Loading...
HomeMy WebLinkAbout20050732 Ver 19_Stormwater Info_20110119I I EcoEngineering A division of The Joh ams Company, Inc. LETTER OF TRANSMITTAL b5 t To: Ms. Laurie Dennison/Mr. Joseph Gyarafi, PE Date NC DENR/Division of Water Qualitv 401 Express Permitting Unit 512 N. Salisbury Street (Archdale Building) 9m Floor. Room #942W Raleigh, North Carolina 27604 Re: Briar Chapel - Phase 4 am sendina you the followina item(s)- COPIES DATE NO. DESCRIPTION 1 Express Revew Application Fee - Check for $1,000 2 Express Review SW Management Plan Application 2 Bioretention Area Final Design Calculations Booklet 2 Bioretention Area Construction Drawings 2 BMP Supplement Forms and O&M Agreements 1 Data CD of full size plans in TIFF format These are transmitted as checked below: ? As requested ? For your use ® For approval ? ? For review and comment ? o "71 n Remarks: Please call with any questions/comments. JAN 11 4 MIG•WATEK Tf $YOW AMfllliA11G1 Job No. 4 Januarv 19. 2011 E Y-9 o 5- Dl 3 a. U11 ** HAND DELIVER ** NEW-09002 Copy to: Signed: ? Finch, PE anager FOR INTERNAL USE ONLY ® Copy Letter of Transmittal Only to File ? Copy Entire Document to File 2905 Meridian Parkway, Durham, North Carolina 27713 PO Box 14005, RTP, North Carolina 27709 OFFICE USE ONLY Date Received Fee Paid Permit Number(s) State of North Carolina Department of Environment and Natural Resources Division of Water Quality 401/Wetlands Unit EXPRESS REVIEW PROGRAM STORMWATER MANAGEMENT APPLICATION FORM This form may be photocopied for use as an original 1. GENERAL INFORMATION 1. APPLICANT'S NAME (specify the name of the corporation, individual, etc. who owns the project): NNP - Briar Chapel, LLC 2. OWNER/SIGNING OFFICIAL'S NAME AND TITLE (person legally responsible for facility and compliance): Mr. William Mumford, PE 3. OWNER MAILING ADDRESS (for person listed in item 2 above): 16 Windy Knoll Circle Chapel Hill, NC 27516 4. OWNER ADDITIONAL CONTACT INFORMATION: Phone: 919-951-0713 Fax: 919-951-0711 Email: bmumford@newlandco.com 5. PROJECT NAME (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, inspection and maintenance agreements, etc.): Briar Chapel - Phase 4 6. PROJECT LOCATION: Street Address: US HWY 15-501 (west side) between Manns Chapel Rd & Andrews Store Rd City: County: Chatham State: NC Zip Code: Latitude: 35'49'29" Longitude: 79°05' 51 7. DIRECTIONS TO PROJECT SITE (from nearest major intersection): From intersection of US HWY 15-501 and US HWY 64, go north on US HWY 15-501. Approximately 5,000 feet north of the intersection of US HWY 15-501 and Andrews Store Road, the project entrance will be on the left. 8. CONTACT PERSON (who can answer stormwater-related questions about the project): Name: Jeremy Finch, PE Company: EcoEngineering Phone: 919-287-4262 Fax: 919-361-2269 Email: jfinchgecoengr.com 1/2009 Version 1.1 Page 1 of 5 H. PERMIT INFORMATION 1. THE PROJECT IS (check one): ? NEW ? A RENEWAL A MODIFICATION 2. OTHER JURISDICTIONS: Which local government(s) has jurisdiction over the project (e.g. Town of Cary or Johnston County)?: Chatham County 3. STORMWATER MANAGEMENT PROGRAM Check all of the state-approved stormwater management programs (implemented by either the State or local government) that apply to your project: ?X Phase It Post Construction ?X Water Supply Watershed ? Neuse or Tar-Pamlico NSW ? Randleman WSWS ? USMP ? Coastal Counties ? HQW ? ORW 4. PERMIT HISTORY (renewal or modification requests must complete this item): Existing DWQ Permit Number:EXP 05-0732v18 Date issued: 10/08/10 5. PROJECT TYPE (check one): ? Low Density* ?X High Density* * Low Density projects shall be under 24% Impervious with only vegetated stormwater conveyances. A curb and gutter or pipe system for stormwater conveyance shall result in reclassification of project as High Density even if below 24%, except when pipes are used for road or driveway crossing purposes. 6. ADDITIONAL PROJECT REQUIREMENTS (check all that apply): ? CAMA Major ?X Sedimentation/Erosion Control ?X NPDES Stormwater ?X 404/401 Permit ? Non-404 Jurisdictional Permit ? Other: Note: Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748 III. PROJECT INFORMATION 1. STORMWATER TREATMENT METHODS (Describe briefly how stormwater will be treated): Under the existing stormwater management plan approval for Phase 4 of the Briar Chapel development, 6 wet pond BMP's serve as the primary water quality treatment devices. The majority of the single-family residential lots were shown to be treated by a wet pond BMP. To allow more flexibility in the lot grading, this permit modification proposes to install a bioretention area to provide water quality treatment for several lots that were previously permitted to be treated by a wet pond (but will now be treated by the bioretention area). Important Note: attach a detailed narrative (one to two pages) describing stormwater management for the project. 2. RIVER BASIN/STREAM INFORMATION a. Stormwater runoff from this project drains to which River Basin?: Cape Fear River Basin b. Nearest named stream: Pokeberry Creek c. Water quality classification of nearest named stream: WS-IV; NSW 1/2009 Version 1.1 Page 2 of 5 3. TOTAL PROJECT AREA: I Approx 174 (acres) 4. PROJECT BUILT UPON AREA: I Approx 35 % 5. DRAINAGE AREAS (How many drainage areas does the project have?): i bioretention area Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area 2 Receiving Stream Name Pokeberry Creek Receiving Stream Class WS-IV; NSW Drainage Area 42,233 SF Existing Impervious* Area N/A Proposed Impervious*Area 15,700 SF % Impervious* Area (total) 37.2% Impervious* Surface Area Determination (Breakdown) Impervious* Surface Area Drainage Area 1 Drainage Area 2 On-site Buildings 15,700 SF (RESID LOTS) On-site Streets N/A On-site Parking N/A On-site Sidewalks N/A Other on-site N/A Off-site N/A Total: 15,700 SF Total: * Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. 6. EXPLAIN HOW THE OFF-SITE IMPERVIOUS AREA WAS DERIVED: N/A IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS Deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development draining to the proposed stormwater management devices prior to the sale of any lot. If applicable, please complete and submit a copy of the deed restrictions and protective covenants along with your application. 1/2009 Version 1.1 Page 3 of 5 V. SUPPLEMENT FORMS 1. The applicable stormwater management supplement form(s) listed below must be submitted for each BMP specified for this project. The most current form(s) located on the 401/wetlands unit website at http://h2o.enr.state.nc.us/su/bmp forms.htm must be used. Please include both the Design Summary and the Required Items Checklist along with all required items and supporting design calculations. (Check the supplement forms that will be required for your project): ?X Bioretention Supplement ? Level Spreader/Filter Strip/Restored Buffer Supplement ? Dry Detention Supplement ? Grassed Swale Supplement ? Sand Filter Supplement ? Infiltration Basin Supplement ? Stormwater Wetland Supplement ? Infiltration Trench Supplement ? Wet Detention Supplement VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the DWQ Central Office. 1. Please indicate that you have provided the following required information by initialing in the space provided next to each item. Initials • Original and two copies of the Express Review Stormwater Management Application • Signed and Notarized Inspection and Maintenance Agreement • Three copies of the applicable Supplement Form(s) for each BMP J • Application processing fee (payable to DWQ) • Detailed narrative description of stormwater treatment/management • Three copies of plans and specifications, including: J ? Development/Project name ? Engineer and firm ? Legend ? North arrow ? Scale ? Revision number & date ? Mean high water line ? Dimensioned property/project boundary ? Location map with named streets or NCSR numbers ? Original contours, proposed contours, spot elevations, finished floor elevations ? Details of roads, drainage features, collection systems, and stormwater control measures ? Wetlands and streams delineated, or a note on plans that none exist ? Existing drainage (including off-site), drainage easements, pipe sizes, runoff calculations ? Drainage areas delineated ? Vegetated buffers (where required) 1/2009 Version 1.1 Page 4 of 5 VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. 1. DESIGNATED AGENT (individual or firm): EcoEngineering 2. MAILING ADDRESS: PO Box 14005 RTP, NC 27709 Phone: (919) 287-4262 Fax: (919) 361-2269 VIII. APPLICANT'S CERTIFICATION 1, (print or type name of person listed in General Information, item 2) P'?Ut-?Fp? 17 , certify that the information included on this application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants (if applicable) will be recorded, and that the proposed project complies with the requirements of 15A NCAC 2H .1000. Signature: 14/ ?T-- _ Date: / Z -Zo . 7a 10 a35l _ V r4-4P • is etAfL Gj4pe%-, u..C 1/2009 Version l.1 Page 5 of 5 'S[ BRIAR CHAPEL - PHASE 4 Final Stormwater Management Facility Design - Bioretention Area General Description Located off of US Highway 15-501, north of Andrews Store Road and south of Mann's Chapel Road in Chatham County, NC is the proposed development known as Briar Chapel. Phase 4 of the proposed development is approximately 174-acres and will consist of the construction of single-family lots, a clubhous memty center, along with the associated utility, parking, and roadway infrastructure. 1W - The overall proposed Briar Chapel development is located within the Cape Fear River Basin, and drains to a stream (Pokeberry Creek) classified as Water Supply IV (WS-IV), and Nutrient Sensitive Waters (NSW). As a result of the proposed development exceeding the maximum allowable limit for stream impacts, an individual permit issued by The United States Army Corps of Engineers (USACE) was required (Clean Water Act Section 404 permit). Also, a Clean Water Act Section 401 Water Quality Certification from NCDWQ was attached to the individual permit. Under the 401 Water Quality Certification issued by NCDWQ, the proposed site will be required to comply with the following stormwater management requirements: 1. A. final written stormwater management plan for each subwatershed (including signed and notarized Operation and Maintenance agreements) shall be submitted to the 401 Oversight and Express Permitting Unit. The stormwater management plan maybe submitted to DWQ in phases for written approval as long as no impact to wetlands or streams occur in that phase until written approval is received from DWQ. 2. The stormwater plans shall utilize constructed wetlands, bioretention areas, wet ponds followed b_y Forested filter strips and similar best management practices designed to remove nutrients. The stormwater management plan mast include plans, specifications, and worksheets.for stormwater management facilities that are appropriate for the surface water classification and designed to remove at least 85% TSS according to the most recent version of the NCDENR Stormwater Best Management Practices Manual. 