) J J_ H O O - r" I? CD V -N- -M N CA h y , N tC) I- O LC) m O m O co O oMO tNf) ' ' N? p 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 O O 0 0 0 OO ? O 00 ? C) t- N N d d T d N c- M CD 1- 04 C) O O O O C) O O O C) - LO C Ch L6 M A N M C+') d CD 00 Q VV 7'.. 4 bta? sG&',0 to M CO O NO m m Lo v- c- CO I O 00 - IN O Cq 0 0 0 0 0 0 0 0 0 0 k 6 CO* LO, C f)' O I? 00 00 L o 0 0 0 O O O O O O O ' ?- - -v r O LO LO e O M U') V-- I' N O I N d O M ` ti r 0 0 O O O O O O O O .. O Oa C l I? 00 In C D co m N I t N M a, + d { V N N O L) N ' N N O M 00 C' C N t U) N P-- N N In O D O CD ti ti 6 0 0 0 0 0 0 0 0 0 CD pp CA N 00 O LO o0 CD O N O O O ti f O p 0 0 O O O O O O O O O O O 4 N z a CO Lo O C) LC) I? O 00 ti O (D O i-- T- CO m m p O O O O O ` O s N i m C d '4 CD CO oo CA d I I r N Cr ?y CI) xR3 E? _ U') O N O O O CD CD CO O 14, OD d. . d. M CO LC) CO D CO O . ti p CA I,- M CD O ?t N m N In O?aO O r- N? M O d- O N O ti d M Ln O N N CO M ILD CD pp c0f`x* s^ M N O O i - I ` N d' cD I d' M l- c m C o A ,, f G I O n C CA O 00 L N O CO L M C O I ? ' - d l ' N CD It ' LO m CD N C j O CD I LD 0 O o N O d to ti Lo d N I-- I-- 00 m co N c d' ? N Ln CD CO d' CO ?- N y? N O 'It LC) N N N It d' ILO I-- N r-- N I-- N I? N 0 Ce) Cr) r ' 'CQ + o L+ "N 00 m m N LO Cb Cn m OO Oo N O Ln N O 6 In CD co 0 - I, CA "t OO ;i:r . t d N Y? M M d' d' d' L6 Ln CD 00 r ?R t ' c ?' i , ma / Y y/W . 1 V O /? U) a) 00 N CD 1-- 00 0 V LCD 4 i i . = y o o p ° o `r cD c 6 o cei m c0 s p O p O p O o O p O N O . - O ~ 31 U v ?. N DO CV U-) I` OD , _ N ? r . ,. y ? N ?.. O t() N ti N N N I` 2 , ly=E V O 0 O 0 O 0 O 0 O 0 d m N 0 O M In CO qT M d O d N O 2 . O Ci 0 0 0 N CD m w CD OO m In N O r IN T - CD LO Q1 00 N CD I? (J N ) Lur I- CqL .'w O O 0 O 0 0 0 0 0 O 0 O 0 M O o n O -' Ot Q C, 0 0 0 O Lo OD N 00 O 0 0 0 T CA m (D N .' . N M C' M m to m rN - C O -- 0 0 0 0 0 0 0 0 0 0 0 0 0 lD Z; , N T7 r Ln r r LIB O O O LO S O Ln L! ) ',. E I` 00 00 C ) C) co C) In c- In CV CO CO CO M t 00 In LO In C0 In d ? 00 In In IM ? W 0 rn U U U U rI r, LO r- N I? ul cq ? N r m m o r- m Lo M o O E O 0- CL = a c c > Y ? r`o aJ E a E CD r CL m O m 0, CU E E E E 7 3 au v m Y Y -0 ro ro d 75 -5 `O E E U- M U U Q Q W F. H ?a r ,U VO 0 a ?1 J 1 1 1 1 1 McGffi A S S O C I A T E S Engineering • Planning • Finance McGill Associates. PA. P.O. Box 2259, Asheville, NC 28802 PROJECT: FOCSC! us Gowme PROJECT NO.: MICAUD DESCRIPTION CALCULATED BY: CHECKED BY: ", nnTF• SHEET NO. OF 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 W 0 LU U) 2 CL N w N W Zm? 0 0 Z ()Z0 wwo Ill f- w Q 0 0W? J t=- 0 U N rB N L (9 C 4- U v O N N L M O 2 U U f0 L N 11 Y O d-+ U o U U f9 L _ C O U 'O O U O L- 4-- C O U u U 4 N L E U 3 0 O _ 4-- a? 4o- o o M > > -0 N 3 16 O C 0 - O 0 O C t9 4- O M OD 00 U O m t N U C v L U O .5 U U O D U a 0 t» \ 0 bO N N N U u 4f u O' O N O Ln O N lD O N N M r1 Q o o M O 00 M 41 C14 1 1 - 0 Q aO M > O U \ O C = ro c? C 2 O L iS c O N N !n I\ ri N M N 11 m \ O aA N cr N a U +J N .a f0 f9 .C N U 4- N M \ O 2 U f4 L N L 41 41 l? Cl) O 4+ m cu O N y._ O 72 O iL+ C U U 0 L L } 7 C+ C U U O C i 3 O 0 N m c? L C co MO U C: L to co C OJ U L cu D -0 $' U LO Ln o t` M O M m > \ O 2 C) F: O O Q 0 N rn O d• V) M O M M Ln M I I M \ O 00 dF N L 1S N a .a U Y is) D 2 2P Wet Basin 2 Subcaf. Reach Pon Link I Drainage Diagram for WetBasin2 Prepared by tenter your company name here}, Printed 1/7/2011 HydroCAD® 8.50 s/n 004263 0 2007 HydroCAD Software Solutions LLC ' WetBasW Type 1124-hr 1-Year Storm Rainfall=3.10" - - -Prepared--by {enter your company name here} -Printed - 1/7/207/2011 2 H)IdroCAD®8 50 s/n 004263 © 2007 HydroCAD Software Solutions LLC pArip ' Time span=0.00-160.00 hrs, dt=0.04 hrs, 4001 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment lS: DA 2 Runoff Area=7.580 ac 44.43% Impervious Runoff Depth=1.67" ' Tc=5.0 min CN=85 Runoff=23.06 cfs 1.057 of ' Pond 2P: Wet Basin 2 Peak Elev=864.17' Storage=43,758 cf Inflow=23.06 cfs 1.057 of Outflow 0.09 cfs 0.259 of Total Runoff Area = 7.580 ac Runoff Volume =1.057 of Average Runoff Depth =1.67" 55.57% Pervious = 4.212 ac 44.43% Impervious = 3.368 ac 1 1 1 1 1 1 r WetBasin2 Type 1124-hr 1-Year Storm Rainfall=3.10" -Prepared-by {enter your-company name here} - ----- - -- - -Printed--117/2011 HydroCADS 8.50 s/n 004263 © 2007 HydroCAD Software Solutions LLC Page 3 for Subcatchment IS: DA 2 Summary ' Runoff = 23.06 cfs @ 11.96 hrs, Volume= 1.057 af, Depth= 1.67" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-160.00 hrs, dt= 0.04 hrs ' Type II 24-hr 1-Year Storm Rainfall=3.10" Area (ac) CN Description ' 3.368 98 Paved parking & roofs 4.212 74 >75% Grass cover, Good, HSG C 7.580 85 Weighted Average 4.212 Pervious Area 3.368 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment IS: DA 2 Hydrograph ---=- --'---- ---- --- ---- ---.----,..-------- --- T --- 24 - ? 23.06 cfs 23 --' --- ---, - - _ ---- --- -'-- --- , _e If24hr 1er,Stormr -- 22 --- - - - ---- ----------- - Y-p------------------- ? ?-+ --- 21 --- --- - -- ---- --- --- -- - - -- --_Rain_fa11 *J0"-- - _ _ _ _ .{ _ - _. _ _ -------- 1B -- --- --- ----, -------- ---- --- ---; - -Rur off_ArW7.SRO-ac __,_ _ __ _ unoff ?oi:urrie ' 17 - -- -- J- -- ---- -- __-- - ;- R u 16 R- - -n -- off [3e tth0'L7'of-- ,5 ----------------' 67' - 14 -- --- --.-,---- T6 5..0_. ffilft 0 12 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 10 9 -- -- - - - - - - - - - - - - - - - - -------- r---,---- -------- - - - - - - - - -------- 5 -- - -- --...-- - -i 4 -- --- ---=,---- - 3 J -- --- --- -- --- -- 0 .... ............... .. ,....,.....,..,...,,...,,. 0 10 20 30 40 S0 60 70 80 90 100 110 120 130 140 150 160 Time (hours) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 WetBasin2 Type 1124-hr 1-Year Storm Rainfall=3.10" Prepared- by-{enter your company name here} - - -Printed 1/7/2411 HydroCAD(D8 50 s/n 004263 02007 HydroCAD Software Solutions LLC Page 4 Hydrograph for Subcatchment 1S: DA 2 Time Precip. Excess Runoff (hours) ( inches) ( inches) (cfs) 0.00 0.00 0.00 0.00 2.00 0.07 0.00 0.00 4.00 0.15 0.00 0.00 6.00 0.25 0.00 0.00 8.00 0.37 0.00 0.01 10.00 0.56 0.02 0.18 12.00 2.06 0.84 19.89 14.00 2.54 1.21 0.73 16.00 2.73 1.36 0.46 18.00 2.86 1.47 0.36 20.00 2.95 1.55 0.26 22.00 3.03 1.61 0.24 24.00 3.10 1.67 0.22 26.00 3.10 1.67 0.00 28.00 3.10 1.67 0.00 30.00 3.10 1.67 0.00 32.00 3.10 1.67 0.00 34.00 3.10 1.67 0.00 36.00 3.10 1.67 0.00 38.00 3.10 1.67 0.00 40.00 3.10 1.67 0.00 42.00 3.10 1.67 0.00 44.00 3.10 1.67 0.00 46.00 300 1.67 0.00 48.00 3.10 1.67 0.00 50.00 3.10 1.67 0.00 52.00 3.10 1.67 0.00 54.00 3.10 1.67 0.00 56.00 3.10 1.67 0.00 58.00 3.10 1.67 0.00 60.00 3.10 1.67 0.00 62.00 3.10 1.67 0.00 64.00 3.10 1.67 0.00 66.00 3.10 1.67 0.00 68.00 3.10 1.67 0.00 70.00 3.10 1.67 0.00 72.00 3.10 1.67 0.00 74.00 3.10 1.67 0.00 76.00 3.10 1.67 0.00 78.00 3.10 1.67 0.00 80.00 3.10 1.67 0.00 82.00 3.10 1.67 0.00 84.00 3.10 1.67 0.00 86.00 3.10 1.67 0.00 88.00 3.10 1.67 0.00 90.00 3.10 1.67 0.00 92.00 3.10 1.67 0.00 94.00 3.10 1.67 0.00 96.00 3.10 1.67 0.00 98.00 3.10 1.67 0.00 100.00 3.10 1.67 0.00 102.00 3.10 1.67 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 104.00 3.10 1.67 0.00 106.00 3.10 1.67 0.00 108.00 3.10 1.67 0.00 110.00 3.10 1.67 0.00 112.00 3.10 1.67 0.00 114.00 3.10 1.67 0.00 116.00 3.10 1.67 0.00 118.00 3.10 1.67 0.00 120.00 3.10 1.67 0.00 122.00 3.10 1.67 0.00 124.00 3.10 1.67 0.00 126.00 110 1.67 0.00 128.00 3.10 1.67 0.00 130.00 3.10 1.67 0.00 132.00 3.10 1.67 0.00 134.00 3.10 1.67 0.00 136.00 3.10 1.67 0.00 138.00 3.10 1.67 0.00 140.00 3.10 1.67 0.00 142.00 3.10 1.67 0.00 144.00 3.10 1.67 0.00 146.00 3.10 1.67 0.00 148.00 3.10 1.67 0.00 150.00 3.10 1.67 0.00 152.00 3.10 1.67 0.00 154.00 3.10 1.67 0.00 156.00 3.10 1.67 0.00 158.00 3.10 1.67 0.00 160.00 3.10 1.67 0.00 1 1 1 1 7 11 1 WetBasin2 Type 1124-hr 1-Year Storm Rainfall=3.90" Prepared- by {enter your company name here} - - - - - ---Printed -117/2011 HydroCADO 8.50 s/n 004263 © 2007 HydroCAD Software Solutions LLC Page 5 Summary for Pond 2P: Wet Basin 2 Inflow Area = 7.580 ac, 44.43% Impervious, Inflow Depth = 1.67" for 1-Year Storm event Inflow = 23.06 cfs @ 11.96 hrs, Volume= 1.057 of Outflow = 0.09 cfs @ 24.09 hrs, Volume= 0.259 af, Atten= 100%, Lag= 727.6 min Primary = 0.09 cfs @ 24.09 hrs, Volume= 0.259 of Routing by Stor-Ind method, Time Span= 0.00-160.00 hrs, dt= 0.04 hrs / 3 Peak Elev= 864.17' @ 24.09 hrs Surf.Area= 14,708 sf Storage= 43,758 cf Plug-Flow detention time= 1,658.4 min calculated for 0.259 of (25% of inflow) Center-of-Mass det. time= 1,525.9 min ( 2,349.4 - 823.5) Volume Invert Avail Storage Storage Description #1 858.10' 83,792 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 858.10 0 0 0 858.50 3,753 751 751 859.10 4,098 2,355 3,106 860.10 4,689 4,394 7,499 _ 860.50 6,076 2,153 9,652 863.00 9,669 19,681 29,334 863.50 11,926 5,399 34,732 864.00 14,378 6,576 41,308 865.50 17,318 23,772 65,080 866.50 20,106 18,712 83,792 Device Routing Invert Outlet Devices #1 Device 3 862.00' 24.0" Vert. Orifice/Grate. C= 0.600 #2 Primary 863.50' 2.0" Horiz. Orifice/Grate Limited to weir flow C= 0.600 #3 Primary 865.50' 36.0" Vert. Orifice/Grate C= 0.600 #4 Primary 865.60' 10.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.09 cfs @ 24.09 hrs HW=864.17' (Free Discharge) 2=Orifice/Grate (Orifice Controls 0.09 cfs @ 3.94 fps) 3=Orifice/Grate ( Controls 0.00 cfs) t-1=Orifice/Grate ( Controls 0.00 cfs) =Broad-Crested Rectangular Weir (Controls 0.00 cfs) 1 1 1 1 1 1 1 1 1 WetBasin2 Type II 24-hr 1-Year Storm Rainfall=3.10" Prepared by-{enter your company name here} - -- _-Printed- 1/71201-1 HydroCADO 8.50 sln 004263 © 2007 HydroCAD Software Solutions LLC Page 6 Pond 2P: Wet Basin 2 Hydrograph nflow - - - - - - . --- - El Primary " " 23.00 cf5 - 24 -- ------- - -- - -- ---- Inft_ow Area=7:580_ac _ 22 -------- --- -------- Peak Elev_=864.17'_ _ - - - - - - - - - - Storage=43;758 -Ef - 18 ---- --- --- ---- ------- 14 -- ----------------.---- --- -------- - --------- -- ------------ ----------- --- -- -- 0 12-- U. ------ - --- ------- --- 10 _..-- --- -- -------------- -------- ---- ------------ 8 -- ------- --- -- - --- -------- --- q 0 10 20 30 40 50 60 70 8D 90 100 110 120 130 140 150 160 Time (hours) Pond 2P: Wet Basin 2 Stage-Discharge m c 0 .m m W ? Primary 0 20 40 60 80 l uu -i zu i l+u Discharge (cfs) ' WetBasin2 Type 1124-hr 1-Year Storm Rainfall=3.10" - "- Prepared "by {enter your company name here} - -- - -" -- Printed--1/7/2011 HydroCAD®8 50 s/n 004263 © 2007 HydroCAD Software Solutions LLC Page 7 1 l-, 1 r 1 1 E Pond 2P: Wet Basin 2 Stage -Area-Sto rage Surface/HorizontalMetted Area (sq-ft) 0 2,000 4,9DD 6, DOD 8,000 10,000 12,000 14,000 16,000 18,000 20,000 ? Surface D Storage ! -' ---- ----- ' - -------------- - --- 868 - - - - 867 _- __- .,______________, -__-__- 866 ------i-------,-..... - - - - - - - - - ------ 865 ? ------ .- - - - --- ?-- ------>-- i -r - w 864 ----- ------ --- '.- -fir` ---- - ---- -- - --- - -------------- : ---- c --- ? 863 W u 862 - - - - - - -------------- ---- -- .._- -- ---'-- __ ? ? 860 -- -- ---- _.-------?--•----- ------ r------ i- ---- 859 ...... ... , 0 10,000 20,000 30,000 40,000 50,000 60,000 70,000 80,000 Storage (cubic-feet) I 1 u 1 1 WetBasin2 Type 1124-hr 1-Year Storm Rainfall=3.10" Prepared-by {enter your company name here} - - - - - --Printed--1/7/2011 HydroCAD®8 50 s/n 004263 © 2007 HydroCAD Software Solutions LLC Page 8 Hydrograph for Pond 2P: Wet Basin 2 Time Inflow Storage Elevation Primary (hours) (cfs) (cubic-feet) (feet) (cfs) 0.00 0.00 0 858.10 0.00 4.00 0.00 0 858.10 0.00 8.00 0.01 3 858.11 0.00 12.00 19.89 18,881 861.81 0.00 16.00 0.46 37,224 863.70 0.05 20.00 0.26 41,440 864.01 0.07 24.00 0.22 43,735 864.17 0.09 28.00 0.00 42,597 864.09 0.08 32.00 0.00 41,477 864.01 0.08 36.00 0.00 40,435 863.94 0.07 40.00 0.00 39,476 863.87 0.06 44.00 0.00 38,600 863.80 0.06 48.00 0.00 37,811 863.75 0.05 52.00 0.00 37,107 863.69 0.05 56.00 0.00 36,498 863.64 0.04 60.00 0.00 35,976 863.60 0.03 64.00 0.00 35,595 863.57 0.02 68.00 0.00 35,335 863.55 0.01 72.00 0.00 35,159 863.54 0.01 76.00 0.00 35,039 863.53 0.01 80.00 0.00 34,957 863.52 0.00 84.00 0.00 34,901 863.51 0.00 88.00 0.00 34,863 863.51 0.00 92.00 0.00 34,837 863.51 0.00 96.00 0.00 34,819 863.51 0.00 100.00 0.00 34,805 863.51 0.00 104.00 0.00 34,792 863.51 0.00 108.00 0.00 34,782 863.50 0.00 112.00 0.00 34,774 863.50 0.00 116.00 0.00 34,767 863.50 0.00 120.00 0.00 34,761 863.50 0.00 124.00 0.00 34,756 863.50 0.00 128.00 0.00 34,752 863.50 0.00 132.00 0.00 34,749 863.50 0.00 136.00 0.00 34,746 863.50 0.00 140.00 0.00 34,744 863.50 0.00 144.00 0.00 34,742 863.50 0.00 148.00 0.00 34,740 863.50 0.00 152.00 0.00 34,739 863.50 0.00 156.00 0.00 34,738 863.50 0.00 160.00 0.00 34,737 863.50 0.00 ?J I? --I L 1 1? u 1 1 1 WetBasin2 Type 1124-hr 1-Year Storm Rainfall=3.10" -- - - -- - - -- -Printed--1/712011 Prepared by {enter your company name here} HvdroCAD88 50 s/n 004263 02007 HydroCAD Software Solutions LLC Page 9 Elevation Primary (feet) (cfs) 858.10 0.00 858.16 0.00 858.22 0.00 858.28 0.00 858.34 0.00 858.40 0.00 858.46 0.00 858.52 0.00 858.58 0.00 858.64 0.00 858.70 0.00 858.76 0.00 858.82 0.00 858.88 0.00 858.94 0.00 859.00 0.00 859.06 0.00 859.12 0.00 859.18 0.00 859.24 0.00 859.30 0.00 859.36 0.00 859.42 0.00 859.48 0.00 859.54 0.00 859.60 0.00 859.66 0.00 859.72 0.00 859.78 0.00 859.84 0.00 859.90 0.00 859.96 0.00 860.02 0.00 860.08 0.00 860.14 0.00 860.20 0.00 860.26 0.00 860.32 0.00 860.38 0.00 860.44 0.00 860.50 0.00 860.56 0.00 860.62 0.00 860.68 0.00 860.74 0.00 860.80 0.00 860.86 0.00 860.92 0.00 860.98 0.00 861.04 0.00 861.10 0.00 861.16 0.00 Stage-Discharge for Pond 2P: Wet Basin 2 Elevation Primary (feet) (cfs) 861.22 0.00 861.28 0.00 861.34 0.00 861.40 0.00 861.46 0.00 861.52 0.00 861.58 0.00 861.64 0.00 861.70 0.00 861.76 0.00 861.82 0.00 861.88 0.00 861.94 0.00 862.00 0.00 862.06 0.00 862.12 0.00 862.18 0.00 862.24 0.00 862.30 0.00 862.36 0.00 862.42 0.00 862.48 0.00 862.54 0.00 862.60 0.00 862.66 0.00 862.72 0.00 862.78 0.00 862.84 0.00 862.90 0:00 862.96 0.00 863.02 0.00 863.08 0.00 863.14 0.00 863.20 0.00 863.26 0.00 863.32 0.00 863.38 0.00 863.44 0.00 863.50 0.00 863.56 0.03 863.62 0.04 863.68 0.04 863.74 0.05 863.80 0.06 863.86 0.06 863.92 0.07 863.98 0.07 864.04 0.08 864.10 0.08 864.16 0.09 864.22 0.09 864.28 0.09 Elevation Primary (feet) (cfs) 864.34 0.10 864.40 0.10 864.46 0.10 864.52 0.11 864.58 0.11 864.64 0.11 864.70 0.12 864.76 0.12 864.82 0.12 864.88 0.12 864.94 0.13 865.00 0.13 865.06 0.13 865.12 0.13 865.18 0.14 865.24 0.14 865.30 0.14 865.36 0.14 865.42 0.15 865.48 0.15 865.54 0.16 865.60 0.23 865.66 0.72 865.72 1.56 865.78 2.66 865.84 3.98 865.90 5.52 865.96 7.25 866.02 9.18 866.08 11.35 866.14 13.72 866.20 16.29 866.26 18.81 866.32 21.46 866.38 24.24 866.44 27.13 866.50 30.13 866.56 33.24 866.62 36.48 866.68 39.86 866.74 43.35 866.80 46.95 866.86 50.52 866.92 54.17 866.98 57.90 867.04 61.67 867.10 65.49 867.16 69.36 867.22 73.36 867.28 77.54 867.34 81.32 867.40 84.81 Elevation Primary (feet) (cfs) 867.46 88.36 867.52 91.95 867.58 95.58 867.64 99.26 867.70 102.99 867.76 106.77 867.82 110.58 867.88 114.44 867.94 118.35 868.00 122.30 868.06 126.29 868.12 130.32 868.18 134.39 868.24 138.51 868.30 142.67 868.36 146.86 868.42 151.10 868.48 155.38 1 1 1 1 1 I 1 1 1 WetBasin2 Type ll 24-hr 1-Year Storm Rainfall=3.10" -Prepared-by {enter your company name here} - - - Printed-117/2011 HvdroCAD®8 50 s/n 004263 © 2007 HydroCAD Software Solutions LLC Page 10 Stage-Area-Storage for Pond 2P: Wet Basin 2 Elevation Surface Storage (feet) (sq-ft) (cubic-feet) 858.10 0 0 858.25 1,407 106 858.40 2,815 422 858.55 3,782 939 858.70 3,868 1,513 858.85 3,954 2,099 859.00 4,040 2,699 859.15 4,128 3,312 859.30 4,216 3,937 859.45 4,305 4,576 859.60 4,394 5,229 859.75 4,482 5,894 859.90 4,571 6,573 860.05 4,659 7,266 860.20 5,036 7,986 860.35 5,556 8,780 860.50 6,076 9,652 860.65 6,292 10,580 860.80 6,507 11,540 860.95 6,723 12,532 861.10 6,938 13,557 861.25 7,154 14,614 861.40 7,369 15,703 861.55 7,585 16,824 861.70 7,801 17,978 861.85 8,016 19,165 862.00 8,232 20,383 862.15 8,447 21,634 862.30 8,663 22,917 862.45 8,879 24,233 862.60 9,094 25,581 862.75 9,310 26,961 862.90 9,525 28,374 863.05 9,895 29,823 863.20 10,572 31,358 863.35 11,249 32,994 863.50 11,926 34,732 863.65 12,662 36,576 863.80 13,397 38,531 863.95 14,133 40,596 864.10 14,574 42,756 864.25 14,868 44,964 864.40 15,162 47,216 864.55 15,456 49,513 864.70 15,750 51,853 864.85 16,044 54,238 865.00 16,338 56,666 865.15 16,632 59,139 865.30 16,926 61,656 865.45 17,220 64,217 865.60 17,597 66,826 865.75 18,015 69,497 Elevation Surface Storage (feet) (sq-ft) (cubic-feet) 865.90 18,433 72,231 866.05 18,851 75,027 866.20 19,270 77,886 866.35 19,688 80,808 866.50 20,106 83,792 866.65 20,106 83,792 866.80 20,106 83,792 866.95 20,106 83,792 867.10 20,106 83,792 867.25 20,106 83,792 867.40 20,106 83,792 867.55 20,106 83,792 867.70 20,106 83,792 867.85 20,106 83,792 868.00 20,106 83,792 868.15 20,106 83,792 868.30 20,106 83,792 868.45 20,106 83,792 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 WetBasin2 Prep-ared-by {enter your- company- name-here} Hvrirr)CADO 8.50 s/n 004263 © 2007 HydroCAD Sof Type// 24-hr 10-Year Storm Rainfall=5.41 " - -Printed -1/7/201-1 dons LLC Page 11 Time span=0.00-160.00 hr s, dt=0.04 hrs, 4001 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: DA 2 Runoff Area=7.580 ac 44.43% Impervious Runoff Depth=3.75" Tc=5.0 min CN=85 Runoff=49.87 cfs 2.368 of Pond 2P: Wet Basin 2 Peak Elev=865.75' Storage=69,419 cf Inflow=49.87 cfs 2.368 of Outflow=2.09 cfs 1.569 of Total Runoff Area = 7.580 ac Runoff Volume = 2.368 of Average Runoff Depth 3.75" 55.57% Pervious = 4.212 ac 44.43% Impervious = 3.368 ac 1 WetBasin2 Type // 24-hr 10-Year Storm Rainfall=5.41" -P-repared-by {enter your company name here} - - -- -- - - ----Printed-1/7/201-1 H ydroCAD®8 50 s/n 004263 © 2007 HydroCAD Software Solutions LLC Page 12 Summary for Subcatchment 1 S: DA 2 ' Runoff = 49.87 cfs @ 11.96 hrs, Volume= 2.368 af, Depth= 3.75" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-160.00 hrs, dt= 0.04 hrs ' Type II 24-hr 10-Year Storm Rainfall=5.41" Area ac CN Description 3.368 98 Paved parking & roofs 4.212 74 >75% Grass cover, Good, HSG C 7.580 85 Weighted Average ' 4.212 Pervious Area 3.368 Impervious Area Tc Length Slope Velocity Capacity Description ' (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, ' Subcatchment IS: DA 2 Hydrograph ' 55 ? Runoff - 49.E7 So Type II 24-hr 10-Year Storm 45 Rainfall=5.41" Runoff Area=7.58 ac 40 ' 35 --- ---;-- -------- --------;----;---- -Runoff-D-epth=3.75" N 30- - -- ----- - ---- - --- -- c=5:0-mirt- --- - 0 25 -, 20 15 ---- 10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 ' Time (hours) r 1 i? J 1 1 F 1 WetBasin2 Type 1124-hr 10-Year Storm Rainfall=5.41" 117/2011 Prepared-by-[enter your company name here} Printed- Pa a 13 H ydroCADO 8.50 s/n 004263 © 2007 HydroCAD Software Solutions LLC 9 Hydrograph for Subcatchment 1S: DA 2 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.00 0.12 0.00 0.00 4.00 0.26 0.00 0.00 6.00 0.43 0.00 0.06 8.00 0.65 0.04 0.24 10.00 0.98 0.16 0.72 12.00 3.59 2.09 42.18 14.00 4.44 2.85 1.45 16.00 4.76 3.15 0.89 18.00 4.98 3.35 0.69 20.00 5.15 3.51 0.51 22.00 5.29 3.63 0.46 24.00 5.41 3.75 0.43 26.00 5.41 3.75 0.00 28.00 5.41 3.75 0.00 30.00 5.41 3.75 0.00 32.00 5.41 3.75 0.00 34.00 5.41 3.75 0.00 36.00 5.41 3.75 0.00 38.00 5.41 3.75 0.00 40.00 5.41 3.75 0.00 42.00. 