Loading...
HomeMy WebLinkAbout20110027 Ver 1_401 Application_20110111 T.E. ALLEN ENGINEERING, P.C. 20, 100 Post Office Box 103 Rosman, North Carolina 28772 Phone (828) 877-4883 Firm # C-1997 Fax (828) 877-4893 December 28, 2010 SUBJECT: Seawall Replacement at Barger Residence, 229 East Shore Drive, Lake Toxaway, Transylvania County, NC J P-1 p ,?. NC DWQ, 401/Wetlands Unit , - JAN 1 0 2019 1650 Mail Service Center Raleigh, NC 27699-1650 [ -WATERJAn WMWW STCRMNATFR WAPICk Dear DWQ: Enclosed, please find five (5) copies of the 401/404 application (PCN form). A check for the application review fee is also enclosed. The project site is a private residence on Lake Toxaway, Transylvania County, North Carolina. Lake Toxaway is a private lake and is classified as B; Trout. A trout buffer variance, if required, will be submitted under separate cover to the NCDENR - Division of Land Resources. If you have any questions or require any additional information, please do not hesitate ,citcom.net. to contact me at (828) 877-4883 or email teallenengg Sincerely, Te Allen, P.E. Consulting Engineer Enclosures Copy Furnish w/ attachment: 401 PERMITTING Mr. Kevin Barnett NCDENR Division of Water Quality 2090 US Hwy 70 Swannanoa, NC 28778 828-296-4500 1 copy of 401/404 PCN Application Form NC FISH & WILDLIFE PERMITTING NC Wildlife Res. Commission Old Fish Hatchery Attn: Mr. Dave McHenry 20830 Great Smoky Mtn. Expressway Waynesville, NC 28786 1 copy of 401/404 PCN Application Form US FISH & WILDLIFE PERMITTING U.S. Fish and Wildlife Service 1 copy of 401/404 PCN Application Form Asheville Field Office 160 Zillicoa Street Asheville, NC 28801 USACE PERMITTING Mr. Tyler Crumbley Asheville Regulatory Field Office US Army Corps of Engineers 151 Patton Ave, Room 208 Asheville, NC 28801-5006 1 copy of 401/404 PCN Application Form YJ 1 o?oF wArFq?c r P Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre-Construction Notification PCN Form A. Applicant Information 1. Processing A 1 a. Type(s) of approval sought from the Corps: t Section 404 Permit El Section 10 Permit -------- 1 b. Specify Nationwide Permit (NWP) number: 3 & 13 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ® Yes ? No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit ? 401 Water Quality Certification - Express ? Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ? Yes ® No For the record only for Corps Permit: ? Yes ® No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. ? Yes ® No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ? Yes ® No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ® No 2. Project Information 2a. Name of project: Seawall Replacement at Barger Residence 2b. County: Transylvania L9 Cd? 2c. Nearest municipality / town: Brevard 11 r . w' 2d. Subdivision name: Lake Toxaway N t '- 2e. NCDOT only, T.I.P. or state project bt?NR'WATER 3. Owner Information 3a. Name(s) on Recorded Deed: Charles G. & Jean C. Barger 3b. Deed Book and Page No. Book ?y Page ?