3. For low densitv areas of the project with low impervious surface area, engineered stormwater management facilities are not expected. For these areas of lower impervious area, similar best management practices that remove nutrients such as grassed swales and vegetated riparian buffers should be sufficient rather than more intensive engineered stormwater devices such as constructed wetlands. In addition to the above DWQ stormwater requirements, the following stormwater quality and quantity items are required per Section 8.3 ("Stormwater Controls") of the Chatham County Compact Communities Ordinance: 1. Control and treat the first inch of runoff from the project site and from any offsite drainage routed to an on-site control structure. Ensure that the draw down time for this treatment volume is a minimum o/. forty eight (48) hours and a maximum of one hundred and twenty (120) hours. 2. Maintain the discharge rate for the treatment volume at or below the pre-development discharge rate for the 1-year. 24-hour storm. To satisfy these stormwater requirements, Phase 4 of the Briar Chapel development is currently permitted with DWQ to be treated via water quality ponds with preformed scour hole/level spreader outlets that will provide sheet flow of the I" runoff volume into the existing stream buffers. The existing stream buffers downstream of these facilities will be utilized as forested filter strips. Lots #349-#353 were shown in the current DWQ permit to be treated by water quality pond #2. However, due to site topography constraints, these lots (when developed) will be difficult to direct to water quality pond #2. As a result, a bioretention area is proposed behind lot #353 that is designed to capture and treat stormwater runoff from half of lots #349-350 and all of lots 9351-353. Permit Number: (to be provided by DWQ) O??F W ATF9pG ATA ti WDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM BIORETENTION CELL SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. I. PROJECT INFORMATION Project name Briar Chapel - Phase 4 Contact name Jeremy Finch, PE Phone number 919-361-5000 Date January 5, 2011 Drainage area number To Bioretention Area I. DESIGN INFORMATION Site Characteristics Drainage area 42,233 ft2 Impervious area 15,700 ft2 Percent impervious 37.2% % Design rainfall depth 1.0 inch Peak Flow Calculations Is pre/post control of the 1-yr, 24-hr peak flow required? 1-yr, 24-hr runoff depth 1-yr, 24-hr intensity Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak control Storage Volume: Non-SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5" runoff volume Pre-development 1-yr, 24-hr runoff Post-development 1-yr, 24-hr runoff Minimum volume required Volume provided Cell Dimensions Ponding depth of water Ponding depth of water Surface area of the top of the bioretention cell Length: Width: -or- Radius Media and Soils Summary Drawdown time, ponded volume Drawdown time, to 24 inches below surface Drawdown time, total: In-situ soil Soil permeability Planting media soil: Soil permeability Soil composition % Sand (by volume) % Fines (by volume) % Organic (by volume) N - See Note (Y or N) 4 NOV N/A in N/A in/hr N/A ft3/sec N/A ft3/sec #VALUE! ft3/sec 1,354.0 ft3 1,600.0 ft3 OK N/A ft3 N/A ft3 N/A ft3 #VALUE!ft3 N/A ft3 9 inches OK 0.75 ft 1,857.0 ft2 OK 51 ft OK 45 ft OK ft 4.5 hr OK 16.5 hr OK 21 hr Not Known in/hr OK 2.00 in/hr OK PKE A*T twafdw nr? Fk"00 61y qo l tn?- a;g-T $? I S ?Rc50 Y COA-m wn cawr-i #VALUE! 85-88% Sand should be -85-88% 8-12% Fines should be -8-12% 3-5% Organic should be -3-5% Total: 0% Phosphorus Index (P-Index) of media 30 (unitless) OK Form SW401-Bioretention-Rev.8 June 25. 2010 Parts I and It. Design Summary, Page 1 of 2 Basin Elevations Temporary pool elevation Type of bioretention cell (answer "Y" to only one of the two following questions): Is this a grassed cell? Is this a cell with trees/shrubs? Planting elevation (top of the mulch or grass sod layer) Depth of mulch Bottom of the planting media soil Planting media depth Depth of washed sand below planting media soil Are underdrains being installed? How many clean out pipes are being installed? What factor of safety is used for sizing the underdrains? (See BMP Manual Section 12.3.6) Additional distance between the bottom of the planting media and the bottom of the cell to account for underdrains Bottom of the cell required SHWT elevation Distance from bottom to SHWT Internal Water Storage Zone (IWS) Does the design include IWS Elevation of the top of the upturned elbow Separation of IWS and Surface Planting Plan Number of tree species Number of shrub species Number of herbaceous groundcover species Additional Information Does volume in excess of the design volume bypass the bioretention cell? Does volume in excess of the design volume flow evenly distributed through a vegetated filter? What is the length of the vegetated filter? Does the design use a level spreader to evenly distribute flow? Is the BMP located at least 30 feet from surface waters (50 feet if SA waters)? Is the BMP localed at least 100 feet from water supply wells? Are the vegetated side slopes equal to or less than 3:1? Is the BMP located in a proposed drainage easement with access to a public Right of Way (ROW)? Inlet velocity (from treatment system) Is the area surrounding the cell likely to undergo development in the future? Are the slopes draining to the bioretention cell greater than 20%? Is the drainage area permanently stabilized? Pretreatment Used (Indicate Type Used with an "X" in the shaded cell) Gravel and grass (flinches gravel followed by 3-5 ft of grass) Grassed swale Forebay Other Form SW401-Bioretention-Rev.8 June 25, 2010 Permit Number: (to be provided by DWQ) 433.75 fmsl Y (Y or N) OK (Y or N) 433 fmsl N/A inches Insufficient mulch depth, unless installing grassed cell. 431 fmsl 2ft n111ft Y (Y or N) 12 OK 10 OK 1ft 429.67 fmsl 427.63 fmsl 2.04 ft OK N (Y or N) fmsl 433 ft Grassed Cell Grassed Cell Grassed Cell #VALUE! Y (Y or N) OK N (Y or N) Excess volume must pass through filter. N/A ft N (Y or N) Show how flow is evenly distributed. Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK 9.19 ft/sec Insufficient inlet velocity unless energy dissipating devices are being used. N (Y or N) OK N (Y or N) OK Y (Y or N) OK OK Parts I and II. Design Summary, Page 2 of 2 Permit No: (to be assigned by DWQ) IIL REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. "Sf 131 "ro 03 1. Plans (1" - 50' or larger) of the entire site showing: Sw Z Ex?t)&r- Design at ultimate build-out, ?N (LE(?y2'? Off-site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Cell dimensions, Pretreatment system, High flow bypass system, Maintenance access, Recorded drainage easement and public right of way (ROW), Clean out pipe locations, Overflow device, and Boundaries of drainage easement. 7F BI TO 43 2. Plan details (1" = 30' or larger) for the bioretention cell showing: Cell dimensions Pretreatment system, High flow bypass system, Maintenance access, Recorded drainage easement and public right of way (ROW), Design at ultimate build-out, Off-site drainage (if applicable), Clean out pipe locations, Overflow device, and Boundaries of drainage easement. Indicate the P-Index between 10 and 30 ?0 Q3 3. Section view of the bioretention cell (1" = 20' or larger) showing: Side slopes, 3:1 or lower Underdrain system (if applicable), and Bioretention cell layers [ground level and slope, pre-treatment, ponding depth, mulch depth, fill media depth, washed sand, filter fabric (or choking stone if applicable), #57 stone, underdrains (if applicable), SHWT level(s), and overflow structure] 3 F S rnf. w?° 4. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The fle" Pw5 results of the soils report must be verified in the field by DWQ, by completing & submitting the soils POA090 investigation request form. County soil maps are not an acceptable source of soils information. All f So16s elevations shall be in feet mean sea level (fmsl). Results of soils tests of both the planting soil and the in PLOAT Nor situ soil must include: Qwofko- -Soil permeability, 5Nt/ ?? Soil composition (% sand, % fines, % organic), and rift*- ow&K P-index. " ' d 5. A detailed planting plan (1 = 20 or larger) prepared by a qualified individual showing: A variety of suitable species, Sizes, spacing and locations of plantings, Total quantity of each type of plant specified, A planting detail, The source nursery for the plants, and Fertilizer and watering requirements to establish vegetation. dr 6. A construction sequence that shows how the bioretention cell will be protected from sediment until the entire drainage area is stabilized. r7R? 7. The supporting calculations (including underdrain calculations, if applicable). Sb`- 8. A copy of the signed and notarized inspection and maintenance (I&M) agreement. sR 9. A copy of the deed restriction. Form SW401-Bioretention-Rev.7 Part III, Page 1 of 1 t Permit Number: (to be provided by DYVQ) Drainage Area Number:-__________ Bioretention Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important operation and maintenance procedures: - Immediately after the bioretention cell is established, the plants will be watered twice weekly if needed until the plants become established (commonly six weeks). - Snow, mulch or any other material will NEVER be piled on the surface of the bioretention cell. - Heavy equipment will NEVER be driven over the Bioretention cell. - Special care will be taken to prevent sediment from entering the bioretention cell. - Once a year, a soil test of the soil media will be conducted. After the bioretention cell is established, I will inspect it once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall =be repaired immediately. BMP element: Potential problems: How I will remediate the problem: The entire BMP Trash/ debris is resent. Remove the trash/debris. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to bioretention cell erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. The inlet device: pipe, The pipe is clogged (if Unclog the pipe. Dispose of the stone verge or swale applicable). sediment off-site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the swale if necessary to swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Stone verge is clogged or Remove sediment and clogged covered in sediment (if stone and replace with clean stone. applicable). Form SW401-Bioretention O&M-Rev.3 Page 1 of 4 BMP element: The pretreatment area The bioretention cell: vegetation The bioretention cell: soils and mulch Potential problems: Flow is bypassing pretreatment area and/or gullies have formed. Sediment has accumulated to a depth greater than three inches. Erosion has occurred. Weeds are present. Best professional practices show that pruning is needed to maintain optimal plant health. Plants are dead, diseased or dying. Tree stakes/wires are present six months after planting. Mulch is breaking down or has floated away. Soils and/or mulch are clogged with sediment. An annual soil test shows that p1 l has dropped or heavy metals have accumulated in the soil media. How I will remediate the problem: Regrade if necessary to route all flow to the pretreatment area. Restabilize the area after grading. Search for the source of the sediment and remedy the problem if possible. Remove the sediment and restabilize the pretreatment area. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Remove the weeds, preferably by hand. Prune according to best professional practices. Determine the source of the problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Remove tree stake/wires (which can kill the tree if not removed). Spot mulch if there are only random void areas. Replace whole mulch layer if necessary. Remove the remaining much and replace with triple shredded hard wood mulch at a maximum depth of three inches. Determine the extent of the clogging - remove and replace either just the top layers or the entire media as needed. Dispose of the spoil in an appropriate off-site location. Use triple shredded hard wood mulch at a maximum depth of three inches. Search for the source of the sediment and remedy the problem if possible. Dolomitic lime shall be applied as recommended per the soil test and toxic soils shall be removed, disposed of properly and replaced with new planting media. Form SW441-13ioreteittion 0&M-Rev.3 Page 2 of 4 BMP element: Potential problems-, How 1 will remediate the problem: The underdrain system Clogging has occurred. Wash out the underdrain system. (if applicable) The drop inlet Clogging has occurred. Clean out the drop inlet. Dispose of the sediment off-site. The drop inlet is damaged Repair or replace the drop inlet. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. Dorm SW401-Bioretention O&M-Rev.3 Page 3 of 4 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Briar Chapel - Phase 4 BMP drainage area number:Bioretention Area Print name: Title: AOxsisTR-t4? V%(- =- P¢ -SIDt T _.__ Address: 1 k.IV40 V444=-L.l G.t2e.? 1G u? ??L 2?Si4 Phone: 119- 9951-0-715 Signature: x,[,14, . V '7v? - - Date: 1Z- so -201 b Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, GCS i f I'SDh , a Notary Public for the State of VY Latb k yta_, County of 1. f Clc- len b , do hereby certify that 1.i9 i 1) c0.m mWMfOrd personally appeared before me this J-6 day of.., IDer lae , --2-61 b , and acknowledge the due execution of the forgoing bioretention maintenance requirements. Witness my hand and official seal, SEAL My commission expires 311 12 Form SW401-Bioretention I&M-Rev. 2 Page 4 of 4 ,JAN 1 9 2011 BOOK 15 0 4 PAGE 0 878 Prepared by / Upon recording, please return to: 1o Anne P. Stubblefield Hyatt & Stubblefield, P.C. 1200 Peachtree Center, South Tower 225 Peachtree Street, N.E. Atlanta, GA 30303 STATE OF NORTH CAROLINA COUNTY OF CHATHAM FILED CHATHAM COUNTY NC TREVA B. SEAGROVES REGISTER OF DEEDS FILED Mar 16, 2010 AT . 04:02:59 pm BOOK 01504 START PAGE 0878 END PAGE 0883 INSTRUMENT # 02340 EXCISE TAX (None) NOTE TO CLERK: Please Cross-Reference to: Declaration at Book 1372 Page 884 Community Covenant at Book 1372 Page 996 SUPPLEMENTAL DECLARATION OF COVENANTS, CONDITIONS AND RESTRICTIONS AND SUPPLEMENT TO THE COMMUNITY COVENANT FOR BRIAR CHAPEL (PHASE 4, SEC Ioh 4) This Supplemental Declaration of Covenants, Conditions and Restrictions and Supplement to the Community Covenant for Briar Chapel ("Supplement") is made by NNP- Briar Chapel, LLC, a North Carolina limited liability company (the "Declarant"). Background Statement The Declarant is the developer of the planned community located in Chatham County, North Carolina known as Briar Chapel. The Declarant executed and filed that- that certain Declaration of Covenants, Conditions, and Restrictions for Briar Chapel recorded November 16, 2007 in Deed Book 1370, Page 1020, et seq., and re-recorded November 28, 2007 in Deed Book 1372, Page 884, et seq., in the Office of the Register of Deeds of Chatham County, North Carolina (as it may be amended and supplemented, the "Declaration") and that certain Community Covenant for Briar Chapel recorded on November 28, 2007 in Deed Book 1372, BOOK 1504PAG£0879 Page 996, et .req., in the Office of the Register of Deeds of Chatham County, North Carolina (as it may be amended and supplemented, the "Covenant"). The Declaration has been amended by that instrument recorded on June 12, 2009 in Book 1465, Page 482, et seq., in the Office of the Register of Deeds of Chatham County, North Carolina ("First Amendment") and that instrument recorded on June 19, 2009 in Book 1466, Page 675, et seq., 'in the Office of the Register of Deeds of Chatham County, North Carolina ("Second Amendment").. Pursuant to Sections 9.1 and 9.3 of the Declaration, the Declarant reserved the right to expand the Briar Chapel community by recording one or more Supplemental Declarations submitting to the terms of the Declaration all or any portion of the property described on Exhibit "B" of the Declaration ("Expansion Property") and/or to impose on such property additional covenants and easements, with the consent of the owner of such property (if not the Declarant). Pursuant to the Section 4.1 of the Community Covenant, the Declarant may, with the consent of the owner thereof, submit all or any portion of the Expansion Property described on Exhibit "B" of the Community Covenant to the terms of the Community Covenant and/or impose additional covenants and easements on such property. The property described on Exhibit "A" to this Supplement (the "Additional Property") is a portion of the Expansion Property described on Exhibit "B" to the Declaration and Exhibit "B" to the Community Covenant. As the owner of the Additional Property, the Declarant desires to submit such the Additional Property to the terms of the Declaration, the Community. Covenant, and this Supplement. NOW, THEREFORE, the Declarant hereby submits the real property described on Exhibit "A" of this Supplement to the provisions of the Declaration, the Community Covenant, and this Supplement, which shall hereafter encumber the title to such property and shall be binding upon all persons having any right, title, or any interest in such property, their respective heirs, legal representatives, successors, successors-in-title, and assigns. The provisions of this Supplement shall also be binding upon Briar Chapel Community Association, Inc., a North Carolina nonprofit corporation (the "Association") and Briar Chapel Community Council, Inc., a North Carolina nonprofit corporation (the "Council"), in accordance with the terms of the Declaration and the Community Covenant. ARTICLE I Definitions The definitions set forth in Article II of the Declaration are incorporated by reference in this Supplement. BOOK 15 0 4 PAGE0880 ARTICLE II Desianation of Service Areas Pursuant to Section 7.3 of the Declaration, the Additional Property has been assigned to the Service Area(s), if any, designated on Exhibit "A" to this Supplement. ARTICLE III Additional Covenants, Restrictions and Easements The additional covenants, restrictions and easements, if any, set forth in Exhibit "B" of this Supplement shall apply to the Additional Property and shall be binding upon the owners and occupants of Units within the Additional Property, their guests and invitees, in addition to the terms of the Declaration. ARTICLE IV Amendment 4.1 By the Declarant. Until termination of the Class "B" Control Period, the Declarant may unilaterally amend this Supplement for any purpose. Thereafter, until termination of the Development and Sale Period, the Declarant may unilaterally amend this Supplement to reflect any revisions or amendments to any plats referenced on Exhibit "A," and, provided the amendment has no material adverse effect upon any right of any Owner without such Owner`s consent in writing.- for any other purpose. Notwithstanding this reserved right, a revision or amendment to a plat shall not require an amendment to this Supplement so long as no property is added or excluded from the plat by the revision or amendment thereto. The Declarant reserves the right to record revised, amended, or additional plats that only affect internal boundaries between lots, combine lots, or subdivide lots shown on the original plat and, so long as they do not alter the overall property submitted to the Declaration by this Supplement, such revised, amended or additional plats shall not necessitate an amendment to this Supplement. 4.2. Owners. Except as otherwise specifically provided in this Article IV, this Supplement may be amended only by the affirmative vote or written consent, or any combination thereof, of Owners of at least 67% of the Units within the Additional Property and the written consent of the Association, acting through its board of directors. In addition, so long as the Declarant owns any Unit within the Additional Property, the consent of the Declarant shall be required to amend this Supplement. 