5.41 3.75 0.00 44.00 5.41 3.75 0.00 46.00 5.41 3.75 0.00 48.00 5.41 3.75 0.00 50.00 5.41 3.75 0.00 52.00 5.41 3.75 0.00 54.00 5.41 3.75 0.00 56.00 5.41 3.75 0.00 58.00 5.41 3.75 0.00 60.00 5.41 3.75 0.00 62.00 5.41 3.75 0.00 64.00 5.41 3.75 0.00 66.00 5.41 3.75 0.00 68.00 5.41 3.75 0.00 70.00 5.41 3.75 0.00 72.00 5.41 3.75 0.00 74.00 5.41 3.75 0.00 76.00 5.41 3.75 0.00 78.00 5.41 3.75 0.00 80.00 5.41 3.75 0.00 82.00 5.41 3.75 0.00 84.00 5.41 3.75 0.00 86.00 5.41 3.75 0.00 88.00 5.41 3.75 0.00 90.00 5.41 3.75 0.00 92.00 5.41 3.75 0.00 94.00 5.41 3.75 0.00 96.00 5.41 3.75 0.00 98.00 5.41 3.75 0.00 100.00 5.41 3.75 0.00 102.00 5.41 .3.75 0.00 Time Precip. Excess Runoff (hours) ( inches) ( inches) (cfs) 104.00 5.41 3.75 0.00 106.00 5.41 3.75 0.00 108.00 5.41 3.75 0.00 110.00 5.41 3.75 0.00 112.00 5.41 3.75 0.00 114.00 5.41 3.75 0.00 116.00 5.41 3.75 0.00 118.00 5.41 3.75 0.00 120.00 5.41 3.75 0.00 122.00 5.41 3.75 0.00 124.00 5.41 3.75 0.00 126.00 5.41 3.75 0.00 128.00 5.41 3.75 0.00 130.00 5.41 3.75 0.00 132.00 5.41 3.75 0.00 134.00 5.41 3.75 0.00 136.00 5.41 3.75 0.00 138.00 5.41 3.75 0.00 140.00 5.41 3.75 0.00 142.00 5.41 3.75 0.00 144.00 5.41 3.75 0.00 146.00 5.41 3.75 0.00 148.00 5.41 3.75 0.00 150.00 5.41 3.75 0.00 152.00 5.41 3.75 0.00 154.00 5.41 3.75 0.00 156.00 5.41 3.75 0.00 158.00 5.41 3.75 0.00 160.00 5.41 3.75 0.00 1 1 1 7 1 t 1 t WetBasin2 Type 1124-hr 10-Year Storm Rainfall=5.41 " Prepared by-{enter-your company name here} -= - ---- - -- ---Printed-117/201-1 HydroCADO 8.50 s/n 004263 © 2007 HydroCAD Software Solutions LLC Paae 14 Summary for Pond 2P: Wet Basin 2 Inflow Area = 7.580 ac, 44.43% Impervious, Inflow Depth = 3.75" for 10-Year Storm event Inflow = 49.87 cfs @ 11.96 hrs, Volume= 2.368 of Outflow = 2.09 cfs @ 13.26 hrs, Volume= 1.569 af, Atten= 96%, Lag= 77.9 min Primary = 2.09 cfs @ 13.26 hrs, Volume= 1.569 of Routing by Stor-Ind method, Time Span= 0.00-160.00 hrs, dt= 0.04 hrs / 3 Peak Elev= 865.75' @ 13.26 hrs Surf.Area= 18,003 sf Storage= 69,419 cf Plug-Flow detention time= 1,570.3 min calculated for 1.569 of (66% of inflow) Center-of-Mass det. time= 1,470.4 min (2,270.9 - 800.5) Volume Invert Avail.Stora a Storage Description #1 858.10' 83,792 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 858.10 0 0 0 858.50 3,753 751 751 859.10 4,098 2,355 3,106 860.10 4,689 4,394 7,499 860.50 6,076 2,153 9,652 863.00 9,669 19,681 29,334 863.50 11,926 5,399 34,732 864.00 14,378 6,576 41,308 865.50 17,318 23,772 65,080 866.50 20,106 18,712 83,792 Device Routing Invert Outlet Devices #1 Device 3 862.00' 24.0" Vert. Orifice/Grate C= 0.600 #2 Primary 863.50' 2.0" Horiz. Orifice/Grate Limited to weir flow C= 0.600 #3 Primary 865.50' 36.0" Vert. Orifice/Grate C= 0.600 #4 Primary 865.60' 10.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef: (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=2.00 cfs @ 13.26 hrs HW=865.75' (Free Discharge) 2=Orifice/Grate (Orifice Controls 0.16 cfs @ 7.22 fps) 3=Orifice/Grate (Orifice Controls 0.46 cfs @ 1.69 fps) 't-1=Orifice/Grate (Passes 0.46 cfs of 7.50 cfs potential flow) =Broad-Crested Rectangular Weir (Weir Controls 1.38 cfs @ 0.95 fps) 1 1 1 1 1 1 1 1 WetBasin2 Type 1124-hr 10-Year Storm Rainfall=5.41 " Prepared-by {enter your company name here} - -Printed-1 /7/2011 --- Paae 15 H ydroCADO 8.50 s/n 004263 © 2007 HydroCAD Software Solutions LLC Pond 2P: Wet Basin 2 Hydro9raPh ®inflow -- -- --- - - - - - _ - - _ Primary ,. - 49.87 cis - W_Ar_ea-'7.580_aC _ _In o 50 --- . ---------------- -- ----- 45 P-ea-k Elev,865.7a'-- - - - - - - - - Storage=69,--419-e#- -- --,---- --- --- 35 - - - - -- _ t 30- N _ _ -------- 3 - - - - - - - - --- 25-' 15 10 - ------- ------- -- -----...__...._--------- --- ._ ------- - 5 2.09 cfs 0 100 110 120 130 140 150 160 0 0 10 20 30 40 50 60 i6 ?O (hours) Time d d c 0 m w 0 20 80 100 Discharge (cfs) ? Primary Pond 2P: Wet Basin 2 Stage-Discharge ' Type// 24-hr 10-Year Storm Rainfall=5.41" WetBasin2 ---Printed- 1/7/201-1 1 Prepared by- -- - {enter your company name here} Page 1 H ydroCAD®8 50 sin 004263 © 2007 HydroCAD Software Solutions LLC Pond 2P: Wet Basin 2 Stage-Area-Storage Surface/Horizontalffetted Area (sq-ft) ODD 14,000 16,000 18,000 000 12 DDO 10 20,OD0 ? Surface D , , 2,9D0 4,000 6,000 8, ? Storage = ------------------- '- --------------- - -- - -- 868 ----?--------- 867 866 --- ------' ------------ ?--- ?- ------ -----?-- 865 ; ------- ------ -----?--=---?----'-- ------ -- -- 864 ---I' - - - - -- - 863 - -----.------ r--------?------ ------ ------ -- ---,- > w 862. ------- ..------- I_- ?--- - -- 861 --! - ----,---, ----- --------------- --- 8599 . . . . ' 0 10,000 20,000 30,ODO 40,000 50,000 60,000 70,000 80,000 bic-feet) Storage (cu 0 r WetBasin2 Type // 24-hr 10-Year Storm Rainfall=5.41" -Prepared-by-{enter your company name-here} - - - ---- - - - Printed-1/7/201-1--- H ydroCADO 8.50 s/n 004263 © 2007 HydroCAD Software Solutions LLC Page 17 for Pond 2P: Wet Basin 2 Hydrograph ' Time Inflow Storage Elevation Primary (hours) (cfs) (cubic-feet) (feet) (cfs) 0.00 0.00 0 858.10 0.00 4.00 0.00 0 858.10 0.00 8.00 0.24 1,106 858.59 0.00 12.00 42.18 48,881 864.51 0.11 00 16 0.89 68,230 865.68 1.01 . 20.00 0.51 67,409 865.63 62 0.55 44 0 24.00 0.43 67,196 865. . 28.00 0.00 64,575 865.47 0.15 32.00 0.00 62,485. 865.35 0.14 36.00 0.00 60,462 865.23 0.14 40.00 0.00 58,507 865.11 0.13 44.00 0.00 56,621 865.00 0.13 48.00 0.00 54,806 864.89 0.12 52.00 0.00 53,062 864.78 0.12 56.00 0.00 51,389 864.67 0.11 00 60 0.00 49,789 864.57 0.11 . 64.00 0.00 48,264 864.47 0.10 10 0 68.00 0.00 46,813 864.37 . 72.00 0.00 45,438 864.28 0.09 76.00 0.00 44,139 864.19 0.09 ' 80.00 0.00 42,919 864.11 0.08 84.00 0.00 41,776 864.03 0.08 88.00 0.00 40,713 863.96 0.07 92.00 0.00 39,731 863.89 0.07 1 96.00 0.00 38,832 863.82 0.06 100.00 0.00 38,019 863.76 0.05 104.00 108.00 0.00 0.00 37,291 36,656 863.71 863.66 0.05 0.04 112.00 0.00 36,109 863.61 0.04 116.00 0.00 35,685 863.58 0.02 120.00 0.00 35,397 863.55 0.02 124.00 0.00 35,201 863.54 0.01 128.00 0.00 35,067 863.53 0.01 132.00 0.00 34,976 863.52 0.01 136.00 0.00 34,914 863.52 0.00 ' 140.00 0.00 34,872 863.51 0.00 144.00 0.00 34,843 863.51 0.00 148.00 0.00 34,824 863.51 0.00 152.00 0.00 34,808 863.51 0.00 156.00 0.00 34,795 863.51 0.00 160.00 0.00 34,785 863.50 0.00 1 1 J 1 1 77 I 1 1 1 WetBasin2 Type 1124-hr 10-Year Storm Rainfall=5.41 " --P-r-epared-by{enter-your-company-name here} -- - - --- - - - - - _Rrinted-11-7/2011 HvdroCAD®8 50 s/n 004263 © 2007 HydroCAD Software Solutions LLC Page 18 Elevation Primary (feet) (cfs) 858.10 0.00 858.16 0.00 858.22 0.00 858.28 0.00 858.34 0.00 858.40 0.00 858.46 0.00 858.52 0.00 858.58 0.00 858.64 0.00 858.70 0.00 858.76 0.00 858.82 0.00 858.88 0.00 858.94 0.00 859.00 0.00 859.06 0.00 859.12 0.00 859.18 0.00 859.24 0.00. 859.30 0.00 859.36 0.00 859.42 0.00 859.48 0.00 859.54 0.00 859.60 0.00 859.66 0.00 859.72 0.00 859.78 0.00 859.84 0.00 859.90 0.00 859.96 0.00 860.02 0.00 860.08 0.00 860.14 0.00 860.20 0.00 860.26 0.00 860.32 0.00 860.38 0.00 860.44 0.00 860.50 0.00 860.56 0.00 860.62 0.00 860.68 0.00 860.74 0.00 860.80 0.00 860.86 0.00 860.92 0.00 860.98 0.00 861.04 0.00 861.10 0.00 861.16 0.00 Stage-Discharge for Pond 2P: Wet Basin 2 Elevation Primary (feet) (cfs) 861.22 0.00 861.28 0.00 861.34 0.00 861.40 0.00 861.46. 0.00 861.52 0.00 861.58 0.00 861.64 0.00 861.70 0.00 861.76 0.00 861.82 0.00 861.88 0.00 861.94 0.00 862.00 0.00 862.06 0.00 862.12 0.00 862.18 0.00 862.24 0.00 862.30 0.00 862.36 0.00 862.42 0.00 862.48 0.00 862.54 0.00 862.60 0.00 862.66 0.00 862.72 0.00 862.78 0.00 862.84 0.00 862.90 0.00 862.96 0.00 863.02 0.00 863.08 0.00 863.14 0.00 863.20 0.00 863.26 0.00 863.32 0.00 863.38 0.00 863.44 0.00 863.50 0.00 863.56 0.03 863.62 0.04 863.68 0.04 863.74 0.05 863.80 0.06 863.86 0.06 863.92 0.07 863.98 0.07 864.04 0.08 864.10 0.08 864.16 0.09 864.22 0.09 864.28 0.09 Elevation Primary (feet) (cfs) 864.34 0.10 864.40 0.10 864.46 0.10 864.52 0.11 864.58 0.11 864.64 0.11 864.70 0.12 864.76 0.12 864.82 0.12 864.88 0.12 864.94 0.13 865.00 0.13 865.06 0.13 865.12 0.13 865.18 0.14 865.24 0.14 865.30 0.14 865.36 0.14 865.42 0.15 865.48 0.15 865.54 0.16 865.60 0.23 865.66 0.72 865.72 1.56 865.78 2.66 865.84 3.98 865.90 5.52 865.96 7.25 866.02 9.18 866.08 11.35 866.14 13.72 866.20 16.29 866.26 18.81 866.32 21.46 866.38 24.24 866.44 27.13 866.50 30.13 866.56 33.24 866.62 36.48 866.68 39.86 866.74 43.35 866.80 46.95 866.86 50.52 866.92 54.17 866.98 57.90 867.04 61.67 867.10 65.49 867.16 69.36 867.22 73.36 867.28 77.54 867.34 81.32 867.40 84.81 Elevation Primary (feet) (cfs) 867.46 88.36 867.52 91.95 867.58 95.58 867.64 99.26 867.70 102.99 867.76 106.77 867.82 110.58 867.88 114.44 867.94 118.35 868.00 122.30 868.06 126.29 868.12 130.32 868.18 134.39 868.24 138.51 868.30 142.67 868.36 146.86 868.42 151.10 868.48 155.38 1 1 1 1 1 1 1 1 1 1 1 1 1 WetBasin2 Type II 24-hr 10-Year Storm Rainfall=5.41" -Prepared by {enter your company name here} - ------ -- ---Printed-1/7/2011--- HydroCAD®8 50 s/n 004263 © 2007 HydroCAD Software Solutions LLC Page 19 Stage-Area-Storage for Pond 2P: Wet Basin 2 Elevation Surface Storage (feet) (sq-ft) (cubic-feet) 858.10 0 0 858.25 1,407 106 858.40 2,815 422 858.55 3,782 939 858.70 3,868 1,513 858.85 3,954 2,099 859.00 4,040 2,699 859.15 4,128 3,312 859.30 4,216 3,937 859.45 4,305 4,576 859.60 4,394 5,229 859.75 4,482 5,894 859.90 4,571 6,573 860.05 4,659 7,266 860.20 5,036 7,986 860.35 5,556 8,780 860.50 6,076 9,652 860.65 6,292 10,580 860.80 6,507 11,540 860.95 6,723 12,532. 861.10 6,938 13,557 861.25 7,154 14,614 861.40 7,369 15,703 861.55 7,585 16,824 861.70 7,801 17,978 861.85 8,016 19,165 862.00 8,232 20,383 862.15 8,447 21,634 862.30 8,663 22,917 862.45 8,879 24,233 862.60 9,094 25,581 862.75 9,310 26,961 862.90 9,525 28,374 863.05 9,895 29,823 863.20 10,572 31,358 863.35 11,249 32,994 863.50 11,926 34,732 863.65 12,662 36,576 863.80 13,397 38,531 863.95 14,133 40,596 864.10 14,574 42,756 864.25 14,868 44,964 864.40 15,162 47,216 864.55 15,456 49,513 864.70 15,750 51,853 864.85 16,044 54,238 865.00 16,338 56,666 865.15 16,632 59,139 865.30 16,926 61,656 865.45 17,220 64,217 865.60 17,597 66,826 865.75 18,015 69,497 Elevation Surface Storage (feet) (sq-ft) (cubic-feet) 865.90 18,433 72,231 866.05 18,851 75,027 866.20 19,270 77,886 866.35 19,688 80,808 866.50 20,106 83,792 866.65 20,106 83,792 866.80 20,106 83,792 866.95 20,106 83,792 867.10 20,106 83,792 867.25 20,106 83,792 867.40 20,106 83,792 867.55 20,106 83,792 867.70 20,106 83,792 867.85 20,106 83,792 868.00 20,106 83,792 868.15 20,106 83,792 868.30 20,106 83,792 868.45 20,106 83,792 WetBasin2 Type II 24-hr 25-Year Storm Rainfall=6.46" - Prepared-by-{e-nter- your company name here} - -Printed-117/2011 HydroCADG) 8.50 s/n 004263 © 2007 HydroCAD Software Solutions LLC Page 20 Time span=0.00-160.00 hrs, dt=0.04 hrs, 4001 points Runoff by SCS TR-20 method, UH=SCS ' Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: DA 2 Runoff Area=7.580 ac 44.43% Impervious Runoff Depth=4.74" Tc=5.0 min CN=85 Runoff=62.15 cfs 2.993 of ' Pond 2P: Wet Basin 2 Peak Elev=866.00' Storage=74,009 cf Inflow=62.15 cfs 2.993 of Outflow=8.39 cfs 2.195 of Total Runoff Area = 7.580 ac Runoff Volume = 2.993 of Average Runoff Depth = 4.74" 55.57% Pervious = 4.212 ac 44.43% Impervious = 3.368 ac 1 1 1 1 1 11 WetBasin2 Type 1124-hr 25-Year Storm Ralnfall=6.46" - --- -- - - -- - - - ---- -Prepared-by {enter your company name-here} Printed- 1/712011 pace 21 HydroCAD®8 50 s/n 004263 © 2007 HydroCAD Software Solutions LLC Summary for Subcatchment 1S: DA 2 Runoff = 62.15 cfs @ 11.96 hrs, Volume= 2.993 af, Depth= 4.74" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-160.00 hrs; dt= 0.04 hrs ' Type II 24-hr 25-Year Storm Rainfall=6.46" Area ac CN Description ' 3.368 98 Paved parking & roofs 4.212 74 >75% Grass cover, Good, HSG C 7.580 85 Weighted Average 4.212 Pervious Area 3.368 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, ' Subcatchment 1S: DA 2 Hydrograph - - - 65 62.15 cf5 - 25l -- -- - - T'___11_24--hr =Year form pe 60 ---- ---- --- ---- . --- ---- --- - - ---- --- ---- ------------ y - - Rainfall=6.46" 55 Runoff Area=7.580 'ac I I - - - - - 50 I - ------- 45 Runoff Volume-2.,9931 of I 74- -4 Depth nOff R 40 _ . _ u_ l -- --- ---- --- - --.._ ., 35 - - i=9,0-minI ---- --- --- - -- ---- 3 o 30 il: :' - --- ------ ------------ -6-N =8 5- - , I --- --- --- - I , I I 25 -- - - - - - - - - - - - - - - --- -- --- - 20 15 ---- 10 5 ..._...- ? I ' . . 0 0 110 120 130 140 150 160 , 10 20 30 40 50 60 7 0 100 „ Time (hours) 1 1 WetBasin2 Type 1124-hr 25-Year Storm Rainfall=6.46" - --P-r-inted 1-/7/2011 Prepared-by-{enter your company-name-here} - - ----- --- page 22 H ydroCAD®8 50 s/n 004263 @2007 HydroCAD Software Solutions LLC 1 1 1 1 I E 1 1 Hydrograph for Subcatchment 1S: DA 2 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.00 0.14 0.00 0.00 4.00 0.31 0.00 0.00 6.00 0.52 0.01 0.14 8.00 0.78 0.08 0.37 10.00 1.17 0.26 1.01 12.00 4.28 2.71 52.33 14.00 5.30 3.64 1.77 16.00 5.68 4.01 1.09 18.00 5.95 4.26 0.85 20.00 6.15 4.44 0.62 22.00 6.31 4.60 0.56 24.00 6.46 4.74 0.52 26.00 6.46. 4.74 0.00 28.00 6.46 4.74 0.00 30.00 6.46 4.74 0.00 32.00 6.46 4.74 0.00 34.00 6.46 4.74 0.00 36.00 6.46 4.74 0.00 38.00 6.46 4.74 0.00 40.00 6.46 4.74 0.00 42.00 6.46 4.74 0.00 44.00 6.46 4.74 0.00 46.00 6.46 4.74 0.00 48.00 6.46 4.74 0.00 50.00 6.46 4.74 0.00 52.00 6.46 4.74 0.00 54.00 6.46 4.74 0.00 56.00 6.46 4.74 0.00 58.00 6.46 4.74 0.00 60.00 6.46 4.74 0.00 62.00 6.46 4.74 0.00 64.00 6.46 4.74 0.00 66.00 6.46 4.74 0.00 68.00 6.46 4.74 0.00 70.00 6.46 4.74 0.00 72.00 6.46 4.74 0.00 74.00 6.46 4.74 0.00 76.00 6.46 4.74 0.00 78.00 6.46 4.74 0.00 80.00 6.46 4.74 0.00 82.00. 6.46 4.74 0.00 84.00 6.46 4.74 0.00 86.00 6.46 4.74 0.00 88.00 6.46 4.74 0.00 90.00 6.46 4.74 0.00 92.00 6.46 4.74 0.00 94.00 6.46 4.74 0.00 96.00 6.46 4.74 0.00 98.00 6.46 4.74 0.00 100.00 6.46 4.74 0.00 102.00 6.46 4.74 0.00 Time Precip. Excess Runoff (hours) ( inches) ( inches) (cfs) 104.00 6.46 4.74 0.00 106.00 6.46 4.74 0.00 108.00 6.46 4.74 0.00 110.00 6.46 4.74 0.00 112.00 6.46 4.74 0.00 114.00 6.46 4.74 0.00 116.00 6.46 4.74 0.00 118.00 6.46 4.74 0.00 120.00 6.46 4.74 0.00 122.00 6.46 4.74 0.00 124.00 6.46 4.74 0.00 126.00 6.46 4.74 0.00 128.00 6.46 4.74 0.00 130.00 6.46 4.74 0.00 132.00 6.46 4.74 0.00 134.00 6.46 4.74 0.00 136.00 6.46 4.74 0.00 138.00 6.46 4.74 0.00 140.00 6.46 4.74 0.00 142.00 6.46 4.74 0.00 144.00 6.46 4.74 0.00 146.00 6.46 4.74 0.00 148.00 6.46 4.74 0.00. 150.00 6.46 4.74 0.00 152.00 6.46 4.74 0.00 154.00 6.46 4.74 0.00 156.00 6.46 4.74 0.00 158.00 6.46 4.74 0.00 160.00 6.46 4.74 0.00 1 1 1 1 1 1 1 d 1 1 1 1 1 WetBasin2 Type 1124-hr 25-Year Storm Rainfall=6.46" 117/201 1- ------ - --- - ----Prepared-by-{enter your-company name here} -Printed-Pa a 23 H ydroCADO 8.50 s/n 004263 © 2007 HydroCAD Software Solutions LLC Summary for Pond 2P: Wet Basin 2 Inflow Area = 7.580 ac, 44.43% Impervious, Inflow Depth = 4.74" for 25-Year Storm event Inflow = 62.15 cfs @ 11.96 hrs; Volume= 2.993 of Outflow = 8.39 cfs @ 12.18 hrs, Volume= 2.195 af, Atten= 86%, Lag= 13.5 min Primary = 8.39 cfs @ 12.18 hrs, Volume= 2.195 of Routing by Stor-Ind method, Time Span= 0.00-160.00 hrs, dt= 0.04 hrs / 3 Peak Elev= 866.00' @ 12.18 hrs Surf.Area= 18,700 sf Storage= 74,009 cf Plug-Flow detention time= 1,157.6 min calculated for 2.194 of (73% of inflow) Center-of-Mass det. time= 1,067.0 min ( 1,860.9 - 793.9 ) Volume Invert Avail.Stora a Storage Description #1 858.10' 83,792 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (s .-ft) (cubic-feet) (cubic-feet) 858.10 0 0 0 858.50 3,753 751 751 859.10 4,098 2,355 3,106 860.10 4,689 4,394 7,499 860.50 6,076 2,153 9,652 863.00 9,669 19,681 29,334 863.50 11,926 5,399 34,732 864.00 14,378 6,576 41,308 865.50 17,318 23,772 65,080 866.50 20,106 18,712 83,792 Device Routing Invert Outlet Devices #1 Device 3 862.00' 24.0" Vert. Orifice/Grate C= 0.600 #2 Primary 863.50' 2.0" Horiz. Orifice/Grate Limited to weir flow C= 0.600 #3 Primary 865.50' 36.0" Vert. Orifice/Grate C= 0.600 #4 Primary 865.60' 10.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=8.35 cfs @ 12.18 hrs HW=866.00' (Free Discharge) 2=Orifice/Grate (Orifice Controls 0.17 cfs @ 7.61 fps) Orifice/Grate (Orifice Controls 1.83 cfs @ 2.40 fps) 1=Orifice/Grate (Passes 1.83 cfs of 10.64 cfs potential flow) =Broad-Crested Rectangular Weir (Weir Controls 6.35 cfs @ 1.61 fps) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 WetBasin2 Type 1124-hr 25-Year Storm. Rainfall=6.46" Prepared-by-{enter your company name here} - - - -- - - - -- - ----Printed-11-7/2011_ HydroCADS 8.50 s/n 004263 © 2007 HydroCAD Software Solutions LLC Page 24 Pond 2P: Wet Basin 2 Hydrograph _ -' --- --- 5c _______ _ ____ ____ 62.1 owry fs 10 Prima 65 -- - Inflow Area 7.58 ----- ------ -Peak Elev=866.OQ' - - - 55 50Stdrage=74,009 _c# _ 45 --- ---- --- ----- ------ y 40 -- --- --- -------- ---------- 35 ,• o ---- --- - --- u. 3C)--' ---- --- ----,-- 25 20 - - - --------------- -- - ---- 15 1D 8.39 tfs ___ ___. ____ __ __ ._. ____.____ ____ _ _ ___. _ __ _ _ .- 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 6 Time (hours) a c 0 w 60 s0 100 Discharge (cfs) 1 ? Primary Pond 2P: Wet Basin 2 Stage-Discharge Type 1124-hr 25-Year Storm Rainfall=6.46" WetBasin2 -- - - - -- P 1/71201? - rinted- --- - --Prepared-by {enter your company name here)- Pa a 25 H ydroCADO 8.50 s/n 004263 © 2007 HydroCAD Software Solutions LLC 9 Pond 2P. Wet Basin 2 Stage-Area-Storage ' Surface/HorizontallNetted Area (sq-ft) 000 14,ODD 16,000 18,000 000 12 000 10 OD0 8 6 20,DDD ? Surface 0 , , , , 2,000 4,000 Storage -- I --'- --------------- -------- ----- ------ ------ I i ? -- I ---- -------------- ------- - - - --------------- 1 868 ? I 867 _' ------'------------------- -- _ _ _ - I I I I I I I ' _ 865 --------- ---?-- ------ -- -,. I - 864 864 I--- ----------- 0 863 - -' --- ---- ---- - ------ ----- ---- i--,- ---,--- ----------- -- - to 862 I_ -------- __ _ ---1-- ?-------- - - - - - I I ' ' . -- ' 861 I I --- --- --- ' I ------ I I I I I I --- 859 ?t'?14Qt Sta9a ?& . 0 10,000 20,000 30,000 40,000 50,00060,000 709000 80,000 Storage (cubic-feet) 1 1 fl 1 1 1 1 1 11, 1 1 1 1 1 1 WetBasin2 Type II 24-hr 25-Year Storm Rainfall=6.46" P-repared-by-{enter- your--company, name here}- - --- - - --- -Printed 1%7/-201-1 - HydroCADO 8.50 s/n 004263 © 2007 HydroCAD Software Solutions LLC Page 26 Hydrograph for Pond 2P: Wet Basin 2 Time Inflow Storage Elevation Primary (hours) (cfs) (cubic-feet) (feet) (cfs) 0.00 0.00 0 858.10 0.00 4.00 0.00 0 858.10 0.00 8.00 0.37 2,140 858.86 0.00 12.00 52.33 63,842 865.43 0.15 16.00 1.09 68,503 865.69 1.18 20.00 0.62 67,626 865.65 0.67 24.00 0.52 67,365 865.63 0.53 28.00 0.00 64,626 865.47 0.15 32.00 0.00 62,535 865.35 0.14 36.00 0.00 60,510 865.23 0.14 40.00 0.00 58,554 865.11 0.13 44.00 0.00 56,667 865.00 0.13 48.00 0.00 54,850 864.89 0.12 52.00 0.00 53,103 864.78 0.12 56.00 0.00 51,429 864.67 0.11 60.00 0.00 49,828 864.57 0.11 64.00 0.00 48,300 864.47 0.10 68.00 0.00 46,848 864.38 0.10 72.00 0.00 45,471 864.28 0.09 76.00 0.00 44,170 864.20 0.09 80.00 0.00 42,947 864.11 0.08 84.00 0.00 41,803 864.03 0.08 88.00 0.00 40,738 863.96 0.07 92.00 0.00 39,754 863.89 0.07 96.00 0.00 38,853 863.82 0.06 100.00 0.00 38,037 863.76 0.05 104.00 0.00 37,308 863.71 0.05 108.00 0.00 36,670 863.66 0.04 112.00 0.00 36,121 863.61 0.04 116.00 0.00 35,694 863.58 0.02 120.00 0.00 35,403 863.56 0.02 124.00 0.00 35,205 863.54 0.01 128.00 0.00 35,070 863.53 0.01 132.00 0.00 34,978 863.52 0.01 136.00 0.00 34,915 863.52 0.00 140.00 0.00 34,873 863.51 0.00 144.00 0.00 34,844 863.51 0.00 148.00 0.00 34,824 863.51 0.00 152.00 0.00 34,809 863.51 0.00 156.00 0.00 34,796 863.51 0.00 160.00 0.00 34,785 863.50 0.00 WetBasin2 Type 11 24-hr 25-Year Storm Rainfall=6.46" - --- Prepared-by {enter-your company name here} --- -Printed- 1-17/201-1 Pa e 27 HydroCADO 8.50 s/n 004263 © 2007 HydroCAD Software Solutions LLC 9 I 1 1 1 1 1 1 1 1 1 Elevation Primary (feet) (cfs) 858.10 0.00 858.16 0.00 858.22 0.00 858.28 0.00 858.34 0.00 858.40 0.00 858.46 0.00 858.52 0.00 858.58 0.00 858.64 0.00 858.70 .0.00 858.76 0.00 858.82 0.00 858.88 0.00 858.94 0.00 859.00 0.00 859.06 0.00 859.12 0.00 859.18 0.00 859.24 0.00 859.30 0.00 859.36 0.00 859.42 0.00 859.48 0.00 859.54 0.00 859.60 0.00 859.66 0.00 859.72 0.00 859.78 0.00 859.84 0.00 859.90 0.00 859.96 0.00 860.02 0.00 860.08 0.00 860.14 0.00 860.20 0.00 860.26 0.00 860.32 0.00 860.38 0.00 860.44 0.00 860.50 0.00 860.56 0.00 860.62 0.00 860.68 0.00 860.74 0.00 860.80 0.00 860.86 0.00 860.92 0.00 860.98 0.00 861.04 0.00 861.10 0.00 861.16 0.00 Stage-Discharge for Pond 2P: Wet Basin 2 Elevation Primary (feet) (cfs) 861.22 0.00 861.28 0.00 861.34 0.00 861.40 0.00 861.46 0.00 861.52 0.00 861.58 0.00 861.64 0.00 861.70 0.00 861.76 0.00 861.82 0.00 861.88 0.00 861.94 0.00 862.00 0.00 862.06 0.00 862.12 0.00 862.18 0.00 862.24 0.00 862.30 0.00 862.36 0.00 862:42 0.00 862.48 0.00 862.54 0.00 862.60 0.00 862.66 0.00 862.72 0.00 862.78 0.00 862.84 0.00 862.90 0.00 862.96 0.00 863.02 0.00 863.08 0.00 863.14 0.00 863.20 0.00 863.26 0.00 863.32 0.00 863.38 0.00 863.44 0.00 863.50 0.00 863.56 0.03 863.62 0.04 863.68 0.04 863.74 0.05 863.80 0.06 863.86 0.06 863.92 0.07 863.98 0.07 864.04 0.08 864.10 0.08 864.16 0.09 864.22 0.09 864.28 0.09 Elevation Primary (feet) (cfs) 864.34 0.10 864.40 0.10 864.46 0.10 864.52 0.11 864.58 0.11 864.64 0.11 864.70 0.12 864.76 0.12 864.82 0.12 864.88 0.12 864,94 0.13 865.00 0.13 865.06 0.13 865.12 0.13 865.18 0.14 865.24 0.14 865.30 0.14 865.36 0.14 865.42 0.15 865.48 0.15 865.54 0.16 865.60 0.23 865.66 0.72 865.72 1.56 865.78 2.66 865.84 3.98 865.90 5.52 865.96 7.25 866.02 9.18 866.08 11.35 866.14 13.72 866.20 16.29 866.26 18.81 866.32 21.46 866.38 24.24 866.44 27.13 866.50 30.13 866.56 33.24 866.62 36.48 866.68 39.86 866.74 43.35 866.80 46.95 866.86 50.52 866.92 54.17 866.98 57.90 867.04 61.67 867.10 65.49 867.16 