-J 3c. Responsible Party (for LLC if applicable): 3d. Street address: 229 East Shore Drive 3 r 3e. City, state, zip: Lake Toxaway, NC 28747 hp?, P 3 306 3f. Telephone no.: 954-290-8983 3g. Fax no.: 3h. Email address: cgbarg@bellsouth.net Page 1 of 10 PCN Form - Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ? Agent ? Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: Page 2 of 10 PCN Form - Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 8522-22-0915-000 1 b. Site coordinates (in decimal degrees): Latitude: 35.123378 Longitude: - 82.93534 (DD.DDDDDD) (-DD.DDDDDD) 1 c. Property size: 0.501 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to Lake Toxaway proposed project: 2b. Water Quality Classification of nearest receiving water: B, Trout 2c. River basin: Savannah 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: This is an existing home site located in Toxaway Estates, a private residential development in western Transylvania County, NC. The lot borders Lake Toxaway which has a classification of B: Trout. The general land use is residential. 3b. List the total estimated acreage of all existing wetlands on the property: none 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: none 3d. Explain the purpose of the proposed project: Replace existing seawall. All work to be performed using hand labor & small equipment. 3e. Describe the overall project in detail, including the type of equipment to be used: Construct 103 LF of new stone seawall in front of, and tight against, existing seawall. Existing wall to remain in place. New wall will extend beyond the footprint of the existing wall. See attached sketches for specifications. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ? Yes ®No ? Unknown project (including all prior phases) in the past? Comments: 4b. If the Corps made the jurisdictional determination, what type ? Preliminary ? Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Name (if known): Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for ? Yes ® No ? Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ? Yes ® No 6b. If yes, explain. Page 3 of 10 PCN Form - Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ? Wetlands ? Streams - tributaries ? Buffers ® Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) Temporary T W1 ? PEI T ? Yes ? Corps ? No ? DWQ W2 ? PEI T ? Yes ? Corps ? No ? DWQ W3 ? P ? T ? Yes ? Corps ? No ? DWQ W4 ? P ? T ? Yes ? Corps ? No ? DWQ W5 ? P ? T ? Yes ? Corps ? No ? DWQ W6 ? P ? T ? Yes ? Corps ? No ? DWQ 2g. Total wetland impacts 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ - non-404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ? P ? T ? PER ? Corps ? INT ? DWQ S2 ? P ? T ? PER ? Corps ? INT ? DWQ S3 ? P ? T ? PER ? Corps ? INT ? DWQ S4 ? P ? T ? PER ? Corps ? INT ? DWQ S5 ? P ? T ? PER ? Corps ? INT ? DWQ S6 ? P ? T ? PER ? Corps ? INT ? DWQ 3h. Total stream and tributary impacts 3i. Comments: Page 4 of 10 PCN Form - Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number - (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 01 ® P ? T Lake Toxaway 103 LF of Stone Seawall with Lake 0.01 Acres Concrete Footer 02 ?P?T 03 ?P?T 04 ?P?T 4L Total open water impacts 0.01 Acres 4g. Comments: Work will be accomplished "in the dry" while the lake level is down. Excavation with small excavator with minimual incidental fall back. 5. Pond or Lake Construction If and or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 R Total 5g. Comments: 5h. Is a dam high hazard permit required? ? Yes ? No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: Page 5 of 10 PCN Form - Version 1.3 December 10, 2008 Version 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require mitigation, then you MUST fill out Section D of this form. 6a. ? Neuse ? Tar-Pamlico ? Other: Project is in which protected basin? ? Catawba ? Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number - Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact required. 61 ®P?T ?Yes ? No B2 ?P?T ?Yes ? No B3 ?P?T ?Yes ? No 6h. Total buffer impacts 6i. Comments: D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Work will be performed during a scheduled lake drawdown to minimize contact with surface waters. Excavation is the minimum amount necessary to install seawall. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. To minimize disturbance during construction, the work will be accomplished with the smallest mechanical equipment practicable. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for ? Yes ® No impacts to Waters of the U.S. or Waters of the State? 2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps ? Mitigation bank 2c. If yes, which mitigation option will be used for this El Payment to in-lieu fee program project? ? Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity Page 6 of 10 PCN Form - Version 1.3 December 10, 2008 Version 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ? Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ? Yes ? No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Should project exceed 10% or 100' in 1000', a trout buffer waiver will be sought from NCDENR - Div of Land Resources Page 7 of 10 PCN Form - Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified ? Yes ® No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ? Yes ? No Comments: 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? % 2b. Does this project require a Stormwater Management Plan? ? Yes ® No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: ? Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ? DWQ Stormwater Program ? DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? ? Phase II 3b. Which of the following locally-implemented stormwater management programs ? NSW ? USMP apply (check all that apply): ? Water Supply Watershed ? Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No attached? 4. DWQ Stormwater Program Review ? Coastal counties ? HQW 4a. Which of the following state-implemented stormwater management programs apply ? ORW (check all that apply): ? Session Law 2006-246 ? Other: 4b. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No 5b. Have all of the 401 Unit submittal requirements been met? ? Yes ? No Page 8 of 10 PCN Form - Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ? Yes ® No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ? Yes ? No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ? Yes ? No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes ® No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after-the-fact permit application? ? Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N.A. Page 9 of 10 PCN Form - Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ? Yes ® No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ? Yes ® No impacts? ? Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ? Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ? Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ? Yes ® No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? r Charles G. Barger Jean C. Barger Applicant/Agent's Signature Date Applicant/Agent's Printed Name (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 10 of 10 PCN Form - Version 1.3 December 10. 2008 Version 'Transylvania County, NC -- Printable Map Transylvania County, NC Page 1 of 2 LAY-& .'? 1280 212 t `? / X4(1 ?r d ?? Li U 92 ?%rf fr f`^?, 1 v ? Y(?? v r Lj ite Toxaway 74 1?r?C j' 2P U915 224 r? e ?! ? M5$ '/ i ! 23U ?- R - 7BA, Z F12)'&34 75 F 1112 S -56A, °i 2801 92,21 23.0 c? y,?,`,n su al DISCLAIMER: The information contained on this page is NOT to be construed or used as a "legal description". Map informa believed to be accurate but accuracy is not guaranteed. 103 LF of New Stone Seawall w/ Concrete Footer - Barger Residence Parcels Pin: 8522-22-0915-000 Acres: 0.501 Zoning: Owner: Heated Sq.Ft.: 3877 Land Value: $1,100,000 BARGER CHARLES G & JEAN C Township: 8 Bldg Value: $213,260 3031 NE 43RD ST Deed Book: 0 Year Built: 1979 LIGHTHOUSE POINT,FL 33064 Deed Page: 0 XFOB Value: $7,830 Sale Date: 0 Sale Inst: Assessed Value: $1,321,090 Sale Price: $0 Sale Imp: Legal Address: B A L074 LAKE TOXAWAY Other Attributes at point 822001, 522969 Zoning: None Map Grid: Tile Name: 852203 http://arcims.webgis.net/nc/transylvania/printable2.asp 12/28/2010 Q. ? -F?ry 0 :T {a :p0 o - OUta ;i(,a>•N?, O 7 to (D ac»rtaor° X oX > o O UN ° cD F`D 3 0 0< m t< rtE. ?. - < -0 n CD O C O - X 7. O m O C ?. 