Loading...
HomeMy WebLinkAbout20100510 Ver 2_Stormwater Info_20110105Chatham County Law Enforcement Center t 1 1 n 1 Parking Lot Modifications and Expansion Stormwater Calculatio November 3, 2008 June 24, 2010 (Revised) January 4, 2011 (Revised) Prepared For: Chatham County 12 East Street P.O. Box 1809 Pittsboro, NC 27312 ' ,n N - 5 2011 rJ ?:. . Prepared by: Rivers and Associates, Inc. 6131 Falls of Neuse Road, Suite 300 Raleigh, NC 27609 (919) 848-3347 Rivers & Associates Inc. Job #2008107 4I r Permit Number: (to be proi)ided by DWQ) Drainage Area Number: Bioretention Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important operation and maintenance procedures: - Immediately after the bioretention cell is established, the plants will be watered twice weekly if needed until the plants become established (commonly six weeks). - Snow, mulch or any other material will NEVER be piled on the surface of the bioretention cell. - Heavy equipment will NEVER be driven over the bioretention cell. - Special care will be taken to prevent sediment from entering the bioretention cell. - Once a year, a soil test of the soil media will be conducted. After the bioretention cell is established, I will inspect it once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problems: How I will remediate the problem: The entire BMP Trash/debris is resent. Remove the trash/debris. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to bioretention cell erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. The inlet device: pipe, The pipe is clogged (if Unclog the pipe. Dispose of the stone verge or swale applicable). sediment off-site. The pipe is cracked or Replace the pipe, otherwise damaged (if applicable). Erosion is occurring in the Regrade the swale if necessary to swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Stone verge is clogged or Remove sediment and clogged covered in sediment (if stone and replace with clean stone. applicable). Form SW40 I -Bioretention 0&M-Rev.3 Page 1 of 4 BMP element: Potential problems: How I will remediate the problem: The pretreatment area Flow is bypassing Regrade if necessary to route all pretreatment area and/or flow to the pretreatment area. flies have formed. Restabilize the area after grading. Sediment has accumulated to Search for the source of the a depth greater than three sediment and remedy the problem if inches. possible. Remove the sediment and restabilize the pretreatment area. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. The bioretention cell: Best professional practices Prune according to best professional vegetation show that pruning is needed practices. to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Tree stakes/wires are present Remove tree stake/ wires (which six months after planting. can kill the tree if not removed). The bioretention cell: Mulch is breaking down or Spot mulch if there are only random soils and mulch has floated away. void areas. Replace whole mulch layer if necessary. Remove the remaining much and replace with triple shredded hard wood mulch at a maximum depth of three inches. Soils and/or mulch are Determine the extent of the clogging clogged with sediment. - remove and replace either just the top layers or the entire media as needed. Dispose of the spoil in an appropriate off-site location. Use triple shredded hard wood mulch at a maximum depth of three inches. Search for the source of the sediment and remedy the problem if possible. An arunual soil test shows that Dolomitic lime shall be applied as pH has dropped or heavy recommended per the soil test and metals have accumulated in toxic soils shall be removed, the soil media. disposed of properly and replaced with new planting media. Form SW401-Bioretention O&M-Rev.3 Page 2 of 4 BMP element: Potential problems: How 1 will remediate the problem: The underdrain system Clogging has occurred. Wash out the underdrai n system. (i£ applicable) The drop inlet Clogging has occurred. Clean out the drop inlet. Dispose of the sediment off-site. The drop inlet is damaged Repair or replace the drop inlet. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. Form SW401-Bioretention O&M-Rev.3 Page 3 of 4 Permit Number: (to be provided by DWO) I acknowledge and agree by my signature below that I am responsible for the perfonnance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Chatham County Law Enforcement Center Parking Lot Mod. & Expansion BMP drainage area number:I Print name: ?) V {? ?i 4A b yoe' Title: ` Address: ?? ?ccsfc?e P'0.6 D X I? Pi?'?,?, ?,? I?C ??l Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. (A+e-\ , a Notary Public for the State of loY l law ?t ??i; , County of C"+?\am , do hereby certify that ??tf1?y1Gln? ?i?Or VV Ak personally appeared before me this day oft2p f! t' M X 10 , and acknowledge the due execution of the forgoing bioretention maintenance requirements. Witness my hand and official seal, ELIZA67 A-1 I'1 NOTARY PUBLIC ? Chatham County, North_ Carolina, t9y Commission Expires SEAL My commission expiress•1` a01 Form SW401-Bioretention I&M-Rev. 2 Page 4 of 4 Date: ?a1_I S ?!0 t ? Narratives i i EROSION AND SEDIMENT CONTROL NARRATIVE FOR CHATHAM COUNTY LAW ENFORCEMENT CENTER ' PARKING LOT MODIFICATIONS AND EXPANSION PITTSBORO, NORTH CAROLINA August 21, 2008 PROJECT DESCRIPTION: Chatham County Law Enforcement Center, Parking Lot Modifications and Expansion consists of the removal of two existing buildings totaling 4,128 square feet on the southwest corner of the site and the removal of 9,948 square feet of paving and 1,180 linear feet of curb and gutter. New construction will include 29,720 square feet of new pavement, 25,027 square feet of pavement overlay and 2,557 linear feet of curb. Storm water management will consist of a new stormwater collection system on the northern portion of the site and modifications to the collection system on the southerly portion of the site. Stormwater BMP's will consist of a 4,110 square foot bio-retention basin. Parking will increase from 84 parking spaces to 128 parking spaces. PROJECT SITE: The project is located in Chatham County in the Town of Pittsboro on the Southeasterly corner of the intersection of West Road (NC Highway 64) and McClenahan Street. The site is dominated by rolling terrain. The soils on the site consist primarily of Georgeville-Urban land complex, 2 to 10 percent slopes a Hydrologic Group B soil. The site is bounded by West Road (NC Highway 64) on the North, McClenahan Street on the West a County park and a small stream to the South and a blue line stream to the East. The Northern portion of the existing site drains via sheet flow to the stream on the Eastern boundary. The Southern portion of the existing site drains via a pipe system and sheet flow to the stream on the Southern. Copies of soil information and a copy of the USGS Quadrangle Map are attached. WATER QUALITY: This site is within a WS-N NSW protected watershed with local jurisdictional oversight by the town of Pittsboro. This site drains to the Haw River via Roberson Creek. The project will not impact any streams or riparian buffers and will not require Section 401 Certification though NCDENR. We have proposed a bio-retention basin for the northern drainage area and utilization and reconfiguration of the existing piping system as well as sheet flow to the southern stream for the southern drainage area. EROSION CONTROL: Sedimentation and erosion control for this project will require the installation and maintenance of a variety of device types including diversion and settling measures. A skimmer basin has been proposed for the Northern drainage area and has been designed in accordance with current state regulations. Both streams will be protected with silt