Loading...
HomeMy WebLinkAbout20100645 Ver 1_Certification of Completion_20110112S KAPSTONE January 5, 2011 Mrs. Lia Gilleski Express Review Coordinator DWQ 401 Unit 2321 Crabtree Blvd., Suite 250 Raleigh, North Carolina 27604 1@@[ROW909 JAN 12 2011 DW. MATER %7LA ft AND SWp4W* BRANCH Re: DWQ EXP#: 10-0645 -Notification of Completion KapStone Natural Gas Line Roanoke Rapids, North Carolina KKP-10100 Dear Mrs. Gilleski: KapStone Kraft Paper Corporation is pleased to submit the attached certification of completion for two stream crossings associated with the construction of a natural gas pipeline near the Roanoke River referenced in permit DWQ EXP# 10-0645 dated August 12, 2010. Seven photographs of the upstream and downstream view of each crossing are attached. For completeness, I have also included a copy of the Section 404 certification to the Army Corps of Engineers. Construction on the area of the crossings was completed December 22, 2010 with Heath Engineering and Foremost Construction. Overall we did not have any issues with the project and are very pleased with the outcome. If you should have any questions or require additional information, please do not hesitate to contact me at (252) 533-6255. Sincerely, iEnviroieAntal rt-c?nsmeier Programs Manager Cc: Robert Miller, Heath Engineering Kevin Yates, EcoEngineering Neal Davis, KapStone Stan Clayton, KapStone KAPSTONE KRAFT PAPER CORPORATION A Division of KAPSTONE PAPER AND PACKAGING CORPORATION 100 Gaston Road Roanoke Rapids, NC 27870 kapstonepaper.com MA North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director Dee Freeman Secretary DWQ Project No.: bL? Ifl - D U 4 5 County: )A 4. tx Applicant: KapStone Kraft Paper Corp/Mary Lee Ransmeier Project Name: Natural Gas Pipeline Construction/ Roanoke River [030208, 23-(26), C] Date of Issuance of 401 Water Quality Certification: R - I A - I Q Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification 1, Mary Lee Ransmeier , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the a ro dpla s av pecifcatiops, and other supporting materials. Signature: ate: January 5, 2011 Agent's Ce on 1, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: N this project was designed by a Certified Professional 1, , as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Date Registration No. pa6¢ono? BAH , :Zen 401 OversiphVExpress Review PernOV Unl 1650 Mal service Center, Raietgh, North Carolina 27698.1660 _ocabon: 2321 Crabtree Blvd., Raleigh, North Carolina 27601 Phone: 919.733.17861 FAX: 919-733.6893 interner htlp:02o.enr.state.nc.us/ncwellandsl DENR VMTER-QUAL" AND 3'f ORMWAM PMCM Np Caro ina Natural?lU J An Equal Opportunity t Affirmative Action Empbyw Page 1 of 7 ,3 KapStone Kraft Natural Gas Pipeline Construction 1 F ) err"' f: Page 2 of 7 Picture 1: Upstream on 10' stream crossing 01.03.2011 Picture 2: Downstream on 10' stream crossing 01.03.2011 KapStone Kraft Natural Gas Pipeline Construction a { t .-4{' Picture 4: View North near Lowground property line at Piedmont connection 01.03.2011 Page 3 of 7 Picture 3: View North towards mill from 40' creek crossing 01.03.2011 KapStone Kraft Natural Gas Pipeline Construction •4 Y, +'` f Ap" ? ` '? Asa ;a• ", ? z. i ` k { r "13 A sj{g`? •' ?'' ??` .?k' t x?i? jHr?. ?1*?ZC?t?y?ta?<??lfi p,fC d, y?, \ 9?? ? y?]? k F- aY. .`4 f 'F i.• r 15w r 'x ' (' S ,5g 4 p y ' J d?w it" AF, Picture 5: View upstream at 40' stream crossing 01.03.2011 Page 4 of 7 Picture 6: View downstream at 40' stream crossing 01.03.2011 KapStone Kraft Natural Gas Pipeline Construction +d,adt" alp a d R ter. x ? "°i.•' ?iB 8 Y e°Y ~L??? ? i.."T? V N3. S?. ?^"?T' iT? .R x•.w ? J'. "a0. "A.t r Picture 7: Close up view of stream substrait at 40' stream crossing 01.03.2011 Page 5 of 7 KAPSTONE KRAFT PAPER CORPORATION A Division of KAPSTONE PAPER AND PACKAGING CORPORATION 100 Gaston Road Roanoke Rapids, NC 27870 kapstonepaper.com January 5, 2011 Mr. James Lastinger US Army Corps of Engineers Wilmington District Raleigh Regulatory Field Office 3331 Heritage Trade Dr., Suite 105 Wake forest, North Carolina 27587 Re: SAW-2010-01377- Notification of Completion KapStone Natural Gas Line Halifax County Roanoke Rapids, North Carolina Dear Mr. Lastinger, KapStone Kraft Paper Corporation is pleased to submit the attached certification of completion for two stream crossings associated with the construction of a natural gas pipeline near the Roanoke River referenced in permit SAW-2010-01377 issued August 17, 2010. Seven photographs showing the upstream and downstream views of each crossing are attached. Construction on the area of the crossings was completed December 22, 2010 with Heath Engineering and Foremost Construction. Overall we did not have any issues with the project and are very pleased with the outcome. If you should have any questions or require additional information, please do not hesitate to contact me at (252) 533-6255. Sincerely, Mary ee ansmeier Environmental Programs Manager Cc: Robert Miller, Heath Engineering Kevin Yates, EcoEngineering Neal Davis, KapStone Stan Clayton, KapStone Lia M. Gilleski, DWQ Page 6 of 7 Action ID Number: SAW-2010-01377 County: Halifax Permittee: Kapstone Kraft Paper Corporation Date Verification Issued: August 17, 2010 Project Manager: James Lastinger Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT RALEIGH REGULATORY FIELD OFFICE 3331 HERITAGE TRADE DR., SUITE 105 WAKE FOREST, NORTH CAROLINA 27587 Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. If you fail to comply with this permit you are subject to permit suspension, modification, or revocation. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Sig a re f Permittee o? os-aaii Date Page 7 of 7