69.36 867.22 73.36 867.28 77.54 867.34 81.32 867.40 84.81 Elevation Primary (feet) (cfs) 867.46 88.36 867.52 91.95 867.58 95.58 867.64 99.26 867.70 102.99 867.76 106.77 867.82 110.58 867.88 114.44 867.94 118.35 868.00 122.30 868.06 126.29 868.12 130.32 868.18 134.39 868.24 138.51 868.30 142.67 868.36 146.86 868.42 151.10 868.48 155.38 1 1 1 WetBasin2 Type 11 24-hr 25-Year Storm Rainfall=6.46" -P-repared-by-{enter your company-name-here} _ - - --r-inted---1/712011 - - - Page 28 H ydroCADO 8.50 s/n 004263 © 2007 HydroCAD Software Solutions LLC Stage-Area-Storage for Pond 2P: Wet Basin 2 Elevation Surface Storage (feet) (sq-ft) (cubic-feet) 858.10 0 0 858.25 1,407 106 858.40 2,815 422 858.55 3,782 939 858.70 3,868 1,513 858.85 3,954 2,099 859.00 4,040 2,699 859.15 4,128 3,312 859.30 4,216 3,937 859.45 4,305 4,576 859.60 4,394 5,229 859.75 4,482 5,894 859.90 4,571 6,573 860.05 4,659 7,266 860.20 5,036 7,986 860.35 5,556 8,780 860.50 6,076 9,652 860.65 6,292 10,580 860.80 6,507 11,540 860.95 6,723 12,532 861.10 6,938 13,557 861.25 7,154 14,614 861.40 7,369 15,703 861.55 7,585 16,824 861.70 7,801 17,978 861.85 8,016 19,165 862.00 8,232 20,383 862.15 8,447 21,634 862.30 8,663 22,917 862.45 8,879 24,233 862.60 9,094 25,581 862.75 9,310 26,961 862.90 9,525 28,374 863.05 9,895 29,823 863.20 10,572 31,358 863.35 11,249 32,994 863.50 11,926 34,732 863.65 12,662 36,576 863.80 13,397 38,531 863.95 14,133 40,596 864.10 14,574 42,756 864.25 14,868 44,964 864.40 15,162 47,216 864.55 15,456 49,513 864.70 15,750 51,853 864.85 16,044 54,238 865.00 16,338 56,666 865.15 16,632 59,139 865.30 16,926 61,656 865.45 17,220 64,217 865.60 17,597 66,826 865.75 18,015 69,497 Elevation Surface Storage (feet) (sq-ft) (cubic-feet) 865.90 18,433 72,231 866.05 18,851 75,027 866.20 19,270 77,886 866.35 1908 80,808 866.50 20,106 83,792 866.65 20,106 83,792 866.80 20,106 83,792 866.95 20,106 83,792 867.10 20,106 83,792 867.25 20,106 83,792 867.40 20,106 83,792 867.55 20,106 83,792 867.70 20,106 83,792 867.85 20,106 83,792 868.00 20,106 83,792 868.15 201106 83,792 868.30 20,106 83,792 868.45 20,106 83,792 r YlmapmrricenGrten LMD6 V.. 1-3 Dinl92pIDIR'33PM'DMPU-cD BY.. RHH cG N4ME LeienmaPn.1 IFRDI N •?DDII6 DM EIATIDN/?i • 6eein2 D6TATIDN/R.J?Qti FoeGw SW IDFWNA'uE ARA i.3poc 1DESIGp FFEDUENCY: i•Yen'oloim H YDRAULIC RESULTS P:iDI70Q ' DmOwa, Idd Feel. Flee' Peved llr_t vdedly II mm 1?1 Hyds?c NmmM Red?v911 DedhM ?9 p5 3m i'3 D7D 97 1•,• 'I 1 I Li 6ollom V.4tllh. iDp Il .D Nmm6de IIN RR S T ' fiee? Melting iyes SLepk PepeT 'Leh6LY YepJetim?Gme]nelrs F-t+'e Phee Bees iype Lemnu Shee Slm. lean CdeuWed Shea Sb? leer 6eidv i.... F;-.k. 6v:ipid PTaaD VepNatien 3 L M: T>eS 5<.fID 5t1 257 6iABLE Ste*E Sd F e Sne! _259 DZI 7138 6749E 1 1 1 1 1 1 1 1 1 6e.l to lnpul Sveen NORTH AMERICAN GREEN EROSION CONTROL MATERIALS DESIGN SOFTWARE VERSION 4.3 R T H AMERICAN GREEN CHANNEL PROTECTION - ENGLISH/S.I. ER SPECIFIED CHANNEL LINING BACK-UP COMPUTATIONS nn*******************?n?nnn?nnnnnnnnnn n***n?nnnnnnnnnnnnnnnnnnn***..nnn I PROJECT NAME: Foothills Commerce Center - Ph.1 PROJECT NO.: 09.00116 C MPUTED BY: RHH DATE: 11/19/2010 OM STATION/REACH: Basin 2 TO IONIREAC / Yeabay Sm DRAINAGE AREA: 1.3 Acres DESIGN FREQUENCY: **..nnn?n-n nnnnnnn*****n inn ?? nn*******?***..*r.*-nnnnnnnnnnn***nn nn?..nnn***n INPUT PARAMETERS -.-.non noon.-.n..nnnnnn nn nn nn non n*?Cn.-.noon nnnn?. n..nnnn-. n..: nn:.. :nn.. n.. n..n.. .•.. n.'?. *.'?.n?n n Channel Discharge : 3.9 cfs (.11 m^3/s) eak Flow Period : 0.5 hours ?hannel Slope : 0.385 ft/ft (0.385 m/m) Channel Bottom Width : 5.0 ft (1.52 m) eft Side Slope :3:1 right Side Slope : 3:1 hannel Lining : P550 Staple E Mix 75-95% ermi. Shear(T p) :14.00 psf (670.3 Pa) Phase = 3 Class = C Vegetation Soil = Fine Sand Allowable Soil Shear(Ta):3.25 psf (155.61 Pa) CALCULATIONS ,n Initial Depth Estimate = 0.16'" (3,9!(0.385^0.5))^0.375 = 0.32 ft (. 10 m) Final Channel Depth (after 7 iterations) =.23 ft (0.07 m) ,Flow Area = (5.0 * 0.2)+(0.5 *0.23^2 * (3.0+3.0)) = 1.3 sq.ft (0.1 m^2) Wet Per. =5.0 +(0.2*(((3.0^2)+1)^.5 +((3.0^2)+1)^.5)) = 6.4 ft (2.0 m) Hydraulic Radius = (1.3 / 6.4) = 0.2 ft (0.1 m) 'Channel. Velocity =(1.48610.104)*(0.2^0.667)*(0.385^.5) = 3.0 fps (0.9 m/s) Channel Effective Manning's Roughness = 0.104 Calculated Shear (Td) = 62.4 * 0.23 0.385 = 5.44 psf (260.6 Pa) Safety Factor = (Tp/T d) _ (14.00 15.44) = 2.57 Effective Stress on Blanket(Te) = 5.4*(1-0.75)*(10.104)^2 = 0.21 psf (10.1 Pa) I Safety Factor = (Ta/Te) _ (3.25 /0.211) = 15.38 Nalha -G -ED1DSV., 4.3 ?ROJECf NAME:-r Caansnef pm-Pni WE%STATID EADd: - 11051ATIONMEAM Fota4p NE HYDRAULIC RESULTS i%9y? HydeuE NanW 041,10' Palk Fb+ Ympp4y 110: I" fdl Feddllml Red?clRt Dwhnn 75.3 OS I fi56 23 032 436 dlTl192DIp :72 PM COMPUTED BY RHH pRWECT N0. 0EOOI76 RAINA'aE 4REk UAea I ESIGN FicDUENLY: 11ea "° P5DIm0.Ga1? I??I A 'wmti,I?°?DBU ?O Nm m sade Melting type YepeMEOn Quieincf c?4 l l C 4 d FrJa R'mvP_ Solel R? 'ateh8yi Jys- Pnn 94 ? Sh a e a u Spar 54r y Sleple Paliun Phas Clrs Type Dweu e u 4 . _ 5aapht P550 vepyetim 3 C Afa 755: 11.80 i.90 7.77 STABLE StapleE 5d Fna Send 3'u? 0.901 '?` 91A9LE Bag. m 1- Eamn i 1 ^ ^ _ t*RT H AMERICAN GREEN EROSION CONTROL MAT ERIALS DESIGN SOFTWARE VERSION 4.3 RTH AMERICAN GREEN CHANNEL PROTECTION - ENGLISH/S.I. ER SPECIFIED CHANNEL LINING BACK-UP COMPUTA T IONS IROJECT NAME: Foothills Commerce Center - Ph.1 PROJECT NO.: 09.00116 OMPUTED BY: RHH DAT E: 11/19/2010 ROM STATION/REACH: Basin 2 STATIONIREACH: 1-Year hStorNm RAINAGE AREA: 5.0 Acres INPUT PARAMETERS _ -------------- -- hannel Discharge : 15.3 cfs (.43 m13/s) Oak Flow Period : 0.5 hours hannel Slope : 0.333 ft/ft (0.333 m/m) hannel Bottom Width : 5.0 ft (1.52 m) fi ft S ide Slope : 3:1 ght Side Slope :3:1 hannel Lining : P550 Staple E Mix 75-95% ermi. Shear(Tp) :14.00 psf (670.3 Pa) Phase = 3 Class = C Vegetation Soil = Fine Sand Allowable Soil Shear(Ta):3.25 psf (155.61 Pa) CALCULATIONS y Initial Depth Estimate - - 0.16 ° (15.3 /(0.333 ^0.5))^0.375 = 0.55 ft (.17 m) Final Channel Depth (after 10 iterations) =38 ft (0.12 m) ' Flow Area = (5.0 * 0.4)+(0.5 *0.38^2 * (3.0+3.0)) = 2.3 sq.ft (0.2 m"2) Wet Per. -5.0 +(0.4(((3.0^2)+1)^.5 +((3.0^2)+1)^.5)) = 7.4 ft (2.3 m) Hydraulic Radius = (2.3 / 7.4) = 0.3 ft (0.1 m) ' Channel Velocity =(1.486/0.061)'(0.3^0.667)'(0.333^.5) = 6.6 fps (2.0 m/s) Channel Effective Manning's Roughness = 0.061 ' Calculated Shear (Td) = 62.4 * 0.38 = 0.333 = 7.90 psf (378.2 Pa) Safety Factor = (Tpf-I d) = (14.00 17.90) = 1.77 Effective Stress on Blanket(T e) = 7.9=(1-0.75)(/0.061)^2 = 0.90 psf (43.3 Pa) Safety Factor = (Ta/Te) = (3.25 10.904) = 3.59 1 11 1 1 1 1 1 1 1 1 1 1 1 1 1 i ..... fNaltiala G CCMISV13 5111/tlll (04ff PMTCDMPU7CD HY RHH „ (CADM:iATIpNlRCPCH: Wd '(ip :-TATIpN/RCACM: ?DRAINAfiC ARCA. 6.3 Ancy IDEvIGN TREDU•NGY 1Yea ,I•m HYDRAULIC RF`?l`II TS R? RpaP Im,p,p7n Diediaps Peak Flow docly llpel aea la¢iD Hydia,6c Namd clcPeriod Radaa 111 D th 111 p9.2 n5 n63 3nII2 n32 DIZ s•nD?o 1 II1 BED w? 4D.oon ?Co Na m scde Reaeh Mabny Type udSb Ar?dye¢ Veyeblion C'hasdemtiv Puirirs3le SU Sh LakJaed Shea Saem Sdeb Fadw Remake Slagle Pdldn Phes Ome Type Dmeib me ea, ?? Ipo9 Shdd+l Pw:k Pp,ap pmepdded 1.W n13 7.fi9 STABLE 3n Beak 1e 1( S.- 1 10RTH AMERICAN GREEN EROSION CONTROL MATERIALS DESIGN SOFTWARE VERSION 4.3 RTH AMERICAN GREEN CHANNEL PROTECTION - ENGLISH/S.I. ER SPECIFIED CHANNEL LINING BACK-UP COMPUTATIONS 10JECT NAME: Foothills Commerce Center E0 O MPUTED BY: RHH M STATION/REACH: Wet Detention Basin INAGE AREA: 6.3 Acres - Ph 1 PROJECT NO.: 09.00116 DATE: 1/11/2011 2 - Forebay Weir DESIGN FREQUENCY: TO STATION/REACH: 1-Year Storm *************************************************************************** INPUT PARAMETERS ***************************************************************************** annel Discharge ak Flow Period Channel Slope annel Bottom Width tft, Side Slope Right Side Slope 19.2 cfs (.54 m"3/s) 0.5 hours 0.005 ft/ft (0.005 m/m) 50.0 ft (15.24 m) 80:1 . 30:1 I annel Lining : Rock Riprap 3in Permi. Shear(Tp) :1.00 psf (47.9 Pa) Phase = 0 CALCULATIONS Initial Depth Estimate = 0.16 * (19.2 /(0.005A0.5))A0.375 = 1.31 ft (.40 m) inal Channel Depth (after 9 iterations) _ .42 ft (0.13 m) low Area = (50.0 * 0.4)+(0.5 *0.42A2 * (80.0+30.0)) = 30.4 sq.ft (2.8 mA2) et Per. =50.0 +(0.4* (((80.0A2) +1) A.5 +((30.OA2)+1) ~.5) ) = 95.9 ft (29.2 m) Hydraulic Radius = (30.4 / 95.9) = 0.3 ft (0.1 m) I hannel Velocity =(1.486/0.077)*(0.3A0.667)*(0.005~.5) = 0.6 fps (0.2 m/s) Channel Effective Manning's Roughness = 0.077 t alculated Shear (Td) = 62.4 * 0.42 * 0.005 = 0.13 psf (6.2 Pa) afety Factor = (Tp/Td) = (1.00 /0.13) = 7.69 i McGift O C _ ineering Planning • Finance Eng McGill Associates, PA.P.O. Box 2259, Asheville, NC 28802 , PROJECT: FODTH-LLLS PROJECT NO.: M xxm(O DESCRIPTION: r?TI- C`?- V??Tst??Z CALCULATED BY: -? CHECKED BY: DATE: 1' 711 SHEET NO. L OF {to be prop lded by DWO) Drainage Area Number- Wet Detention Basin operation and Maintenance Agreement ' t in a ke ill b d p e w I will keep a maintenance record on this Me. This maintenance recor log in a lazown set location. Any deficient BMP elements noted in the inspection will be ' corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basil system is defined as the wet detention basil, retreatment including forebays and the vegetated filter if one is provided. p This system, (check one): does ® does not incorporate a vegetated filter at the outlet. i This system (check one): [? does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: - Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). - No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. ' - Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. - If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. - Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established., it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set ' location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall ' be repaired immediately. u BMP element: The entire BUT Potential roblem: Trash/ debris is resent. Haw I will remediate the roblem: Remove the trash debris. The perimeter of the wet Areas of bare soil and/ or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Mai n{3. vegetation at aheight of lon . approximately six inches.. 1 Form SW401-Wet Detention Basin O&M-Rev.4 Page 1 of 4 r 1 1 11 1 1 i 1 -P-emit-Number:--- ---- - (to be proWded by DW-Q) Drainage Area Number: lement: BMP Potential problem: How I will remediate the roblems: e The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off-site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future roblems with erosion. The forebay Sediment has accumulated to Search for the source of the diment and remedy the problem if a depth greater than the se original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than s ra nt . The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. b Remove the weeds, prefera hand. If pesticide is used, the lants rather than s ra q The main treatment area Sediment has accumulated to Search for the source of th a depth greater than the sediment and remedy the original design sediment possible. Remove the sedi storage depth. dispose of it in a location will not cause impacts to s the BMP. Algal growth covers over Consult a professional to rertzove 50% of the area. and control the al owth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% o f with pesticide (do not spray). the basin surface. Form SW401-Wet Detention Basin O&1,4-Rev.4 Page 2 of 4 ------ - -- --Permit Number-:--- (to be provided by DTd1Q) Drainage Area Number. BMP element: Potential roblem: How I will remediate the roblevr: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present consult a professional to remove beavers. A tree has started to grow on Consult a darn safety specialist to the embankment. remove the free. An manual inspection by an Make a1I needed repairs. appropriate professional shows that the embankment needs re air. (if a licable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device is dama ed Re air or repLace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. n-Le measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads ?j.4 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 3.4 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fIIl in the blanks) V Permanent Pool Elevation 863.5 Sediment Removal .960.1 Pe nanen Pool Volume Sediment Removal Elevation 958.1 Volutne -------------------------- ------ ------------- Bottom Elevario 859.1 -ft Min. ----- Sediment Bottom Elevation 857.1 1-ft Storage Sedimer Storage FOREBAY 14AYN POND Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 of 4 1 -- --P-ennitN-runber_:-- --- - - - ----- - - (to be proi? ded by D3?Q) I aclmowledge and agree by my signature below that I am responsible for the ' performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project naineToothills Commerce Center ' Bh2P draiizage area nuinber:2 I Print name:Bra.d Comwell Title:Public Utilities Director Address:P O Box 207 824 West Grover Street Shelby. North Carolina 28151(28150) 1 1 1 1 PI. Si U VIYA bdi .?,j1?? k aNotary Public for the State of I, r 'J ?O(, u, _ , County of Cl? V(Aa 41 k , do hereby certify that V--. OcT o w t U personally appeared before me this 1 day of L1'9 o b-cr and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, KAREN DILLEMUTH WILKINS Notary Public, North Carolina Cleveland County My Commission Expires September 21 , 2013 SEAL 1? j 1v1y canlnlission expire s? {f? M01 n I Form SW40I-wet Detention Basin O&M-Rev.4 Page 4of4 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. 1 I November 16, 2010 19LE114c, BUNKELL-LAMMONS ENGINEERING, INC. Gor?wcw, &1V1ioNMVrALAND COkSii MI ON MA71RALS CONSL TAWS McGill Associates, P.A. 55 Broad Street Asheville, Noy tli Carolina 28801. r Attention: Mr. Dale Pennell, P.E., P.L.S. Senior Project Manager Subject: Report of CeotechnicA Exploration and Sail Iuffitration Testing Foothills Commerce Center ' Phase I Wet Detention Basins Shelby, North Carolina BLE Project No: SIO-6667-02 i Dear Mr. Pennell: Bunnell-Lammons Engineering, Incorporated (BLE) is pleased to present the ge-otechnical exploration and infiltration test results for the proposed Phase I Wet Detention Basins for the Foothills Commerce Center project. The •geotechnical exploration and infiltration testing, was performed generally as ' described in BLE Proposal No. P10-0672 dated October 21, 2010. The exploration was authorized by your signing our Proposal Acceptance Sheet on November 5, 2010. . SITE AND PROJECT DESCRIPTION We previously prepared a Report of Preliminary Geotechnical Exploration (BLE Project No. J09- 6667-01) dated September 24, 2009. The preliminary report should be read in conjunction with this report. We have been provided with a drawing titled "Overall Plan" by McGill Associates, P.A. dated July, 2010 showing the planned development, location of wet detention basins and the existing topographic contours: The site consists of a 145-acre tract of land generally located within the southeast quadrant of the intersection of Artee and Plato Lee Roads on the west side of Shelby, North Carolina (reference Figure 1). We understand that the property is planned to be an industrial business park. The geotechnical exploration and infiltration testing for this report are specific to the Phase I Wet Detention Basins, which consists of three basin locations. The basins range' is plan size from 11,926 to 35,628 square feet with maximum depths of 8 to 11 feet. A north-south trending'creek divides the property with approximately % of the property located east of the creek. The property east of the. creek is used as farmland. The remaining 1/4 of the sits located ' west of the creek was formerly a pine forest that was cleared some time ago and has since become overgrown with brash. The site topography slopes down from the north/northeast to the south/southwest to Little Beaver Dam Creek and then slopes up to the.west to Plato Lee Road. The ground surface elevations range from about 800 to 8800 feet. 1 ?I L r I' ?ILEG , November 16, ?010 Report of Geoted=ical Fxploration and Soil Irgiliration Testing B> E project No. JI D-6667-0? Foothills Commerce Center-Phase I Fret Detention Basins Shelby, North Carolina STi-RS1iiWA.CE ExTEGRATION of the Report of Preliminary Ten soil test borings (B-1 to B-10) were previously performed as part Co- ochnical Exploration dated September 24, 2009 (reference Figure 1). Three soil test boring (B- 11 to B-13) were performed specific to the Phase I Wet Detention Basins (reference Figure 2) with a Soil Sentry truck-mounted drill rig with 21/4-inch inside diameter hollow stem augers for the proposed project. One test boring was drilled near the center of each proposed wet detention basin to depths of 17 to 20 feet. The test boring depth was extended to a minimum of four feet below the proposed bottom at each wet detention basin. In addition, fourteen infiltration test borings (reference Figure 2) . infiltration test borings J-1 to I-3) were drilled within the footprint of the wet detention basins. Three were performed in Basin No. 1, three infiltration test borings (I-4 to I-6) were performed in Basin No. 2 and eight infiltration test borings (I-7 to I-14) were performed in Basin No. 3, Wet Detention Basin No.1 Soil Conditions (13-11) - The surface consisted of approximately 5 inches of silty fine sand topsoil. The subsurface soils generally consisted of loose to firm, moist to wet, slightly micaceous silty fine to medium sand to a depth of about 4 feet. The loose to firm sand appeared to be alluvial (water deposited) soils. A chemical odor was noted in the soil sample obtained from 4'/z to 6 feet. Beneath the alluvial sand, boring B-11 encountered residual soils that consisted of firm to dense, moist, slightly micaceous silty fine to medium sand to auger ref sal at la feet. Residual soils are soils weathered in- place from the parent rock. Auger refusal likely occurred on partially weathered rock (PWR). Groundwater Conditions - Groundwater was not encountered during the drilling operations. Groundwater was encountered at a depth of about 5 feet after 4 days. Based on sample coloration, soil moisture content and observed water levels, the hydrostatic water table was estimated to be at a depth of approximately 5 feet during the observation period. met Retention Basin -No. 2 Soil Conditions (B-12) - The surface consisted of approximately 5 inches of slightly clayey, silty sandy topsoil. The subsurface soils generally consisted of loose to firm, moist, slightly clayey sandy silt to moist, silty fine to medium sand to the boring termination depth of 20 feet. This silty fine to medium sand is residual soil. Residual soils are soils weathered in-place from the parent rock. Groandwater Conditions - Groundwater 'vas not encountered during the drilling operations or 4 days after the drilling operations. Based on sample coloration, soil moisture content and lack of water, the hydrostatic water table was estimated to be below the test boring depth of 20 feet. Wet Detention Basin Igo- 3 Soil Conditions (B-13) - The surface consisted of approximately 5 inches of slightly clayey, silty sand topsoil, The subsurface soils generally consisted of loose to firm, moist, slightly micaceous, slightly clayey, silty fine sand to a depth of about 14 feet. These soils are residual soils which are weathered in place from the parent rock. Partially weathered rock or boulders were encountered from ' 14 to 17 feet. Auger refusal material was encountered at 17 feet. 1 'J I 1 1 1 1 1 Nol?em.ber 16, 2010 Report of Geotechnical Exploration and Soil Injzl -ation Testing BTE Project No. JIO-6667-02 Foothills Commerce Center -phase I Wet Detention Basins Shelby, North Carolina ? ed at a depth of 8 feet during the nrilhnQ Groundwater Conditions - Crroundwater was encounter le coloration, soil moisture content operations and at a depth of 6 1/-, feet a$er 4 days. Based on ramp and observed water levels, the hydrostatic water table was estimated to be at a depth of 61/z feet during the observation period. Oroundater Considerations anog Groundwater levels may fluctuate several feet with seasonal and ground- all var at zls and chn lie F' t r water level in adjacent drainage featoxes. Formally, the hide and spring and the lowest levels occur in late summer and fall. etiseasonal on Basins No. land 31 and bel wla estimated to exsst at a depth of 5 feet in the vicinity of Jet eten depth of 20 feet in Wet Detention Basin No. 2. LABORATORY TESTING I'Za ral moisture Content WithA 'RA D2216. orance 11-S The natural moisture content of select soil samples was da erminndemta e of the weight of water in a The moisture content of the soil is the ratio, expressed P given mass of soil to the weight of the soil particles. The results are shown on the table below. percent .Liiner than 1'?0.200 Sieve A percent finer than a No. 200 Sieve test was performed on u three asSoil hed oerl85U S. Standard No 200 content of these materials. After initial drying, the camp sieve to remove the fines (particles finer than a No. 2Q0 mlh? shown onstatest,was b e 1 below owed in a manner similar to that described by ASTM D1140. Th t ' Depth No. 200 t e Percent Tie Natural IM?oistnr c ss fication Cla S Tes Boring No. . (feet) / ) ( ve Sie Content (%) . , 24 SM B-11 13.5-15.0 12.5 SM B-12 13.5-15.0 26.7 37 SM B-13 8.5-10.0 38.7 24 ,NyffiTgAT1OF TEST PROCEDURE, AND RESULTS A borehole was drilled and converted to a monitoring mwell T?mfiltration testing diameter performed in to a depth of 2 feet below the proposed pond botto whi general accordance with Appendix C - Testing Requirements GuideubYolumer2,liYeratioi;e Biofilters part of the Stormwater Best Management Practice. Design dated September 2004 prepared by the U.S. Environmental Protection Agency. well, and in accordance with iiie above referenced Upon completion of the infiltration (monitoring) testing, requirements, the well was then filled with clean water to a depth of 24 inches and allowed to pre- soak for 24 hours. t fl 1 1 1 1 1 1 t 1 1 1 November. l6, 2010 Report of GeotechnicaI F plora;ion and Soil Injfltration Testing BL:i,: Project No. J10-6667-02 Foothills Commerce Center-Phase I t1'etDetention Easins Shelby, North Carolina Upon 24 hours later, the casing was refilled with clean water to the top of the casing and the water level was monitored (measured) from the top of the casing for 1 hour. This test procedure was repeated 3 additional times for a total of four times. The PVC p borehole with soil if no additional testing is required. BLE can remove the PVC pipe and bacl?ll the ? required. The average infiltration rate for each wet detention basin is presented in the following tables. FABLE 3 -WET AE'TEIdMON BASIN i O Inmtration No I-4 I-5 1-6' Average of I4 to I-6 i ij LTRA`IT0 lES`p RESULTS iVe ge Inft'atroa Rate Cinches per hour 61.73 86.56 30.34 59.54 CONCLUSIONS A10 ALTERNATE LMR P?ECOMM NDATIONS The average infiltration test results of 0.55 and 0.96 inch per hour for proposed Basins No. 1 and 3, respectively are in the range of expected values for firm silty sand residual soil encountered by the test borings. The infiltration test result of nearly 60 inches per hour for Basin No. 2 is typical for.loose sands. If these infiltration rates are higher than allowable for the basins, a low permeability liner would be required. Based on the sandy soils encountered by the test borings, a bentonite clay amended liner is recommended. 