fence with silt fence outlets to restrict sediment from entering the stream buffers. All storm inlets will be protected to restrict sediment from entering the storm system. All storm outlets will be protected with permanent velocity dissipaters. Calculations and design related to basin sizing are attached. Stormwater Management Narrative This project lies within a Watershed Overlay District and must meet the requirements as outlined in section 5.5 of the current Zoning Ordinance. This project is an expansion of ' use of an existing development as defined in Section 5.5.7.c. Section 5.5.7.c states that "the built upon area of the existing development is not required to be included in the density calculation". Removing the existing built upon area from the density calculations yields a density of 16.2°/x. A density of 16.2% is below the permitted 24% as required in section 5.5.2.b. Therefore, this project does not qualify as a High Density Development ' which would require engineered stormwater controls to control the first inch of rainfall (Section 5.5.10.a) or wet detention pond stormwater controls (Section 5.5.1 l.c). ' Stormwater management on the Northern portion of the site will be accomplished with a bio-retention basin BMP to treat the northern parking. The drainage on the southern portion of the site will be conveyed to the southern drainage way via existing drainage ' structures and sheet flow through the buffer. Where possible stormwater from existing impervious areas that drained to the Southern drainage way have been re-routed to the proposed bio-retention basin. The treatment of the existing impervious area on the Northern portion of the site is to offset the additional impervious area added to the Southern portion that will flow to the Southern drainage way. Bio-retention Basin: The Bio-retention basin has been sized in accordance with the current "North Carolina ' Division of Water Quality - Stormwater Best Management Practices Manual" and was designed with enough storage to provide active storage control per Section 3.4. The basin drainage area is 2.33 acres. The basin impervious area is 0.93 acres Future impervious area 0.60 acres Percent impervious area of the basin is 40% The runoff coefficient of the basin per section 3.4 is 0.4 The required treatment volume per section 3.4 is 3,461 ft3 The proposed basin volume is 3,725 ft3 which is 108% of the required volume. The required treatment surface area with a V depth of plants per section 3.4 is 3,461 ft2 The proposed basin treatment area is 4,110 ft2 which is 119% of the required area. Impervious treatment areas: Existing Impervious area 1.45 ac Proposed impervious area 2.12 ac Increase in impervious area 0.67 ac Impervious area treated: Bio-retention 0.93 ac 139% of new impervious area treated Rivers Page 1 1/5/2011 Chatham LEC Stormwater Peak Flow Summary Storm Event Pre Peak CFS Post Peak CFS Percent Reduction 1 6.58 6.53 1 2 10.68 9.54 11 5 17.81 17.37 2 10 24.24 22.19 8 100 52.31 40.86 22 MAChatham County\2008107 - LEC\ADMIN\K - Design Data\Peak Summary currentAs ? Deeds i 0391 0301 ., i? i STATE OF NORTH CAROLINA COUNTY OF CHATHAM 0 4 Book 391 Page 301 THIS DEED, made this the 10th day,of September, 1975 by the CHATHAM COUNTY BOARD OF EDUCATION, a body corporate under the laws of the State of North Carolina, party of the first part, to CHATHAM COUNTY, a North Carolina Municipal Corporation, P, 0, Box 12f , Pittsboro, North Carolina 27312, party of the second part; W I T N E S S E T H: THAT WHEREAS, Chatham County Board of Commissionex desires to acquire the property hereinafter described, and the Chatham County Board of Education agreed to transfer said property; and whereas, the Board of Education in Pittsboro, Nortr Carolina by resolution duly adopted at a meeting held on June 2, 1975 the Board voted to so transfer said land. NOW, THEREFORE, in