HomeMy WebLinkAbout20100645 Ver 1_Certification of Completion_20110112S
KAPSTONE
January 5, 2011
Mrs. Lia Gilleski
Express Review Coordinator
DWQ 401 Unit
2321 Crabtree Blvd., Suite 250
Raleigh, North Carolina 27604
1@@[ROW909
JAN 12 2011
DW. MATER
%7LA ft AND SWp4W* BRANCH
Re: DWQ EXP#: 10-0645 -Notification of Completion
KapStone Natural Gas Line
Roanoke Rapids, North Carolina
KKP-10100
Dear Mrs. Gilleski:
KapStone Kraft Paper Corporation is pleased to submit the attached
certification of completion for two stream crossings associated with the
construction of a natural gas pipeline near the Roanoke River referenced in
permit DWQ EXP# 10-0645 dated August 12, 2010. Seven photographs of
the upstream and downstream view of each crossing are attached. For
completeness, I have also included a copy of the Section 404 certification to
the Army Corps of Engineers. Construction on the area of the crossings was
completed December 22, 2010 with Heath Engineering and Foremost
Construction. Overall we did not have any issues with the project and are very
pleased with the outcome.
If you should have any questions or require additional information, please do
not hesitate to contact me at (252) 533-6255.
Sincerely,
iEnviroieAntal rt-c?nsmeier
Programs Manager
Cc: Robert Miller, Heath Engineering
Kevin Yates, EcoEngineering
Neal Davis, KapStone
Stan Clayton, KapStone
KAPSTONE
KRAFT PAPER CORPORATION
A Division of KAPSTONE PAPER AND PACKAGING CORPORATION
100 Gaston Road Roanoke Rapids, NC 27870
kapstonepaper.com
MA
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Coleen H. Sullins
Governor Director
Dee Freeman
Secretary
DWQ Project No.: bL? Ifl - D U 4 5 County: )A 4. tx
Applicant: KapStone Kraft Paper Corp/Mary Lee Ransmeier
Project Name: Natural Gas Pipeline Construction/ Roanoke River [030208, 23-(26), C]
Date of Issuance of 401 Water Quality Certification: R - I A - I Q
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer
Rules, and any subsequent modifications, the applicant is required to return this certificate to the
401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC,
27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or
the project engineer. It is not necessary to send certificates from all of these.
Applicant's Certification
1, Mary Lee Ransmeier , hereby state that, to the best of my abilities, due care
and diligence was used in the observation of the construction such that the construction was observed to
be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer
Rules, the a ro dpla s av pecifcatiops, and other supporting materials.
Signature: ate: January 5, 2011
Agent's Ce on
1, , hereby state that, to the best of my abilities, due care
and diligence was used in the observation of the construction such that the construction was observed to
be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer
Rules, the approved plans and specifications, and other supporting materials.
Signature: Date:
N this project was designed by a Certified Professional
1, , as a duly registered Professional (i.e.,
Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized
to observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state
that, to the best of my abilities, due care and diligence was used in the observation of the construction
such that the construction was observed to be built within substantial compliance and intent of the 401
Water Quality Certification and Buffer Rules, the approved plans and specifications, and other
supporting materials.
Signature
Date
Registration No.
pa6¢ono?
BAH , :Zen
401 OversiphVExpress Review PernOV Unl
1650 Mal service Center, Raietgh, North Carolina 27698.1660
_ocabon: 2321 Crabtree Blvd., Raleigh, North Carolina 27601
Phone: 919.733.17861 FAX: 919-733.6893
interner htlp:02o.enr.state.nc.us/ncwellandsl
DENR VMTER-QUAL"
AND 3'f ORMWAM PMCM
Np Caro ina
Natural?lU
J
An Equal Opportunity t Affirmative Action Empbyw Page 1 of 7
,3
KapStone Kraft Natural Gas Pipeline Construction
1 F )
err"' f:
Page 2 of 7
Picture 1: Upstream on 10' stream crossing 01.03.2011
Picture 2: Downstream on 10' stream crossing 01.03.2011
KapStone Kraft Natural Gas Pipeline Construction
a { t
.-4{'
Picture 4: View North near Lowground property line at Piedmont connection 01.03.2011
Page 3 of 7
Picture 3: View North towards mill from 40' creek crossing 01.03.2011
KapStone Kraft Natural Gas Pipeline Construction
•4 Y, +'` f
Ap"
? ` '? Asa ;a• ", ? z. i ` k { r
"13 A
sj{g`? •' ?'' ??` .?k' t x?i? jHr?. ?1*?ZC?t?y?ta?<??lfi p,fC d, y?, \ 9?? ?
y?]? k F- aY. .`4 f 'F
i.• r 15w r 'x ' (' S ,5g
4 p y ' J d?w
it"
AF,
Picture 5: View upstream at 40' stream crossing 01.03.2011
Page 4 of 7
Picture 6: View downstream at 40' stream crossing 01.03.2011
KapStone Kraft Natural Gas Pipeline Construction
+d,adt" alp a
d R ter. x
? "°i.•' ?iB 8 Y e°Y ~L??? ? i.."T? V N3. S?. ?^"?T'
iT? .R x•.w ? J'. "a0.
"A.t r
Picture 7: Close up view of stream substrait at 40' stream crossing 01.03.2011
Page 5 of 7
KAPSTONE
KRAFT PAPER CORPORATION
A Division of KAPSTONE PAPER AND PACKAGING CORPORATION
100 Gaston Road Roanoke Rapids, NC 27870
kapstonepaper.com
January 5, 2011
Mr. James Lastinger
US Army Corps of Engineers
Wilmington District
Raleigh Regulatory Field Office
3331 Heritage Trade Dr., Suite 105
Wake forest, North Carolina 27587
Re: SAW-2010-01377- Notification of Completion
KapStone Natural Gas Line
Halifax County
Roanoke Rapids, North Carolina
Dear Mr. Lastinger,
KapStone Kraft Paper Corporation is pleased to submit the attached
certification of completion for two stream crossings associated with the
construction of a natural gas pipeline near the Roanoke River referenced in
permit SAW-2010-01377 issued August 17, 2010. Seven photographs
showing the upstream and downstream views of each crossing are attached.
Construction on the area of the crossings was completed December 22, 2010
with Heath Engineering and Foremost Construction. Overall we did not have
any issues with the project and are very pleased with the outcome.
If you should have any questions or require additional information, please do
not hesitate to contact me at (252) 533-6255.
Sincerely,
Mary ee ansmeier
Environmental Programs Manager
Cc: Robert Miller, Heath Engineering
Kevin Yates, EcoEngineering
Neal Davis, KapStone
Stan Clayton, KapStone
Lia M. Gilleski, DWQ
Page 6 of 7
Action ID Number: SAW-2010-01377 County: Halifax
Permittee: Kapstone Kraft Paper Corporation
Date Verification Issued: August 17, 2010
Project Manager: James Lastinger
Upon completion of the activity authorized by this permit and any mitigation required by the permit,
sign this certification and return it to the following address:
US ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
RALEIGH REGULATORY FIELD OFFICE
3331 HERITAGE TRADE DR., SUITE 105
WAKE FOREST, NORTH CAROLINA 27587
Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of
Engineers representative. If you fail to comply with this permit you are subject to permit suspension,
modification, or revocation.
I hereby certify that the work authorized by the above referenced permit has been completed in
accordance with the terms and condition of the said permit, and required mitigation was completed in
accordance with the permit conditions.
Sig a re f Permittee
o? os-aaii
Date
Page 7 of 7