4 1 1 1 1 1 1 November 16, 2010 Report of GeotechnicaI Exploration and Soil I?INZ'dion Testing BLEProjectNo. J10-6667-02 Foothills Commerce Center -.Phase I Wet Detention.Basins. ShzIby, North Carolina r c uing, sodium The bentonite far a low permeablity liner, should be free-flowing, powdered, hid_swe montmorillonite clay that is free of additives. The bentonite am should be a silty s dbwith 00 pert at 3 to 6 percent by dry weight. I'he soil used with the bentontt erc enting the No. 2DQ siet?e passing the No. 4 sieve and a maximum of 3 5 percent (preferably _ 5 p ) P ass the bentanite should be thoroughly or a mixed with the native soil using a tiller before adding sufficient mater to promote compaction All fill used for replacement o of material that is unck rcat I d Proctor maximum dry density uniformly compacted in 6-inch Iii to at least 95 percent _ (AST T) 690) at 2 to 5 percent above the optimum mo zee ??ntGf rt the soil bentmionite soil o confirm the recommend laboratory tests be performed with samples? construction, a test pad should be required bentonite to achieve the required permeability. At the start or performed at the proposed finished grade within the. basin- The We test pad should b therf o th d us s nigt e recommend that lift rkne be same equipment and construction methods as the actual X21• to 10 inches, loose measure before compaction. Infiltration tests should be performed on the test pad to verify acceptable permeability rates. All existing topsoil, vegetation, disturbed soils, and soils containing organic matter or other deleterious ? . in and ro ?h excavation to within materials should be stripped from support for the liner be careful y inspected for soft surficial grading, «?e recommend that areas soils and proofrolled with a 25 ton, four-wheeled, rubber tired roller or similar ep approve equipment. feet of over the within recommend a visual inspection rather than proofrollmg basin areas that each groundwater level. The proofrollEr should make at least ?a ePruteoT deflect e.lcesstvely and continue passes perpendicular to the first two. Any areas w do so after several passes of the proofroller should be excavated to firmer soils. The excavated areas should be backfilled in thin lifts with suitable compacted fill materials. Th ephm fronllingo aide under the operations should be. carefully monitored by an experienced engineering direct supervision, of the geotmhnical engineer. We appreciate the opportunity to provide our professional services on this project. If you have any questions regarding this report, please contact us at ($28)277-0100. . Sincerely, BMiNE L,LA3fMGNS ENGINEERRiG,I I ?I11ff I?AR(?Z?firr? 30 7 Gary L. Weekley, PR William T. Gentry III, P.E.?6 0 14,1 3 ?? Senior Geotechnical Engineer Senior Engineer NC NC Registration No. 339_7 Registration No. 0251 iC)MN? Attachments. Figure 1- Boring Location Plan for Preliminary Geotechnical Exploration Figure 2 - Boring and Infiltration Location Plan for Phase I Wet Detention Basins Field Exploration Procedures Soil Test Boring Logs (3) Key to Soil Classifications and Consistency Descriptions 5 1 1 1 i 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 W z vi ? o ¢ C a J clZ cm O JJ W ? Q --- ?--- -- --__ d0 O O UL U= OUZO ti7? J UI=U Z ?? "e I GCO JUt-Z I [Z10 cc? UJ pd ? c pZ ¢pV) N - ! ? E I I I r e... a..a a.a.?. v I ! U En ?? ? f I 'e?? cl ?s • i _-- _ ? J c o -_ - Zvi- I ? \\ u0: I ? ouo 1 I F B e E. ? E ? moo Q f ? o ie ? \ Eg. c? a ?N s q •.c ? I ? ?-pII ? ? ¢ ?? s ? l E ? ?y "a a ¢ 0 al !! SZ I ? [g?? e E Y W N ? CT / t F "s `<E I ? acG X 11111 1111 1 111111 \ 's~i ° s'' ' 11111 I I II I1 II 1 Iil I III 111111 I 1 11 I I 1 111111111111 I II 1 I II 111 WHO I I I 'o \ 6 F? 11111111 111. 1 II 1111 unn,tll 11 .nll a nnl : Innlmlunan I1 nn 1 a ^ m I No \ ____ c I sl i I. E I N z O C) ; tD 1 O }+ ? "t ?° • i i " ? j _ e F al O p 000 \ r ! AL LLI I w I CR o c I KIL13p_ Held Exploration Procedures S011 Test Sorings flight S=i eel auger into the soil. Soil The borinD were made by mechanically twisting a continuous 6 were erformed in general accordance vrith ASpM D 150. At sampling and penetration testinb P tu5 assigned intervals, soil samples were obtained with a standard 1.4-inch 1. D., ?? ? men d?? n ban sampler. The sampler, was first seated 6 inches penetrate any 0 inch The number of hammer additional 12 inches with blows of a 1. 0-pound hammer falling blows required to drive the sampler the final 12 inches was recorded and is designated the "standard ' tion resistance, vrhen properly evaluated., is an index to the penetration resistance:' The penetration strength of the soil and foundation supporting capability. ' of the soil samples, thus obtained, were placed in glass jars and transported Representativa Portions m?n_ed by a geotechnical engineer to verify to the laboratory. In the laboratory, the samples ? ere exa the field classifications of the driller.- Test Boring Records are attached, showing the soil dcriptions and penetration resistance. es u 1 1 SOIL T BORING NO. B-1i PROJECT-. Foothills Commerce Center Phase I Wet Detentian Basins PROJECT NO.' JiDSo- ' BUMELL4JMMS DATTE 5TART: 10-2240 EldlZ: 9-22-1D. CLIENT: McG I A&sDdatPS 81215 NC4N LOCATION[: Shelby, Borth Cara{Ena ELEMTIDN: R LOGGED W. G_ e_ ntry ° ` `?? tic. DRILLER: Metro Drill, Enc., R- Frye DRILLING METHOD: Soil Sentry Trunk mount: 2-114 inch ED hoi{aw stem, e 5 e GA1?ti?C> DEPTH To. 1R?ATER> EE11T1AL: dry AF TER 4 DAYS: rr, 7SE 1 J SAIL STANDARD PEWF RATI DN RESULTS DFPTIi BLA1h?5r-QDT FPT T (Mr SDIL DESCRiPTiDN E e H 2 5 10 20 30 40.50 TO DD i 1 S-irlclreS os tan and gray, slaty SAND -(topsoli) 4 :. ?. Pi`1D - (atluvlum) s .. Loose, moist, silty, tins to medium, s B(0 ' slightly micaceous, _. and white, vet, Firm, brown, tan, gray T : ? .................... _ silty, fine to medium SAND - (alluvium) 5 Chemical odor noted in sample 3 .. 6 ?. .......:.. .....: Firm lxaw tan and white, moist, slightly micaceous, silty, . t ' :,? ...:. .............. ..._.._........... fine to medium SAND - (residuum) .. 605 :.• ' s Firm to dense, i3facic, Q['-, .. and tan, moist, slightly g micaceous, silty, fine to medium SAND - (residuum) ;. a ?o ' 600 11 1s ... . 32 1 'S 795 _ Boring terminated at IS feet due to auger refusal.as groundwater encountered attire of drilling, zD encountered at b feet aver 4 days. 790 25 , 765 . ' 30 . 0 r r 7BO i _ :_ 35 - } 4 F 775 : - o Z11 SOILTSSTBORR-4Li NO. B-11 Sheet I of I 0 1 SOIL TEST BORING NO. B42 PROJECT: Foathi[is Gemreserce Center Phase { Wet Detertti°n DABasins TE START: CID-ZZ-i DJ END ®®asGLIENT: f?icGillAssoc[ates ELEVAiDDf': 865.0 ??? ? LDGA i1DR: Shelby, North Car°iina LOGGED BY: W GDntrY INC. DRILLER: ivietro Drill, Inc., R. Frye E?e®FMVr?«m,y DRILLING METHOD: S0711 Sentry Truck mount; 2-914 inch ID hatiovr?ern a?? CA?'ING? C.a??vztTS - DEPTH TO -Y?ATER> INITIAL: ? dry AFTER 4 DAYS: 0 SDIL I STANDARD PENETRATION RESULTS ELEVATIDNI SDiL DESCRIFrIDN il?E M. BL0NN'vFDDI DEPTH i? u? 2 0 90 2D 36 46 50 70 9D silty SAND - 5-inches of reddish-Enron, slightly olayey, s 655 (topsoil) .........:................ Firm, reddish-brDV?ri, moist, slightly clayey, Tlne to medium s sandy SILT - (residuum) s 7 90 66D Firm to loose, reddish-broom and tan, moist, slightly clayey, 7 :.......:. g.:- s :..,.:.:.._...._........... ... ; fine to medium sandy SILT (residuum) 6 94 655 Loose to ttrm, tan and white, moist, silty, fine to medium •;:.,;.::.. .:...:....:..:..:... ?- SAND - (residuum) 3 - S ® - - 55 - B50- 4 - 7 20 Bas Boring terminated at 20 feet. Pao groundwater encountered at tame of drilling. 25 840 :...:....:.. •.............. . ' 30 B35 - a 35 N ................-.. _.... _....: .. 630 ' SOILTEST BORING NO. B-12 z? Sheet i of 1 0 D EST BORING NO. B-13 -BOIL ??ltdG. Fo°thitfs Conmerce Genter Phase [ Wet Detention Basins J PROJECT: END: iD-22-10 CLIENT: Mc!,3111 Associates ELEVA11OH: 90T.0 SUMMED LOCATION: Shelby, North Garolina LOGGED BY: NY. Gentry MEEMG5 INC. DRILLER: 1,4etro Dn'€1, Inc., R- Frye E a f? l?s?P -a 'T661. DRILLING METHOD: S°it Sentry Truck mount; 2-414 tech ID ftott°w stem auger 6.5 CAVING> fCpMs41ISlXTS C7 g AFTER 4 DAYS: DEPTH TO - vdATER> 114 MIL: _- Sall STAt lA Pr7S=TRkTlah' RESUL TS iYi'E ? SLOVt'a+FOaT ELEVATIC)w SOIL DESCRIFTi )DN DEPTH (FTC vii ? 5 50 29 30 40 50 70 90 A • Silty Sfl?[D - 3 5_[nches of reddish-brQn, 5[ightty clayey, - - ' (topsoil) 4 ....:....:..._.........._. ;.: say Loose to firm, reddish-brawn, moist, slightly clayey, silty, 3 fine to medium SAND $ 4 ` _ . 5 - 2 :•_ _ Loose to frM, reddish-brovin and black, moist, micaceous, ?....._...._... - s smo j silty, fine SAD V7 6 10 Trace rock fragments at '10 feet - - 785 72 ;Pc :.:• • 5015" - ... _..:....:..:.'.. .... ...:....:..:........ PARTIAL LY y1(EATHERED RdCl4 which sampled as wet rack . 15 fragments with silty sand : • • - 790 ... Baring terminated at 17 feet due to auger refusal. ' Groundwater encountered at 8 feet at time of drilling and at ............ ...... ........... 6.5 feet after 4 days. 20 •' 785 • • 25 - - 30 ............................ 775 - 1 35 .. - r __ 0 770 , SOIL TEST BORING NO. B-13 o Z Sheet 1 cf '[ ®???INC ICY TO SOIL CLASSIFICATIONS AND CONSISTENCY DESCRIPTIONS BfJNWELL-LAMMO0 S ENGINEERING, INC. ASHWLLE, ROM H CAROUNA Fanetration Resistance Relarne Pai?tii,-la Size Identli-15 Blows per Foot DanSity Bouldac Gr-pier ftn 300 nn SF,NDS Cobble: 75 to 3D0 mm 0 to 4- Very L oDra Gn_vet: Coarse - IS to 75 mm 5 to 10 I Firie Fine. 4.T5 to i g mn 11 to 2D Sand: 31 to 3D I? se Coarse - 2 b 4.75 mn 31 to so Dense Wedium - 0.425 to 2 mn over W Very Dansz Fine - 0.075 to 0.425 mm Silt $ Clay. Less than 0.9-15 mm Penetration Resistance= Consistency Blots per Foot SR: 78 aid CLRYS 0 to 2 Very SOS 12 Number of blows in first E lnrJis soft 3 to 4 Fam ;5 Hunter of blows in second Vhches 5 to B MY 18 Number of blows in third a-tnches 9 t 15 Vary Stiff 's1 16 t to to 30 50 ard over 50 Vey Hard 'As-lu D 1585 KEY To njuiL ua off/ Y ml aLs . ® Grab Simple _ C-roundwater Table Ed Tme of Dulling ® split Spoon Sample GrcundwaterT=hle 24 Hour of ere Ccmpl?Son at Drilling ® Undlerarbed Sample KEY TO SOIL CLASSIFICATIONS Sand Silt Wall-graded Gavel Low Plasticity Clay Clayey MH 5? • GVJ . GL ref ?? ,• , I,•..i a ?? Poorly-graded Grave! C S y Clay Sandy MLS Silt Topsoil GP TOPSOIL ? o Partially Weathered Rack Silty Clay Sand Bedrock SIM BLbRG88L CL-1.3L SW BEDROCK J 1` L: High Plasticity Clay Silt Clayey Sand r Zv Concrete CH Sc As WET DETENTION BASIN 3 WET DETENTION BASIN SUPPLEMENT -DESIGN SUMMARY WET DETENTION BASIN SUPPLEMENT- REQUIRED ITEMS CHECKLIST TABLE OF ELEVATIONS, AREAS, INCREMENTAL VOLUMES AND ACCUMULATED VOLUMES FOR POND AND FOREBAY CALCULATIONS • GENERAL • DRAWDOWN TIMES • HYDROCAD MODEL • CHANNEL REINFORCEMENT • ANTI-FLOTATION BLOCK OPERATION AND MAINTENANCE AGREEMENT REPORT OF GEOTECHNICAL EXPLORATION AND SOIL INFILTRATION Permit No. (to be provided by DWQ) ' F W A TF 9 ?O ?G ATA y ~ T O WNW ST ORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. 11.' PROJECT; INFORMATIONS Foothills Commerce Center -Phase One Project name Brad Cornwell - City of Shelby - Public utilities Director person Contact . Phone number (704) 484-6840 ' Date 7-Jan-11 Drainage area number 3 ll.? DESIGN INFORMATION:.,. ° . , Site Characteristics 1,447,499 ftz Drainage area 866 f? 654 ' Impervious area, post-development % impervious , 45.24 % 1 0 i Design rainfall depth . n Storage Volume: Non-SA Waters 146 ft3 OK 55 Minimum volume required , ' Volume provided 84,735 ft3 OK, volume provided is equal to or in excess of volume required. Storage Volume: SA Waters , 1.5" runoff volume -ft ft? Pre-development 1-yr, 24-hr runoff 3 ft Post-development 1-yr, 24-hr runoff 3 Minimum volume required ft ' Volume provided ft3 Peak Flow Calculations Is the prelpost control of the 1 yr 24hr storm peak flow required? Y (Y or N) ' 1-yr, 24-hr rainfall depth 3.1 in 0.30 (unitless) Rational C, pre-development 0.57 (unitless) Rational C, post-development 13 inthr OK 0 ' Rainfall intensity: )-yr, 24-hr stone . 1.30 ft3lsec Pre-development 1-yr, 24-hr peak flow 2.46 ft3lsec Post-development 1-yr, 24-hr peak flow 1 16 ft3lsec Pre/Post 1-yr, 24-hr peak flow control . Elevations 50 fmsl 805 Temporary pool elevation . 50 fmsl 803 . Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) 800.50 fmsl Top of 1Oft vegetated shelf elevation 804.00 fmsl Bottom of 10ft vegetated shelf elevation 803.00 fmsl Sediment cleanout, top elevation (bottom of pond) 798.10 fmsl Sediment cleanout, bottom elevation 797.10 fmsl ' Sediment storage provided 1.00 ft Is there additional volume stored above the state-required temp. pool? N (Y or N) Elevation of the top of the additional volume fmsl Parts I. & H. Design Summary, Page 1 of 2 Form SW401-Wet Detention Basin-Rev.8-9/17109 1 1 1 1 1 1 1 Surface Areas Area, temporary pool Area REQUIRED, permanent pool SAIDA ratio Area PROVIDED, permanent pool, Apermpoo Area, bottom of 10ft vegetated shelf, Aboi SheK Area, sediment cleanout, top elevation (bottom of pond), Abotp,nd 46,421 ft2 30,397 ft' 2.10 (unitless) 35,817 ft` OK 30,628 fte 14,677 ft Volumes 84,735 ft3 Volume, temporary pool Volume, permanent pool, Vpe,mp? 137'983 fts Volume, forebay (sum of forebays if more than one forebay) 25,702 ft Forebay % of permanent pool volume 18.6% % SAIDA Table Data Design TSS removal coastal SAIDA Table Used? Mountain/Piedmont SAIDA Table Used? SAIDA ratio Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) Volume, permanent pool, Vpermpo0l Area provided, permanent pool. Apes pool Average depth calculated Average depth used in SAIDA, d,,, (Round to nearest 0.5ft) Calculation option 2 used? (See Figure 10-2b) Area provided, permanent pool, Apermpool Area, bottom of 1 Oft vegetated shelf, Ab,,sha Area, sediment cleanout, top elevation (bottom of pond), Abotpond "Depth" (distance b/w bottom of 1 Oft shelf and top of sediment) Average depth calculated Average depth used in SAIDA, dav, (Round to nearest 0.5ft) Drawdown Calculations Drawdown through orifice? Diameter of orifice (if circular) Area of orifice (if-non-circular) Coefficient of discharge (Cc) Driving head (Ho) Drawdown through weir? Weir type Coefficient of discharge (CW) Length of weir (L) Driving head (H) Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time 90 % N (Y or N) Y (Y or N) 2.10 (unitless) N (Y or N) 137,983 ft° 35,617 ft ft y (Y or N) 35,617 ft` 30,628 ft` 14,877 f? 4.90 ft 4.27 ft 4.5 ft OK OK Need 3 ft min. OK OK Y (Y or N) 4.50 in in2 0.60 (unitless) 1.05 ft N (Y or N) (unitless) (unitless) ft ft 1.30 ft3lsec 2.46 ft3lsec 0.37 ft3/sec 2.03 days OK, draws down in 2-5 days. Additional Information 3 :1 OK Vegetated side slopes 10 :1 OK Vegetated shelf slope 10.0 ft OK Vegetated shelf width 5 :1 OK Length of flowpath to width ratio 5.0 :1 OK Length to width ratio Y (Y or N) OK Trash rack for overflow & orifice? 1.0 ft OK Freeboard provided N (Y or N) OK Vegetated filter provided? Y (Y or N) OK Recorded drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build-out? Drain mechanism for maintenance or emergencies is: Portable pump Parts I. & II. Design summary, Page 2 of 2 Form SW401-Wet Detention Basin-Rev.8-9/17/09 Permit No. (to be provided by DWQ) 1 -III. - - -REQUIRED 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Permit No. (to be provided by DWQ) CHECKLIST. umentation in the space package provided toill Please indicate the page or plan sheet numbers where the supporting d review and approval of the project incomplete result in a request for additional information. This will delay final indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. C-106 1. Plans (1" - 50' or larger) of the entire site showing: _ C-108 - Design at ultimate build-out, C-701 - Off-site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (R01N), - Overflow device, and - Boundaries of drainage easement. C-509 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: - Outlet structure with trash rack or similar, - Maintenance access, - Permanent pool dimensions, - Forebay and main pond with hardened emergency spillway, - Basin cross-section, -Vegetation specification for planting shelf, and - Filter strip. l1111, C-509 3. Section view of the wet detention basin (V = 20' or larger) showing: - Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures. clean out of the basin is specified truction N/A , 4. If the basin is used for sediment and erosion control during cons on the plans prior to use as a wet detention basin. Attached 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. A construction sequence that shows how the wet detention basin will be protected from sediment until the 6 C-509 . entire drainage area is stabilized. X71 ?? Attached 7. The supporting calculations. Attached 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. y? NIA 9. A copy of the deed restrictions (if required). Attached 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County . soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.8-9/17/09 Part III. Required Items Checklist, Page 1 of 1 -c-- I OD CV ~ M r M T' Od p 0 0 0 0 0 0 0 0 O r CA L!) O CO o O M O CA M T COO td0 M d O 0 0 0 0 0 0 0 0 0 0 p O r__ Co C0 - r 1? I` N O 0 rn 0 C4 ' O Ln M M C d CO N N M Lo N f? T CO r N M d Ln CD O r T r N N C 6 O r N to I? OO CA +?+ y N O O d M O T O? O M L!) d O ?` ?