consideration of the premises and for the sum of ONE DOLLAR ($1.00) to it in hand paid by the said party of the second part, receipt of which is hereby acknowledged, the said party of the first part does bargain, sell and convey unto the said party of the second part, its successors and assigns, all that certain tract or parcel of land situate in Center Township, Chatham County, North Carolina, and more particularly described and defined as follows, to-wit: BEGINNING at a point in the intersection of Harmon Street and U. S. Highway 64 West and running thence along a line 15 feet from the centerline of said Harmon Street South 0 degrees 40 minutes West 388 feet to a point; thence South 84 degrees 53 minutes-East 560 feet to a point in the center of Hill Creek; thence along the center of said creek the following traverse distance North 3 degrees 17 minutes West 391 feet to a point; thence North 84 degrees 53 minutes West 533 feet to the point or place of BEGINNING, containing 4,85 acres, more or less according to a map entitled "Old Elementary School" prepared by Robert J. Ayers, Surveyor, dated August 7, 1975, reference to which is hereby made for a more particular description. TO HAVE AND TO HOLD the aforesaid parcel of land together with all the rights, privileges and appurtenances thereunto belonging unto it, the said party of the second part, its successors and assigns, in fee simple absolute forever. IN WITNESS WHEREOF, the said Chatham County Board of Education has caused this deed to be signed in its name by itsI , Chairman and its official seal to be hereto affixed, and atteste& by the Superintendent of Chatham County Schools who is Ex Officio Secretary to the Board, this the day and year first above written( CHATH?A_MQ COUNTY BOARD OF EDUCATION ;Ii ATT9" T. w BY : C [aa i rman yer nLenaenr o= unatnam X o u n Schools ?''Ex Officio Secretary to the Board 0391 0302 It It ?t• Book 391 Page 302 STATE OF NORTH CAROLINA j COUNTY OF CHATHAM I? & cDsurc? a Notary Public of Chatham County, North Carolina, do hereby certify that Perry Harrison, County Superintendent of Schools of Chatham County I and Ex Officio Secretary to the Chatham County Board of Education, personally came before me this day and acknowledged that he is Secretary of Chatham County Board of Education,.a body corporate, and that by authority duly given and as the act of the Chatham County Board of Education, the foregoing deed was signed in its name by Jack Wilkie, Chairman of the Chatham County Board of i Education, sealed with its corporate seal, and attested by himsel as its Secretary. Witness my hand and official seal, this the.... day of ? w 1975. Oj Cc 4 Notary ?.;. '.: - t ;•,v??;r,'."'' ??; My Commission Expires : My Oommi:sionExp1resJune 9, .197.6 NORTH CAROLINA CHATHAM COUNTY The foregoing certificate of Ethel B. Strowd a Notary Public is certified to be correct. This instrument was presented for registration at10:55 o'clock a. M. on October 20, 1975 and recorded in BooF391 Page 301 LEMUEL R. JOHNSON Register of Deeds BY: Deputy . k F i 4 1 t. STATE OF NORTH CAROLINA COUNTY OF CHATHAM WARRANTY DEED 0300.1 600K 514rA F163 THIS DEED, made this day of July, 1987, by and bet- weep the CHATHAM COUNTY BOARD OF EDUCATION, hereinafter referred to as Grantors and the COUNTY OF CHATHAM, a body politic and corporate of the State of North Carolina, 'hereinafter referred to as Grantees W I T N E S S E T H: That Grantor, for a valuable consideration paid by the Grantee, the receipt and sufficiency of which is hereby acknowledged, has bargained and sold and by these presents does grant, bargain, sell and convey unto Grantee in fee simple, all of its right, title and interest in and to all of that certain tract or parcel of land located in Center Township, Chatham County, North Carolina, and more par- ticularly described as follows: BEGINNING at a set iron pipe in