4.3. Validity and Effective Date. No amendment may remove, revoke, or modify any right or privilege of the Declarant or without the written consent of the Declarant (or the assignee of such right or privilege). eoox 15 0 4 PAGE 0 8 81 If an Owner consents to any amendment to this Supplement, it will be conclusively presumed that such Owner has the authority to consent, and no contrary provision in any Mortgage or contract between the Owner and a third party will affect the validity of such amendment. Any amendment shall become effective upon recording, unless a later effective date is specified in the amendment. No action to challenge the validity of an amendment may be brought more than two years after its recordation. In no event shall a change of conditions or circumstances operate to amend any provisions of this Supplement. In witness of the foregoing, the Declarant has executed this Supplement on the L" day of M,'Ch ,2010. DECLARANT: NIVP-BRIAR CHAPEL, LLC, a Delaware limited liability company STATE OF NORTH CAROLINA COUNTY OF 1, G. L.4t„ P:WIVA IJ,, , a Notary Public in and for ?? k =? ?? County, North Carolina, certify that Keith Hurand personally came before me this day and acknowledged that he is Assistant Vice President of NNP-BRIAR CHAPEL, LLC, a Delaware limited liability company, and that by authority duly given and as a fact of said limited liability company, he executed the foregoing instrument on behalf of said limited liability company. Witness my hand and official stamp or seal, this : t day of _ -4r k , 20?. By: -r ?name: 16eith Its: Notary Public My Commission Expires: 11;//14 [NOTARY SEAL] O - itkOTAqI, ;30+01: cadcx:. iupp Ded - P9 +. Sect i .OUS IJ. lix- 4 AIJ3Li0 C BOOK 1 5) 0 4 PAGE 0 8 8 2 EXHIBIT "A" Addition I Projactly_ ALL THOSE TRACTS OR PARCELS OF LAID lying and being in Chatham County, North Carolina, and being more particularly described as on that certain Subdivision, Easement Dedication and Right-of-Way Dedication Plat of Briar Chapel Phase 4, Section 4 recorded on ZO-LG'in Plat Book Pages ? -(?j as Instrument No. in the office of the Register of Deeds of Chatham County, North Carolina, as such plat may be revised from time to time. BOOK 1504PAGE0883 EXHIBIT "B" ditional Covenants, Restrictions, and Easements 1. Maximum Permitted Building Area. Pursuant to Section 16.8 of the Declaration, as amended by the First Amendment, Exhibit "F" of the Declaration shall be supplemented to include the following Maximum Permitted Building, Area for Units within the Additional Property: Maximum Permitted Buildina Area Consoctfon `• rawino Lot i o. i Lord Plat SUMP 92! { Record Plat I Lot No. Lot Tvne I maximum Imnerv/ous /bear a Wa Quelity Poond No 112 See Ex. A I 317 80' Lot 4,300 1 113 318 80' Lot 4,300 1 114 319 80' Lot 4,300 1 115 " 1 320 80' Lot 4,300 116 321 80' Lot 4,300 1 117 322 ; 80' Lot 4,300 1 118 " i 323 80' Lot 4.300 1 119 i 324 i 80' Lot 4,300 1 120 325 60' Lot 3.700 { 1 121 326 60' Lot 3,700 1 122 I 327 60' Lot 3,700 1 123 f i 328 60' Lot 3,700 1 124 329 60' Lot i 3,700 1 125 " 330 60' Lot 3,700 1 132 331 60' Lot 3,700 1 133 332 I 60' Lot 3,700 1 134 333 60' Lot 3,700 1 135 " 334 ; 60' Lot 3,700 1 136 335 60' Lot 3,700 1 137 1 336 60' Lot 11 3,700 NIA 138 351 70' Lot 4,000 2 139 352 70' Lot 4,000 2 140 353 70' Let 4,000 2 141 { 337 50' Lot 3,400 WA 142 338 50' Lot 3.400 2 143 i 339 50' Lot 3,400 2 144 340 80' Lot 4,300 2 145 341 80' Lot 4,300 2 146 342 80' Lot 4,300 2 147 ; 343 80' Lot 4,300 2 148 344 80' Lot 4,300 2 149 345 80' Lot 1 4,300 2 150 346 80' Lot 4,300 2 151 347 60' Lot + 3,700 2 152 348 60' Lot 3,700 2 153 349 60' Lot 3,700 2 154 350 60' Lot 3,700 2 r? EcoEngineering A division of The John R. McAdams Company, Inc. o "@gv D AN 1 9 2011 BRIAR CHAPEL - PHASE 4 CHATHAM COUNTY, NORTH CAROLINA Bioretention Area Final Design Calculations NEW-09002 • January 2011 Jeremy V. Finch, PE Project Manager Research Triangle Park, NC Post Office Box 14005 Research Triangle Park, North Carolina 27709 29 G ^geridian Parkway North Carolina 27713 5646 919-287-4262 919-361-2269 Fax www,ecoengr.com i Design Services Focused On Client Success • BRIAR CHAPEL - PHASE 4 Final Stormwater Management Facility Design - Bioretention Area General Description Located off of US Highway 15-501, north of Andrews Store Road and south of Mann's Chapel Road in Chatham County, NC is the proposed development known as Briar Chapel. Phase 4 of the proposed development is approximately 174-acres and will consist of the construction of single-family lots, a clubhouse/amenity center, along with the associated utility, parking, and roadway infrastructure. The overall proposed Briar Chapel development ' is located within the Cape Fear River Basin, and drains to a stream (Pokeberry Creek) classified as Water Supply IV (WS-IV), and Nutrient Sensitive Waters (NSW). As a result of the proposed development exceeding the maximum allowable limit for stream impacts, an individual permit issued by The United States Army Corps of Engineers (USAGE) was required (Clean Water Act Section 404 permit). Also, a Clean Water Act Section 401 Water Quality Certification from NCDWQ was attached to the individual permit. Under the 401 Water Quality Certification issued by NCDWQ, the proposed site will be required to comply with the following stormwater management requirements; 4. 1. A final written stormwater management plan for each subwatershed (including signed and notarized Operation and Maintenance agreements) shall be submitted to the 401 Oversight and Express Permitting Unit. The stormwater management plan may be submitted to DWQ in phases for written approval as long as no impact to wetlands or streams occur in that phase until written approval is reeeived.from DWQ. • 2. The stormwater plans shall utilize constructed wetlands, Bioretention areas, wet ponds followed by forested filter strips and similar best management practices designed to remove nutrients. The stormwater management plan must include plans, specifications, and worksheets for stormwater management.facilities that are appropriate.for the surface water classification and designed to remove at least 85% TSS according to the most recent version of the NCDENR Stormwater Best Management Practices Manual. 3. For low density areas of the project with low impervious surface area, engineered stormwater management.facilities are not expected. For these areas of lower impervious area, similar best management practices that remove nutrients such as grassed swales and vegetated riparian. buffers should be sucient rather than more intensive engineered stormwater devices such-as constructed wetlands. In addition to the above DWQ stormwater requirements, the following stormwater quality and quantity items are required per Section 8.3 ("Stormwater Controls") of the Chatham County Compact Communities Ordinance: 1. Control and treat the first inch- of runoff from the project site and. from any offsite drainage routed to an on-site control structure. Ensure that the draw down time.for this treatment volume is a minimum of forty eight (48) hours and a maximum of one hundred and twenty (120) hours. 2. Maintain the discharge rate for the treatment volume at or below the pre-development discharge rate for the 1 -year, 24-hour storm. • To satisfy these stormwater requirements, Phase 4 of the Briar Chapel development is currently permitted with DWQ to be treated via water quality ponds with preformed scour hole/level spreader outlets that will provide sheet flow of the 1" runoff volume into the existing stream buffers. The existing stream buffers downstream of these facilities will be utilized as forested filter strips. Lots • #349-#353 were shown in the current DWQ permit to be treated by water quality pond #2. However, due to site topography constraints, these lots (when developed) will be difficult to direct to water quality pond #2. As a result, a bioretention area is proposed behind lot #353 that is designed to capture and treat stonmwater runoff from half of lots #349-350 and all of lots #351-353. This report contains the final design calculations for the proposed bioretention area behind lot #353. Please refer to the summary of results and discussion of results sections 'of this report for additional information. Calculation Metliodolo Rainfall data for the Chatham County, NC region is from NOAA Atlas 14, with a partial duration series assumption. The rainfall depths were entered into a spreadsheet that calculated a center-weighted storm based upon the NOAA Atlas 14 depths. The 1-year/24-hour rainfall depth is 2.95 inches, the 2-Year/24-hour rainfall depth is 3.56 inches, the 10-Year/24-hour rainfall depth is 5.15 inches, and the 100-year/24-hour rainfall depth is 7.61 inches. All of these "computed" storms were modeled within the hydrologic model. Please reference the rainfall data section within this report for additional information. y Using maps contained within the Chatham County- Soil Survey, the watershed soils were determined to be from hydrologic soil group (HSG) `B' soils. Since the method chosen to compute the post-development peak flow rates and runoff volumes is dependent upon the soil type, all hydrologic calculations are based upon the assumption of HSG `B' soils. A composite SCS Curve Number was calculated for the post-development condition using SCS curve numbers and land cover conditions. Land cover conditions for the post-development condition were taken from the proposed development plan. • The post-development time of concentration to the bioretention area was assumed to be 5 minutes in the post-development condition. All on-site topo was taken from a flown aerial topographic survey by others provided to The John R. McAdams Company, Inc. by McKim & Creed. The drainage map for the post- development condition has been included in this report. Pondpack Version 10.0, by Haestad Methods, was used to generate post-development peak flow rates and generate the stage-discharge rating curve for the proposed bioretention area. Final routing calculations for the bioretention area were also performed within Pondpack. y The stage-storage rating curve and stage-storage function for the proposed bioretention area was generated externally in a spreadsheet and then input into Pondpack. A velocity dissipater is provided at the end of the principal spillway outlet for the bioretention area to prevent erosion and scour in the downstream area. The dissipater is constructed using nprap, underlain with a woven geotextile filter fabric. The filter fabric is used to minimize the loss of soil particles beneath the riprap apron. The dissipater is sized for the 10-year storm event using the NYDOT method. It is a permanent feature of the outlet. i- Water quality sizing calculations for each facility were performed in accordance with the N.C. Stormwater Best Management Practices manual (NCDENR July 2007). The bioretention surface area was sized using the runoff volume computed using the Simple Method and a maximum ponding depth of 9-inches. 