` O O O O O O O O O ' N C „- CO ti M N M? ao r 00 CC) T 0 0 0 00 00 0 0 co co M M 0 0 0 0 0 0 O O O 0 C9 M m ti CA 4 H 2- V ? C M O O O r- Ln 6 r T U) C- D CO O LO I*- t) 7. CO M co 0 T- r r I N N r I r 0 d N d I? d r T T r LO CO co d' r LSD co N d' ti O O O O O O O OIO O N Ln N M I 0 0 0 0 0 0 0 0 0 0 C,4 r O Cp 00 OO N O N V; O O IC (0 00 M M r N N 1-0 CD N r T N d p O O O O O N ' I t O ?; Q N p d M DD M M M d^ (0 Cfl O M r M O N d I? O Ln Lo CD r CO O ? d d M M - r T N N N N - r ? LJ 1 T co co I I N LO N N CMO M O M M N w 1- 00 ? N o O L ,, T c . E 00 Ln N d O co o '+= O Cfl ti r M ~d to CO M f? co 0~O O M lJ l U) L) c; N r T d T N I? O N CO CO N O •• d NOOco titiOTNr T N Cfl r N M co d to t-- a) T r T I ? Z W Q = "'' N 1` N O O O O O O (o 00 0 N N° a C O O m ' I` L u co o co O C :d E O r d r N f? O M ti T O O ti LA O W Z N Lo co N T O O N co LO CD = Q) pY. O CO U.) O CM O p f N d O L!7 U O Lo titi00aoCA NNrr M W U3 't r ti (? co T O N LA N t1? N LS) N N N CDO T U.1 y C) O CD O Oo OO N oro 't O M 't rn "t 00 Ln N N CD O (D U) M CD 0) O O It ' O F. u J N 't r. N O 1` N O 00 CO ?t O O d: C Q:' N ti 00 CA r N CO c d C? V ?j N d Lf) CO N T T T T r T. T N N N M co co J ' J 'C7 co I-- N?M co O r r T co m 'O 0 O F- 0 to Lo ti O c+- d C O O O 0 T T O) T N d' N d cc) M 0 j N 0 LL U N f? N 0 CY) C 0 O I-- O N d E' ?` O O N O CA d: d^ Ct) r O O CO M M M T N d CD M T- N N M d L!? I Q r d LLB COI co 0 41 O O O C) N 0) r N d N i? d CO O O co O O to O O N LU N O N w r. O ?, y c) ti to M r I? N CA 00 t-- O O O N CA N CO T T LS ) N 0 0 r CO Ln LLs d O I co Lo ,i Lo M r' Ln I? d r rT N C O O O d I? ti d d CO t` I-- Ln O O I` _ O. O C) O r to N co co .-. O O O CO O d O O co N T T 00 N O O ? 00 co CA N N m O N N 0 CO CLumn) CA Q N O 00 M O I ` C6 (O r N (n CD - N N d d C f? 00 CA r r- ' o C' LOC) O 0 O O O t0C) O O O t? O m O 0 N r L f) N E0p0°a)°)oo0000000 rn rn rn rn ? 3 d??ti?titiaooo000000aoao0olao W U V U U N N lD 00 m -1 00 " 00 ; .0 m O 00 ? r r, Ln 00 N ro N r-i 0 o E °o 41 > o r' C: ° E ao E O n°. Fes- c`a o- tYa O m CD ° m a, 3 7 N O ~ O -o - O OJ 4, 4? N 7 3 O E E u- :3 7 U U Qa y W ? F U UO N Q W?1 i 1 1 1 1 1 1 1 1 1 1 1 1 1 PROJECT: f y0pr??? PROJECT NO.: McGI_pE-Q6Q4p-TION A S S O C I A CHECKED BY: Y • Planning Finance CALCULAT Engineering NC 28802 heville 9 A : ED B SHEET NO. ! OF , s , DATE: McGill Associates, P.A. P.O, Box 225 2518 28801 828-252-0575 Fax 828-252 1 55 Broad street, Asheville, NC I -I , a Irv l . , i I rr. `1: i- - I, ------- I , I { ` I ,t l i d K? V I , I I ? ? n ? ' ' I l ? - ? li I i .. :,.:+ .. . 1 ! ? 1'?•4 . _..._I .._ .I , ! 1 i I { . v , 111 r, I ? 1 1 h I 1 • , ? I I .. I • I a I I , I 1 I 1 U OA co a 1 1 1 1 1 1 1 1 1 1 1 1 1 1 H N a o ? f6 4J ? Y Ca Y Y ? U U U Q) 4- ln O U M L m m 0 0 0 _ N v U u fC 4?- Q L H C G L W it O "a O O > co O W Y *? U) O o 0 CL M ro Z Q) 0 v Ix Y N W F m c U N ~ cn Y WZ UOZ s- ' o 4+- M ° c r o :O W ()ZO °U' O o FWD `+- W 4' ? L O 0) O y W u u O W ? E E >? o 0 11 ° u o to o 0 N 4-- c J v o 3: v 3 J m 0 2 2 o m '- O T y L f " U d O of c9 C]O O M 6 O iv O N -0 ti ro O o - to v U U . ? ? L ? OO C6 f 4 a COA f0 V, v ') O H V L II ? U cu O c i 0 0 0 Q O O 'O M O O = 2 * CO N N < LA 4- - 4- N -f u 'n 4 N O 0 0 o m oN LO 00 rl Q o o N C) - ° rn 0 co 0 U O N U 00 00 r; II d > tf) > II u < C13 7 U O 0 C = to Ili O Qi O L CL O Y CO CIO r` m N N o6 O Ln N N m I I m O 2 tiO N L_ 6 N Q v U > Y 1 r 1 1 1 u fl Df? 3 Wet Basin 3 Reach'' Pon Link Subcat,' Drainage Diagram for WetBasin3 Prepared by (enter your company name here}, Printed 1/7/2011 HydroCAD® 8.50 sin 004263 © 2007 HydroCAD Software Solutions LLC 1 Type 11 24-hr 1-Year Storm Rainfall=3.10" WetBasin3 -rimed 1-17/2011- P-repa-r-ed-by-{enter-you-r-cernpa-n-y-n-ame-here} Pa e 2 H droCADO 8.50 sin 004263 0 2007 Hydro AD Software Solutions LLC Time span=0.00-180.00 hrs, dt=0.04 hrs, 4501 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: DA 3 Runoff Area=33.230 ac 45.24% Impervious Runoff Depth=1.67" Tc=5.0 min CN=85 Runoff=101.10 cfs 4.632 of Pond 2P: Wet Basin 3 Peak Elev=804.79' Storage=190,612 cf Inflow=101.10 Outflow=0.37 cfs 1.464 of Total Runoff Area = 33.230 ac Runoff Volume = 4.632 of Average Runoff Depth =1.67' 54.76% Pervious= 18196ac 45.24% Impervious= 15.034ac ' Type 11 24-hr 1-Year Storm Rainfall=3.10" ri-• n?-1 /7126'f 1-- WetBasin3 Prepared by {enter your company name here} Page 3 H dro'AD® 8.50 s/n 004263 ©2007 H droCAD Software Solutions U Summary for Subcatchment 1S: DA 3 ' Runoff = 101.10 cfs @ 11.96 hrs, Volume= 4.632 af, Depth= 1.67" ' Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-180.00 hrs, dt= 0.04 hrs Type II 24-hr 1-Year Storm Rainfall=3.10 1 Area ac CN Descri tion 15.034 98 Paved ass cover, Good, & roofs HSG C 18.196 74 0 ' 33.230 85 Weighted Average 18.196 Pervious Area 15.034 Impervious Area cfs Description Tc Length Slope Velocity Capacity min feet ft/ft ft/s 5 Direct Entry, ' .0 Subcatchment iS: DA 3 Hydrograph ' ----- - -- -- -r--- Runoff ------------- F07 _ r 110 ._ - -- 105 101.10 Os - - -- - - '_---------Type ii 24-hr 1 Year Storm - 100 _ ---' -- - 95 ? , --?-----------?.- _ -- ----- -- - of#.r_e=j3,23._ac- ---Run A 8 - --- - - - - - - - - - a 0 99 75 -J-------------=Runoff=volume=4?63.2`af- 85 -- -- ---- - - ------------ 70 - - :67" _ y 65 -- --- --- ---i-------- - - 0nvff De?th-1 --- - - - - - - - - - - - - - - - - ----- - - _ - - 55 Tc-5 60 -- --- --- ---- -- - , - - - - - - - - - - - -- -- -- 1= 0 - ---- -- -?---' -1- ---- ----- --GN=85- 45 --- - - - -- -- -- -- ,------- -- -- r -- --- -------- .------- ------- - - - - - - -- --- --- i 40 - - I i 35--- -- I- '-------- 30 -- --- 1-- -' - ' ----------- - 25 - - --- - - - - - - - - - - - - - - - - - --- -- + - : - - - 15 1 .- -------- -- - - - -------- -. ---- - - - 10 s 0 20 30 40 5,0 60 70 80 9C) 0 11D 120 130 140 150 160 170 180 0 1 Time (hours) 0 1 1 WetBWO P r-epa r-e d-by-{enter-your-co m pa n -Prepared H droCADO 8.50 s/n 004263 ©200 i J 1 H 1 L L Type 11 24-hr 1-Year Storm Rainfall=3.10" A"le) n14 Hydrograph for Subcatchment 1S: DA 3 Time Precip.. Excess Runoff Time Precip. Excess ches) (inches) (i Runoff (hours) (inches) (inches) (cfs) ( 00 0 n hours) 00 3.10 1.67 104 0 00 0.00 0.00 0.00 00 0 . 00 0 . 106.00 3.10 1.67 0.00 2.00 00 4 0.07 15 0 . 0.00 . 0.00 108.00 3.10 1.67 67 1 00.00 00 . 6.00 . 0.25 0.00 0.00 110.00 00 112 3.10 10 3 . 1.67 . 0.00 8.00 0.37 0.00 0.04 77 0 . 00 114 . 3.10 1.67 0.00 10.00 0.56 0.02 84 0 . 87.21 . 116.00 3.10 1.67 0.00 12.00 00 14 2.06 2.54 . 1.21 3.20 118.00 3.10 1.67 67 1 0.00 00 0 . 16.00 2.73 1.36 2.00 120.00 00 122 3.10 10 3 . 1.67 . 0.00 18.00 2.86 1.47 1.57 15 1 . 00 124 . 3.10 1.67 0.00 20.00 2.95 1.55 61 1 . 05 1 . 126.00 3.10 1.67 0.00 22.00 00 24 3.03 3.10 . 1.67 . 0.97 128.00 3.10 1.67 67 1 0.00 00 0 . 26.00 . 3.10 1.67 0.00 130.00 00 132 3.10 10 3 . 1.67 . 0.00 28.00 3.10 1.67 67 1 0.00 00 0 . 134.00 . 3.10 1.67 0.00 30.00 00 32 3.10 3.10 . 1.67 . 0.00 136.00 3.10 1.67 67 1 0.00 0 00 . 34.00 3.10 1.67 0.00 138.00 00 140 3.10 10 3 . 1.67 0.00 36.00 3.10 1.67 67 1 0.00 00 0 . 142.00 . 3.10 1.67 0.00 38.00 00 40 3.10 3.10 . 1.67 . 0.00 144.00 3.10 1.67 67 1 0.00 00 0 . 42.00 3.10 1.67 0.00 146.00 00 148 3.10 10 3 . 1.67 . 0.00 44.00 3.10 1.67 67 1 0.00 00 0 . 150.00 . 3.10 1.67 0.00 46.00 00 48 3.10 3.10 . 1.67 . 0.00 152.00 3.10 1.67 67 1 0.00 0 00 . 50.00 3.10 1.67 0.00 00 0 154.00 00 156 3.10 3.10 . 1.67 . 0.00 52.00 00 54 3.10 10 3 1.67 1.67 . 0.00 . 158.00 3.10 1.67 0.00 0 00 . 56.00 . 3.10 1.67 0.00 160.00 3.10 10 3 1.67 67 1 . .00 0 58.00 3.10 1.67 0.00 00 0 162.00 00 164 . 3.10 . 1.67 0.00 60.00 00 62 3.10 3.10 1.67 1.67 . 0.00 . 166.00 3.10 1.67 67 1 0.00 00 0 . 64.00 3.10 1.67 0.00 168.00 00 170 3.10 10 3 . 1.67 . 0.00 66.00 3.10 1.67 67 1 0.00 00 0 . 172.00 . 3.10 1.67 .00 0 68.00 00 70 3.10 3.10 . 1.67 . 0.00 174.00 3.10 1.67 67 1 00.00 00 . 72.00 3.10 1.67 0.00 176.00 178:00 310 10 3 . 1.67 . 0.00 74.00 3.10 1.67 67 1 0.00 00 0 180.00 . 3.10 1.67 0.00 76.00 3.10 . . 78.00 3.10 1.67 0.00 80.00 3.10 1.67 0.00 82.00 3.10 1.67 0.00 84.00 3.10 1.67 0.00 86.00 3.10 1.67 0.00 88.00 3.10 1.67 0.00 90.00 3.10 1.67 0.00 92.00 3.10 1.67 0.00 94.00 3.10 1.67 0.00 96.00 3.10 1.67 0.00 98.00 3.10 1.67 0.00 100.00 3.10 1.67 0.00 102.00 3.10 1.67 0.00 1 ' Type II 24-hr 1-Year Storm Rainfall=3.10" WetBasin3 Pnnte ??1--- Prepared by {enter your company name here} Pa e 5 H droCAD? 8.50 s/n 004263 ©2007 H droCAD Software es LLC Summary for Pond 2P: Wet Basin 3 Inflow Area 33.230 ac 45.24% Impervious, Inflow Depth = 1.67" for 1-Year Storm event ' - - Inflow = 101.10 cfs @ 11.96 hrs, Volume= 4.632 of 1.464 af, Atten= 100%, Lag= 727.7 min ' Outflow = 0.37 cfs @ 24.09 hrs, Volume= Primary = 0.37 cfs @ 24.09 hrs, Volume= 1.464 of Routing by Stor-Ind method, Time Span= 0.00-180.00 hrs, dt= 0.04 hrs / 4 t Peak Elev= 804.79' @ 24.09 hrs Surf.Area= 43,858 sf Storage= 190,612 cf Plug-Flow detention time= 2,017.1 min calculated for 1.464 of (32% of inflow) ' Center-of-Mass det. time= 1,888.6 min ( 2,712.0 - 823.5 ) Volume Invert Avail.Stora e Stora a Descri tion ' #1 797.10' 270,550 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store ' (feet) (sq ft) (cubic-feet) (cubic-feet 797.10 0 0 0 798.00 15,410 6,934 6,934 798.50 16,857 8,067 15,001 799.00 18,334 8,798 23,799 799.50 19,813 9,537 33,336 800.00 21,321 10,284 43,619 ' 800.50 22,829 11,038 54,657 801.00 24,367 11,799 66,456 802.00 27,469 25,918. 92,374 803.00 30,628 29,049 121,422 ' 803.50 35,617 16,561 137,983 804.00 41,015 19,158 157,141 805.50 46,421 65,577 222,718 806.50 49,243 47,832 270,550 Device Routin Invert Outlet Devices ' #1 Device 3 802.50' 18.0" Vert. Orifice/Grate C= 0.600 #2 Primary 803.50' 3.5" Horiz. Orifice/Grate Limited to weir flow C= 0.600 #3 Primary 805.50' 36.0" Vert. Orifice/Grate C= 0.600 #4 Primary 805.70' 52.0' long x 5.0' breadth Broad-Crested Rectangular Weir ' Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.34 2.50 2.70 2.68 2.68 2.66 2.65 2.65 2.65 ' 2.65 2.67 2.66 2.68 2.70 2.74 2.79 2.88 Primary OutFlow Max=0.37 cfs @ 24.09 hrs HW=804.79' (Free Discharge) ' 2=Orifice/Grate (Orifice Controls 0.37 cfs @ 5.47 fps) L_33=0 rifice/Grate ( Controls 0.00 cfs) 1=Orifice/Grate ( Controls 0.00 cfs) Broad-Crested Rectangular Weir (Controls 0.00 cfs) WetBasin3 t-P-repared-by HydroCADO 8 1 11 1C 1 v O 7 I U_ 2 2 1 1 1 Type II 24-hr 1-Year Storm Rainfall=3.10" P-r-inted 1./7/2011 - Pond 2P: Wet Basin 3 H dro ra h --.. - ------ --- -_.---- --- ---I-- ,o,,ocfs - "I ___ ea=33:230 ac_- -? . : _ --- --- - --- -- --- - ?r irrfbW '- -- - - - - - - _ ' - - - - - '- - - --- -- - - - -' -- - I --- -' -- - - T -- -- -- -- r - '_ - -- I- - --.- --1 - --' - - 04 Rte c k - --- tlea ___ - - _ _ - _ _ _ _ --------- - -- ---- -- -- , _ _ t --------- _ _ _ - - - - - - ----------- --- - - - ------ --- -- - - - ------------ _ - ' ------------ --- ------- I ' -- - - - - - - - -I - - - - - - - - I ? '- - - - - - - - - - _ _ _ - - - - - -- - - - - - ----------- --- - _ _ _ _ _ _ _ _ _ _ _. _ _ _ - - . I -- - r - - --- ---- ' _ ___._ I ----- ---------- - --- --- -- --------------- ------- -- _ _ ___ I L • -- l -- - - -.. - --I- - -. _. _ 1 0.37 cfs ? ' 80 90 100 70 180 110 120 130 140 150 160 170 10 20 30 40 50 60 0 Time (hours) ® Inflow Q Primary ' Pond 2P: Wet Basin 3 Stage-Discharge ___-- ----------- , -- - ?Primary 808 - - - - - - - - - - - - - - - - - - - - - - - _ -' -----'-----I_.. - - - - - - -- - 807 :. 7 .. ---- - T---- ?-----II_ - - - - - - - :. 806 rg? 44e0Aemanutor Weir - v1ffi4 - ' - ---1-- '-- I 805 I - - - - I I I ---- , -----I -----II I I ----I-' I I 804 6&k$ ! - - - - ------ I 803 0 - r ---- 0 L 602 ---- ---" LLJ --- ------' -- ---- I 1 801 800 ----+----=------ I -----II-.. - - - - - - - - - - - - - - - 799 798 _ _ - _ I ? ____1_____I_____ _ _ _ _ _ 150 200 250 300 350 400 450 500 550 600 650 0 50 100 Discharge (cfs) 1 1 1 1 1 1 1 1 1 1 1 1 1 WetBasin3 Type 1124-hr 1-Year Storm Rainfall=3.10" r1-1157*14 Prepared by {enter your company name here) Pa e H droCAD® 8.50 s/n 004263 © 2007 H droCAD Software Solutions LLC Pond 2P: Wet Basin 3 Stage-Area-Storage Surface/HorizontalMetted Area (sq-ft) p 5,000 10,000 15,000 201000 25,000 30,000 35,000 40,000 45,000 ©S{prage -------------- i ----- ----, ---------------- _ 808 - - 808 ----------- 807 ------ --- ----- ----- ------ 606 -- ------- - - 805 ------ ------------ 804 804 -- - ------ ---- °' --- ---- - ------ ---- c 803 - - 802 ' ----- -------...------. - - -- - - - - 801 ? - ----?.---- 800 ------- - - - 798 Guetn St?A9 Rata 50,000 100,000 150,000 200,000 250,000 ' p ? Storage (cubic-feet) 1 WetBasin3 ,-P-repa-red-by-{-ente HydroCAD® 8.50 s/? Type 1124-hr 1-Year Storm Rainfall=3.10" __,._A d 1-7Mn11 'I IItj G..j ........- ---- © 2007 HydroCAD Software Solutions LLC Hydrograph for Pond 2P: Wet Basin 3 Time Inflow Storage Elevation Primary cfs (hours) (cfs) (cubic feet) 0 (feet 10 797 0.00 ' 0.00 00 4 0.00 0.00 0 . 797.10 0.00 . 8.00 0.04 13 797.11 0.00 00 0 12.00 87.21 82,773 143 162 801.64 804.12 . 0.25 16.00 00 20 2.00 1.15 , 180,367 804.55 0.33 . 24.00 0.97 190,504 804.79 0.36 35 0 28.00 32.00 0.00 0.00 185,631 180,736 804.67 804.56 . 0.33 31 0 00 36 0.00 176,090 804.45 . . 40.00 0.00 171,695 804.35 0.30 28 0 44.00 0.00 167,554 670 163 804.25 804.16 . 0.26 ' 48.00 00 52 0.00 0.00 , 160,045 804.07 0.24 . 56.00 0.00 156,677 803.99 0.22 21 0 ' 60.00 0.00 153,573 742 150 803.91 803.84 . 0.19 64.00 00 68 0.00 0.00 , 148,184 803.77 0.17 . 72.00 0.00 145,905 803.72 0.15 12 0 76.00 0.00 143,941 317 142 803.66 62 803 . 0.10 80.00 0.00 , 996 140 . 803.58 0.08 84.00 00 88 0.00 0.00 , 140,056 803.56 0.05 ' . 92.00 0.00 139,410 803.54 0.04 03 0 96.00 0.00 138,965 659 138 803.53 803.52 . 0.02 100.00 00 104 0.00 0.00 , 138,448 803.51 0.01 . 108.00 0.00 138,304 803.51 0.01 01 0 112.00 0.00 138,204 135 138 803.51 803.50 . 0.00 ' 116.00 120.00 0.00 0.00 , 138,088 55 803.50 50 803 0.00 0.00 124.00 0.00 138,0 . 00 0 128,00 0.00 138,033 017 138 803.50 803.50 . 0.00 ' 132.00 00 136 0.00 0.00 , 138,007 803.50 0.00 . 140.00 0.00 138,000 803.50 0.00 00 0 144.00 0.00 137,995 991 137 803.50 803.50 . 0.00 ' 148.00 00 152 0.00 0.00 , 137,989 803.50 0.00 . 156.00 0.00 137,987 803.50 0.00 00 0 ' 160.00 164.00 0.00 0.00 137,986 137,985 803.50 803.50 . 0.00 00 0 00 168 0.00 137,985 803.50 . . 172.00 0.00 137,984 803.50 0.00 00 0 176.00 0.00 0 137,984 984 137 803.50 803.50 . 0.00 ' 180.00 0.0 , 1 1 WetBasiO 1 H is 1 1 1 Type II 24-hr 1-Year Storm Rainfall=3.10" n n??I?-'r?7T7 ?? enter your company name here ,n c/n 004263 0 2007 HydroCAD Sc Elevation Primary (feet) (cfs) 797.10 0.00 797.16 0.00 797.22 0.00 797.28 0.00 797.34 0.00 797.40 0.00 797.46 0.00 797.52 0.00 797.58 0.00 797.64 0.00 797.70 0.00 797.76 0.00 797.82 0.00 797.88 0.00 797.94 0.00 798.00 0.00 798.06 0.00 798.12 0.00 798.18 0.00 798.24 0.00 798.30 0.00 798.36 0.00 798.42 0.00 798.48 0.00 798.54 0.00 798.60 0.00 798.66 0.00 798.72 0.00 798.78 0.00 798.84 0.00 798.90 0.00 798.96 0.00 799.02 0.00 799.08 0.00 799.14 0.00 799.20 0.00 799.26 0.00 799.32 0.00 799.38 0.00 799.44 0.00 799.50 0.00 799-56 0.00 799.62 0.00 799.68 0.0 799.74 0.0 799.80 0.0 799.86 0.0 799.92 0.0 799.98 0.0 800.04 0.0 800.10 0.0 800.16 0.0 Stage-Discharge for Pond 2P: Wet Basin 3 Elevation Primary (feet) (cfs) 800.22 0.00 800.28 0.00 800.34 0.00 800.40 0.00 800.46 0.00 800.52 0.00 800.58 0.00 800.64 0.00 800.70 0.00 800.76 0.00 800.82 0.00 800.88 0.00 800.94 0.00 801.00 0.00 801.06 0.00 801.12 0.00 801.18 0.00 801.24 0.00 801.30 0.00 801.36 0.00 801.42 0.00 801.48 0.00 801.54 0.00 801.60 0.00 801.66 0.00 801.72 0.00 801.78 0.00 801.84 0.00 801.90 0.00 801.96 0.00 802.02 0.00 802.08 0.00 802.14 0.00 802.20 0.00 802.26 0.00 802.32 0.00 802.38 0.00 802.44 0.00 802.50 0.00 802.56 0.00 802.62 0.0 802.68 0.0 802.74 0.0 802.80 0.0 802.86 0.0 0 802.92 0.0 0 802.98 0.0 0 803.04 0.0 0 803.10 0.0 0 803.16 0.0 0 803.22 0.0 0 803.28 0 p 0 0 p 0.0 Elevation Primary (feet) (cfs) 803.34 0.00 803.40 0.00 803.46 0.00 803.52 0.01 803.58 0.07 803.64 0.12 803.70 0.14 803.76 0.16 803.82 0.18 803.88 0.20 803.94 0.21 804.00 0.23 804.06 0.24 804.12 0.25 804.18 0.27 804.24 0.28 804.30 0.29 804.36 0.30 804.42 0.31 804.48 0.32 804.54 0.33 804.60 0.34 804.66 0.35 804.72 0.36 804.78 0.36 804.84 0.37 804.90 0.38 804.96 0.39 805.02 0.40 805.08 0.40 805.14 0.41 805.20 0.42 805.26 0.43 805.32 0.43 805.38 0.44 805.44 0.45 805.50 0.45 805.56 0.49 805.62 0.58 805.68 0.73 805.74 1.90 805.80 5.02 805.86 9.26 805.92 14.47 805.98 20.75 p 806.04 27.96 0 806.10 36.06 0 806.16 45.25 0 806.22 55.39 0 806.28 66.49 0 806.34 77.38 n 806.40 p p 0 0 0 88.23 elevation Primary (feet) (cfs) 806.46 99.53 806.52 111.33 806.58 123.71 806.64 136.54 806.70 149.26 806.76 161.88 806.82 174.81 806.88 188.02 806.94 201.66 807.00 215.66 807.06 229.95 807.12 244.62 807.18 259.75 807.24 275.19 807.30 290.93 807.36 306.96 807.42 323.27 807.48 339.86 807.54 356.73 807.60 373.88 807.66 391.28 807.72 409.08 807.78 427.39 807.84 445.99 807.90 464.87 807.96 484.04 808.02 503.49 808.08 523.22 808.14 543.22 808.20 563.49 808.26 583.27 808.32 603.26 808.38 623.47 808.44 643.88 808.50 664.50 ' WetBasin3 Type II 24-hr 1-Year Storm Rainfall=3.10" -r-inted 1-/712011 P-repared-by-{enter-your-cor-npany-name-here Page 10 ?H droCAD® 8.50 sln 004263 © 2007 H droCAD Software Solutions LLC Stage-Area-Storage for Pond 2P: Wet Basin 3 ' Elevation Surface Storage Elevation Surface ( Storage (cub (feet) (sq-ft) (cubic-feet) 0 (feet) 804.90 259 95 515 797.10 797.25 0 2,568 193 805.05 44,799 340 45 202,194 208,954 797.40 5,137 770 734 1 805.20 805.35 , 45,880 215,796 797.55 797.70 7,705 10,273 , 3,082 805.50 46,421 844 46 222,718 229,713 ' 797.85 12,842 4,816 934 6 805.65 805.80 , 47,268 236,772 .00 798 .15 798 15,410 15,844 5 , 9,279 805.95 47,691 114 48 243,894 251,079 798.30 ,278 1 11,688 162 14 806.10 806.25 , 48,538 258,328 798.45 798.60 16,712 17,152 , 16,702 806.40 48,961 49243 265,640 270,550 798.75 17,596 9 19,308 980 21 806.55 806.70 49,243 270,550 798.90 799.05 18,03 18,482 , 24,719 806.85 49,243 243 49 270,550 270,55 799.20 18,926 369 27,525 397 30 807.00 807.15 , 49,243 270,550 ' 799.35 799.50 19, 19,813 , 33,336 807.30 49,243 243 49 270,550 270,550 799.65 20,265 36,342 415 39 807.45 807.60 , 49,243 270,550 799.80 799.95 20,718 21,170 , 42,557 807.75 49,243 243 49 270,550 270,550 800.10 21,623 45,766 044 49 807.90 808.05 , 49,243 270,550 800.25 800.40 22,075 22,527 , 52,389 808.20 49,243 270,550 270,550 ' 800.55 22,983 4 55,802 284 59 808.35 808.50 49243 270,550 800.70 23,44 , 800.85 23,906 62,835 801.00 24,367 66,456 801.15 24,832 70,146 801.30 25,298 73,905 801.45 801.60 25,763 26,228 77,735 81,634 801.75 26,694 85,603 801.90 27,159 89,642 802.05 27,627 93,751 ' 802.20 28,101 97,931 802.35 28,575 102,181 802.50 29,049 106,503 802.65 29,522 110,896 802.80 29,996 115,360 802.95 30,470 119,895 803.10 25 803 31,626 33,123 124,535 129,391 . 803.40 34,619 134,472 803.55 36,157 139,778 803.70 37,776 145,323 803.85 39,396 151,111 804.00 41,015 157,141 804.15 41,556 163,334 804.30 42,096 169,608 ' 804.45 42,637 175,963 804.60 43,177 182,399 804.75 43,718 188,916 U 11 1 1 1 1 1 1 1 WetBasW Prepared by {enter your company name ere' HvrirnCADO 8.50 s/n 004263 © 2007 H dy roCAD Sc Type// 24-hr 10-Year Storm Rainfall=5.41 " ri-nTari 17T/2011 L Time span=0.00-180.00 hrs, dt=0.04 hrs, 4501 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method noff Subcatchment 1S: DA 3 Runoff Area=3 Tc35.0 min5 CN=85 pRunoff=218.63 cffse10.381 of Pond 2P: Wet Basin 3 Peak Elev=806.08' Storage=249,902 cf I Outflow132 97 cfs17.2812 of Total Runoff Area = 33.230 ac Runoff Volume = 10.381 18196 acaf 45Average Runoff Depth = 3.75" .24% Impervious =15.034 ac 54.76 /o Pervious = ' Type// 24-hr 10-Year Storm Rainfall=5.41 " • WetBasin3 -rinted117/2011 P-repsred-by-{e-rater-your-company-name here} Pa a 12 ?H droCAD® 8.50 s/n 004263 ©2007 H droCAD Software Solutions LLC Summary for Subcatchment 1 S: DA 3 Runoff 218.63 cfs @ 11.96 hrs, Volume= 10.381 af, Depth= 3.75" ' - - Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-180.00 hrs, dt= 0.04 hrs Type II 24-hr 10-Year Storm Rainfall=5.41" Area ac CN Description t 15.034 98 Pas parking & coverooGood,HSG C >751/o 16.196 74 33.230 85 Weighted Average 18.196 Pervious Area 15.034 Impervious Area ' Tc Length Slope Velocity Capacity Description min feet ft/ft ft/sec cfs Direct Entry, 5.0 ' Subcatchment IS: DA 3 Hydrograph __- '----- _------ ?Runoff 240 ---'- -- ---, _. .------------?- 230 218.63cfs- -- - _ _ - - - - - - - - - - TX Pe 11= _24=fir=107Year=Storm. 210 - ' 22D - --- - -- ----- - -- ---- --; -- --Rainf-- 200 - - - • ;. , ea?33'230 1.- - ac 190 - - - - - Runoff Ar - ------- - ---' -- 160 - -- -- - - - - - - - - - ----, 170 , ----------- ---- - ". - - ,_ _ -- " - ---- Runoff Volume 10:381 a "- 160 '.. -- 150 ---.. -------" -- - --- - - - - - - - 140 off' Dep#h=3:75'- - --- - - - - -- rn - ------?--- - R"un - - -- -------,----;--- ---- Td=__5.0 -min- 0 120 - - --- _ , - - _ ° ---- -?--- - ' 13 -- -- - -------------- -- -- -- --- i - _----- LL 110 100 - --- --- --- ------------ ? --_?