the eastern right of way line of McClennahan Street the southwest corner of Lot Number 1 according to the plat entitled "Property of Chatham County" recorded in Plat Book 38, Page 13 of the Chatham County Registry, and running thence along the line of Chatham County South 84 degrees 53 minutes 00 seconds East 74.18 feet to a set iron pipe, the north- west corner of Lot 2 according to the plat hereinabove referred to; thence South 05 degrees 07 minutes West 75.97 feet to a set iron pipe in the northern line of the property leased to the Town of Pittaboros thence along the Town of Pittaboro's line about North 87 degrees 07 minutes 53 seconds West approximately 66 feet to a point in the eastern right of way line of McClennahan Streets thence along the eastern right of way line of said street about North 00 degrees 58 minu- tes East approximately 78 feet to the point or place of BEGINNING and being all of that small parcel of land denominated as Chatham County Board of Education on the plat hereinabove referred to, reference to which is hereby made for a more particular description. As partial consideration for this conveyance, Grantee hereby expressly warrants and represents to Grantor that this property is intended to be combined with Grantee's existing lot or parcel of land conveyed by deed recorded in Book 391, Page 301 of the Chatham County Registry, and that the resultant lot or parcel of land thus com- bined shall be equal to or exceed the current standards of Chatham County a$ set forth in its subdivision regu- lations. Both parties hereto hereby agree that the property con- veyed herein is not intended nor has it been approved as a separate lot for purpose of sale or building develop- ment. 4 . 3 s a -Y 500K 14FA?? y+?.} TO HAVE AND TO HOLD the a oresai tact or parcel of land and all privileges and appurtenances thereunto belonging to the Grantee in fee simple. AND the Grantor covenants with the Grantee that it is seized of the premises in fear has the right to convey the same in fee simple, that title is marketable and free of all encumbrances, and that Grantor will warrant and defend the title to the same against the claims of all persons whom- soever. IN TESTIMONY WHEREOF, the Grantor has caused this deed to be executed in its name and its seal affixed all by authority duly given. `,?Q`1151);,?ts CHATHAM COUNTY BOARD OF EflUCAftON:;.' Byt rw Cha an;' t.. SUP ""'N ATT STATE OF NORTH CAROLINA COUNTY OF CHATHAM I. cax/ a Notary Public of the County and S to aforesaid, certiry that Perry W. Harrison, personally c e before me this day and acknowledged that he is Secretary of the Chatham County Board of Education, a body politic, and that by authority duly given and as the act of the Board of Education, the foregoing instrument was signed in its name by its Chairman, and attested by its secretary. WITNESS my hand and notarial seal, this day of July, 1987. G,?,, ?? ?!t/ (SEAL) -Fotary 'Pu 1 c NORTH CAROLINA. CHATHA14 COUNTY The foregoing terllHcate(e) ot._.:..._.....Jan .Cr._....DiXOfta.._.._.._.._..._.. _._......___.» __.__ Nota_ry_(.Notal•1es) ,Public-- H ter,) -r9ned to be correct Tilts Instrument was presented for registration at.... ?.:.10 o'etxk ,...p!_M. on .__...aDA$.,.. ..7..._.........-.... .19..87 _, and recorded Jn Book,,, , 514 .... FLEET BARBER REDDISH 87t_ .._' AnIstast Aegteter of Deeds t ? Maps i Ail ? ca f J } 4 7• .rfr OL_? * r ¦ ¦f lw- a..- a, i yam' ??•,?.. •? _•? ,,,,?''..?.? ,.r.?r• .•.-.----'--1•A-. Y. ? ?J '¦'? f.N_ Vim: ? '1 ; ?; ?' if ar F sit- irr) co Cl) 0- C) O N ? ? N 00 O 00 m a O 1m o N IotI T N 7 O (n N O T(n N o j ) ? l9 U O O. U) O -0O oU c 0 m z 0 0 M O r O N M y U_ U Z 7 VJ 1.10 O C UO a) N m C Z.< ZU ?1 m _C O U L ? Z N _U C C m o E E ` L C m LIJ L 3 U m L 2 O U) a) N O 0) c a N O a) C1 (0 () L C .L.+ 0 0 . > U 0 0 75 N -O N 3 C O U O y C;) Z m O C U O m L L 0 j ?