0) m o 3 m 7 (A a,o3 p03c03om c= ooUV°<<0" 7-0 -0 m m O ti. fi rt U C O O OF_. rt1< 7 Om ,.? 7 7 7 rt St0 ° O a j (D 0 0 Q• - j F rt 0 i0 -.0 m ?un '0 a m O CD (D M O a a 0 0 7 a° ?m 0 CD m n (a 0< o 7 ?a _ rt 0 N 7 0 F S CD a O. 7 0 0 n N m p 0 -0 8- F N f a O'-OOw x0 ?O `° a'-0 o m ° 3 rt7 art ? O 7 SO M O G O m m (D m -0 rt O 7 C c C (rtD 7 rt a l Q. oo (Dm p 7 u, a c 3 ? 0 C p SM 3 a 0 0 ?lk U 00 ? O M 7 O p' O X 3 ° ? o v E`<Z o +o ((DD? S? (D «m 0 (a0NZ 0° (Da0 7 ? 7' C p rn3 m o D _. 0 C rt n (D o M n N rt l m moz x Dm 0 ra I r - M Zc QQ N Z(D 0 n N Z0v (D rn - m°5 O Z-JOtp aC) nF =r 7 n '0 app :3 a 7 C 0 O 7 CL C LO-0 -0 < a W CD n 0 0 n O m S O -0 W S N. to ° C N , O 7 .-. 2 0 CD t0 0 0 rt ° ra r D 0 O1 S S N 0° C S: N- rt m ° C ° a(n -c D U O - 70 SN S toao??om(D0 rt S Z ° ?N O 0 3 v) 0 F,0 +mD30 p:0 O 0 0 0 CD 0 O C rt D Q 0 0 Q rt 7 7 0 .-ti• 0 0 O ? Z :3 CD a w m rtr :3 ::r 0 y 0 T fA 7 `< ° ° 0 F (n ° U - p. 0 S 0 m U 7 7 O p U3 m Q a t0 m p 0 oO7F art 7 f o0mv,sa?F 7° 0 m m O O N O 0 m CL < O 0 1 Q av°to°U 07 N7 70 rt a t ? p O O 0? rt -0 St7p7p S3 O 0 m- rt U (D O S S° O (D ET Z) Q. l (D n t0 X, 0 0 t0 0 00 CD fDo 00 r' ° , F 3 CD o'V X O 7 S a X 7°m t< U3 rt < -w -:E 0 - - :T W O N ?tea C ° O 7 .. ° ° 5 t0 0 O D U ° i° 0) 0 (D ct Lt - CD O En 0 W :3 m : rt 7 0 0 m S ?. CD °ro 23tn O m aO -c p m svi0-'v37 m ommom a O N _ rt F V o O a S° rt m 7 N 7 (D O m tp =7t0 0 =r CD = < 0 j n ,O+aOp O V tO m m l - rt (D m rt ? '? n U i; O ..= 7 O -- m rt N m 0 l O 7 N m O 0 0 :3 CD O 0 N m °<070.00 7 o°oa-op 2.37o5C?vo 0 0 Ort 0 N 7 - rt c > O o =r 0 -4 n Z 0 m -O .«O N O -a' ? O 7 mom -0 -0'0 N O C rtc m 0 63 -:T n 'O O 7 O 0 (D m o O 0. CD o (lD. (n m 0 n.rt0 O 0 '< rt M m F O S = -a - C!: (O N°°(D 3 cl o 0 7c ?c <^m v-, 7 p a m v 0 m _m a art r7•. rt'< --I O ((D 0-0 r0+• .Zl < O D 0-00 T 3 c < N 0 ° m 7 l m 7 7 O n a C) o 0 3 s7 Z DO E fi_ 0 0 m m pa o° 3 s° 3 o a 0 UD 0 m m S to r O °0 0 a?°-O F C-j BCD M-0?CD O 0 ' E0- 3 N ? t0 n _ 0 O 7r 0 a C O F ? 7 U3 7. O K O 0 m l M 7 7 N art 7 0 a-0 CD a? c 7 ' 0 C -0000:3w-nw a 7 x p 3 =r (<D (D fi CO 0 (? C rt 0 _ 7 7 - rt m m 7 0 u' ?3 0 0.0 0 m O (D m •+ rt -ti -0 w Er Cn m C C (D 00 DTO ?a3 to Z?N p QasW CD yy 0 a rt0 0 o N O m rt j' s -? m O O Cr N O C-0-U" O p p -^7 0 m m 0 :30 CA m 7(aD 0'-,3• 00 3 mtoU(D? 7 7.0 C j F 00 D -.37 0 0 7 ,? c 7 t0 t0 7 (CD N 'c °-p o ° O F c 0 o-0 O O O w S r! 3 7 FF* 0n? 0 0 0 ° M :3 :3 rn 0 :3.0 O a 3 .7 O O N O rt 0 0 ? O c= l 0 0 a 0 0 O O 1 0(n(n° n o u n S S 7 p o I to (n g m 7 p 7 0° LO 0 to 0 p 7 l (D O m 0 .