0 • ? For 100-year storm routing calculations, a "worst case condition" was modeled in order to ensure the proposed bioretention area would safely pass the 100-year storm event. The assumptions used in this scenario are as follows: The starting water surface elevation in the bioretention area, just prior to the 100-year storm event, is at the top of the principal spillway structure. This scenario could occur as a result of a clogged soil media or a rainfall event that lingers for several days. This could also occur as a result of several rainfall events in a series, before the facility has an opportunity to draw down the storage pool between the bioretention surface and the riser crest elevation. 2. A minimum of 1.02-ft of freeboard between the peak elevation during the "worst case" scenario and the top of the dam was achieved for the bioretention area. Discussion of Results As previously stated, this report contains the final design calculations for the proposed bioretention area located behind lot #353 within Phase 4 of the Briar Chapel development. This facility is proposed to capture stormwater runoff from lots #349-353 (originally permitted to drain to water quality pond #2) and provide water quality treatment. Please refer to the Summary of Results tables for additional information. Conclusion If the development on this tract is built as proposed within this report, then the requirements set forth in the Water Quality Certification #3402 (WQC #3402) and Section 8.3 ("Stormwater Controls") of the Chatham County Compact Communities Ordinance will be met with the proposed bioretention area. However, modifications to the proposed development may require that this analysis be revised. Some modifications that would require this analysis to be revised include: 1. The proposed site impervious surface exceeds the amount accounted for in this report. 2. The post-development watershed breaks change significantly from those used to prepare this report. The above modifications may result in the assumptions within this report becoming invalid. The computations within this report will need to be revisited if any of the above conditions become apparent as development of the proposed site moves forward. 0 • BRIAR CHAPEL - PHASE 4 NEW-09002 SUMMARY OF RESULTS Design Drainage Area = Design Impervious Area = 0.97 acres 0.36 acres Top of Dam = 435.00 ft Surface Elevation = 433.00 ft Required Surface Area = 1,805 sf Provided Surface Area = 1,857 sf Design Ponding Depth = 9 inches Riser Size = 4x4 ft Riser Crest = 433.75 ft Barrel Diameter = 15 inches # of Barrels = 1 Invert In = 429.60 feet Invert Out = 428.00 feet Length = 33 feet Slope = 0.0485 ft/ft • Return Period Inflow [cfs] Outflow [cfs] Peak WSEL [ft] Freeboard [ft] 1-Year 1.49 0.18 433.77 1.23 2-Year 2.21 0.59 433.80 1.20 10-Year 3.82 3.51 433.92 1.08 100-Year L 5.82 5.54 433.99 1.01 J. FINCH, PE 1/5/2011 • • • USGS MAP 1 SOILS INFORMATION 2 PRECIPITATION DATA 3 HYDROLOGIC CALCULATIONS 4 FINAL BIORETENTION AREA DESIGN CALCULATIONS 5 • USGS MAP C, BRIAR CHAPEL - PHASE 4 NEW-09002 1 i 4 ids ? ,w, I? ?.: Pirk ? A 71- r •'? t ?? ?a f?S`I; ?I ;( ?? i f ko) 4- P111 466 ..: \ r _ ?J Beane ?, Mt f . S 2\ r I NIP P I 1 J ?sf til ( h t? - ? r7 JI-Z dr? r ?./ V z J^ ? J Y { ?R !' J/. {}?l? 3\? - 1< l ? f• ? ? _ r 4 - ? ? ? I ,??>' Y ,? is'? ti 4 t 4` ? \ ,• ? L `?`a/.-? 1",?,.) 8?+! il. ? v' ?, f,..'r+ ti i s Name: m:\NC3pro\35079G1A.P24 Location: 035° 49'26.70" N 079° 06' 17.30" W Date: 12/9/2010 Scale: 1 inch equals 2000 feet Copyright (C) 1998, Maptech, Inc. I SOILS INFORMATION 0 0 BRIAR CHAPEL - PHASE 4 NEW-09002 N) a W Q 1? W LL U 2 0 a t? 0O E Q d °c ?' v c Z m m m W c° o 5 O Zi J U I ui N I J LJ ® v +m LLi W ~ 0 W Q W -? J J ? 2 J ~ CO U m o ~ C N L E m W 'N ¦ Z w ° C m o ° m A m T O m E W (n ° a v_ z w m m w E o y 5 -.5 > Z) U LL z p c $a I U a v v U) Z 0 U x x®> !?! o a ' tt w Q W LL m .4' m W co < co s ,w d Z ° m w J 2 Ia' a? g o m F I ii m d U. 3 CL - N ° N N N z r2 d "d O N N T CL O 40 LL W O O m m ° C O T N Y. N W U N A p p 0 W GO) In 8 °c > o p m d = 5pp ap J Z U` C7 a m iq i ('c/7 Ui > p m (J 5 < H9 N C ? « C m ? O m y BE N gL c? m a m m ? -_ U m V N 0 F y g O a V O d C a L E v ?mmai vo o D o 0 0° v ? m ddiu>, o m D E O m O > T TTp -y D O "m m T m m d ?p {p O ,° y`? m Cl T m y m t` W N` m U° O T T - C N C « W N m an d m m m c N N O ° Z m •m• N an d N m d o p m y >. G m 5 .m.. m m m$ m 4 m m d 0 m ° N 000 E om p_ d Ul N T 325 N m N d t»t ma ddoN d y EEE NN o°m °?m a :o mo. OV .2 0 'a 0 Z~ E N o f N N N c m N y C m d d« N y y O N m y y° y h` 0 N n d N ° N ° E G m m A m E N C m N m d c m m m m d O O C y m m m C y N m N N m N O N O_ m d 0 m` an d m d C N O' E O m d N m d d N C N N z « o m m a m C V d O y C an d O O o y y d 0 N d m od 0. y y om 0 m C m a R z dOO O d d S. U C y m d m d 0 N ` an d N N C C m N m m d 0 d O m 0 0 W p m an d -y C ry y o 0 N N y N N N N N y m m` O N O c m m an d ,^ m N o _ d O d 0 m m m d d m m c m m d d m d O N Nd N y d N 0 N d W N d d 4j c m a m O r an d d o c c 2 C m C C C °' m C mc N N C N pp? C, m 0 0 V O d c o 'W O y c O C m` d fo 0 d 0 O m m 0 C m m d m N° C m m m C $?0 qN N N N d o NC d m d c c c a N m c O N C C` m d y is N cmm om E 0 o y mEao m y? ad o y n N N m d d O' m° N C O C d (7 N c m` 0 V ° 0 0 dan 0 U C N N 0 0 C C J c° m E m «c m c c u o o a N y o g s m d?E$?mQ ay cN ° cac cac anma an?Nnd c-°aHUa0-0-?a°°oo ?aa.). oQm 0. NaNN ID 0i mo oCo Womu J c$v amain nudi Io `X%?%o o o?o?mmd ???yoooo«°°?`no??caci nvoo?m°--o ao ??nNNm? ccoacic °-u>a°-in nd and i.-c o o mdd«.. omnaad adad«o« ono a. «ma?. 0210 %% ooo o ?«L?? inM o'-NNO 0 E w m?ao.-«m- N fD? o- o E mm o? ?-? N N©? QQLL]OOOONO'EEEy?OOpo OOaabN?NW%XEN?dOmaO o .ON%N tO Mx ??OEOON dm0dd 2«° 00°ON)Zm m N O Z N t0 N aD X O D U U E E E y` O UU ° UU O O O O N E N W m°%% O O tD N N E N a if E T Eo E N ?o •- o E E E% m m o N ? N m o ;;912 a 00 O o ? •' «m N%% ox x ?5 c C O O Ov d N>>> N tO N OD O m O O d O' ? m m"" O O E O O E o o v U 8 >4 m m m m ? 0 0 p 0 E Eo Eo N aD N aD • o m m m m m m m m m m m °'- E E c a a N 'o «« E m o__ c m d d 9 0 0 o a o N E E E E E E 8 m m m m ax) E N E a d d a o E a v a m° ax J J J m m m m m W m m°° c o o E E N O -° o 'c Vc a c v m' > ,5 E E E y a a a E E N °c o 0 0 0 0 0 0 0 0 0 a as a OE °8c008Em,ma3?Emoy ooooDY?L?°m°m,etc-°°mmc"N??'m ato3?uc°>>.mwm? omHEo vvvavaoooUEEE .0 E o mn m m m u T T c °u C? C? C7 a w m w m m w m m m 7 m m v a vcm um c c m ?.C ` c= v v v> ro m d° = g c o A m c m m m m a a a c c c c I m C CCC> j jm m 96 O o mm m mmmmmmti mm ccyy m`?`?a tC O)mym m m m mCCC i? T•n .?w0 C N N NN N ry md0000 •c m m m m m o 0 0 m m m o c o 0 0 -5 g.S ? 5 "3-53 >.5 > c c umi vmi c c c 'c"c c c c c m c m m m rn=w c - 3 c m c m m m m o 08 c c c c m Z H F F H C C««« c c w o m m m ?i m ?i «««l L-~ ccccc °mmooomrnrnmn rn9vv rnrnrnrnrnrnrnrno?rnrny2 c co°v°=y$aa v v v v02`o `o `o6-6-6'3m?oQ°'umi>ty 333333cn vl v? w w w w eee m m m m m m m m m m m m m m m z .? .O m m m m m m m m m m m o o m m m m d O m m m m m m m m H m m m m m m N Z ^y' > m 9 m la m m m m m m E y .2 C?.2 C?.2 C?.2 C? mmmmmUUUUUUUUUUUUUU C7 C7 C7 C7 (D C7 C7 C9 (9C9 C7 U' (72xxM M 2 2?fZZZa a a aaaain HDo>m ??5 5555 I m °m rn? ? t q J m m m p C14 04 1 N S}' u?O m 0 M 0 m Lc?mL Q lma m L mmL L gay Cc,?y? Gml C L ?' lU lma D 9DIL a my j lm0 w O m Om mU 1 m a7m mmUC?UC?cSc?cScSUt3c?UC3c?pc?ZMMMMMzzaa?aaomv m ?t j >33 ! Nmv 1 E w Tm`2i a'$.h ' jog va m N L? r Q Z 0 0 0 BRIAR CHAPEL - PHASE 4 WATERSHED SOIL NEW-09002 INFORMATION TO BIORETENTION • _> Watershed soils - To WQ Pond #1 Symbol Name Soil Classification WeD Wedowee Sandy Loam B WeE Wedowee Sandy Loam B References: 1) SCS TR-55. UNITED STATES DEPARTMENT OF AGRICULTURE. SOIL CONSERVATION SERVICE. 1986. HSG B = 100% J. FINCH, PE 12/9/2010 _> Conclusion Watershed soils are from 'HSG B' and 'HSG D'soils. The relative percentage of each HSG was calculated. These percentages were then used in the computation of the composite curve numbers. Cover Condition SCS CN - HSG B Impervious 98 Open 61 Wooded 55 0 [jEcoEngineering A division of The John R. McAdams Company, Inc. • MEMORANDUM Date: December 21, 2010 To: Jeremy Finch, PE From: George Buchholz, REM, PW Re: Briar Chapel - Phase 4 Bio Retention Area Seasonal High Water Table New-09002 A field investigation was conducted on December 17, 2010 at the proposed location of the biorentention area associated with the Briar Chapel Phase 4 development. A soil boring was established within the biorentention area to determine the approximate seasonal high water table depth from the soil surface. Below is a brief summary of the soil type(s) and the approximate seasonal high water table depth. Biorentention Area . Soil Type(s): Wedowee sandy loam, 10 to 15 percent slopes: gently sloping to steep, very deep, well drained. Wedowee sandy loam, 15 to 25 percent slopes: steep, very deep, well drained. Soil Boring Results: It is anticipated that the approximate seasonal high water table depth from the soil surface for this biorentention area is 26 inches. General Soil Boring Observations In general, the profile of the soil borings graded from light yellowish brown sandy loams near the surface to yellowish brown with light-gray mottles that are sandy at lower elevations and grayish with prominent pale reddish brown mottles which are sandy at very low elevations. Below is a photograph of a sample boring. Research Triangle Park, NC Post Office Box 14005 Research Triangle Park, North Carolina 27709 2 Meridian Parkway North Carolina 27713 .,-5646 919-287-4262 919-361-2269 Fax www.ecoengrcom Design Services Focused On Client Success • • 0 Soil boring profile located within biorentention area. plus 3a mmm I"" unwm 9001 ZLLaM H3 • Nava YPJNVIBLH=VMM bai'Auedmaj VUMPVM'R uqot aujo u6,uSEnca xouwDai JAM vunouvo iuxox 'Ajxnoo vxo laclVHD HVrdg I IOZ-£0-10 :atva .0 t =„ I :ZTM c XMS-ZO06OM3N :NnYNzw Z0060-M3N •oN ,,Md E9'42;t = A21121 J,MHS X02Iddd 1 / „98 = H.LdHQ ,LMHS X02Iddd 08'6Zt _ Id H'IdIHdS @ AH'I3 XH X02Iddd uoUHHiSxoig xo.i uoisduiMxS,tRa / ,LMHS A0 uOIZdOO'I X02iddV i A0 \ A, \1 i % III-, III III- rl ------------ -- ?I\\ -I I III III I I // I /f III ? ?i 1 /Z-Z /-Ij 01 =?743u!