---- 90 -- --- --_-- -------------------------------- - 70 5 - - - ----- r- 0 50 -- -- -- ---- - 40 __ --- --- -- 30 20 1 - -- ---- - - - T-- --- --- ----- 10 " 0 0 10 20 30 40 50 60 70 80 90 0 110 120 130.140 150 160 170 18 Time (hours) 1 r 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 WetBasW Prepared by {e your company name here nn4263 © 2007 HydroCAD Sc Type// 24-hr 10-Year Storm Rainfall=5.41 " nrrfe? Tr-rr?n11- Hydrograph for Subcatchment 1S: DA 3 Time Precip. Excess Runoff Time Precip. Excess ches) (inches) (i Runoff (hours) (inches) (inches) n (cfs) (hours) 00 5.41 3.75 00 104 0 0 00 0.00 0.00 0.00 00 0 . 00 0 . 106.00 5.41 3.75 0.00 2.00 00 4 0.12 0.26 . 0.00 . 0.00 108.00 5.41 3.75 75 3 0.00 0 00 . 6.00 0.43 0.00 0.25 110.00 00 112 5.41 41 5 . 3.75 . 0.00 8.00 0.65 0.04 1.03 15 3 . 00 114 . 5.41 3.75 0.00 10.00 00 12 0.98 3.59. 0.16 2.09 . 184.92 . 116.00 5.41 3.75 75 3 0.00 00 0 . 14.00 4.44 2.85 6.35 92 3 118.00 00 120 5.41 5.41 . 3.75 . 0.00 16.00 4.76 3.15 35 3 . 05 3 . 122.00 5.41 3.75 0.00 18.00 00 20 4.98 5.15 . 3.51 . 2.22 124.00 5.41 3.75 75 3 0.00 00 0 . 22.00 5.29 3.63 2.03 87 1 126.00 00 128 5.41 5.41 . 3.75 . 0.00 24.00 5.41 3.75 75 3 . 00 0 . 130.00 5.41 3.75 0.00 26.00 00 28 5.41 5.41 . 3.75 . 0.00 132.00 5.41 3.75 75 3 .00 0 00 0 . 30.00 5.41 3.75 0.00 134.00 00 136 5.41 41 5 . 3.75 . 0.00 32.00 5.41 3.75 75 3 0.00 00 0 . 138.00 . 5.41 3.75 0.00 34.00 00 36 5.41 5.41 . 3.75 . 0.00 140.00 -5.41 3.75 75 3 00.00 00 . 38.00 5.41 3.75 0.00 00 0 142.00 00 144 5.41 5.41 . 3.75 . 0.00 40.00 00 42 5.41 41 5 3.75 3.75 . 0.00 . 146.00 5.41 3.75 0.00 00 0 . .00 44 . 5.41 3.75 0.00 148.00 00 150 5.41 41 5 3.75 3.75 . 0.00 46.00 5.41 3.75 75 3 0.00 00 0 . 152.00 . 5.41 3.75 0.00 48.00 00 50 5.41 5.41 . 3.75 . 0.00 154.00 5.41 3.75 75 3 0.00 0 00 . 52.00 5.41 3.75 0.00 00 0 156.00 00 158 5.41 5.41 . 3.75 . '0.00 54.00 00 56 5.41 41 5 3.75 3.75 . 0.00 . 160.00 5.41 3.75 0.00 00 0 . 58.00 . 5.41 3.75 0.00 162.00 00 164 5.41 41 5 3.75 3.75 . 0.00 60.00 5.41 41 5 3.75 75 3 0.00 0.00 . 166.00 . 5.41 3.75 0.00 62.00 64.00 . 5.41 . 3.75 0.00 168.00 5.41 41 5 3.75 75 3 00.00 .00 66.00 5.41 3.75 0.00 00 0 170.00 00 172 . 5.41 . 3.75 0.00 68.00 5.41 41 5 3.75 75 3 . 0.00 . 174.00 5.41 3.75 0.00 70.00 72.00 . 5.41 . 3.75 0.00 176.00 5.41 41 5 3.75 75 3 0.00 0.00 74.00 5.41 3.75 0.00 00 0 178.00 00 180 . 5.41 . 3.75 0.00 76.00 5.41 3.75 . . 78.00 . 5.41 3.75 0.00 80.00 5.41 3.75 0.00 82.00 5.41 3.75 0.00 84.00 5.41 3.75 0.00 86.00 5.41 3.75 0.00 88.00 5.41 3.75 0.00 . 90.00 5.41 3.75 0.00 92.00 5.41 3.75 0.00 94.00 5.41 3.75 0.00 96.00 5.41 3.75 0.00 98.00 5.41 3.75 0.00 100.00 5.41 3.75 0.00 102.00 5.41 3.75 0.00 1 WetBasin3 Type I/ 24-hr 10-Year Storm Rainfall=5.41 " P-rint?d 11712-Oaa ?--------r-epared-by €enter-your-companyname-here} Pa a 14 H droCADO 8.50 s/n 004263 © Mt H droCAD Software Solutions LLC Summary for Pond 2P: Wet Basin 3 0 1 Inflow Area = 33.230 ac, 45.24% Impervious, Inflow Depth = 3.75" for 10-Year Storm event Inflow = 218.63 cfs @ 11.96 hrs, Volume= 10.381 af af, Atten= 85%, Lag= 12.3 min Outflow = 32.97 cfs @ 12.16 hrs, Volume= 7 212 of Primary = 32.97 cfs @ 12.16 hrs, Volume= Routing by Stor-Ind method, Time Span= 0.00-180.00 hrs, dt= 0.04 hrs / 4 Peak Elev= 806.08'@ 12.16 hrs Surf.Area= 48,045 sf Storage= 249,902 cf Plug-Flow detention time= 1,015.0 min calculated for 7.210 of (69% of inflow) Center-of-Mass det. time= 918.4 min ( 1,718.9 - 800.5 ) Volume Invert Avai ,550 cf Cus)rage Description tom Stage Data (Prismatic) Listed below (Recalc) #1 797.10' 2700,55 Elevation Surf.Area Inc.Store Cum.Store ubic-feet ( (feet) (sq ft) ( c cubic-feet) 797.10 00 798 0 15,410 0 0 6,934 6,934 . 798.50 16,857 8,067 15,001 799 23 799.00 18,334 813 19 , 8,798 9,537 33,336 799.50 00 800 , 21,321 10,284 43,619 . 800.50 22,829 11,038 54,657 456 66 801.00 24,367 469 27 , 11,799 25,918 92,374 802.00 00 803 , 30,628 29,049 121,422 . 50 803 35,617 16,561 137,983 . 00 804 41,015 19,158 157,141 . 50 805 46,421 65,577 222,718 . 806.50 49,243 47,832 270,550 Device Routing Invert outlet Devices #1 Device 3 802.50' ' 18.0" Vert. Orifice/Grate C= 0.600 Orifice/Grate Limited to weir flow C= 0.600 5" Horiz 3 #2 Primary #3 Primary 803.50 805.50' . . 36.0" Vert. Orifice/Grate C= 0.600 dth Broad-Crested Rectangular Weir ' ' #4 Primary 805.70' brea long x 5.0 52.0 Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.34 2.50 2.70 2.68 2.68 2.66 2.65 2.65 2.65 2.65 2.67 2.66 2.68 2.70 2.74 2.79 2.88 Primary Out Flow Max=32.62 cfs @ 12.16 hrs HW=806.08' (Free Discharge) 2=Orifice/Grate (Orifice Controls 0.52 cfs @ 7.73 fps) L3=0 rifice/Grate (Orifice Controls 2.45 cfs @ 2.58 fps) -1=Orifice/Grate (Passes 2.45 cfs of 6.45 cfs potential flow) =Broad-Crested Rectangular Weir (Weir Controls 29.66 cfs @ 1.52 fps) 7 WetBasin3 Prepared by {e 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Type 1124-hr 10-Year Storm Rainfall=5.41 " ri Fa-r T/7/011 your company name here} 004263 © 2007 HydroCAD Software Sol Pond 2P: Wet Basin 3 Hydrograph -- --' , - '------------ ------- - _ - - ------- p Pnmary . --- --- 240 " • ` •, . 218.63 cis _ ._ _ _ _. , -- ? 6w_A:ea=33?.23D=a := ==1iif . 23D - -- --- . ______=___:. 220 0 = 806 El ' 210 ?;- -- - : , egy --- - ---- - 200 190 '--- -- ______;---- --- - - --- ___ ------- --- - - --Storage=249.902 cf , 180 -" _ r __ - - -I 170 -- --- ---'-- , 160 - ----------- 150 '", . ', -- ------ r ------ -- ------- 140 = 130 ___ ------- - '---- 7 --- - ------ --- - --- -- --- ------ ° 110 -- ---- ---------- ------ --- --- LL 100 --- ,--- ------ ,. ? --- ---- - -, -- --- I 60 50 -------- _ 40 32.97 cts - ------ 1- --- ---?---- `---` _- ---- -- -- -- _ -- 30 _, 20 10 ' 0 80 1 110 120 130 140 150 160 170 80 ?0- 160. 60 70 0 10 20 30 40 5D ime (hours) T Pond 2P: Wet Basin 3 Stage-Discharge - - ---- ---- ----------- ---- - - - - - - - - --- ? Primary - - I 808 /J - I ---- ----°---- - - - - - - ---- 807 - ---- ---- ---- - -' 806 ----- ieO;Rectanpulsr weir Cria --=--- -- ---- --- i- ---'- -- 805 ----- ------'..- --------- ---- ---- --------- d 804 QrittiCefal84e --- --- --------- ---- -- - a 803 d 802 - - - - --- - -- - - - - - - W ---- ----------- ---- - -- -- 801 / -------- ---------------- 800 ---- ----------- - - - - - - - - ---------- ---- -_-- --- ----- -- ----'------ ---'- 798 ; 600 650 ..,,..,.,... 150 200 400 450 500 550 250 30 5 0 50 100 Dharge (cfs) o WetBasin3 pre p a r-e d-b y- {e m e-r-you r-C o ?HydroL_& 8.50 _sin 004263 D Type// 24-hr 10-Year Storm Rainfall=5.41 " P-rinted 1/-712011- LLC Pond 2P: Wet Basin 3 ' Stage-Area-Storage Surface/HorizontaINkletted Area (sq-ft) 00 Surface 000 45,000 p 000 40 35 p 5,000 10,000 15,000 20,000 25,000 30,0 , , torage S ------... ----- - -------- -- --- I , ' I .. ' ---------- "" ----- -- --- - - - - - - - ' ------- BOB = -- I - - -, - 807 I I --- ' ----- " ; 806 ------ -- I I 805 -------- d aoa w ------ --- ----- ---- I----------- e 803 - ------ I > 802 _. -----?- --- I I ._ --- - --?----- -- ' -- --- I I• U 801 . .----- I I 1 ---. -----____-_._____- I. _ __ -- Boo - - - - - 1 ----1.:---- 799 - ---- f ' I ' 798 .Ot919I9!?ENo Vs 000 150 200,000 250,000 000 50 , 100,000 0 , Storage (cubic-feet) 1 1 1 1 r r Type// 24-hr 10-Year Storm Rainfall=5.41 " Prepared by {enter your company name ere uvrlrnr.AD(R) 8.50 sln 004263 © 2007 H droCAD Software Solutions LLC 1 H 1 I 1 1 Hydrograph for Pond 2P: Wet Basin 3 Time Inflow Storage Elevation Primary cfs (hours) (cfs) (cubic feet) 0 (feet 797.10 0 00 0.00 0.00. 00 0 0 797.10 0.00 4.00 00 8 . 1.03 4,847 797.85 0.00 . 00 2 1 184.92 214,274 805.32 0.43 14 4 . .00 16 3.92 235,877 234 234 805.78 805.75 . 2.38 20.00 00 24 2.22 1.87 , 233,581 805.73 1.90 . 28.00 0.00 224,393 805.54 0.47 44 0 32.00 0.00 217,881 621 211 805.40 805.26 . 0.43 36.00 00 40 0.00 0.00 , 205,597 805.13 0.41 . 44.00 0.00 199,810 805.00 0.39 38 0 48.00 0.00 194,264 962 188 804.87 804.75 . 0.36 52.00 00 56 0.00 0.00 , 183,904 804.63 0.34 . 60.00 0.00 179,095 804.52 0.33 31 0 64.00. 0.00 174,536 230 170 804.42 804.31 . 0.29 68.00 00 72 0.00 0.00 , 166,178 804.22 0.27 . 76.00 0.00 162,383 804.13 0.25 24 0 80.00 0.00 158,846 569 155 804.04 803.96 . 0.22 84.00 00 88 0.00 0.00 , 152,560 803.89 0.20 . 92.00 0.00 149,821 803.82 0.18 16 0 96.00 0.00 147,363 181 145 803.75 803.70 . 0.14 100.00 00 104 0.00 0.00 , 143,342 803.65 0.12 . 108.00 0.00 141,822 803.61 0.10 07 0 112.00 0.00 140,629 804 139 803.57 803.55 . 0.05 116.00 00 120 0.00 0.00 , 139,237 803.53 0.03 . 124.00 0.00 138,846 803.52 0.02 02 0 128.00 0.00 138,577 392 138 803.52 803.51 . 0.01 132.00 00 136 0.00 0.00 , 138,265 803.51 0.01 . 140.00 0.00 138,177 803.51 0.01 00 0 144.00 0.00 138,117 075 138 803.50 803.50 . 0.00 148.00 00 152 0.00 0.00 , 138,047 803.50 0.00 . 156.00 0.00 138,027 803.50 0.00 00 0 160.00 0.00 138,013 004 138 803.50 803.50 . 0.00 164.00 00 168 0.00 0.00 , 137,998 803.50 0.00 . 172.00 0.00 137,993 803.50 0.00 00 0 176.00 0.00 137,990 988 137 803.50 803.50 . 0.00 180.00 0.00 , WetBasin3 P re p a-r-e d-b y-{e n to r-you-r-e 0 I-HydroCAD® 8.50 s/n 004263 1 1 1 0 1 1 u 1 Elevation Primary (feet) cfs 797.10 0.00 797.16 0.00 797.22 0.00 797.28 0.00 797.34 0.00 797.40 0.00 797.46 0.00 797.52 0.00 797.58 0.00 797.64 0.00 797.70 0.00 797.76 0.00 797.82 0.00 797.88 0.00 797.94 0.00 798.00 0.00 798.06 0.00 798.12 0.00 798.18 0.00 798.24 0.00 798.30 0.00 798.36 0.00 798.42 0.00 798.48 0.00 798.54 0.00 798.60 0.00 798.66 0.00 798.72 0.00 798.78 0.00 798.84 0.00 798.90 0.00 798.96 0.00 799.02 0.00 799.08 0.00 799.14 0.00 799.20 0.00 799.26 0.00 799.32 0.00 799.38 0.00 799.44 0.00 799.50 0.00 799.56 0.00 799.62 0.00 799.68 0.00 799.74 0.0 799.80 0.0 799.86 0.0 799.92 0.0 799.98 0.0 800.04 0.0 800.10 0.0 800.16 0.0? Type 11 24-hr 10-Year Storm Rainfall=5.41" .-e_a- J a 17Mf)I I uti Stage-Discharge for Pond 2P: Wet Basin 3 Elevation Primary (feet) cfs 800.22 0.00 800.28 0.00 800.34 0.00 800.40 0.00 800.46 0.00 800.52 0.00 800.58 0.00 800.64 0.00 800.70 0.00 8.00.76 0.00 800.82 0.00 800.88 0.00 800.94 0.00 801.00 0.00 801.06 0.00 801.12 0.00 801.18 0.00 801.24 0.00 801.30 0.00 801.36 0.00 801.42 0.00 801.48 0.00 801.54 0.00 801.60 0.00 801.66 0.00 801.72 0.00 801.78 0.00 801.84 0.00 801.90 0.00 801.96 0.00 802.02 0.00 802.08 0.00 802.14 0.00 802.20 0.00 802.26 0.00 802.32 0.00 802.38 0.00 802.44 0.00 802.50 0.00 802.56 0.00 802.62 0.00 802.68 0.00 802.74 0.00 802.80 0.00 802.86 0.0 802.92 0.0 802.98 0.0 803.04 0.0 803.10 0.0 0 803.16 0.0 0 803.22 0.0 803.28 0 0 p 0 p 0.0? Elevation Primary (feet) (cfs) 803.34 0.00 803.40 0.00 803.46 0.00 803.52 0.01 803.58 0.07 803.64 0.12 803.70 0.14 803.76 0.16 803.82 0.18 803.88 0.20 803.94 0.21 804.00 0.23 804.06 0.24 804.12 0.25 804.18 0.27 804.24 0.28 804.30 0.29 804.36 0.30 804.42 0.31 804.48 0.32 804.54 0.33 804.60 0.34 804.66 0.35 804.72 0.36 804.78 0.36 804.84 0.37 804.90 0.38 804.96 0.39 805.02 0.40 805.08 0.40 805.14 0.41 805.20 0.42 805.26 0.43 805.32 0.43 805.38 0.44 805.44 0.45 805.50 0.45 805.56 0.49 805.62 0.58 805.68 0.73 805.74 1.90 805.80 5.02 805.86 9.26 805.92 14.47 805.98 20.75 806.04 27.96 806.10 36.06 806.16 45.25 806.22 55.39 806.28 66.49 0 806.34 77.38 806.40 0 0 0 p 0 0 88.23 Elevation Primary (feet) (cfs 806.46 99.53 806.52 111.33 806.58 123.71 806.64 136.54 806.70 149.26 806.76 16138 806.82 174.81 806.88 188.02 806.94 201.66 807.00 215.66 807.06 229.95 807.12 244.62 807.18 259.75 807.24 275.19 807.30 290.93 807.36 306.96 807.42 323.27 807.48 339.86 807.54 356.73 807.60 373.88 807.66 391.28 807.72 409.08 807.78 427.39 807.84 445.99 807.90 464.87 807.96 484.04 808.02 503.49 808.08 523.22 808.14 543.22 808.20 563.49 808.26 583.27 808.32 603.26 808.38 623.47 808.44 643.88 808.50 664.50 1 1 1 1 0 1 1 1 1 1 1 WetBas!O Prepared by {enter your company name he Hwirr)CAD® 8.50 s/n 004263 ©2007 HydroCAD Type II 24-hr 10-Year Storm Rainfall=5.41 " a?UVITY- T re of Stage-Area-Storage for Pond 2P: Wet Basin 3 Elevation Surface Storage Elevation (feet) Surface (sq-ft) Storage (cub9 (feet) (sq-ft) (cubic-feet) 0 804.90 44,259 6;515 797.10 797.25 0 2,568 193 805.05 44,799 340 45 202,194 208,954 797.40 5,137 5 770 734 1 805.20 805.35 , 45,880 215,796 797.55 797.70 7,70 10,273 , 3,082 805.50 46,421 844 46 222,718 229,713 797.85 12,842 4,816 934 6 805.65 805.80 , 47,268 236,772 798.00 798.15 15,410 15,844 , 9,279 805.95 47,691 114 48 243,894 251,079 798.30 16,278 11,688 162 14 806.10 806.25 , 48,538 258,328 798.45 798.60 16,712 17,152 , 16,702 806.40 48,961 243 49 265,64 270,560 798.75 17,596 9 19,308 980 21 806.55 806.70 , 49,243 0,550 27 798.90 799.05 18,03 18,482 , 24,719 806.85 49,243 243 49 270,550 270,550 799.20 18,926 9 27,525 397 30 807.00 807.15 , 49,243 270,550 799.35 799.50 19,36 19,813 , 33336 807.30 9,243 4 243 49 270,550 270,550 799.65 20,265 8 36,342 415 39 807.45 807.60 , 49,243 270,550 799.80 799.95 20,71 21,170 , 42,557 807.75 49,243 243 49 270,550 270,550 800.10 21,623 5 45,766 044 49 807.90 808.05 , 49,243 270,550 800.25 800.40 22,07 22,527 , 52,389 808.20 5 49,243 243 49 270,550 270,550 800.55 22,983 55,802 284 59 808.3 808.50 , 49,243 270,550 800.70 23,444 , 800.85 23,906 62,835 801.00 24,367 66,456 801.15 24,832 70,146 801.30 25,298 73,905 801.45 25,763 77,735 801.60 26,228 81,634 801.75 26,694 85,603 801.90 27,159 89,642 802.05 27,627 93,751 802.20 28,101 97,931 802.35 28,575 102,181 802.50 29,049 106,503 802.65 29,522 110,896 802.80 29,996 115,360 802.95 30,470 119,895 803.10 31,626 124,535 803.25 33,123 129,391 803.40 34,619 134,472 803.55 36,157 139,778 803.70 37,776 145,323 803.85 39,396 151,111 804.00 41,015 157,141 804.15 41,556 163,334 804.30 42,096 169,608 804.45 42,637 175,963 804.60 43,177 182,399 804.75 43,718 188,916 Type 11 24-hr 25-Year Storm Rainfall=6.46" WetBasin3 P-tinted 1-/7/2011- P-repar-ed-by-{enter-your-company-name-here} Pa a 20 ?H droCAD® 8.50 s/n 004263 © 2007 H droCAD Software Solutions LLC Time span=0.00-180.00 hrs, dt=0.04 hrs, 4501 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: DA 3 Runoff Area=33.230 ac 45.24% Impervious Runoff Depth=4.74" Tc=5.0 min CN=85 Runoff=272.44 cfs 13.120 of Pond 2P: Wet Basin 3 Peak Elev=806.50' Storage=270,437 cf OInflow=272.44 cfs utflow=106.85 cfs19.666 of Total Runoff Area = 33.230 ac Runoff Volume =13.120 of Average Runoff Depth = 4.74" 54.76% Pervious =18.196 ac 45.24% Impervious =15.034 ac 1 1 1 1 1 1 i 1 1 1 1 1 ' Type 1124-hr 25-Year Storm Rainfall=6.46" WetBasin3 f?rinted-1/T12011 Prepared by {enter your company name here} Pa a 21 Solutions LLC H droCAD® 8.50 s/n 004263 © 2007 H droCAD Software Summary for Subcatchment IS: DA 3 ' Runoff = 272.44 cfs @ 11.96 hrs, Volume= 13.120 af, Depth= 4.74" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-180.00 hrs, dt= 0.04 hrs Type II 24-hr 25-Year Storm Rainfall=6.46" Area ac CN Descri tion 15.034 98 >75 /o Paved parking cover, HSG C 18.196 74 0 ' 33.230 85 Weighted Average 18.196 Pervious Area 15.034 Impervious Area Tc Length Slope Velocity Capacity Description min feet ft/ft ft/sec cfs DirectEntry, 5.0 Subcatchment 1 S: DA 3 Hydrograph p Runoff I ' 300 ---.......__...,- 280 - 272.44 cfs -- - __ Tyq it i4=hr-26;-Y6aT- Storm- I ---;--Rainfal1=6:46'"- 260 1 --- ?--- ---+---?--- -------- 240 - - I I I I 220 - - - - - - - - - - - -'- Runoff Area=33.230 ac ---------------I--------- -- - -13 120 af_ ," ? - I Runoff Volume __ .- __ zoo - ------ -- - - -- 180 Runoff-Depth=4J4" - -- ;----_TC miin- 160 w -- - - 0 140 ____--- - - -' --------- ' 120 - ------------- - - - - - - - - - - - I - F - - _ - - - - ? ? I-._... _------- ,---- 100 - - - - - - ao -- - - - - - - - .------------------ -- , - -------1-------- -- + --- --- 60--- -- - - - I I I 40 -- --- - -I-------- ---.-- 20 T ...................... 0,.,.," ....... ........ .... 0. 10 20 30 40 50 60 70 0 110 120 130 140 150 160 170 18 Time (hours) WetBasW Type 1124-hr 25-Year Storm Rainfall=6.46" P-r-inted 1-17/-2011- Rr-epar-ed-by-{enter-your-compa-ny-name-here} Pa a 22 H droCAD®. 8.50 sln 004263 © 2007 H droCAD Software Solutions LLC Hydrograph for Subcatchment 1S: DA 3 1 1 1 1 1 LJ 1 1 1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 2.00 0.14 0.00 0.00 4.00 0.31 0.00 0.00 6.00 0.52 0.01 0.60 8.00 0.78 0.08 1.62 10.00 1.17 0.26 4.41 12.00 4.28 2.71 229.41 14.00 5.30 3.64 7.76 16.00 5.68 4.01 4.78 18.00 5.95 4.26 3.71 20.00 6.15 4.44 2.70 22.00 6.31 4.60 2.47 24.00 6.46 4.74 2.27 26.00 6.46 4.74 0.00 28.00 6.46 4.74 0.00 30.00 6.46 4.74 0.00 32.00 6.46 4.74 0.00 34.00 6.46 4.74 0.00 36.00 6.46 4.74 0.00 38.00 6.46 4.74 0.00 40.00 6.46 4.74 0.00 42.00 6.46 4.74 0.00 44.00 6.46 4.74 0.00 46.00 6.46 4.74 0.00 48.00 6.46 4.74 0.00 50.00 6.46 4.74 0.00 52.00 6.46 4.74 0.00 54.00 6.46 4.74 0.00 56.00 6.46 4.74 0.00 58.00 6.46 4.74 0.00 60.00 6.46 4.74 0.00 62.00 6.46 4.74 0.00 64.00 6.46 4.74 0.00 66.00 6.46 4.74 0.00 68.00 6.46 4.74 0.00 70.00 6.46 4.74 0.00 72.00 6.46 4.74 0.00 74.00 6.46 4.74 0.00 76.00 6.46 4.74 0.00 78.00 6.46 4.74 0.00 80.00 6.46 4.74 0.00 82.00 6.46 4.74 0.00 84.00 6.46 4.74 0.00 86.00 6.46 4.74 0.00 88.00 6.46 4.74 0.00 90.00 6.46 4.74 0.00 92.00 6.46 4.74 0.00 94.00 6.46 4.74 0.00 96.00 6.46 4.74 0.00 98.00 6.46 4.74 0.00 100.00 6.46 4.74 0.00 102.00 6.46 4.74 0.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 104.00 6.46 4.74 0.00 106.00 6.46 4.74 0.00 108.00 6.46 4.74 0.00 110.00 6.46 4.74 0.00 112.00 6.46 4.74 0.00 114.00 6.46 4.74 0.00 116.00 6.46 4.74 0.00 118.00 6.46 4.74 0.00 120.00 6.46 4.74 0.00 122.00 6.46 4.74 0.00 124.00 6.46 4.74 0.00 126.00 6.46 4.74 0.00 128.00 6.46 4.74 0.00 130.00 6.46 4.74 0.00 132.00 6.46 4.74 0.00 134.00 6.46 4.74 0.00 136.00 6.46 4.74 0.00 138.00 6.46 4.74 0.00 140.00 6.46 4.74 0.00 142.00 6.46 4.74 0.00 144.00 6.46 4.74 0.00 146.00 6.46 4.74 0.00 148.00 6.46 4.74 0.00 150.00 6.46 4.74 0.00 152.00 6.46 4.74 0.00 154.00 6.46 4.74 0.00 156.00 6.46 4.74 0.00 158.00 6.46 4.74 0.00 160.00 6.46 4.74 0.00 162.00 6.46 4.74 0.00 164.00 6.46 4.74 0.00 166.00 6.46 4.74 0.00 168.00 6.46 4.74 0.00 170.00 6.46 4.74 0.00 172.00 6.46 4.74 0.00 174.00 6.46 4.74 0.00 176.00 6.46 4.74 0.00 178.00 6.46 4.74 0.00 180.00 6.46 4.74 0.00 1 t WetBasin3 Type II 24-hr 25-Year Storm Rainfall=6.46" anted 1/712011 Prepared by {enter your company name here} Page 23 HydroCADO 8.50 s/1004233 © 2007 H droCAD Software Solutions LLC Summary for Pond 2P: Wet Basin 3 Inflow Area 33.230 ac 45.24% Impervious, Inflow Depth = 4.74" for 25-Year Storm event ' - - Inflow = 272.44 cfs @ 11.96 hrs, Volume= .13.120 of 3.666 af, Atten= 61%, Lag= 2.6 min ' Outflow = 106.85 cfs @ 12.00 hrs, Volume= 3.666 of Primary = 106.85 cfs @ 12.00 hrs, Volume= Routing by Stor-Ind method, Time Span= 0.00-180.00 hrs, dt= 0.04 hrs 14 ' Peak Elev= 806.50' @ 12.00 hrs Surf.Area= 49,236 sf Storage= 270,437 cf Plug-Flow detention time= 789.1 min calculated for 9.666 of (74% of inflow) Center-of-Mass det. time= 697.1 min ( 1,490.9 - 793.9) Volume Invert Avail.Stora a Stora a Descri tion ' #1 797.10' 270,550 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq ft) (cubic-feet) (cubic-feet) 0 797.10 0 0 6,934 6,934 798.00 15,410 15,001 ' 798.50 16,857 8,067 799.00 18,334 8,798 23,799 799.50 19,813 9,537 33,336 43,619 800.00 21,321 10,284 ' 800.50 22,829 11,038 54,657 801.00 24,367 11,799 66,456 62,374 802.00 27,469 25,918 ' 803.00 30,628 29,049 121,422 803.50 35,617 16,561 137,983 804.00 41,015 19,158 157,141 805.50 46,421 65,577 222,718 806.50 49,243 47,832 270,550 Device Routin Invert Outlet Devices ' #1 Device 3 802.50' 18.0" Vert. Orifice/Grate C=0.600 #2 Primary 803.50' 3.5" Horiz. Orifice/Grate Limited to weir flow C= 0.600 #3 Primary 805.50' 36.0" Vert. Orifice/Grate C= 0.600 #4 Primary 805.70' 52.0' long x 5.0' breadth Broad-Crested Rectangular Weir ' Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.34 2.50 2.70 2.68 2.68 2.66 2.65 2.65 2.65 ' 2.65 2.67 2.66 2.68 2.70 2.74 2.79 2.88 Primary OutFlow Max=106.84 cfs @ 12.00 hrs HW=806.50' (Free Discharge) ' 2=Orifice/Grate (Orifice Controls 0.56 cfs @ 8.34 fps) 3=Orifice/Grate (Orifice Controls 6.99 cfs @ 3.40 fps) t--1=Orifice/Grate (Passes 6.99 cfs of 8.50 cfs potential flow) L=Broad-Crested Rectangular Weir (Weir Controls 99.29 cfs @ 2.39 fps) Type it 24-hr 25-Year Storm Rainfall=6.46" ln3 nted 1-/71-2-011- -r-e a Prepa-red-by-{enter-yoer-company name-here} -r-17/2 Pa a 24 ?H droCAD? 8.50 s/n 004263 ©2007 H droCAD Software Solutions LLC Pond 2P: Wet Basin 3 ' Hydrograph I ------ --------- 300 2?z.4a cts 0 Primary 1 nfl-o_ w area 33-.230 -ac - 280 :" ---------? 1 - --- ------- Peak- Etev806.5--- 260 - ---I--- --- 240 " Stora e=270;437- >cf - 220 Zj- I _ --- --- -- 200 ----------- L ---------- ? I ,.., 18.0 160 --------- --- ---'. --- --- -' - -- LL ------ O 140 -- ---`-------------- --r- ------J -- --- ---r---II---_.,- - --_.._--_.--_. ... _. _.- --- 120 106.85 c(s I ? , __I_ II - ------ 100 --- -- ------------- 81 f__ -...