+ F O S O J U N p p p CD 0 --a n T m 0 0.0 U Oka -0 c j 0 0 M a N CD n00. 0 0 -0 S N O _•a OU M 0 0 7 7.0 o c O m ° - 3 0 7 30ma--• ? 0 rD m rt 0 0 7 CD n a CD -0 M 7 m w 2.0 rt - N 'a O 0 O l O O 0 rt r-1-0 >M 0 0 O O, N O x- x to fD?o3a p p -0 OOCD D x O c O r! °Ov° 00--d- 0 N rtfiO co o ? T7 ?O c Zo m a0rna? t'j 7 0 O (p U CD r, .7+ 0 1 m 0 (D F j T n CD V 0 0 m rt 0 N 7 U3 - M 0 °O? ?O0 0'O C P20 S -., CD O Da p O m ° = O 3 n Cn 7 cn0?m30° O 0 m rt ?rtm '1O(??<F CL 0 CD rt rt=aZ-0 OS c0O(0Op Z o m cnm o o m 3 = 6. D (D 7 3 rt rt U 0 7 7 O7c0 p Z? O 0 -0-0 7 F - b p C O O S p 7 Z m m rta0 ?3 3 0 CD t p S (D 07 7 rc+z N m r 0 ° F'r 7C < m N O rt m 00 a0 = O F V 0 0- 7 a 0 W O 0 7 C ,+ • 0 0 a 7-0 (.n S m O n° 0 o asm rtc < a (D .Z'7 7 p 'D t0 3 N S D n -0 = m 0 _{ U C p 7 0 7- p O - m _ m rt (D -p m rt 7 O O :3(D 0 7 0 S j O m O O 5. 0 D o c° m C) 0 afirt 7 (D .?+rt0 0 O? O j 0-0 K N M N (.0 0 3 N 0 C C a 7 0 rt° 7 c rt O m 7 7 O O a ? U 7 0 - p° ? p CD Q. 2. 7 n O o 7 ° N to O . O 1 :2. O (n (D to 7 O O O 7 0 0 7 t (D m 0(a (d to n to °o 0c00° °-(a00 rtCL:3 ° , l n 1 1 0 rt ?• S O rt ?< (!1 0 M m 0 0 <. uirt n 7 a-i (D O m m 3 O M Sa O m N SS m S _m (D Q w rtj to -0 S 7 t0 j m < rta0 O _ _ O m - O 7 O - rt m O •? O C 0 co Q. CO 0 Z) W 0 0 C W m O O 0 rt m' n- a rt CL 0 = ° O0 (C O 7 0 0 0 a. 7 m CD O - . W O O 0 7 m0 7 T w o a 0 rt a E m Q m 7 t0 O C O -0 (D 3 0 t (D ° m n .+ 0 7 S 0 (D O 3.0 +0 FO 0. O 2 0 ° a (D O y 0- rt (lp m rt c F -3 7 F p= m s 7c0 m =r w m 00 O. w 00 0_ p N l m l < F 0 -1 C (? rt = F m a? 0 C ESN m 7 O. D.D?.nrt m m m 0 3 aj ° o o> -W m rt O U < N to O D .+ 0 + 0 0 . r 0 0 0 ( D < c m a p° O (°n „'~ - 1 n a n p t0 1 a N ? 7 O 0 (D N (D a 0 0 rt a 3 rt 1 to 0 S o - O !d 3 J 7 m (D O CD 0 O a a J N ° m 5 0 M z m Z7 D r z O m N 4 Q ^oo T J Fut FF= 5,07 V l%fl Oo V? D 00 0? D 5701 . K9 Preliminary - Notl for Construction ` SEAWALL REPLACEMENT at T.E. ALLEN ENGINEERING PC Prepared for: ? i - ? N - BARGER RESIDENCE CONSULTING ENGINEERS # C-1997 FIRM Charles & Jean Barger 3031 NE 43rd St Li hth P i t FL 3306 0 229 East Shore Dr. PO BOX 103 g ouse o n , 954-290-8983 n 8 s BA L074 ROSMAN, NORTH CAROLINA 28772 (828) 877-4883 cgbargObellsouth.net Lake TOXaWa NC Y FAX (828) 877-4893 email : tealleneng Ocitcom.net cu m o 0 o- c o ? w m (_4 z o ? ? r V) o -i 0 X' S 0 CD O CD c p CD a -a 0 =r i O Nt Q 0 ? aye o C O Gl al (D y' 0 0 -i N < 3 rt rt 3 < (n p O" r- n D -1 S n °- 7 rt 0 S 0 0 C M00"0000 rtcp O p 3 ,3,,, `< < C CD -0 N Ort N O S N N Z 7 rt 7 a EF3 , 0i0 =r - N `D 7 n 00 ° 0 0 S p 7 - 00 Z N rt 7 0 a m S a n U o a' 7 Z? O - (D o a O _ C7rt rt7 C rt3 p N co 0 co CD S0 7 rtN 3 al O Q N p p p a S rt p 3 -0 c =r X'a * 3o-pc-0 Ort (D 7 5. 5 p 0 3 C p N <N 03,c o o n 0 o p °-3 N p w '0N -~'a m F 0 3? ?