/ 7 01, 0 OL 7, arivos ??Vzlo C7 PRECIPITATION DATA C 0 BRIAR CHAPEL - PHASE 4 NEW-09002 • Precipitation Frequency Data Server Page 1 of 2 POINT PRECIPITATION` FREQUENCY ESTIMATES FROM NOAA ATLAS 14 „North Carolina 35.827003 N 79.102889 W 456 feet from "Precipitation-Frequency Atlas of the United States" NOAA Atlas 14, Volume 2, Version 3 G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland, 2004 Extracted: Mon Dec 6 2010 confidence Limits Seasonality Related Info GIS data Maps D Return to State Map Precipitation Frequency Estimates (inches) ARI* 5 10 15 30 60 120 [91 10 20 30 60 3 hr 6 hr 24 hr 48 hr 4 day 7 day (years) min 0.41 0.66 da d d d d min min 0.83 1.13 1.41 1.68 1.79 2.15 2.54 2.95 3.44 3.85 4.43 5.04 6.75 8.37 10.67 12.79 0 0.49 0.78 0.98 1.36 1.70 2.03 2.16 2.59 3.06 3.56 4.15 4.62 5.29 5.99 7.96 9.85 12.50 14.91 F5 0.56 0.90 1.14 1.62 2.08 2.50 2.67 3.21 3.81 4.46 5.15 5.68 6.42 7.19 9.40 11.45 14.30 16.83 10 0.62 0.99 1.26 1.82 2.37 2.88 3.09 3.71 4.43 5.15 5.92 6.52 7.33 8.13 10.54 12.69 15.69 18.31 25 0.68 1.09 1.38 2.04 2.71 3.34 3.62 4.38 5.28 6.10 6.97 7.66 8.56 9.40 12.09 14.32 17.52 20.21 50 0.72 1.15 1.46 2.20 2.98 3.71 4.05 4.92 5.97 6.85 7.79 8.56 9.53 10.40 13.31 15.58 18.90 21.66 100 0.76 1.21 1.53 2.34 3.23 4.06 4.47 5.47 6.69 7.61 8.63 9.48 10.53 11.41 14.54 16.82 20.25 23.04 200 0.79 1.26 1.59 2.47 3.47 4.41 4.90 6.03 7.45 8.40 9.48 10.43 11.56 12.44 15.79 18.07 21.60 24.39 500 0.83 1.31 .63 7 4.87 5. 47 6.80 8.49 9.49 10.66 11.72 12.97 13.84 17.49 19.74 23.37 26.14 1.65 2 3.7 1000 0.86 1.35 1.69 2.74 4.00 5.23 5.95 7.43 9.38 10.34 11.59 12.75 14.08 14.94 18.82 21.02 24.72 27.45 * These precipitation frequency estimates are based on a partial duration series. ARI is the Average Recurrence Interval. Please refer to NOAA Atlas 14 Document for more information. NOTE: Formatting forces estimates near zero to appear as zero. C, II * Upper bound of the 90% confidence interval I) Precipitation Freauencv Estimates (inches) 200 0.87 1.38 1.73 2.70 3.79 4.84 5.36 6.56 8.05 9.02 10.19 11.20 12.36 13.30 16.80 19.16 22.76 25.67 500 0.91 1.43 1.80 2.87 4.12 5.34 5.99 7.40 9.18 10.20 11.48 12.63 13.90 14.82 18.65 20.98 24.69 27.57 _]F ARI** 10 30 60 120 12 24 48 10 20 30 45 60 (years) m??F15 min mm mm mm min F r hr hr hr hr day day day 11 day 11 day day day 11 0.45 0.72 0.91 1.24 1.55 1.85 1.96 2.35 2.77 3.15 3.69 4.12 4.72 5.36 7.14 8.85 11.22 13.40 0 0.54 0.86 1.08 1.49 1.86 2.23 2.37 2.84 3.34 3.81 4.44 4.94 5.63 6.37 8.42 10.39 13.13 15.63 0 0.62 0.99 1.25 1.77 2.27 2.75 2.94 3.51 4.16 4.76 5.51 6.08 6.84 7.64 9.94 12.08 15.01 17.64 10 0.68 1.08 1.37 1.99 2.59 3.16 3.39 4.06 4.84 5.50 6.34 6.97 7.80 8.64 11.15 13.39 16.48 19.20 25 0.74 1.19 1.50 2.22 2.96 3.66 3.96 4.77 5.73 6.52 7.46 8.20 9.12 10.01 12.80 15.12 18.39 21.21 50 0.79 1.26 1.59 2.40 3.25 4.06 4.43 5.36 6.47 7.33 8.34 9.17 10.17 11.08 14.11 16.46 19.86 22.74 F 1o_ I 0.83 1.32 1.67 2.56 3.52 4.45 4.89 5.95 7.24 8.16 9.26 10.17 11.25 12.18 15.44 17.80 21.32 24.23 1000 024 1.47 1.85 3.00 4.38 5.75 6.53 8.11 10.15 11.14 12.49 13.78 15.13 16.02 20.11 22.39 26.16 28.99 ` The upper bound of the confidence interval at 90% confidence level is the value which 5% of the simulated quantile values for a given frequency are greater than. `* These precipitation frequency estimates are based on a partial duration series. ARI is the Average Recurrence Interval. Please refer to NOAA Atlas 14 Document for more information. NOTE: Formatting prevents estimates near zero to appear as zero. II * Lower bound of the 90% confidence interval (I Precipitation Freauencv Estimates (inches) ?u1 10 11 15 11 30u 120 uu 12 ears mm min mm mm min min hr hr hr 1 0.38 0.61 0.76 1.04 1.29 1.53 1.64 1.97 2.33 0.45 0.72 0.90 1.24 1.56 1.85 1.98 2.38 2.81 0.52 0.83 1.04 1.49 1.90 2.28 2.44 2.94 3.49 10 0.57 0.91 1.15 1.66 2.17 2.61 2.82 3.39 4.05 25 0.62 0.99 1.25 1.85 2.47 3.02 3.28 3.97 4.78 24 48 ?4 Fd 10 20 30 45 60 hr hr day day 11 day 11 day day 11 day 2.76 3.23 3.61 4.17 4.76 6.38 7.93 10.19 12.23 3.34 3.89 4.33 4.98 5.65 7.53 9.33 11.91 14.24 4.17 4.82 5.32 6.05 6.78 8.88 10.83 13.61 16.07 4.82 5.54 6.09 6.89 7.65 9.95 11.99 14.92 17.47 5.68 6.49 7.13 8.02 8.82 11.37 13.50][16 62 19.25 http:llhdsc.nws.noaa.gov/cgi-binlhdsclbuildout.perl?type=pf&units=us&series=pd&statena... 12/6/2010 • Precipitation Frequency Data Server Page 2 of 2 50 0.66 1.04 1.32 1.99 2.70 3.33 3.64 4.43 5.38 6.37 7.23 7.93 8.90 119 12.47 14.66 17.90 20.59 100 0.69 1.09 1.38 2.11 2.91 3.62 3.99 4.88 5.96 7.06 7.99 8.76 9.80 10.65 13.58 15.79 19.13 21.86 200 0.71 1.13 1.42 2.21 3.11 3.91 4.34 5.33 6.56 7.76 8.74 9.60 10.71 11.57 14.69 16.92 20.34 23.09 500 0.74 1.16 1.47 2.33 3.35 4.27 4.79 5.92 7.35 8.72 9.78 10.74 11.94 12.81 16.20 18.40 21.91 24.68 1000 0.75 1.19 1.49 2.41 3.52 4.55 5.15 6.39 7.99 9.46 10.59 11.62 12.90 13.76 17.36 19.53 23.09 25.86 The lower bound of the confidence interval at 90% confidence level is the value which 5% of the simulated quantile values for a given frequency are less than. These precipitation frequency estimates are based on a partial duration maxima series. ARI is the Average Recurrence Interval. Please refer to NOAA Atlas 14 Document for more information. NOTE: Formatting prevents estimates near zero to appear as zero. Text version of tables http://hdsc.nws.noaa.gov/cgi-binlhdsclbuildout.perl?type=pf&units=us&series=pd&statena... 12/6/2010 • • • ? a S D R C O S W O M S N 3 0 5 N S v T N Ci ? e O ? U ? ca 0 5 5 ? r G S L 01 .5 'N y vi aD w ..' ? a e w ^ 40 v N ? O ° d 5 W y J U >U> U p 1, U N c 4 u ? O N I T J ? sa U °• N i ? ly .N. J 0 v d ? U ^ ? J 5 O Q ? i ?° U M O ? J ? U '? N O I 3 n¢+ c N i a ^ N .5 O ! v T ? v ^ ?p k 41 '? W ? .J O O O A y LA Q 7. ? h I v ? m 1 v v T b ^ G O ° Q ? O ? Q O Q O ? p o y Z o O 5 Z w 3 v v O ; 0 « V Q. W x U a a U ? ? b ^ N m d v^i C r??yyy a Rf / O V 1 71 OD M N ?D o Cl! d cv , ?o 00 ^ 0 N .- N cn N ? N ? N r N r ?p N m T b ? °? h N ? r M N r O N d v? r O O N N M N d N r m ap d D\ ? tNn 00 '/? N W r O d r N 0 a) ? ? N d Vl i0 00 ^ D, ^ N r d ?/dl O m vdi r V W O r O. O ^ M d r 00 O D M d d d d ado ON vi \ vl r oo T O N M d M d P N N d m M ?O V1 V1 h ?O ul r °i o0 O d ?/1 ?O r oo P O ^ N d v? 00 N ? 0° O N h iD b ?O a o0 d d ? r M d ? O r o0 O+ ° ^ N d <{ ? N N T r O a, r M ?O oa d b `D °? ? m d V1 M ?° r 0a °? O " td+i N M d vl ?O ?O r 00 O O ?dn O ao d N Q` ? d d M N M M d ?/1 v? ?D r m ? ? °? v? ^ N r+ r W N T r d O O d N N m m d d ?n ?O `O r P r b r ?D T O N ?D ?/1 O r d °? r d v? O? ^ N N m m d d d ?/1 '/1 ?O O oOO M r O d a0 N ^ N N N m M d d d ?n d l' 0o o rrn ^ r oo rn iv r d r r d ^ N N N N M M M M ? N ?O N o0 d O N ? r d ?O d r ^ N N N N N N 00 m T ? ? N m b d m h Q` vl ?O 4` ?O 0 0 ?O r T O ^ N N M M O O O O 2 2 d d ?/Oi IV ?° r r r amo ado 0 0 0 0 0 0 0 0 0 0 .? N h O ? 0 0 0 o ? N L w d O •e u a 0. 0 W aOn a w r Q 0 a L O O ? N f• d o 0 0 o c ?' •" O O O O C O O O O O C C O O O O c 0o E O ?D ? a0 d O O O C O O O C ? E O O O O C h o ?O -•r-. N O O ^ C O O O O C '? O O O O C h N L O O ?n C 0 o O o ? E o 0 0 o c O o vi a, v a q o 0 0 o c T•E o 0 0 o c o r o ? C O ? O O C T E o 0 0 o c N o ?orn- ? °o °o °o o° c E o 0 0 o c O M r O rv 6 7 0 0 0 O C F+ .°a O vl O vl f OIC r r O C O C O G o c O ?t 0 0 0 0 r N ?O O 0 0 6161c 616I6I61 O161c D, ? N 0a d O ?L r o0 O+ D\ O O O O O ^ •- O O O O O O c r o°O oo ? T O C O O O O O m 0 0 0 0 0 o c OpoOOiO? 0 0 0 0 0?o c IM14-I -- r O O .- r .M. 0 0 0 0 0 0 vi a, d ao 0 0 0 0 0 0 0 0 d W ^'? vl 00 N v1 D\ N ? ?? M ?D ? N N N M M M d d d ?/1 vl v1 ?O ?O ?O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O ? o ? W -? d r o iD W •- d r N N N N m d d d d h '/? O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O r O M? O M r O m? O M r v? vt ?O r a) ? O O N d ?/1 iD O O O' O O O ^ ^ ^ ^ ^ ^ ^ °M M a V ?/?1 b b r W- T O o?ooo O O O O O O O O O O O O o ? r o0 oo a, o ^ ^ ^ N 1121°In-I° C, • • 09 1 •a O m n N D. 'D M O n r^ w, N D\ i0 .M. T .O M O h 7 00 .n N Ot M O 7 00 R^ 00 h N a\ M O Y 00 D\ O N N M 7 h r O D\ N O N M a a h r m m li O N M M h M O n n O T O p^ N N N N N N N N N N N N N N N N M M M M M M M M M M M M M R 7 V 7 7?? 7 It V V 7 V a V1 0 8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 G O O O O C 0 0 h sY .D N D\ h N O ^ .rr a O M O. .D N O h^ O 7 O h.. N T. ^ 00 V 1? M O aD M ? N o0 ?T ^ 1? C O W ?? r W 0\ Oi O^ N M M V O .n .D .O 1? O O a O O ^ N M M a h h ?D l? 1? oo O, a, O a 0 0 0 0 0 0 N N N N N N O N N M 7? ?/1 `O ^ ^^ N N N N N N N N N M M . M M M M M M M M M M M M M a 7 V: a V V' V 7 8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 19 rl Y Q` M "? r M O. •D N 00 .?-i O? N W V^ 1? M T v1 -+ 1? M 0\ ?? W a O? N O? r M D\ h^ l? M a\ b N W a O .?. `? ?? W 00 O. O O N N M M of V1 ./1 •O .O h a0 00 T A O N M M? O h .O .D l? [? W T T O O N N M 7 N N N N N N N N N N N N N N N N N M M M M M M M M M M M M M M M M? a 7 7? a V p ? 'e O O O O O C O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 h Y W 7 D. h h N 00 y D\ h ^_ N 00 M D. vt ^ .D N 00 M D\ h O .O N op .Mi T v. O .D N 1? M U V O .D N 1? M T 7 O y . . . . . . 00 . O. O N N M M V vt b b r n W T O. O O N M M 7 a h h m r r W W m O pp?? N N N N N N M N N N N N N N N N M M M M M M M M M M M M M M m M M a a A '8 O O O O O O O O C O N N N O O O O O O O O O O O C C O O C C O C O C O C O 0 0 0 0 0 0 0 0 0 0 0 0 0 N Y O h O h O M O h O V1 O vt O h O v'1 O H O V1 O vt O h O h O h O h O h O h O M O? O h O h O ./1 O ./1 O t o n b r 00 W T O O N N M M O d' h vt .O .O 1? n O W P T O O N N M M a a V1 H N N N N N N N N N N N N N N N N N N N N M M M M M M M M M M M M M •8 O O C O 6 6 6 6 6 6 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 .N. N .O ^ v1 O et O. M 00 M l? N b ^ v1 O 7 D\ M W ? ? ^ .O O ?/1 O. oo M h N .O ^ ?/) O a ? M W N r ^ .O O h w Y ^ N-. .N. M .Mi .fir .?. ? n? 2 ti?- !2 4 ,may O O N N M M M? V h h .O .D t? r O W 00 O. O. O O^ M N N N N N N M M M M p q p ^ N N N N N N N N N N N N N N 8 0 0 0 C O O O O O O O G G C C G C C O N O N C C O O N G C O O O O O O O O O O O O C O C C O C C 0 0 •? h O •? O V l? ^ 7 00 ^ .?. w N h O N h O. N .O D. M •D O M l? O d' h^ a w^ 00 .