HomeMy WebLinkAbout20091287 Ver 1_Certification of Completion_20101201V 'If ?? ? CF WATF9
,Ill O?
61,
„i II
I I
'?1?g11
i
- Michael F. Easley, Governor
Winiam G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Coleen H. Sullins Director
,148 Division of Water Quality
G
DWQ Project No.: Z009(ZBrf County: t4
Applicant: 1N00o P O, 13 o t ISO *7 eenv,'//e /V, C,
ProjeetName: /3-gz3u2 Or,4e`. 2/9 at-ev Itlq,-dec GK I,.,
Date of Issuance of 401 Water Quality Certification: 2O 10.
` Certificate of Complahon
-11 Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and
any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North
Carolina Division of Water Quality; 1621 Mail Service Center, Raleigh, NC, 27699-1621. This form may be
returned to DWQ by, the applicant, the applicant's authorized agent, or the project engineer. It is not necessary too
send certificates from all of these.; .
Signature: ' Date:
Engineer's Certification - =
Partial 1-?Fm 1
E EoTh9bh 7., as a duly registered Professional Engineer in the State of Nortli
Carolina, having been authorized to-observe (periodically, weekly,-full time) the construction of the project, for the
Permittee hereby state that, to the best of my abilities, due cafe and diligence was used in the observation of the
construction such that the construction was observd to be built within substantial compliance and intent of the 401 t
Water QualityCertification and Puffer Rules; th approved plans and specifications, and other supporting materials.
Signature i, ° c. lt? / Registration No.
Date /7., ?l y C?ljyy7rJ/eTe /`?ov, ?•S z0/?
Applicant's Certification,
I, hereby state that, to the best of my abilities, due care and diligence'
was used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the'401 Water Quality Certification and.Buffer Rules, the approved plans and
specifications, and other supporting materials.
Signature:.'. Date:
Agent's Certification
-I - - - ! ', heresy state that, to the best of my abilities, due care and diligence
was used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and
specifications, and other supporting materials.
ti vi t, ?. tar=1VE
JAN 1 S 7011 JAN 1 1 2011.
Transportation Permitting Unit DENR-WATER WPUIY - ND DENp Caro lina
1650 Mail ServKe Center Raleigh, North Carolina 27699-1650 WETLANDS AND STORMPNATER BRANCH Raleigh Regional Officr QlulQ !_/
2321 Crabtree Boulevard, Suite 250,Ralegh, North Carolina 27604
'Phone: 919.733.1786 / FAX 919.733.68931 Internet http://h2o.enr.state.nc uslncwetlands
An Equal Opportunk/Affirm5tive Action Empb er-50%Regd"10% Post Consumer Paper,, -