•? CD CD S (D O 0 0 3. (cD 3 n C`< 7 cn CL-0 -00 0 N aS Oa) (D a CD '2. w a ,craK - a0 N F Ow 0 aim *Q? (D 0 rtw CL C ?3 fiS ='j 0 0 rtN ?- o a- m w ,-Z n ? CD (n rt 0 U N F C N j CD p 0 '" N a 0 0 al of .+ 3 `- 3 3 f • a) N O' S (n N j' 0 - p c F an-wa'•--pr,*v (n vQp - r- 0-0 - _? rt 7 3 0 V' N al to F 0 p p N C C al 0 -' p -1, n S 0 Q? O 7 C rtrtartN , :3 rtn _ '"; 3 Cam 0 F O 3 S (D 3 0 j . a (D 7 N 3< ;v N N rn O co D 7c al O p Cn p ?4? -1 (D O a a) 7 (p ,-(p =+; a) 3 Si•. r"' O rt a p (Q 0 a < N p N 3 rtC C O 7 N cD 3_ CD c !=a CD 0 3 rtcnf m m ? c a° "o Cn ° y 3 F n+ 7 n. N O c) =r- °r+ to atp N N ? (n " C? -` Ort 0 0 3 C ,<-:i n.<-+n - 0 0 S_ 3-0 al vl QO = W o ate.-a,<o_<?w3oOOO-ac?om Q3 ° "" ry p n F rt 3' to (p 5 0 a X a K l rt C 7' n :r D 0 0 S..n u1 N S 0 m •cn ° o rtN 0 CD c' ?n 7 7 3 0- M a i O co 0 0" 0 0 C O rt rt al i° D S Q C 0 3 "- <vD -c o? C p -0 =r a) 0 c ,C... C 0 0 p f ,co (D <3 rtp m S0 7 .' n, ?, a 0 n to to ° 3 ? N 0 N '* l0 ,C p n 0 K CO) rt S M N Cr rt p .O+ ;0 0 3 O m o' N N N (pn o (p rn rtaa :T CL :3 ° m o C C) m 7 (°A --N.'. 7 m o 0 Q 0 N p 0 u/ T' n. C .? S 7 N (a - o aN.< o c 0 N 7 »:3 0 0 3 c v? ° co 10 S F ° N 3 0° t? 0 7 K O a rONi d F p S 3; N 3 O rtp 3 O-0 NO /D a:3 w " rt O 0 _. O i c 7r 0. 1 --1 N C W .x+rt? p 3 < (0 o 3 V) rt0 QrtD 7 3 al S < al . N -- =' S rtp S c (D rt 3 ry (D rtN-0 a7 QC N N S p I N jaw (D 0 N p p_ O 0 N a) O" N 3 0 F< a Z Z rt p 3 0 C 7 0-0 m a rtF N O 0 rt S(D -? ul rt w l w S(D N• ac- a 0 p N 00 CD C 0 =r Q al a1 3° O S 0 rt 0 c a .+ N 0 .3-F 7 Z J n 3 al °- i S a 7 0< S 0 ry 0 h N 00 C rt a A D rt 7 7 al C- O N N C 3 c u1 Q. I N CD O C a N ?` -• m C <(0 CD o to Z p p. 0 7 Q'K ,.- rt 7' F N 3 0 p c o o 0 -.? I (D O C O c y>. =rai S _ Up 3 3 l <,n0 c S rt p al a cr 6: 0- a (D O < 0 (p CL p O w V) 0 N ,? 3 3 p co N = w CD y O K 3 N n S 0 rt rt (II 3 ,+ N S (O 7 S 3. a) p J S N p O %< CD Preliminary - Not for Construction SEAWALL REPLACEMENT at T.E. ALLEN ENGINEERING PC Prepared for: a ` / N fc - BARGER RESIDENCE CONSULTING ENGINEERS • FIRM C-1997 Charles & Jean Burger 3031 NE 43rd St i N N ? Q 229 East Shore Dr. PO BOX 103 Lighthouse Point, FL 3306 954-290-8983 g o o = BA L074 ROSMAN, NORTH CAROLINA 28772 (828) 877_4683 cgbarg®bellsouth.net Lake Toxawa NC Y, FAX (828) 877-4893 email : tealleneng Ocitcom.net Z M o D o (n D M r D M rD_ 1 =D ?Z Z 0 O-1 6- 0 -n p O O z nm nc `A ° z z oaQo X0 No 'O - o z o F O m CD ? N ? W O o 7 ?• x co O 0- • CL ^? HEIGHT VARIES, zhm 4 FT. MAX rtao 3 F :3 0 0 ? M CA ° _ (D M \\??\\ O • FN N M (D ooh (D s L rt-'p 00 3Co (m COD- 0?a ° ° rt a ? X° 3 3 al 7" 7 7 • 0 5•0 O -'° ° 0 N :3 0 , o 0-0 ° o a J f - p 0 I o?