-+ V1 00 ? ?i N b O. M .D O M t? O B Y 0 0 0 0 0 0^ ^ N M M .h O O D h y 00 W o0 D. O O O . . O O N N N N N M M V 7 V h g p 0 0 0 ^^^ ^^ ^ ^ N N N N N N N N N N N N N N WWT ? O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O b N b h O M v1 00 ... '7 h O M vl 00 ^ .y.. .?-. O N M O .-. 7 1? O N h O .? e n a, N h W .•. V l? D\ N h W a b O. N VI O Y O O O O O O O O O O O O O ^ ^ .N. .N. N.. .Ni .. . .D ^ ^a .?i .?+ W O 00 D. D. p. D. O O ?++ °? Q c o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o c c o 0 0 0 0 0 o c o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 D *e r O 1? O M r O M h O M 0 t? O M h O M h O M 1? O n O M O M t? O M n O M h O M O M N O M O W .O h M^ O 00 .O h M O 00 . N v1 M O 00 .O h M O W Vt M O o0 .O h M^ O OD ?i Vt M O 00 •O V1 M O N M? v. V1 .O 1? 00 p. O O M p h V1 .O [? W O. O O N M V ./1 V1 •D 1? W Q\ O O M p h h .O l? W D\ O e ? O N N N N N N N N N N M to M M M M M M M M M M '7 N cf Q 7? V V a 7? V? Vl V1 V1 V1 Vj Vl Vt Vt vj Vl Vl Vt 1p A O M O h O M O V1 O V1 O V1 O h 0 Vl O H O V1 O V1 O V1 O vt O Vt O w1 O ./1 O Vt O ?l O? O h O v. O h O h O M .M. C V h v. .p b (? r O W O\ P O O N N M M s} E l l ^ ^^^^ ^^^^ ?+ ^ N N N N N N N N N N N I N N N N N N N . N N N N N M M M M M M M M m M M M 0 • • 0 9 m .9 d 7 O 'e V A a e a a° 3 ti 0 a W A a e O L a e? o? h yL T j 8! rl L a? eT i L a? N ? L a? o L ? a: T E N ? L ? a= ? E N ? L a? E ? E 0 F ? d ? ?O M ) M ? '. h C ? M Vl t I N N C 0 0 o c 0 0 a • • a z a 7 O 'e 3 u a a a a° r 0 a W a Q 0 0 O L a s? N L ? E 8 ? H L II C h L y C N ? L aE o` a ? E h ? L ? 3E r E N ? L ? F i E+ 1 8 F F? N O et ?"i, M O d M d• d T l- C N M d M "? K ?G M ?L t`I M r a N r • w d .9 0 0 h w a v a 0 a 0 X e 4 N r • w W Q 7 7 C? 3 9 e .9 H yh V A a e a O yO W w A O Y N Q\ iD N? b M O n? .-. w? N Q? .D m l M M V h h? n w w Q? O O .N-i .N-i .m-i ? 1 p 0 0 0 0 0 0 0 0 0 0 •-. H o a x o D; a d d o o; o d o v a a d a w O? O O N N M M a Vl h CG n n w T I T?^ N N N N N N N N N N N N N N N I 10 10 g 8 r ? t` ? n r ? c? t? r r r; l? r h 1? n l Y n M O? vt n M T •O N w^ O O N w d' V h V1 iD n n -0 10 w w O\ 0 0 hN "10 M M V I p 10 10 a a 10 V 7 a M h vl h h M h h 'IT 0 10 N M M V 7 vl In 10 n r w w a O? O n t? r n n r r r l_? n lr n ll? w w w e a, '8 ?n vl vi .n vi ?n vi vi vi In In vi vi vi vi vi In 1 N Y O h O Vl O ?n O h O h O vl O In O vt O 1 N N M M R w V1 h ?p ?D n n w w T O. O 1 O A '8 a a 7 a It a? a t 7 x 7 7 0 of et a H N n .. ?D o vi rn a w M n? ?o .n o v< L ?D ?D r n w w w Q? d\ O O N N M M I p ^" ^' ^-' ^-' ^ •? •-? ^-? •--? N N N N N N N N< T H V 7 7 v a v v v a d' a C V 7 7 7 a h ^ a w ^ v1 w N Vt Ol N 10 a M •D O? M 10 < L m cMn m a a v- .n 1 10 10 ?o r r r w w F w .? M M M M M M M M M M M m M M M M ? H M M M M M M M M M M M M M M M M M f N N 1/1 w^ M iD o+ N Vt w •-? M %0 m N v1 w f l ?D 10 ?o n n n n w w w c. D, rn rn o 0 0 E.8 n n n n n n n n n n n n n n w w w a N N N N N N N N N N N N N N N N N< O M r O M? O M r O M r O M r O M f O O w ?p vt M O w ?O h •--O a0 •D v? M ?.. h .h ?O r w O. O O N M? h vt ?O r w< 7 !b 00 OG O) W 00 D\ O? Q? ? Q\ ^ O? O T T ? C o h o ?n o .n o In o vi o In o ?n o ?n o 8 F H O 0 • • C • O .Y 7 .9 8 • a a e 0 a O a w" r A Q e O IL I'? a E s. r a o E o? L a? voi r ac N ? L aC ?' •E s? ? E h ? a TE N ? r a? A ? ye P j EI F . 0 0 0 0 o_ O h h R 0 M 0 rn N O 0 N HYDROLOGIC CALCULATIONS • 0 BRIAR CHAPEL - PHASE 4 NEW-09002 BRIAR CHAPEL - PHASE 4 HYDROLOGIC CALCULATIONS NEW-09002 Post-development - To Bioretention Area • Ll 0 Assume. HSG Impervious Open Wooded A 98 39 30 B 98 61 55 C 98 74 70 D 98 80 77 HSG'A' = 0.0% HSG'B' = 100.0% HSG'C' = 0.0% HSG'D' = 0.0% Cover Condition SCS CN Comments Impervious 98 Open 61 Assume good condition Wooded 55 Assume good condition J. FINCH, PE 1/3/2011 A. Watershed Breakdown Total 60-ft Single-Family Residential Lots = 1 Lot Impervious Per 60-ft Single-Family Lot (Inc House, Patio, D/W, S/W) = 3,700 SF Total Impervious Area From 60-ft Single-Family Lots = 3,700 SF = 0.08 acres Total 70-ft Single-Family Residential Lots = 3 Lot Impervious Per 70-ft Single-Family Lot (Inc House, Patio, D/W, S/W) = 4,000 SF Total Impervious Area From 70-ft Single-Family Lots = 12,000 SF = 0.28 acres Contributing Area SCS CN Area [acres] Comments Onsite impervious 98 0.36 - Onsite open 61 0.61 Assume good condition Onsite wooded 55 0.00 Assume good condition Onsite and 100 0.00 - Offsite impervious 98 0.00 - Offsite open 61 0.00 Assume good condition Offsite wooded 55 0.00 Assume good condition Offsite and 100 0.00 - Total area = Composite SCS CN = % Impervious = B. Time of Concentration Information ***Time of concentration was assumed tc 0.97 acres 0.0015 sq.mi. 75 37.1% be 5 minutes Time of Concentration = 5.00 minutes SCS Lag Time = 3.00 minutes (SCS Lag = 0.6* Tc) Time Increment = 0.87 minutes (= 0.29*SCS La To Bioretention 11 i Qm. I PIi , ¦ w ¦w D CL C. 0 X 0 c CD 0 0 0 Bioretention Bioretention Out Type.... Master Network Summary Page 2.01 Name.... Watershed File.... X:\Projects\NEW\NEW-09002\Storm\Phase 4 - Lot #351-353\Bioretention Area Design\D MASTER DESIGN STORM SUMMARY Network Storm Collection: Briar Chapel - P Total Depth Return Event in ------------ 1-Yr ------ 2.9500 2-Yr 3.5600 10-Yr 5.1500 100-Yr 5.1500 Rainfall Type ---------------- Time-Depth Curve Time-Depth Curve Time-Depth Curve Time-Depth Curve RNF ID Briar Chapel - 1 Briar Chapel - 2 Briar Chapel - 1 Briar Chapel - 1 MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) 0 Return HYG Vol Node ID ------------- ---- Type ---- Event ------ cu.ft Trun ---------- -- BIORETENTION IN POND 1 3268 BIORETENTION IN POND 2 4734 BIORETENTION IN POND 10 9054 BIORETENTION IN POND 100 16518 BIORETENTION OUT POND 1 1668 BIORETENTION OUT POND 2 3133 BIORETENTION OUT POND 10 7454 BIORETENTION OUT POND 100 14918 *BIORETENTION OUT JCT 1 1668 *BIORETENTION OUT JCT 2 3133 *BIORETENTION OUT JCT 10 7454 *BIORETENTION OUT JCT 100 14918 is Qpeak min 722.00 722.00 721.00 721.00 756.00 732.00 723.00 722.00 756.00 732.00 723.00 722.00 Max Qpeak Max WSEL Pend Storage cfs ft cu.ft -------- -------- ------------ 1.49 2.21 3.82 5.82 .18 433.77 1640 .59 433.80 1727 3.51 433.92 2025 5.54 433.99 2182 .18 .59 3.51 5.54 SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 10:21 AM 1/5/2011 Type.... Master Network Summary Page 2.02 Name.... Watershed File.... X:\Projects\NEW\NEW-09002\Storm\Phase 4 - Lot #351-353\Bioretention Area Design\D MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Max Return HYG Vol Qpeak Qpeak Max WSEL Pond Storage Node ID ----------------- Type ---- Event ------ cu.ft Trun ---------- -- min --------- cfs ft cu.ft -- TO BIORETENTION AREA 1 3268 722.00 ------ -------- ------------ 1.49 TO BIORETENTION AREA 2 4734 722.00 2.21 TO BIORETENTION AREA 10 9054 721.00 3.82 TO BIORETENTION AREA 100 16518 721.00 5.82 C7 0 SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 10:21 AM 1/5/2011 • FINAL BIORETENTION AREA DESIGN CALCULATIONS 0 Ll BRIAR CHAPEL - PHASE 4 NEW-09002 BRIAR CHAPEL - PHASE 4 BIORETENTION AREA NEW-09002 • Stage-Storage Function Project Name: Briar Chapel - Phase 4 Designer: J. Finch, PE Job Number: NEW-09002 Date: 1/5/2011 E J. FINCH, PE 1/5/2011 Average Incremental Accumulated Estimated Contour Contour Contour Contour Volume Contour Stage Area Area Volume Volume w/ S-S Fxn (feet) (feet) (SF) (SF) (CF) (CF) (CF) 433.00 0.0 1,904 433.50 0.5 2,174 2039 1020 1020 0.50 434.00 1.0 2,452 2313 1157 2176 0.98 435.00 2.0 3,022 2737 2737 4913 2.02 Storage vs. Stage 6000 5000 y = 2217.2x11344 4000 R2 = 0.9996 LL V 03000 S N 2000 1000 0 0.0 0.5 1.0 Stage (feet) 1.5 2.0 2.5 Ks = 2217.2 b = 1.1344 • BRIAR CHAPEL - PHASE 4 BIORETENTION AREA J. FINCH, PE NEW-09002 1/5/2011 • _> Stage - Storage Function Ks = 2217.2 • b = 1.1344 Zo = 433.00 Elevation [feet] Storage [cq [acre-feet] 433.00 0 0.000 433.20 357 0.008 433.40 784 0.018 433.60 1242 0.029 433.75 1600 0.037 433.80 1721 0.040 434.00 2217 0.051 434.20 2727 0.063 434.40 3248 0.075 434.60 3779 0.087 434.80 4319 0.099 435.00 4867 0.112 Elevation [feet] 100-Year [cf] [acre-feet] 433.00 - - 433.20 - - 433.40 - - 433.60 - - 433.75 0 0.000 433.80 122 0.003 434.00 617 0.014 434.20 1127 0.026 434.40 1648 0.038 434.60 2179 0.050 434.80 2719 0.062 435.00 3268 0.075 0 Type.... Outlet Input Data Name.... Bioretention Page 2.01 • File.... X:\Projects\NEW\NEW-09002\Storm\Phase 4 - Lot #351-353\Bioretention Area Design\D Title... Project Date: 12/6/2010 Project Engineer: J. Finch, PE Project Title: Briar Chapel - Phase 4 Bioretention Area Project Comments : REQUESTED POND WS ELEVATIONS: Min. Elev.= 433.00 ft Increment = .10 ft Max. Elev.= 435.00 ft OUTLET CONNECTIVITY ---> Forward Flow Only (UpStream to DnStream) <--- Reverse Flow Only (DnStream to UpStream) <---> Forward and Reverse Both Allowed Structure No. Outfall E1, ft E2, ft ----------------- ---- ------- --------- --------- Inlet Box RI ---> BA 433.750 435.000 Culvert-Circular BA ---> TW 429.600 435.000 TW SETUP, DS Channel • • SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 1:34 PM 12/17/2010 Type.... Outlet Input Data Name.... Bioretention Page 2.02 • File.... X:\Projects\NEW\NEW-09002\Storm\Phase 4 - Lot #351-353\Bioretention Area Design\D Title... Project Date: 12/6/2010 Project Engineer: J. Finch, PE Project Title: Briar Chapel - Phase 4 Bioretention Area Project Comments: OUTLET STRUCTURE INPUT DATA Structure ID = RI Structure Type = Inlet Box ------------------- # of Openings = ----------------- 1 Invert Elev. = 433.75 ft Orifice Area = 16.0000 sq.ft Orifice Coeff. _ .600 Weir Length = 16.00 ft Weir Coeff. = 3.000 K, Reverse = 1.000 Mannings n = .0000 Kev,Charged Riser = .000 Weir Submergence = No • • SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 1:34 PM 12/17/2010 Type.... Outlet Input Data Name.... Bioretention Page 2.03 0 File.... X:\Projects\NEW\NEW-09002\Storm\Phase 4 - Lot #351-353\Bioretention Area Design\D Title... Project Date: 12/6/2010 Project Engineer: J. Finch, PE Project Title: Briar Chapel - Phase 4 Bioretention Area Project Comments : OUTLET STRUCTURE INPUT DATA Structure ID = BA Structure Type = ------------------- Culvert-Circular ----------------- No. Barrels = 1 Barrel Diameter = 1.2500 ft Upstream Invert = 429.60 ft Dnstream Invert = 428.00 ft Horiz. Length = 33.00 ft Barrel Length = 33.04 ft Barrel Slope = .04849 ft/ft OUTLET CONTROL DATA ... Mannings n = .0130 Ke = .5000 (forward entrance