_ •C C c ?E - U a) Z m C O U O m E Lo 1O O m E m e T U U M a) In LO . 0 7 m m ` (D Q) co Z CD r o N Q a a ) a) CL aD c c 7 U. p U N Z Cl) o L L 0 3 m 0 3 O O N O Z (n w N cl C N O O mL U m a)?? m a) o C 7 0 O Q-0 > N (V U. co u) Q) o y 3 0 N 3 E o U ?2 ° a) E2•ma, -0 E? Z o a) 6b -0 CAN a) Q ?L? L O E c L' N a a) m m m o cq m a) L (D 3 0. « Q C C O E 'c: 7 (0 J 2 N U> N N N L C. T o m e O C ?, O Z E T) c N N m 0) m o N O `m o.;- -0 Z m o E a) N U) an m m m E T 0 -0 0NaN -cnN cc ?a m o n a? n. 0 O) a) c c E c ° O C C/) O O 0 CD ? Q p m m -0 L O ?, 7 p ' . rn3 @?° m 7.0 O a' . w c - Z Q ° m a) E mE .-m 0 o f 0 0 co rm I- r 07 to u) m o -r- F 0 .,= o N tl) O CL CL O U) C U m L T c a) N N 3 'p a 0 0 U) a N O m co m o = m of m 0 ?. _ U d T 0) LL L -,- N L C d N N C m m m N 0 c Y m a) N > N O C (D ' U') O O) = U -e > N j U O U) C(0 o N r fn m n U 03 L_ O J a l 1 - C z 10 U t t 4 _ l m .V 0 LL t f UJI c w w o N 0 CL m ` \ a W r J a O 0 G ?. G 0 m - (1) m 0 m ° ?, o o _ O c a m d a o O a a > o m C7 o m m :3 W a n N a Q ° m O U. O a a) m a) 4= _ L O N E O U) a) U) T 0 O O Q 0 Q '0 C O (n ' `O t9 O c0 m -C > J N C y Q) Q) U o C C > C _ -Up , O C O a CO 0] U U J (n (n (n (n U) In U (n CL S o m N a ® X > + ICI o ,r., ? lif a J 0 fn Q 00 M O - N O N ? a) W d T m 7 O U) N '0 m cn Z > 7 ?. 0 CL cn O L O mU C Z Q) u N cn 0 y O ? m ? a) 7 N o O Z U D ?I; Soil Map-Chatham County, North Carolina Law Enforcement Center Map Unit Legend Chatham County, North Carolina (NC037) Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI GeB2 Georgeville silty clay loam, 2 to 1.0 5.0% 6 percent slopes, moderately eroded GnC Georgeville-Urban land 19.0 complex, 2 to 10 percent slopes Totals for Area of Interest (AOI) 20.0 95.0% 100.0% Natural Resources Web Soil Survey 2.0 8/19/2008 Conservation Service National Cooperative Soil Survey Page 3 of 3 .t= .t 4 t? G t- it U tL TJ ^L W W U 4-4 E U L O W J } AO ,if, _ I e t? r © t I 0. X 4 4 4 %A C W 7P 'N ;3 C tt? r o y i7 L 7 V T_ 4D Y QCCT, F 4 ti" +J G Q Q y -0 Q Ef w 17 r " y ? ? 4 rfi 17 4 4 Q 4- ? 4 t- E2 C_1 4 Lh CJ 7 7 L r r y 4 r r r r 617 rr I PROJECT / IMPERVIOUS PER CURRENT UDO a P"=?03111 PROPOSED TOTAL AREA = 244,025 S.F. (5.60 AC.) EXISTING IMPERVIOUS AREA = 63,205 S.F. (1.45 AC.) % IMPERVIOUS =25.9% PROPOSED IMPERVIOUS AREA = 92,452 S.F. (2.12 AC.) % IMPERVIOUS =37.9% EXISTING PERVIOUS AREA = 180,820 S.F. (4.15 AC.) ADDITIONAL IMPERVIOUS AREA = 29,247 S.F. (0.67 AC.) PROJECT % IMPERVIOUS PER CURRENT UDO = 16.2% 0 EXISTING i i i i i i PRE CONSTRUCTION DRAINAGE AREAS CHATHAM COUNTY LAW ENFORCEMENT CENTER PARKING LOT MODIFICATIONS AND EXPANSION CENTER TOWNSHIP, CHATHAM COUNTY, NORTH CAROLINA GRAPHIC SCALE 100 0 50 100 ( IN FEET ) 1 inch = 100 ft. i i i i i i i III N GRAPHIC SCALE 100 0 50 100 ( IN FEET ) 1 inch = 100 ft. 1,22 ac POST CONSTRUCTION DRAINAGE AREAS CHATHAM COUNTY LAW ENFORCEMENT CENTER PARKING LOT MODIFICATIONS AND EXPANSION CENTER TOWNSHIP, CHATHAM COUNTY, NORTH CAROLINA 8' WIDE EMERGENCY ZONE 2 IMPACT / U.S. HIGHWAY 64 SPILLWAY (ELEV. 370.0) WITH 496 S.F. 1 (70' RIGHT-OF-WAY) 14' WIDE x 30' LONG x 12" THICK CLASS "B" RIP-RAP ' - - ' - SPILLWAY PROTECTION ON FILTER FABRIC - - - - ZONE 1 IMPACT ® X111 / 564 S.F. LIMITS OF DISTURBED AREA 14' WIDE x 45' LONG PYRAMAT 4' SQ. CONCRETE RISER (OR EQUAL) SPILLWAY LINING WITH TRASH RA JA .. ? 1 I ` !? 98 L.F. 8" HDPE ® 3.26% t, ? I BIOR 1R10?1IN NE 2 i ZO 1 -- BUFFER IMPACT - B 1 ?TION BAST ??? ?LIMITS OF s, w - _ W IDISTURBED AREA ?! I t1! I ? I I ? I ZONE 2 IMPACT (EXEMPT) 988 S.F. I II 2:1 37 1 374 373 3721 371 ';fit i 50' 1,5UFFER ' i 20' I 30 I ZONE 2 , ZONE 1 I I EXEMPT BUFFER IMPACT Engineers 0 30 N ?? l` "" '•• '/ `' i?lVerS Planners •• • Surveyors • • & Associates, Inc. Lie. No. F-0334 • Since 1919 107 East Second Street 6131 Falls of Neuse Road, Suite 300 1 inch = 30 ft. Greenville, NC 27858 (252) 752-4135 Raleigh, NC 27609 (919) 848-3347 of ® CHATHAM COUNTY LAW ENFORCEMENT CENTER PROJECT NO. PARKING LOT MODIFICATIONS AND EXPANSION 2008107 00 BUFFER /MPA CTS SHEET ?ro ,??Ili.......tt?,, CFNTFR TnM(Z141P rMATNAA/ rn/MITV A11D7u I-ADM/AIA 1 of 1 Storm System Calculations ca a. I _0 V 2 -7 7 co O O N O MT W O ?4? -V ? N T W J O Z rd - =3 O y T C14 co c?