---- ----- _-._ ... _ ---'-- -- --- _ - 60 _ - - - I I I I } 40 20 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 Time (hours) Pond 2P: Wet Basin 3 Stage-Discharge ---- ----, ---- ---- ---------- --- --------- ?Primary 808 '? 1-----I-----I-. ---------- ----I 807 --- ----- ----;----;-----I ----- c Moir 606 ----------------------- ---------- ---- ---------- ---- ---- I I ' 805 ---------- --------- -- --r - I I 804 ---I- v c 803 ' BOZ ' Uwj 801 - ---- ---I- 1 - - - - - - - - - -- - - - - - - '- - - - '- + - - - - - - - - -----'- 800 ---- I, --- I ---------- ---- ---------- --- ---- ---------- ---- 799 - - ---- ----------- ----_----=-------- I 79B 0 50 100 150 200 250 300 350 400 450 500 550 600 650 Discharge (cfs) 1 WetBasin3 Prepared by 1 1 1 1 1 C 1 1 Type 1124-hr 25-Year Storm Rainfall=6.46" PnntPr] '177/201T {enter your company name here} 50 s/n 004263 © 2007 H droCAD Software Solutions LLC Pond 2P: Wet Basin 3 Stage-Area-Storage Surface/HorizontaiMfctted Area (scq-ft) 0 000 40,000 45,000 0 Surface 35 p 5,000 10,000 15,000 20,000 25,000 30,00 -- , „ ? Storage -- 1'-- ---- ---- ---- ----------- --- iii 808 ,. , ' - ------- - - ?-------',-------,,- - - 807 -- - '---- ---- - - - - 1-1 ---- --- _ - ? ---- --- -- 806 --- ---- ,-i ------ ------ -, ---,- -- 805 - - - - - - ___ - ---- / ---------- ---- d 804 - - - - - - - - - - - - - - - - - - - - c O 803 - ---------- ..., .. .----.. i m 802 ? ? ? -.._._ -- ----'------ ' 801 800 - - -- -'- --- - ----- ' ---- 799 - ---- --------- --- --- - % 798 GusSO?! Stfi9 R.a1a , 000 .150,000 100 250,000 200,000 0 50,000 , Storage (cubic-feet) 1 WetBasin3 P-r-epa-r-red-by--{enter-you-r-corr ?HydroCAD? 8.50 s/n 004263 Type 1124-hr 25-Year Storm Rainfall=6.46" Hydrograph for Pond 2P: Wet Basin 3 ' Time Inflow Storage Elevation Primary (hours) (cfs) (cubic-feet) (feet) (cfsl 0.00 0.00 0 0 797.10 10 797 0.00 0.00 ' 4.00 00 8 0.00 1.62 9,380 . 798.16 0.00 . 12.00 229.41 270,437 806.50 106.85 05 5 16.00 4.78 236,514 805.79 . 86 2 ' 20.00 2.70 234,894 805.76 . 31 2 24.00 2.27 234,141 805.74 . 47 0 ' 28.00 32.00 0.00 0.00 224,519 218,000 805.54 805.40 . 0.44 43 0 00 36 0.00 211,735 805.26 . . 40.00 0.00 205,706 805.13 0.41. 39 0 44.00 0.00 199,915 365 194 805.00 804.87 . 0.38 r 48.00 00 52 0.00 0.00 , 189,058 804.75 0.36 . 00 56 0.00 183,996 804.64 0.34 . 60.00 0.00 179,182 804.53 0.33 31 0 ' 64.00 0.00 0 174,618 307 170 804.42 804.32 . 0.29 68.00 00 72 0.0 0.00 , 166,250 804.22 0.27 . 76.00 0.00 162,451 804.13 04 804 0.25 24 0 80.00 0.00 158,910 . . 22 0 84.00 0.00 155,628 613 152 803.96 803.89 . 0.20 ' 88.00 00 92 0.00 0.00 , 149,869 803.82 0.18 . 96.00 0.00 147,406 803.75 0.16 14 0 100.00 0.00 145,219 803.70 . 12 0 ' 104.00 0.00 0 143,373 848 141 803.65 803.61 . 0.10 108.00 00 112 0.0 0.00 , 140,648 803.57 0.07 . 116.00 0.00 139,817 803.55 0.05 03 0 ' 120.00 0.00 139,245 852 8 1 803.53 52 803 . 0.02 124.00 0.00 00 0 , 3 581 138 . 803.52 0.02 128.00 00 132 . 0.00 , 138,395 803.51 0.01 ' . 136.00 0.00 138,267 803.51 0.01 01 0 140.00 0.00 138,178 118 138 803.51 803.50 . 0.00 144.00 00 148 0.00 0.00 , 138,076 803.50 0.00 ' . 152.00 0.00 138,047 803.50 0.00 00 0 156.00 0.00 00 0 138,027 014 138 803.50 803.50 . 0.00 ' 160.00 164.00 . 0.00 , 138,004 98 803.50 50 803 0.00 0.00 168.00 0.00 137,9 . 00 0 172.00 0.00 137,993 803.50 . 00 0 176.00 0.00 0 137,990 988 137 803.50 803.50 . 0.00 ' 180.00 0.0 , 1 WetBasin3 Prepared by { q%irImCAD(R) 8.5 1 1 1 1 1 1 1 1 1 1 1 1 1 1 i your company name 004263 © 2007 HydroC Elevation Primary (feet) (cfs) 797.10 0.00 797.16 0.00 797.22 0.00 797.28 0.00 797.34 0.00 797.40 0.00 797.46 0.00 797.52 0.00 797.58 0.00 797.64 0.00 797.70 0.00 797.76 0.00 797.82 0.00 797.88 0.00 797.94 0.00 798.00 0.00 798.06 0.00 798.12 0.00 798.18 0.00 798.24 0.00 798.30 0.00 798.36 0.00 798.42 0.00 798.48 0.00 798.54 0.00 798.60 0.00 798.66 0.00 798.72 0.00 798.78 0.00 798.84 0.00 798.90 0.00 798.96 0.00 799.02 0.00 799.08 0.00 799.14 0.00 799.20 0.00 799.26 0.00 799.32 0.00 799.38 0.00 799.44 0.00 799.50 0.00 799-56 0.00 799.62 0.00 799.68 0.00 799.74 0.0( 799.80 0.0 799.86 0.0 799.92 0.0 799.98 0.0 800.04 0.0 800.10 0.0 800.16 0.0 Type II 24-hr 25-Year Storm Rainfall=6.46" Stage-Discharge for Pond 2P: Wet Basin 3 Elevation Primary (feet) {cfs 800.22 0.00 800.28 0.00 800.34 0.00 800.40 0.00 800.46 0.00 800.52 0.00 800.58 0.00 800.64 0.00 800.70 0.00 800.76 0.00 800.82 0.00 800.88 0.00 800.94 0.00 801.00 0.00 801.06 0.00 801.12 0.00 801.18 0.00 801.24 0.00 801.30 0.00 801.36 0.00 801.42 0.00 801.48 0.00 801.54 0.00 801.60 0.00 801.66 0.00 801.72 0.00 801.78 0.00 801.84 0.00 801.90 0.00 801.96 0.00 802.02 0.00 802.08 0.00 802.14 0.00 802.20 0.00 802.26 0.00 802.32 0.00 802.38 0.00 802.44 0.00 802.50 0.00 802.56 0.00 802.62 0.0 802.68 0.0 802.74 0.0 802.80 0.0 802.86 0.0 0 802.92 0.0 0 802.98 0.0 0 803.04 0.0 0 803.10 0.0 0 803.16 0.0 0 803.22 0.0 n 803.28 0 p p 0 0 0.0 Elevation Primary (feet) (cfs) 803.34 0.00 803.40 0.00 803.46 0.00 803.52 0.01 803.58 0.07 803.64 0.12 803.70 0.14 803.76 0.16 803.82 0.18 803.88 0.20 803.94 0.21 804.00 0.23 804.06 0.24 804.12 0.25 804.18 0.27 804.24 0.28 804.30 0.29 804.36 0.30 804.42 0.31 804.48 0.32 804.54 0.33 804.60 0.34 804.66 0.35 804.72 0.36 804.78 0.36 804.84 0.37 804.90 0.38 804.96 0.39 805.02 0.40 805.08 0.40 805.14 0.41 805.20 0.42 805.26 0:43 805.32 0.43 805.38 0.44 805.44 0.45 805.50 0.45 805.56 0.49 805.62 0.58 805.68 0.73 805.74 1.90 805.80 5.02 805.86 9.26 805.92 14.47 805.98 20.75 p 806.04 27.96 0 806.10 36.06 0 806.16 45.25 0 806.22 55.39 0 806.28 66.49 0 806.34 77.38 n 806.40 0 0 0 0 0 88.23 elevation Primary feet _cfs 806.46 99.53 806.52 111.33 806.58 123.71 806.64 136.54 806.70 149.26 806.76 161.88 806.82 174.81 806.88 188.02 806.94 201.66 807.00 215.66 807.06 229.95 807.12 244.62 807.18 259.75 807.24 275.19 807.30 290.93 807.36 306.96 807.42 323.27 807.48 339.86 807.54 356.73 807.60 373.88 807.66 391.28 807.72 409.08 807.78 427.39 807.84 445.99 807.90 464.87 807.96 484.04 808.02 503.49 808.08 523.22 808.14 543.22 808.20 563.49 808.26 583.27 808.32 603.26 808.38 623.47 808.44 643.88 808.50 664.50 ' , 3 Type 1124-hr 25-Year Storm Rainfall=6.46" WetBasln -r-inted 1171--2011 P-r-epa-r-ed-by-{enter-your-co- m{?a-ny name-here- Pa a 28 ?H droCADO 8.50 sin 004263 © 2007 H droCAD Software Solutions LLC Stage-Area-Storage for Pond 2P: Wet Basin 3 Elevation Surface Storage Elevation (feet) Surface s ft Storage cubic-feet ( (feet) (sq-ft) (cubic-feet 0 804.90 44,259 195,515 ' 797.10 25 797 0 2,568 193 805.05 44,799 340 45 202,194 .208,954 . 797.40 5,137 770 734 1 805.20 805.35 , 45,880 215,796 .55 797 70 797 7,705 10,273 , 3,082 805.50 46,421 844 46 222,718 229,713 . 797.85 12,842 4,816 934 6 805.65 805.80 , 47,268 236,772 798.00 15 798 15,410 15,844 , 8,279 805.95 47,691 48 114 114 243,894 251,079 . 798.30 16,278 712 11,688 162 14 806.10 806.25 48,, 258,328 40 798.45 60 798 16, 17,152 , 16,702 806.40 48,961 243 49 265,6 270,550 . 798.75 17,596 19,308 980 21 806.55 806.70 , 49,243 270,550 ' 798.90 05 799 18,039 18,482 , 24,719 806.85 49,243 243 49 270,550 270,550 . 799.20 18,926 27,525 397 30 807.00 807.15 , 49,243 270,550 ' 799.35 50 799 19,369 19,813 , 33,336 807.30 49,243 49 243 270,550 270,550 . 799.65 20,265 36,342 415 39 807.45 807.60 49,243 270,550 ' 799.80 .95 20,718 21,170 , 42,557 766 45 807.75 90 807 49,243 49,243 270,550 270,550 800.10 800 21,623 , 044 49 . 808.05 49,243 270,550 800.25 40 800 22,075 22,527 , 52,389 808.20 49,243 243 49 270,550 270,550 ' . 800.55 22,983 55,802 284 59 808.35 808.50 , 49,243 270,550 800.70 85 800 23,444 23,906 , 62,835 . 801.00 24,367 66,456 ' 801.15 24,832 70,146 30 801 25,298 73,905 . 801.45 801.60 25,763 26,228 77,735 81,634 801.75 26,694 85,603 801.90 27,159 89,642 802.05 27,627 101 28 93,751 97,931 802.20 802.35 , 28,575 102,181 802.50 29,049 106,503 802.65 29,522 110,896 802.80 29,996 115,360 802.95 30,470 119,895 803.10 803.25 31,626 33,123 124,535 129,391 803.40 34,619 134,472 803.55 36,157 139,778 803.70 37,776 145,323 ' 803.85 39,396 151,111 804.00 41,015 157,141 804.15 41,556 163,334 804.30 42,096 169,608 ' 804.45 42,637 175,963 804.60 43,177 182,399 75 804 43,718 188,916 i . 1 D V75IMID W924 PML:DMPUTED BY. PHH NodhAa?:sn GaanEa1D5 Vadon t9 FR ELI M.. Fht E°PDJER ND: D°-uml. f:alhBeCanuao:e 4rCa' N WPAINAGE APEa 2BAae WE'aIGN FPEDUENCT: IYea gleam FROM STATIUNGiEAtit 6asi9 RD STxTIDN IPEACIt Faabrv ' h 'pRAUL1C RFaIJLTS P? In'a?? , Ped?Flar.' doeN OF Aleel?.lA PedmBlt DedhB11 Ob l mdB T".1 aa Idd h 5 65 i.82 1.56 7 BD 623 X . c.8,9S8 width=°iDO It yy Not m Scale I IIJER RFSULTa Melling Typa VepeJeb:n Goavwic Fvmcmt Ldvh? Seledy Fade Prmek: Feach l.bT 'A"°- SlsFle Rehm Phew Sheen Slew Shea Slie= Cle= Type Denm. ?.n 51494 F»D Vep9eGon 3 7110 i.ST 7.84 BTABL C Mi. 75- - 518 627 STABLE 8 BI+PIeE Sol . 8 F Sand 1 1 1 1 1 1 l 1 Sad. W Inwi Saav 1 1 tR. OSI ON CONTROL MATERIAL O/DEs ?GN R T H AMERICAN GREEN ER TH AMERICAN GREEN CHANNEL PROTECTION - ENGLI USER SPECIFIED CHANNEL LINING BACK-UP COMPUTATIONS r SOFTWARE VERSION 4.3 ROJEC T NAME: Foothills Commerce Center - Ph.2PROJECT NO.: 09.00116 IOMPUTED BY: RHH DATE: 11/19/010 TO STATION/REACH: Fore bay N FROM STATION/REACH: Basin 3 RAINAGE AREA: 2.8 Acres DESIGN FREQUENCY: 1-Year Storm INPUT PARAMETERS '??..r.r.:.......r.r.n-nF..r.'..*n?F:"•.i,?1Z..i. .'r. i.?T'?. ?. .i.'..'.. ma'r'. .. r. :r. r. .. :. .. .. .. r. ..nr. .. hannel Discharge : 7.5 cfs (.21 MA 31s) eak Flow Period t : 0.5 hours 455 mlm) 455 ft/ft 0. 0 Channel Slope l Bottom W . idth : 5.0 ft (1.52 m) hanne Left Side Slope :31 Right Side Slope :3:1 'Channel Lining : P550Staple E 0Mi Pa)95% Permi. Shear(Tp) :14.00 p 6 Phase = 3 ' Class = C Vegetation Soil =Fine Sand Allowable Soil Shear(Ta):3.25 psf (155.61 Pa) CALCULATIONS ' .. .. .. .. ..n ....r r. nr.r..-.. ..-.... . f'+r. ?. .. ?n ?j:'i.nr.T*ry.r.r.r?.r.....r.'..X'.b.r'..'r. . rs. r'r. ::Sw.: r'.. n.. r'.. a. Initial Depth Estimate = 0.16 * (7.5!(0.455"0.5))^0_375 ft (0.39 ft 0 08 m) 2 m) ' Final Channel Depth (after 8 iterations) .27 Flow Area = (5.0 * 0.3)+(0.5 '-0.27"2 ' (3.0+3.0)) = 1.6 sq.ft (0.1 m^2) Wet Per. =5.0 +(0.3(((3.0^2)+1)^.5 +((3.0^2)+1)".5)) = 6.7 ft (2.0 m) ' Hydraulic Radius = (1.6 / 6.7) = 0.2 ft (0.1 m) Channel Velocity =(1.48610.079)*(0.2^0.667)*(0.455".5) = 4.8 fps (1.5 m/s) ' - = Channel Effective Manning's Roughness 0.079 .3 Pa Calculated Shear (Td) = 62.4 * 0.27 * 0.455 ®187.461 psf (364 ) Safety Factor= (I pTd) _ (14.00 /7.61) Effective Stress on Blanket(Te) = 7.6'(1-0.75)' (/0.079)^2 s 0.52 psf (24.8 Pa) ' Safety Factor = Tame) _ (325 /0.518) = 6.27 1 1 1 1 1 1 1 1 1 n1119r3n ?IAPUTED BY. RXX Nmlh Ammiun Gman•ECMCS Vesan/.3 • Pirt1 0JEC1 NAME: Fmdh9: Cmmamce ?N ROJER ND. na mnl6 AINAGE AREA' Zs2Ame: IDESIGN FREOl1ENCl:1Yem 0l0im o p 3M FAl 67ATIDN/RFACH. B-3 6iAT10N/READi: Fme6eY5 R - F,'YDRpUUGR SF ULTS D'mamie FOd.Flve dom4'lIF aeal?U Xyyeuic Xmmd Idd Fc df .1 ReiviRl Deou+BB 537 CS6 05 Dln o.DS P B,5 7? 12 F9.T s • D.3a'G 1I ?1 N01 b bole t Ir?FR RESULT'; Ma16n6Type YeDma4o^Gam°?^^! ^= Fm b U +M d 6ale¢fe_Im r-d-- fiee? A 'Sha SYCa SXem S4e '? ndlti Phew ?e: type Dwny IFII ?°n Slagle P.R.. 1yTj 1.0"0 6i0HL 73 5.00 3 SeaipH FE>D vepelelian F Sand 6d E.:SL 3008 7.DB 6iABL SlegeE Bad. m Inpii Ev:v 1 DESIGN SOFT WARE VERSION 4.3 RTH AMERICAN GREEN EROSION CONTROL MATERIALS TE ENGLISH. L D S.I. ?R I H AMERICAN GREEN CHAN EBPP,CK-UP ICOMPUTATIONS USER SPECIFIED CHANNEL LINING ^-^^ -_^^__-^ r ROJECT NAME: Foothills Commerce Center - Ph.1 p PROJECT NO.: 09.00116 1OMP.UTED BY: RHH DATE: 111 TO STATION/REACH: Fore bay S FROM STATION/REACH: Basin 3 RAINAGE AREA: 26.2 Acres DESIGN FREQUENCY: 1-Year Storm INPUT PARAMETERS ll.*************************************-,-=***************-'-******************** hannel Discharge : 69.7 cfs (1.97 m^3/s) eak Flow Period : 0.5 hours Channel Slope 0.385 ft/ft (0.385 m/m) lChannel Bottom Width : 8.0 ft (2.44 m) ¦Left Side Slope : 3:1 Right Side Slope : 3:1 (Channel Lining : P550 Staple E Mix 75-95% Permi. Shear(Tp) :14.00 psf (670.3 Pa) ' Phase = 3 Class = C Vegetation Soil, =Fine Sand Allowable Soil Shear(Ta):3.25 psf (155.61 Pa) ^^ -^ CALCULATIONS Initial Depth Estimate = 0.16' (69.7 /(0.385^0.5))^0.35 (0.9 7 t (29 m) ' Final Channel Depth (after 8 iterations) .55 0.5 m"2) Flow Area = (8.0 ' 0.6)+(0.5 '0.55"2 ' (3.0+3.0)) = 5.3 sq.ft Wet Per. =8.0 +(0.6%(3.012)+1)A.5 +((30^2)+1)^.5)) = 11.5 ft (3.5 m) ' Hydraulic Radius = (5.3 / 11.5) = 0.5 ft (0.1 m) Channel Velocity =(1.48610.042)(0.5^0.667)'(0.385^.5) = 13.1 fps (4.0 m/s) Channel Effective Manning's Roughness 0.042 = 3.23 sf 633.2 Pa) Calculated Shear (T d) = 62.4' 0.55' 0.385 1 = 113. p Safety Factor _ (Tp[T d) _ (14.00 /13.23) t Effective Stress on Blank( et T e) = 13.2'(1-0.75)'(!0.042)^2 _ 3.00 psf (143.7 Pa) 1 J ............__.........._..._.._..__? ......._............. ....... 11 ED BYi RHN e P .nMIC . 1 1 D 1 ?pglB ..............._...._..._.____................_..._.__.__.____..___...... . .. _ .._.......... •^?PFlpICLI NO' 0907110 ARAINhGE AACh :90 Aaes SIGN fRCDU NCY itca +lwm •-? ' (FROM $tgl10N/RCALN: Wd RESLI T4 ? • X1051 ni10N/fl[ACH-, Rock Rp- °I?GO7D1 ' _ ?• yDReULIG DrcdwGe PeeF.Flwv YebcdY lbc bea ls6ltl Redu:Il?t Dahll Pedotl 1 0.,i 9860 D3B 0.65 F7. .2 0.5 h7 5-60050 ' 1 t j]5? f WBh:°T00011 165.0 No: m Sank 1 Ir.FR RESULTS M a0n9 Type Reech P VegeWion Chxedeutics P. S,is Cnkdeled 5eleb F.W, R-1- IedTlly ? Sham bw Sham SV Phase 0w TYPa De OY W et- Sleple 1.00 0.70 4.91 STABLE 5trs.¢d Pct R'mw Unve?eleted 3n 1 1 Ili Back to lrssu snag ?I TH AMERICAN GREEN EROSION CONTROL MATERIALS DESIGI SOFTWARE VERSION 4.3 TH AMERICAN GREEN CHANNEL PROTECTION R SPECIFIED CHANNEL LINING BACK-UP COMPUTATIONS PROJECT NAME: Foothills Commerce Center DATE:11/RO ECT NO.: 09.00116 /2011 OM ST BY: RHH OM STATION/REACH: Wet Detention Basin Forebay Weir DRAINAGE AREA: 29.0 Acres *************************************************************************** INPUT PARAMETERS ***************************************************************************** Cannel Discharge 77.2 cfs (2.18 mA3/s) Peak Flow Period 0.5 hours annel Slope 0.005 ft/ft (0.005 m/m) annel Bottom Width 40.0 ft (12.19 m) eft Side Slope 175:1 ight Side Slope 165:1 ihannel Lining : Rock Riprap Sin Permi. Shear(Tp) :1.00 psf (47.9 Pa) ' Phase = 0 ***************************************************************************** CALCULATIONS **************************************************************************** Initial Depth Estimate = 0.16 * (77.2 /(0.005A0.5))A0.375-= 5.21 f(0(207m)) inal Channel Depth (after 11 iterations) = 965 ft . sq.ft (9.2 m~2) Clow Area = (40.0 * 0.7)+(0.5 *0. 65A2 * (175.0+165.0) ) Wet Per. =40.0 + (0 . 7* (( (175.0"2) +1) A .5 +((165 . 0A2) +1) A . 5) ) O 246 f.0 (fOt1 (m) 9 m) ydraulic Radius = (98.6 / 262.0) 1* = 0.8 fps (0.2 m/s) hannel Velocity =(1.486/0.070)*(0.40.667) (0.005 .5) Channel Effective Manning's Roughness 'Calculated Shear (Td) = 62.4 * 0.65 * 0.005 Safety Factor = (Tp/Td) _ (1.00 /0.20) 1 1 1 = 0.070 = 0.20 psf = 4.91 (9.8 Pa) 1 1 1 n 1 1 1 1 1 ll 1 1 1 • cG MM _A S S O C I A T E S Engineering • Planning Finance . , . _ D A Pn Rnr ?259- Asheville. NC 28802 PROJECT: PROJECT NO.' DESCRIPTION. CALCULATED BY: F-T [" CHECKED BY: n ATC• M ? • ?? SHEET NO. OF_- pPn?,-iL??Tumber• (to be provided by DWQ) ' Drainage Area Number: Wei: Detention Basin OPerafiO aid Isla nten ?e green-Lent i n a I willkeep a maintenance record on this BMP. This maintenance record will be kept ient BW elements noted in the inspection will be d fi c e log in a ki Lown set location. Any repaired or replaced immediately. These deficiencies can affect the integrity corrected / , 1P. of structures, safety of the public, and the removal efficiency of fine Bh The wet detention basin system is def -Led as the wet detention basin, rovided ne is if l f . p o ter i retreatment including forebays and tlne vegetated p This system (check one): orate a vegetated filter at the outlet. i ncorp does ® does not This system. (check one): treatment other than a forebay. ® does ® does not incorporate pre ' Important maintenance procedures: - Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if become established (commonly six weeks). t l s an needed, until the p - No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. ed in the drainage area to reduce the i t i ' n a n - Stable groundcover should be ma sediment load to the wet detention basin. ency or to perform ma -ttenance, the emer d f ' g or an - If the bash-, must be draine flushing of sediment through the emergency drain should be minimized to the maximum extent practicaL - Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and rm event greater than 1.0 inches (or 15 incites if in a t o within 24 hours after every s Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. ' Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. ' BMP element: Potential roblem: I-low I will remediate the roblem: Remove the trash/debris. the entire BMP Trash debris is resent. erimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to The t l p a an detention basin erosive gullies have formed. remove the gully, and then p ground cover and vafter until it is established. Provide Lime and a one-time fertilizer application. Vegetation is too short or too Maintun vegetation at a height of six inches t l dm . e , a- long. a rT ' 4 Form S)hr40t-\?'et Detection Basin O&M-F•ev.4 Page 1 of 1 Pernii N ?ttll?er. (to be provided by D K'Q) ' Drainage Area Nmnber: BMP element: The inlet device: pipe or syaale 1 1 1 1 1 1 r potential problem: rise pipe is clogged. The pipe is cracked or otherwise da-maged. Erosion is occurring in the sivale. forebay Sediment has accumulated to a depth greater than the original design depth for sediment storage. 'Ti'ne vegetated shelf The main treatment area Erosion has occurred. Needs are present. Best professional practices show that pruning is needed to maintain optimal plant health. Plants are dead, diseased or dying. Weeds are present. l Eos? l s?+ill remediate the problem: Unclog the pipe. Dispose of Ilse sediment off-site- Replace the pipe. Rea ade the Swale if necessary to smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it s/=ill not eau-',e impacts to streams or the BNT Provide additional erosion protection such as reinforced turf matting or rip-rap if needed to revent future erosion problems. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the lants rather than s ra Prune according to best professional practices Determine the source of the problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil fis'i,-1 dicates it is necessary. - Remove the weeds, preferably by hand. if pesticide is used, vApe it on the Lams rather than s erapsu . Search for the source of the sediment and remedy the problem. if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Consult a professional to remove and control tine algal ovath. Remove the plants by wiping them with pesticide (do not spray). Seth- enthas accumulated to a depth greater than the original design sediment storage depth. Algal growth covers over 50% of the area. ' Cattails, phrab sites or other invasive plants cover 50 % of the basin surface. ' Page 2 of 4 Fornm SVd401-Viet Betendon Basin O&M-Rev.4 p?2z,?ithuinber• (to be provided by DTVO) ' Drainage Area plumber: BW element: The embankment The outlet device kTh-erece-i-v-Es water Potential problem; Shrubs have started to grout' on the embankment Evidence of muskrat or beaver activity is present. A tree has st-aarted to grow on the errbanla ent An annual inspection by an appropriate professional shows that the eli-tibanka-Lent needs repair. (if applicable) Clogging has occurred. The outlet device is damaged Erosion or other signs of damage have occurred at the ousel. Haw I will rentediate the problem: Remove shrugs immediately. Use traps to remove muslaats and consult a professional to remove beavers. Consult a dam safety specialist to remove the tree. 1\I&ke all needed repairs. Clean out the outlet device. Dispose of the sediment off-site. Repair or replace the outlet device. Contact the local NC Division of Water Quality Regional Office, or the 401 oversight Unit at 919-733- 1786. The measurh-L device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. when the peranent pool depth reads 5.4 feet in the main pond, the sediment m r shall be removed. When the permanent pool depth reads 5.4 feet in the forebay, the sedunent ' shall be removed. BASIN DIAGRAM (fll in the blanks) Permanent Pool Elevation 803.5 ' v Sediment Removal . 798.1 Pe. ianen Pool -------- Volume Sediment Removal Elevation 798.1 ---------- --------- --------- Bottom Elevatio 797A -ft Min. Sediment Bottom Elevation 797.1 Storage 1L OREBAV 1IId 110ld13 I Volum 1-ft Storage ' Page 3 of 4 Form SVJ401-Wet Basin O'11?f-Rev?