loss) Kb = .023225 (per ft of full flow) Kr = .5000 (reverse entrance loss) HW Convergence = .001 +/- ft INLET CONTROL DATA. .. Equation form = 1 Inlet Control K = .0098 Inlet Control M = 2.0000 Inlet Control c = .03980 Inlet Control Y = .6700 T1 ratio (HW/D) = 1.136 T2 ratio (HW/D) = 1.283 Slope Factor = -.500 Use unsubmerged inlet control Form 1 equ. below T1 elev. Use submerged inlet control Form 1 equ. above T2 elev. In transition zone between unsubmerged and submerged inlet control, interpolate between flows at T1 & T2... At T1 Elev = 431.02 ft ---> Flow = 4.80 cfs At T2 Elev = 431.20 ft ---> Flow = 5.49 cfs • SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 1:34 PM 12/17/2010 Type.... Outlet Input Data Name.... Bioretention Page 2.04 • File.... X:\Projects\NEW\NEW-09002\Storm\Phase 4 - Lot #351-353\Bioretention Area Design\D Title... Project Date: 12/6/2010 Project Engineer: J. Finch, PE Project Title: Briar Chapel - Phase 4 Bioretention Area Project Comments : OUTLET STRUCTURE INPUT DATA Structure ID = TW Structure Type = TW SETUP, DS Channel ------------------------------------ FREE OUTFALL CONDITIONS SPECIFIED CONVERGENCE TOLERANCES... Maximum Iterations= 40 Min. TW tolerance = .01 ft Max. TW tolerance = .01 ft Min. HW tolerance = .01 ft Max. HW tolerance = .01 ft Min. Q tolerance = .00 cfs Max. Q tolerance = .00 cfs • • SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 1:34 PM 12/17/2010 Type.... Composite Rating Curve Name.... Bioretention Page 2.09 File.... X:\Projects\NEW\NEW-09002\Storm\Phase 4 - Lot #351-353\Bioretention Area Design\D Title... Project Date: 12/6/2010 Project Engineer: J. Finch, PE Project Title: Briar Chapel - Phase 4 Bioretention Area Project Comments: ***** COMPOSITE OUTFLOW SUMMARY **** WS Elev, Total Q Elev. Q ft cfs -------- 433.00 ------- .00 433.10 .00 433.20 .00 433.30 .00 433.40 .00 433.50 .00 433.60 .00 433.70 .00 433.75 .00 433.80 .54 433.90 2.79 434.00 6.00 434.10 9.94 434.20 11.98 434.30 12.14 434.40 12.29 434.50 12.45 434.60 12.59 434.70 12.74 434.80 12.89 434.90 13.04 435.00 13.18 • Notes -------- Converge ------------------------- ft +/-ft Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Contributing Structures (no Q: RIBA) (no Q: RI,BA) (no Q: RI,BA) (no Q: RI,BA) (no Q: RI,BA) (no Q: RIBA) (no Q: RIBA) (no Q: RIBA) (no Q: RI,BA) RIBA RIBA RIBA RIBA RI,BA RIBA RIBA RI,BA RIBA RIBA RIBA RIBA RI,BA SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 1:34 PM 12/17/2010 Type.... Master Network Summary Page 2.01 Name.... Watershed File.... X:\Projects\NEW\NEW-09002\Storm\Phase 4 - Lot #351-353\Bioretention Area Design\D • MASTER DESIGN STORM SUMMARY Network Storm Collection: Briar Chapel - P Total Depth Return Event in 1-Yr ---- 2.9500 2-Yr 3.5600 10-Yr 5.1500 100-Yr 5.1500 Rainfall -Type ---- ---------- Time-Depth Curve Time-Depth Curve Time-Depth Curve Time-Depth Curve RNF ID Briar Chapel - 1 Briar Chapel - 2 Briar Chapel - 1 Briar Chapel - 1 MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Max • Return HYG Vol Qpeak Qpeak Max WSEL Pond Storage Node ID Type Event cu.ft Trun min --------- cfs -------- ft -------- cu.ft ------------ -------------- BIORETENTION --- IN ---- POND ------ 1 ---------- -- 3268 722.00 1.49 BIORETENTION IN POND 2 4734 722.00 2.21 BIORETENTION IN POND 10 9054 721.00 3.82 BIORETENTION IN POND 100 16518 721.00 5.82 BIORETENTION OUT POND 1 3268 724.00 1.28 33.83 207 BIORETENTION OUT POND 2 4733 723.00 2.01 433.87 290 BIORETENTION OUT POND 10 9054 723.00 3.60 433.92 431 BIORETENTION OUT POND 100 16518 722.00 5.57 433.99 581 *BIORETENTION OUT JCT 1 3268 724.00 1.28 *BIORETENTION OUT JCT 2 4733 723.00 2.01 *BIORETENTION OUT JCT 10 9054 723.00 3.60 *BIORETENTION OUT JCT 100 16518 722.00 5.57 t'4?-cftsl? w5rt- • S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 10:22 AM 1/5/2011 Type.... Master Network Summary Page 2.02 Name.... Watershed File.... X:\Projects\NEW\NEW-09002\Storm\Phase 4 - Lot #351-353\Bioretention Area Design\D C7 MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Max Return HYG Vol Qpeak Qpeak Max WSEL Pond Storage Node ID ----------------- Type ---- Event cu.ft Trun min --------- cfs ft cu.ft -------- -------- ------------ TO BIORETENTION AREA ------ 1 ---------- -- 3268 722.00 1.49 TO BIORETENTION AREA 2 4734 722.00 2.21 TO BIORETENTION AREA 10 9054 721.00 3.82 TO BIORETENTION AREA 100 16518 721.00 5.82 0 - - 'L -m SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 10:22 AM 1/5/2011 BRIAR CHAPEL - PHASE 4 BIORETENTION AREA SIZING CALCULATIONS NEW-09002 • Determination of Water Quality Volume (WV;,) WQ v = (P) (R v)(A)/12 where, WQv = water quality volume (in acre-ft) Rv = 0.05+0.009(I) where I is percent impervious cover A = area in acres P = rainfall (in inches) Input data: Total area, A = 0.97 acres Impervious area = 0.36 acres Percent impervious cover, I = 37.2 % Rainfall, P = 1.0 inches Calculated values: Rv= 0.38 WQv= 0.03 acre-ft 1,354 cf. _> Bloretention Area Minimum Required Surface Area Calculation WQ Volume = 1354 cf. • Maximum Ponding Depth = 9 inches Minimum SA Required = 1,805 square feet => Calculated Fonding Depth its Bioretention Area Ks = 2217.2 b = 1.1344 V = 1,354 Surface Elevation = 433.00 feet WQ Elevation = 433.65 feet J. FINCH, PE 1/5/2011 0 BRIAR CHAPEL - PHASE 4 BIORETENTION AREA UNDERDRAIN SIZING NEW-09002 0 Bio-Retention Surface Area 1857 sf @ EL = 433.00 Water Ponding Depth 9 in Soil Layer Thickness 2.00 ft Total Fill Layer Thickness 3.33 ft Assume Soil Permeability of 2 in/hr Assume n = 0.012 for PVC pipe S = 0.5 % Using Darcy's Law qp= 12 in/hr ) [ 3.33 ft] _ -[ 2.00 ft = Q = (3.33 in/hr ) (1857 sf ) *Design System to Handle 10 Times Minimum Flow: Design Q = 1.43 cfs N*D= 16*(Q*n/S"0.5)^(3/8) 16 1.43 cfs 0.012 ^ 3/8 0.005 0.5 N*D= 9.4 inches N= 3 D= 4 in J. FINCH, PE 1/5/2011 3.33 in/hr per unit area 0.14 cfs Use 3 - 4" PVC Pipes for drain system Note: Calculation Methodology taken from NCSU "Workshop on Bio-Retention", Page 7, "Selecting" Underdrain Pipes. 0 -- BRIAR CHAPEL - PHASE 4 BIORETENTION INLET J. FINCH, PE NEW-09002 1/5/2011 • Velocity Dissipator NRCD Land Quality Section Pipe Design Entering the following values will provide you with the expected outlet velocity and depth of flow in a pipe, assuming the Manning's roughness number is constant over the entire length of the pipe. Flow Qlo (cfs) = 3.82 Slope S (%) = 1.90 Pipe Diameter Do (in) = 12 Manning's `n' = 0.009 Flow Depth (ft) = 0.52 Outlet Velocity (fps) = 9.189 NRCD Land Quality Section NYDOT Dissipator Design Results • Pipe Diameter (ft) = 1.00 Outlet Velocity (fps) =.9.19 Apron Length (ft) = 6.00 d50 Stone Thickness (inches) Class (inches) 3 A 9 6 B 22 <-- 13 B or 1 22 23 2 27 Width = La + Do Width=6+1 Width (ft) = 7 Use NCDOT Class `B' Rip Rap d50 = 8" 6'L z 7'W z 22"Thick 0 BRIAR CHAPEL - PHASE 4 BIORETENTION OUTLET J. FINCH, PE NEW-09002 1/3/2011 • Velocity Dissipator NRCD Land Quality Section Pipe Design Entering the following values will provide you with the expected outlet velocity and depth of flow in a pipe, assuming the Manning's roughness number is constant over the entire length of the pipe. Flow Qio (cfs) = 3.51 Slope S (%) = 4.85 Pipe Diameter Do (in) = 15 Manning's `n' = 0.013 Flow Depth (ft) = 0.42 Outlet Velocity (fps) = 9.601 NRCD Land Quality Section NYDOT Dissipator Design Results • Pipe Diameter (ft) = 1.25 Outlet Velocity (fps) = 9.60 Apron Length (ft) = 7.50 d50 Stone Thickness (inches) Class (inches) 3 A 9 6 B 22 E- 13 B or 1 22 23 2 27 Width = La + Do Width = 7.5 + 1.25 Width (ft) = 8.75 Use 9-ft Use NCDOT Class `B' Rip Rap d50=8" 7.51L z 9'W z 22"Thick 0 F- L r 4 m m IL • OA w` W E E r0 c/ L 3 O *0 r c/ C 0 C m C) C C 0 7 N N 0 N N N r ~ N 0 N N N N O C7 C7 C7 (7 C7 C7 N l f) O i C C C C O C=Z 'V ? M r r W d m O M O C? 0? r C S -2 LO LO e M M M 0 y y CO O m m m m m ?? o c 2 c c c J 2 O) V CO 7 N U? n CO N M r O M W In V' t/l N LO L Cl) m Cl) C 0 J C i! c00 ON1 r r .0 S C v VO M C07 co m 7 v a tt v v v Z m C O v e J y o o rn ? o rn CO - O N M COO o n0 h ? N ? 7 J C W t LO LO C V C M M W) Ov LO O C W pi C ci V c6 M Cl M M v I-T Nr v 'd' ? C O O N O ? O O N J d N ? n N V t 0 CL r lb Ft U U U U U U J y C N C CO CO .N- co Jy' 32,0 Lq co O LL lp 7 q ? C CD O N O Cl) 8 N C _ I •I Vj } I 0 u D C W 0 .C a' J CO to d' M N M O r D 0 0 0 O M C? r N to M a> Q-' W y Cp y J ? Z J Z CO u'f v co N r- O N co O R 12 Cl) 2 N 10 a • • O L? wL 2W F- -I 6a A CO LC) y m N Cl) ? C L 0 L 0 L ? L 0 L ? _ Q J ? ? sF L C7 r r L N D D 0 0 0 O N LO ? O O 0 l CL O O n O C D. Lq o I ! M N c CA ? E v v v Cl) Cl) 0 y 0 0 0 0 0 0 LO 'p C O O O Ln LC) N C 7 C Cl) O M M rn O O v m C9 V V Ir ° ° ^ > a rn o r o 0 c co 0 y LO a c Ln V W v v v v J C9 O N r ? N 2 C ^. O CO CA r r O D 0 CA CG LO LC) Cl) `MV MV Cl) m co D O M O 00 O n O CA N N O to . ' LL1 0 d c c M Cl) to 'd LO 00 E v v v v Z 0 e 0 o M - C) rn W y -- ao of N .- 'a ao Co 04 04 00 04 U) x 0 a m N C00 C00 n q M N tl > ? Lri o) Ch M Cl) LO a n CL_ V w n n O m 11 w ? V' r ? r r r N O w to CO C14 LO co N co m W r- I- U II H v O O N O M U C R v L c N N CID N r .- n h CD CG O_ C O O O f` O N I N LC) to LC) CO Cn P? 0 12 _ C 41 c C E O LO O LC) O U' O LO O LA O Lri a E ) m _ O co 04 Cl) co x R O o 0 c 0 M 0 0 0 c v o 0 0 - c O o 0 0 0 0 o o CV C (? CND 000. OOD [ CO C0D + 2 C1 O O O O O O E R r O N O C v N O O C H O O O CD O O U O O N C 0 O C t 6 N 0 - 0 0 0 0 0 o y rn d N O C) 0 O O N n ?. J $ N V r 0 ? N C - CA r M c C O C l- C N M C O .J a st Cl) W a M uj W C O O J CO LC) [1' M N J Z 0 N 0 N m to E N 0 x O O O M in Z: in L? L Ilep 0 .? o W O O O O O O O O CO N co m O O O (`')m O O r O CD O O O r- O O U') U N of 0 v 0 co 0 N O -j 2 0 0 0 O co O 0 O N N U) E O U) 3 0 co v T O 0 0 0 0 O V M M d' V tt ? 1.7 4- O L. I. L 3 Cl) PM inc b :u u inc CI u inc 0 0 0 It 0 0 °o °o Cl) v LO ? CO 0 0 6i 0 0 N 0 LJO N n .C U o m o N Of 0 LO LO N J 0 0 0 of N It 00 0 0 N 3 a? E I 0 m V T 2 w 0 0 0 00 0 0 0 0 6 cri Ln f-? > v CD v It CO ED E U? C L 0 cn N 0 J ei v=- 'o d inc g :u u inc q :u u 3nC O O co v O O O O O O O O O N In co Ln LO It Cl) It It It v O O M v M O LO N O O 0 N N r 0 LO Ull N J O O 0 M O 0 O N Ln N 9 N U) O N 3 0 m T 2 0 0 0 O 0 O O O O O (D L M _N W M LO M M Cl) w 0 J aj O a W O L L 4) 4) jr 9 jr b 1 o °0 0 0 L °o 04 LO GOO LO L O M 0 0 M O 0 M 0 N O 0 0 0 rn 0 O t U o N 0 0 O O 0 v 0 M O N J O = 0 0 0 Cl) v co 0 0 N 3 a? E 0 O = I w °0 00 00 00 C? L6 06 > t v v Cl) N W