-1 co r+ i I ? I I I o I I I ko Ln cli i? T w? i L V V 0 0 N N N 3 V) E `0 U) 3 0 m D 2 ' r l4 ' CL m `v w? W ¦CL CL 00 O N 00 O N N ai (D C O N E 7 Z W O. O co O Iq O Lq Lo d' m N 00 Uf O N 00 (D It I-- Lf) O r, r` O > W N m (D m oo m N 00 N OD W (D 00 co N N O co Cl) m co m m m m m O O (D M O Lo LO N m V co N O O O Lo 00 (D co r, Lf) f? t` (MD [ [ (D N W M D M r- C M Cl) N M N Cl) M co ( D co ( M ( D Cl) M N M M 0) O. O O LO M N h O r M (M N M C O c M M W N N O D) J N O Lfi 6 r ? r O N N N r N C O) OM V N 0?0 p r M CO J GCI (MD N N rn r N N N Cl) rn N co J ? t a 0) 4) 00 W 0 0 LO U) LO C\j co o U') Ln LO C _N C - .- r r r - - - r r r r J (A .. 6 R U d r N Cl) It Lf) (O r M O O T C - r C 66 C O 6 T N M It LO (D M M O T 7 W J O w z u? O O N N a`) U) E 0 3 0 m 'o T d a ?a U 1 d O O N O N l6 N N LO ? ? r` r` O r` r` O 7 cD N O L.L7 N ? Q r- ?. C? Co O) r` r` O T OA N CO - v T T O O O O 0 0 0 o O W Q O O C? p U? 7 COO W 't m N d E Q V r o 0 0 0 0 O r O O o 0 Z L Q V x O N O) O r r N O H' N N N O (o N ? O O) O W O U o 0 0 0 0 0 0 0 o O o 0 ud ? IR rl? o m ° 0? v m n m Li 5 " r o o = o r r N r o 0 0 c V co co co 00 co 00 co co co 00 co ? U o 0 0 0 0 0 0 0 0 0 0 0 C d 0 N r ,?- W O O O co O N O LO N M O O r _ O p` V 0 0 0 0 0 0 0 0 0 0 0 0 Gl d O. > C O N LO LO N CO co co CO CO N Cl) N N It o O N V It N V n F E o 0 0 0 0 0 0 0 o r o 0 <0 C O O r` O co ? O co O Cl) N O N N CO O M N O H Q v O O o 0 0 0 r 0 o O o r- G C N ON O i? CA O m i? NO cMO, cD N F 0 .V.. N V M N N r r LO M r r o r x co 00 co Lo It Ln Cl) V rn N N N N O m O to 7 N N N O U o 0 0 0 0 0 0 0 0 0 0 0 d CO 0 0 00 0 0 0 0 0 C V 0 0 0 0 0 0 0 0 CO 0 0 0 0 co 0 0 W = V o 0 o o 0 0 0 0 0 0 0 0 U C O a' n r M O O CA Ln 0 'E N o o to LO CO 0o N LO LO z U' 19 w V M ^ O co cNO co It °r, Ln N LO U V r O O r O r r N r O O O r C w O N M O CO Ln O) O C07 0 u ON C M O O LLLq LL? .V.. Ln d' M N N r r L17 Cvj r r O L Q J of U ? r N M d' L.n (p CO O) O r r U _ C ? k L (n d r N M d' LO cD N C0 O O r T V W _j Z y 0 Z 0 0 N N 3 e 0 3 0 m o T 2 v a 1 1 J Z 1 ? 00 O O N CA Co O N D N CA C O E 7 Z C C T N O in O M UO N (MD O LO 7 v M v M N N r r (ii C6 r r p lp (6 rl' O V (o O N N O O G) v 0 I? Iq D U? co M N (o Cl? N r O O O O O . O r O O O O L C Cn 7 I? r M O O r r m ([') O ~ f? t` co co (O (n co co t` (f) (n LO m U p d O CO O N O M O W O 00 O 0 O O O O O O U C V 0 CD W W W N OR U O O O O O O O O O O O O Gl d M W CO (n ( f) to N M CO (n L2 (2 C N_ J to ... r r r r r r r r r r r r } O_ O O O N 00 00 O 00 'IT N (D II 4) CL M (n Lq 7 N (n N (D I? O > D V 00 N (0 00 N N 00 co ? C7 O O C O Cl) r Cl) N co t\ M M M 00 Cl) (D M (D M r M I- Cl) N M N Cl) N a E L t (n N 00 Cl) (.(Y (n It N Cn CA I-- O M N O N Lr) It () N N O 1, O j fA (D Co (O (D (o 1.-: (o (o co (D (D r` Ir a J _ Cn (° N (n 00 00 LO to C\j rn N CD 6 _ E OD m 6 (D 0i N N . r m r` N 00 rn (D N N u) I- (o N O Cl) co co M M M co co co co < O -? U co N I- N N N co r t!) OR O Cn O CO (n N 'd: (D Uf aD N CD 'I: LO T C CA co M I- M m M N m M M O Cl) m N It (D (0 } co Cl) M M M M N E J Cl) N N C\j M r (f) M O N O co ((') N V (D Uf O N (O V N 2 m O co Il m N co CA m N V O (D C M r Cl) N co N Cl) 00 M 00 M (D M (D co ? M N M N co N M 00 E rn CL 2 2 coo °o °o ° oMO c? m r o v 0 r` c w r- r- N n ao N ri m I: w 00 oo ? ` N N r o I M M M M M M M co co M Co co ? *- N M V lly CO f- W Cn O T E ? C r C C ? (n C O r N M V (() (O I? (D Cn O T (? LU J Z r iU Z N 0 0 N N 3 E 0 3 0 m io T Pre-Construction runoff -vs- Post-Construction runoff at peak discharge ponts 10-year storm Bio-retention basin outfall FES "EA" FES T H" pre post 10.07 cfs 3.84 cfs 5.88 cfs 5.56 cfs no change a 3 L 2 O O O N O N 00 O ai N C J O Z 4M- ,^rJalJ T N TT ? T N ? T L V 0 0 0 N N N 3 0 N 3 0 m a x r Q ' a ¦a U M O O N O N OD O O) M V N C ? CO ? r c p y O r O O p N w o rn . CO E Qp cr v r o 0 o Z V K N N N N 5U o 0 0 0 L CQ F w m N co Ln co m LO v r r r r c d V m OR cq CR ? V o 0 0 0 Q 0 N M It N C O O O O a> N v CO o n E o 6 6 6 G! O Co N 0 a v T O O O C N co COO. r0 Lm 7 .V.. Ln C7 r a0. K O W L N U r o o O c a 0 U W co W W ¢ o 0 0 0 O C c0 N O O H 'E O O O U') 0 m w 'IT LO ccoo W Lmn U v r - r .