- (to be provided by DRT) I acknosjedge and agee by my siglature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. 1 1 1 1 1 1 piroJea 77a777e:Footlulls Conunerce Center BW dra.hjage area nu7nber-3 Print name:Brad Cornvrell Title:Public Utilities Director Address:P.O. Box 207, 824 West Grover Street, Shelby, North Carolina 28151(28150) I, J ?Yk krVN-,3 , a Notary Public for the State of j'?t91 (?? ??lU??c? , County of do hereby certify that 6l'l1d ? (n,m1rC.M -personally appeared before nee this J-7 day of NW vn alC) , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, H WILKINS LKAREN rth Carolina ounty n Expires 1 , 2013 SEAS. lgiy COMM-iSSiOn expireS 1 Form SW401-Wet F? etention Basin ©Q:M-Rev.4 Page 4 of4 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdi-vision has been named the president. November 16, 2010 11LIHINC, gUNNELL-LAMMONS ENGINEERING, INC. G c?wck4 ENVIRD*X=VTAL AM C0N5MMi ON MUEMAI5 CONSULTW3 McGill Associates, P.A. 55 Broad Street Asheville, North Carolina 28801 Attention: Mr. Dale Pennell, P.E., P.L.S. Senior Project Manager 1 1 1 1 Subject: Report of Oeotechnieal Exploration and Soil IuMtratfoa Testing Foothills Commerce Center Phase I Wet Detention Basins Shelby, North Carolina BLE Project No: 310°6667-02 Dear Mr. Pennelh Bunnell-Lammons Engineering, Incorporated (BLE) is pleased to present the geotechnical exploration and infiltration test results for the proposed Phase I Wet Detention Basins for the Foothills Commerce Center project. The - geotechnical exploration and infiltration testing.. was performed generally as described in BLE Proposal No. P10-0672 dated October 21, 2010. The exploration was authorized by your signing our Proposal Acceptance Sheet on November 5, 2010. SITE AND PROJECT DESCRIPTION We previously prepared a Report of Preliminary Geotechnical Exploration (BLE Project No. J09- 6667-01) dated September 24, 2009. The preliminary report should be read in conjunction with this deport. We have been provided with a drawing titled "Overall Plan"' by McGill Associates, P.A. dated July, 2010 showing the planned development, location of wet detention basins and the existing topographic contours: The site consists of a 145-acre tract of land generally located within the southeast quadrant of the intersection of Artee and Plato Lee Roads on the west side of Shelby, North Carolina (reference Figure 1). We understand that the property is planned to be an industrial business park. The geotechnical exploration. and infiltration testing for this report are specific to the Phase I Wet Detention Basins, which consists of three basin locations. The basins range' in plan size from 11,926 to 35,6280 square feet with maximum depths of 8 to 11 feet. A north-south trending creek divides the property with approximately % of the property located east of the creek. The property east of the creek is used as farmland. The remaining 1/4 of the site located west of the creek was formerly a pine forest that was cleared some time ago and has since become overgrown with brash. The site topography slopes down from the north/northeast to the south/southwest to Little Beaver Dam Creek and then slopes up to the west to Plato Lee Road. The ground surface elevations range from about 000 to 000 feet. 1 MILK. November 16, ?010 P.eport of Geoteclzrcical Exploration and Soil 'Iry-iltration Testing BLE project yo, JIO-6667-03 Foothills Commerce Center-Phase I p7'etl3eter:tionBasins Shelby, North Carolina SuS ACE RXpL4IFtATIGI ' Ten soil test borings (B-1 to B-10) were previously performed as part of the Report of Preliminary -s P iuro Geotechnical Exploration dated September 24, 2009 (refgetention aslins (ree znce rigure 2) with a 11 to B-13) were Performed specific to the Phase I Wet aug Soil sentry tmck mounted drill rig -with 21/4-inch inside diameter h ll wet dm ratiogers for the n basin to props osed project. One test boring was drilled near the center of each proposed de Of 17 to 20 feet The test boring depth was extended toa minimum of four feDt below the proposed test borings (ref Enc e Figure 2). bottom at each wet detention basin. In addition, fourteen n test were drilled within the footprint of the we detention basins. s Three infiltratooe performed borings Basin No. were performed in Basin No. 1, three infiltration test bor g (1-4 to 1-6) wer r 2 and eight infiltration testborings (I-7 to I-14) were performed in Basin No. 3. 'Wet Detenfd°n Basin Igo. l Soil Conditions (B-11) - The surface consisted of approximately 5 inches of silty fine sand topsoil. silty fine to The subsurface soils generally consisted of loose ti fo irm,to f ist to and aP eared to bell vial (watt medium sand to a depth of about z feet. The ned deposited) soils. A chemical odor was noted in the soil tsample hat cons ted of firm to dense, moist, slightly the alluvial sand, boring B-11 encountered residual soils micaceous silty fine to medium sand to auger refusal feet. so is are soils weathered in- place from the parent rock. Auger refusal likely occurred on weathered r . Groundwater Conditions - Groundwater was not encountered during the drilling operations. d on Dol soil Groundwater was encountered at a depth of about 5 ftaft ?? er tabBava esfm?ated to be at depth moisture content and observed water levels, the hydrostatic of approximately 5 feet during the observation period. Wet Detention Basin No. 2 1 Soil Conditions (13 -12) - The surface consisted of approximately 5 inches of slightly clayey, silty sandy topsoil. The subsurface soils generally consisted pi ° Lion depth of 20 feet slightly silty fine to silt to moist, silty fine to medium sand to the b medium sand is residual soil. Residual soils are soils weathered in-place from the parent rock. Groundwater Conditions - Groundwater vras not encountered dm ture content and lack of water, days after the drilling operations. Based on sample coloration, soil is" the hydrostatic water table was estimated to be below the test boring depth of 20 feet. Wet Detention Basin I'd°. 3 it Conditions (8-13) - The surface consisted of approximately 5 u-ichesolftslslghtl 1 clayey, ccaceousSilty So Y sand topsoil. The subsurface soils generally bsu?il4d °? 1o??5e°soi>'ae residual soils which are slightly clayey, silty fine sand to a depth weathered in place from the parent rock. P tially encountered weathered.rock ck or boulders were encountered from I feet. Auger refusal material was en 17 feet. 14 to 17 0 1. ???,w? No>>ember 16, 2010 Report of Geotechnical Exploration and Soil Irjl ltradon Testing PLE project ATo. J10-6667-02 1 Foothills Commerce Center-Phase I Y' et Detention Basins ? Shelby, North Carolina depth -5d at a O feet g the d11ZnQ Groundwater Conditions -',/Oundwater was encore to sarQple coloration, soil moisture content d Bas ' rations and at a depth of 61/? feet a tI- A ei z days. ope and observed water levels,;he hydrostatic mater table was estimated to be at a depth of 6'/z feet during the observation period. Oroundater Oonslderations ter levels may tiuctuate several feet with seasonal and o awater leT els occurhn late winter Groundwa features. Formally, the hi?e..t gr 1 is water level in adjacent drainage fall. seasonal big?i water table (SHW ) and spring and the lowest levels occur in late S mer of ?ntion Basin's No. 1 and 3 and below a estimated to exist at a depth of 5 feet in the vicinity depth of 20 feet in duet Detention Basin No. 2. LABORATORY TESTING ' WithA D2216. Natural Moisture Content moisture content of select soil samples was determined inn e oo?? Wei& owater in a ASUA The natural m ercen o of the soil is the ratio, expressed as a p the weight of the soil particles. The results are shown on the table below. The mass o moisture Of soil content given percent F aner than hTQ. 200 Sieve s to cent finer than a No. 200 Sieve test was performed on , r soil A per ashed oovverl a U.S. Stan ward No. 00 w content of these materials. After initial drying, the sample w o?? in a are shown This ttest e to remove the fines (Particles finer than a No. 200 mesh ma e 1 'below. manner similar to that described by AST'M D1140. The results 'FABLE 1- LABORATOR TTEST pESV?TS Test CS Soil ' Depth Natural Moisture Percent Finer than No. 200 USClssCS Scion (° ) Boring No. (feet) Content (%) Sieve ° 24 SM B-11 13.5-15.0 12.5 SM B-12 13.5-15.0 26.7 37 ?4 SM B-13 85-10.0 38.7 1tESTJL'FS ?i,TpATION TEST PROCEDURE' AND solid 2-inch diameter PVC casing rehole was drilled and converted to a monitoring well utilizing Performed 'n -stin- was to abo depth of 2 feet below the proposed pondBbemmen h foiubsoils for IItratio, which is a general accordance with Appe71dix C . Testin d quire etative Bto Iters part of the Stormwater Best Mariagenze7it Practice. Desi gr0 ion Agency.2? Yep ue, Volume dated September 2004 prepared by the U.S. Environmental g) well, and in accordance with the above referenced upon completion of the infiltration (monitorinb testing requirements, the well was then filled with clean water to a depth of 24 inches and allowed to pre- ' soak for 24 hours. ABL E,- November. 16, ?010 Report o GeotechrdcaI Exploraron and Soil Infiltration Tesiing HE Project No. J10-6667-02 Foothills Commerce Center-Phase 1 Wet Detention Basins Shelby, North Carolina , an the Weter level Upon 24 hours later, the casing was refilled with clean water to hour. the top This test crow dure was repeated 3 was monitored (measured) from the top of the casing for e was left in place, for additional testing if additional times for a total of four times. The PVC Pip required. BLE can remove the PVC pipe and bacluf 1.1 than basin l? yr e nted in the llow tables. is Soil "no p, iditional testing ' required. The average ln$ltration rate for each wet detest! P ET-R=?ATIQN TEST fl1tr Lion i"at ?? ese r hour} TABLE : DETENTION BASIN No.1 Il? ?tration No. Average In' I-1 ? 0.31 1 ?0 ' I-2 0.15 I-3 035 Averaca of 1_1 to 1-3 1 1 1 1 1 1 1 CONCLUSIONS AND ALTERNATE LINER, p-E COAUvM-4 NDATIOIdS proposed 1 en Basins No. t andtest 3, The average infiltration test results of 0.55 and 0.96 inch per for respectively are in the range of-expected values for silty sand residual l typical for loose sands. borings. The infiltration test result of haul ll web allowable for basins, a ow permeability liner would be If these infiltration rates are higher required. Based on the sandy soils encountered by the test borings, a bentonite clay amended liner is recommended. 4 1 November 16, 2010 B T E Proj ect No. J10-6667-02 Report of Geoterhn'cal Exploration and Soil Inflir anon Testing Foothills Commerce Center - pFwse 1 Wet Detention.Bazins . Shelby, North Carolina sodium liner should be wee-mowing, likely ? Qe of The bentonite for a low permeabi-? a powdere high-swelling, ' eld be a silty s d be nitth e 100 pranergcent ntmorillonite clay that is free of additives. The bentoni?e h a mo 3 to 6 percent by dry weight The soil used with the en 25 ercent) passing the No. 200 siege. passingtheNo. 4 sieve and amaimum of 35 percent (preferably p ' 'v ith the native soil using a tiller belora adding g suffi The benton r sufficient ita should be thorn ? 6 y m.L?ed w water to promote camPaction. All fill used for replacement of material that ?uno e? cT should be ' uniformly compacted in 6-inch lily to at least 95 percent of the standard ASS T) 698) at,_? to 5 percent above the optimum m z?e den o??soil tmixture soil r0Lx"u0- We recommend laboratory tests be performed with samples tonite to achieve the required permeability. A t the start of constr?? ctio?, a =Lest pad should be perf ade within. the basin. The test pad should be performed using the ' required hen thi lift performed at the proposed finished grade end e-ss same equipment and construction methods as the actual liner. tests should ba performed on thectmest pad to to 10 inches, loose measure before compaction. Tnultratlon verify acceptable permeability rates. bed soils, and soils containing organic matter or other deleterious ' All existing topsoil, vegetation, fi?stUr d basins. After stripping and r mater ough excavation materials should be stripped from v, =thin the proposed ected for so$ surficial liner b grading, «'e recommend that areas to provide eeledprubber--tr ed roller or?imilar approved equipment. due a visual with a 25 ton, four uhan proo&ohling basin areas that are within 2 feet of the ' soils and proofrolled recommend a visual inspection r s than asses over each location, with the last two groundwater level. The proofrollEr should make wav Pt, or deflect e ?cess. ely and continue to excavate areas passes perpendicular to the first two. Any so after several passes of the proofroller should be e fi?vmated ateritozls. firmer The proosoils.fTrolliheng and e do acted Q xcavating under the should be baclilled in thin lifts with suitable P erienced engineering technician working operations should be carefully monitored by P direct supervision of the geotechnical engineer. the o ortunity to provide our professional services on this project. if you have any ' We appreciate PP questions regarding this report, please contact us at (828)277-0100. 1 1 1 Sincerely, BUNNRvI,LAT'TM0 NS E Grn ERRING9 ? II /J;f/j fE R OZ 3gg?7 :BEE William T. Gentry III, P.E. .?.?' Senior Engineer s i ;? k- NC RegistrationNo. 33927 0"e'/ ?. vu6vp" 5e, Gary L. Weekley, P.E. Senior Geotechnical Engineer NC Registration No. 8251 rrrii?l?? Location Plan for Preliminary G' "technical Exploration Attachments: Figure 1-Boring Figure 2 -Boring and Infiltration Location Plan for Phase I Wet Detention Basins Field Exploration Procedures Soil Test Boring Logs (3) Key. to Soil Classifications and Consistency Descriptions 5 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 ;Ili, k \N r z t,; 04 o ¢ C n • o0 oN Uo 0 0 0 ¢ ?m ?0 _•.? ?••'?.-•-?••'? G? Ors m Z?Z LL. z ?CL. z?FU ?u° @ p Z c ° I C p t . Zcq I J(_y ?b? 1 I? ?,j?0 :aA p w 11 r 4p _ ? - ? ?C] ? I InV ? ?L? r -? t I Q? o I t ' I U? I r _ _ _ ?fE u C) U>U L? ( ? `? / ? 1 ? :E pCCZ t I DOO J II I o I( 6 E ? ¦ ? aE? - ? \ z ¢oU I ? IPA 8 eE ? / to ; p ? a g? r E ?\ rsw a 6?: QV E U1t.z0 .1 is !! G S l r ]gp I `FS • ? ? i FF6F[. a III IIII 1IIII 111111 I \ c I 111111 I I 111 III 11 \ 's". II 111111 1 1 111111111111 111 11 I IIII 111111 $ \ ' e VIII II 1 111 1 II 11 1 5 r t { 11111111 I . 1111 11 11111 :. 1111 I II11 11 II 1111 1 ° t z o r \ ? z I??e cwi ? \ o ,I o o 0 e z F_e ?`sE I I O O_ I Z ¢ .<<1 r ° \ I ° Z? t €eFgl F ¢ o \ I p 000 `? 1 o r 1 \ r°) c cam` 1 S ,. Field Exploretian Procedures Sol] Test Sorings Q a continuous flight steel auger into the soil. Soil The borings were made by mechanically twistir? accordance v+'ithSTI?i D 15 06. At ' sampling and.penetratiou testing were performed in general lit-tube assigned intervals, soil samples were obtained with a standard 1.A inch I. D , 6m an then driven an sampler. The sampler was first seated 6 inches to penetrate any IW ? The number of hammer additional 12 inches with blows of a 1410-pound hammer falling ' blows required to drive the sampler the fmal 12 inches wasrerorde d ediuat???? index odard penetration resistance." The penetration resistance, when P P Y the strength of the soil and foundation supporting capability. ' ass ars and transported Representativa portions of the soil samples, thus obtained, were placed ical engineer to verify to the laboratory. In the laboratory, the samples were examined by a g n ' the field classifications of the driller. Test Boring Records are attached, showing the soil descriptions and penetration resistance. 1 1 1 1 1 11 SOIL TEST O NO. B-1 i PROJECT: Foothills Commerce Center Phas I Viet Detention Resins PROJECT No : J1DS6? 2 DATE START: 10-22-10 END: ID-22-9. ?????pp?? CLIENT: h4cGill Associates 2.5 WMHELLPLA M LOCATION: Shelby, North Carolina ELEVATION: LOGGED 612.5 1 W. Gentry ENOWERM090C. DRILLER: idietro Drill, Inc„ R. Frye -r DRILLIElG METHOD. Soil Sentry Truck r,oun? 2-'l14 Inch ID heliow? auger GA\RNC> sI?I.Tt??s V AFT ER 4 DAYS: - DEPTH TO - lhrA T ER> [hli'CIAI: - d N SOIL nJ STAUDARD PEh1Fi2Ai70N RESULT ?? .?,E SL0WSr-0DT ELE1? 4TIp}31 SOIL DESCRIF110H N 2 5 10 20 30 40 50 TO 90 DEPTH (F7 5 1 ::•.::. 5-incites of tan and gray, silty SAND (a luvium : m SAMD ) ..:...:...?.:................... Loose, moist, silty, Tine to mediu s s caceous, z 61D _ Firm, brown, tan, gray and tWhlte wet, silghtly mi . at 7 um SAID - ( ) silty, fine to medi luvium 5 Chemical odor noted in sample 3 _ • - 9 :. ?._....'....:. Firm, brown, an andrhite, moist, slightly micaceous, silty, 6 •: •• .:.:. . _......: . SAND uum) fine to medium SP.N - (resid :................. ....:...:..:...:..:..:.:.. 805 Firm to dense, black, brown and tan, moist, slightly $ ;. B micaceous, s, j, fine to medium SAND - (residuum) - 10 ... BOO 11 - 16 32 15 . ' 745 - Boring terminated at is feet due to auger refus?tlv?as but groundwater encountered at time of drilling, 20 . ....:..... :...; encountered at S feet aver 4 days. .. 790 25 - 785 . 30 - 0 N 78D N - U } 0 F 775 a SAIL TEST BC)Pjl4D NO. B-11 Z Sheet of I r 1 1 1 1 1 1 MURINC. SUMMELL4"MONS EG1 INC. Ca?.?It?T?4•rs ELEVATIONI DE'c TH (F-1) B SOIL TEST BORING NO. S-i2 PROJECT: Foothills Gommeroe Center Phase I Vtirat Detention Basins PROJECT 140- J1 DS667-D? GLIENT: MoG7111 Asseaiates DATE START: 10-22-JO END: 10-22-10 ELEVATlOK- MID LOCATION: Shelby, North Caraiina LOGGED BY: W. Gantry DRILLER: hrietro Drill, Inc, R. Frye DRILLING it MOD: Soil Gentry Truck moan ; 2-114 inch ID hallovt stem anger DEPTH TO - WATER> 11411= AFTER 4 DAYS: V dry CAVING> SDIL DE.SCRFnDW sandy SILT - (residuum) 1 1 1 1 1 1 1 1 1 1 Firm to loose, reddishi-brown and tan, n fine to medium sandy SILT -(residuum) 1D 855 LDDSa to TIrrI•I, tan an f5AI?D - (residuum) 15 B50 M r, slily 7ANU - y, Tine to medium Dist, B igghtly clayey, fine to medium SDIL a STANDARD F>M4ETRAi1DW R=SU':"S TYPE M BLOW& FDO i H 2 5 10 2D 3D 4D 5D 71) DD ... s . 7 10 8 ..?............... s 3 - - ® 5' .. - 4 - 7 .®' SOIL TEST BORING NO. B-12 Sheet I of 1 Boring tei-Minated at 20 feet. No groundwater encountered at time of drilling. 25 540 30 835 a a r7 N ti 35 m 630 a v 1 SOIL TEST 13ORING NO. B43 woz AD-6557-02 ???ietda. ['RD lECT: Footlv[Es Conmerce Center Phase I Wet Deenfton D TE START* I 22.10 END: lo-ZI-11 CLIENT: McGill Associates ? ? ??, ELEVA11014: B07.0 EMMEL LOCATION: Shelby, NDTth Garol•Ina LDGGED BY: 1q- ' DRILLER 14stro Dnil, Inc„ R- Frye Tc?vcdr?rFTtS. RRILL[NG VIE:T!'DD: Soil 5ers Truck mount; 2-114 Inch ID ho[fovd?em 26 5 r CAVING REP T N TO - Yc'ATER> FI?EI T [AL: R 4 DAYS' - - M ' SO1L J 5Tkl lD RD pa4=-TRATID[2 EZS:SI}LTS 'W- BLOY+'6rrODT VAnp SDILDESCRIF IDN ELE DEPTrI t1 T) vii 2 5 1D 20 3D 40 5D 70 90 i ' ..:: ....?. - ht GEa e , silty SAND - 3 _ 5-inches of reddish-brown, g Il' y y 3 Bas leaose to srrrE, reddish-brot?n, malst, sdightty clayey, silty, •• _ .....:......?..?......_. ilneto medium SAND :•: ;:.`• 5 4 5 2 !-ease to firm, reddish-brown and btact4, moist, micaceous, 2 :?....._.... .... ..... ' - '' = ?- •'• 5 • Boa silty, fine SAND 6 10 - T' ce roDk fragments at'I0 feet 795 sa?• 72 sDtS° PARTIAL L`f 1f?l -ATHERED ROCl4 which sampled as Wet rock 15 fragments with silty sand _ 790 Boring terminated at •f7 feet due to auger refusal. _ ' Groundwater encountered at 3 feet at time of drilling and at - 6.5 feet after' days. .:_ 795 25 780 30 775 -- IL IL 35 N D 770 BOIL TEST BORING NO. B-13 z Sheet I of 't KEY TO SOIL CLASSIFICATIONS AND Goms[STENCY Emse-P.tMONS BUNKIELL-LAMMONS ENGINEERtNC, IN'C- ASHEMLE, NORTH CAROUNA penetration Resistance= ales, - Blows per Foot t`y Sfi1IBs D to 4- V. ry Loose 5 to 10 Loose Firm 11 io 20 21 to 30 Very Fm 31 to 50 Dense Very Dense over 50 penetration Resistance= CansistencY Biome per Foot SILT B and C1A's S 0 to 2 Very SDn 3 to 4 Soft Firm 5 to B 9 to 15 _ Sir 15 to 30 Very stiff Hard 31 to so over 50 V_ty Hard particle Sim Id'aniina-ation Boulder. Gr-..ater than 300 Mn Cnbbi_. 75 to 3DD MM Gravel: Coara -IS to 75 mm Fine - 475 to 19 Min Sandi: Curse - 2 b 4.T5 mm Madiun - 0.425 b 2 Mn, D.425 M7,11 Fine - eSS t to W U TS mm Slt € Clay: L 12 Number of blov,3 in Itrst 64nd)eS 15 liumbN of Mans in saoond B-inches Is h umber of biov s in third S-inohes -ASTu D15BS f?5f1? Grab swnple ® spld spoon sample undislrirbed Sample KEY T® EmI! LING M Y ees301.3 0 GroundwahxTable atTimeofDn11ring Groundv atarTable 24 }iDl1'a after C-om*-b.0nor Drilling JqEY TO SOIL CLASSIFICATIONS w .. Wall-graded Gravel r? . GW 0 Q Poorly-graded Gravel O c GP f IHyay Sift Silly sand Low PIErticity Glay SM CL Sandy Clzy CLS Parazlly VhIaathered RaCIC Silly Clay AMA BLDRGBBL GL-)?iL Sandy Silt MLS Sand 5W • ,'- '-' Topsoil TDPSDIL Bedrock BEDROCK J 1` L: Silt Clayey Sand r Zw Concrete High Pizsiia y City Sc i` 2 CH NL I. <,