_a CO 7 K O al O C 0 m 7 Q. Q. D ° °_ to N 0;U ? -• 7 O ° a n ° o p c 7 o ? OF 7(3 X °Oo F ° ,or: 3 7 rn <. a O s c :3 m 7 7 3 z 3 a 3 a0 rn O (p 0 C V on 3 Preliminary - Not for Construction 7 UD N 0 7 (D p 0 m 3 p z 0 7 I f O CD 7 7 ° CD Q_ (D c 7 O 7' N a La N 0 rt xx 0 0 Q f F O-(OO N (n0-- W c _0f CO-N) (° N ?p so ?3 ° 05- a m m =0 ° -0 Qa. 0 c = x- -0 -N,. N G7 3 N c a° X' 0 ? :; p° D N7 N-?.0 0-a- 7 Q O rt,N-.C U) O7m N -7 - N rt f2D to O+ 3 - ?0 3o m a -U 8 v) -U K -f o ? s0 Q3 am° rt0o ? ° ,3 ;3 (n O0cn on ?; n ° O ccnnw ?co N N m 0? z° M _0 ?ply 3 (ncDN.a3 CL -0 - CO X a U) = 7 = rt N N I art 7 p 0 O> N 0-0 Q. a? fn n? S_ 57 5 'o n N 0 7 al :T Q p M w a 7 0 to `L0 0 X0 a0 aa(A - 0 ?Nrt0 C -.,a O?? 0.0 0 ( 0? o 3 f 0 ° ° a D :3 O n N. = N N rt M 0 7 (D - 0 fn 7 Q. 7 C 7 N° ° O N 0 a O n ° Q j (D n m 0 7 NN N Q. O p 0 °;-m ° `j a00 0. a?00 N o c?o wj o Cc) rt _ 0 C F 0 (°n3 ?cnVg0 m 5.5 o 0 7 0 as 0 w 0 f'1 0 c? N N o. - ) ? O 0 to S O- 0 0 (D G) O o' S n 7 0 N O O J ?O =r rtrt =3 0 aO O D7N 37 00 n a? (rtD' -(p a1 N 7 7 O (70 a N (OD N ? a N ° .+ .O•? 00 3 v 0 3 O) O Cn 1 j 0? 0? p? m 3 m C = o ° N O C O ` m O w w m 'p - r r to 7 to C m t 0 D OO mWO m Co 0, 0°m rt -I 3 - m N z O 7 7 j Q O W Ncn t O O 3 0 0 I D rt r;r m o 3CJNw I 0.C 7 ?0 0 f N 0.7 00 o c (Da m c 0 ?? O ° m 7 ? a N? 50 O = 0 :r ? ? f;s aaD p '° 7 0 c 7 0 (/) 7' °< N O l O' 7 0 0 7 am a :3. N = Q ° X 0 0 0° O m c _ c 3 a c ?' cr c 7 7 O a (D ° fD ° (D 7 '_o n 7 a' 0 (7 o r o ° mv to 3 Notoc rtN a 7. Z7 c ° 0 r+v7c3 ° M o C O ?. 0 o N + O to O< N X_ f N N Q' Cr ° M oa(D O dO C Q. K ° O' O rt N °- O =r N j of 7 a c n 5 ° c 0 m y C 3= (T 7 N° C (D p a p. VI C (D ° 7 0 2 N o ° O N a C N 7 -0 3 < 0 0 (ten ° o - s? D 3 r^p ?`< 3 1 K o "w -0 x- _LQ w 1 -to co mo 0 - wto U) < CD ° o c < N -0 rte (7D p 'o N (7D o - O) ( p < '7 D N I'('I - 7' N P17' 0 S EM * N Ln h X- ? '? '-`. f rW 'rt ='• f S O Z - >=. (0 0 ° 3 0 5 N ' o -o 'o 0 Z O m Q z z - m o K - = 7 rt r rt ,7.. 7 to m w ° 0 X 0 ±, m a 'a O o V Z 0 S ° co ° ° o%< o ° ° z to 'c o ?0 ° ?0 ° -? o Q. m, f° p 0 m o c c v Z o D .o 7 D f 0 D m ( Z 0 0 C)o 3- 3 m o 3 0 - X p =0 ? ? f 070 ? f so z l co z -o rom _ F - co .7. 17CT -•to 7- ° C -Z) M M Z F 0 f Z Z_O ? 30 300 D . - 07 3 3 m r c . rt 0 7 fA ° 0 n c 0 to F 1. - p C 7 z 3 M 0 C 7 3 CD Z r- o f to 7 - -( 0 0 O ° .« 7 (D (D .Z O a CD _. CD CD =3 N * a - (D V a 14 0 v (A v 7"o o m oa a m° C (D ° ° = a° m o a X ° M c i 7 (D C 0 < ' to S N D o °'p O 7 7 7 D N zr 7 7 7 N? 0 N N N O a N rt o (D a o (D 7 D 0 a ° - O M N SEAWALL REPLACEMENT at T.E. ALLEN ENGINEERING PC Prepared for: ^ l 1 H 4 BARGER RESIDENCE CONSULTING ENGINEERS • FlRA1 # C-1997 Charles & Jean Barger 3031 NE 43rd St i h h P i t FL 3306 I 4 0 229 East Shore Dr. ?X 103 g n , L t ouse o 954-290-89e3 W < g . s BA L074 ROSMAN, NORTH CAROLINA 28772 (828) 877-4883 cgbarg0bellsouth.net Lake Toxawa , NC Y (828) 93 FAX email : tealleneng leneng Ocitcom.net