- ~ c w m ou m m o m Ln LL V V C'7 r a cp a :3 ro U d p O r0 r N U C - C G1 L L 66 C O N M V O V ui ?Z 0 Z 0 O N f/1 N 3 0 E 0 3 0 m v` 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Aug 20 2008, 2:13 PM Hyd. No. 1 bio-retention pre-constructionr o, If Hydrograph type = SC Runoff Peak discharge 10.07 cf Storm frequency = 10 yrs Time interval = min Drainage area = ac Curve number = 80 Basin Slope = 4.7 % Hydraulic length = 253 ft Tc method = LAG Time of conc. (Tc) = 4.87 min Total precip. = 4.99 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 19,368 cuft Q (cfs) 12.00 bio-retention pre-construction runoff Hyd. No. 1 -- 10 Yr 10.00 8.00 6.00 4.00 2.00 0.00 -L_ 0.0 2.2 4.3 6.5 8.7 Hyd No. 1 Q (cfs) 12.00 10.00 8.00 6.00 4.00 2.00 0.00 10.8 13.0 15.2 17.3 19.5 21.7 Time (hrs) 7f tLE ?x( ? BMP Calculations i ? B'iomretent'ion Basin i 1 1 1 1 1 1 1 1 1 1 1 1 Bio-retention basin sizing Chatham County Law Enforcement Center Job #2008107 Bioretention Basin Area = Impervious Area: Proposed offsite TOTAL Percent Impervious = Runoff Volume 0.93 divided by 2.33 2.33 ac 0.93 ac 0.00 ac 0.93 ac 40% Rv = 0.05 + (0.9 x la) la= 40% Rv = 0.41 Treatment Volume V= 3630 x Rd x Rv x A Rd = 1 Rainfall Depth Rv = 0.41 A = 2.33 ac Basin Area V = 3461 ft3 Treatment Surface Area A = Qv/Dp Qv = 3461 ft3 Dp = 1.00 ft Depth (plants) A = 3461 ft2 Required vs Proposed Areas and Volumes Total Area: Required = 3461 ft2 Proposed = 4110 ft2 Total Volume Required = 3461 ft3 Proposed = 3725 ft3 Bio-retention Basin flow summary Fde x. th duration above 1' max. flow at discharge max flow to emergency spillway duration 2 r 24hr storm 1.30' 12.38 hrs. 3.38 cfs 0.00 cfs 0.0 hrs. 10 r 24hr storm 2.05' 12.65 hrs. 3.42 cfs 0.44 cfs 0.10 hrs. 100 r 24hr stom 2.60' 14.17 hrs. 3.47 cfs 12.43 cfs 0.41 hrs Pond Report ¦ Hydraflow Hydrographs by Intelisolve Pond No. 1 - Bioretention basin Pond Data Pond storage is based on known contour areas. Average end area method used. ' Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 368.00 3,340 0 0 1.00 369.00 4,110 3,725 3,725 2.00 370.00 4,950 4,530 8,255 3.00 371.00 5,840 5,395 13,650 Tuesday, Jan 4 2011, 11:4 AM Culvert / Orifice Structures [A] [B] [C] [D] Rise (in) = 8.00 0.00 0.00 0.00 ' Span (in) = 8.00 0.00 0.00 0.00 No. Barrels = 1 0 0 0 Invert El. (ft) = 362.00 0.00 0.00 0.00 Length (ft) = 98.00 0.00 0.00 0.00 Slope (%) = 3.26 0.00 0.00 0.00 N-Value = .013 .000 .000 .000 Orif. Coeff. = 0.60 0.00 0.00 0.00 Multi-Stage = n/a No No No ' Stage (ft) 3.00 ! 2.00 ! 1.00 0.00 Note: Culvert/Orifice outflows have been analyzed under inlet and outlet control. Weir riser checked for orifice conditions. Stage / Discharge Stage (ft) 3.00 0.00 3.00 6.00 9.00 12.00 15.00 18.00 21.00 24.00 27.00 Total Q Weir Structures [A] [B] [C] [D] Crest Len (ft) = 16.00 8.00 0.00 0.00 Crest El. (ft) = 369.00 370.00 0.00 0.00 Weir Coeff. = 3.33 3.33 0.00 0.00 Weir Type = Riser Rect --- --- Multi-Stage = Yes No No No Exfiltration = 0.000 in/hr (Wet area) Tailwater Elev. = 0.00 ft 2.00 1.00 --L 0.00 30.00 Discharge (cfs) ? Bmiomretentimon Basin i 2-year storm i 1 I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Tuesday, Jan 4 2011, 11:4 AM Hyd. No. 1 direct to bmp Hydrograph type = SCS Runoff Peak discharge 0.68 cf? Storm frequency =2r s Time interval = 1 min Drainage area = 1.0 0 ac Curve number = 61 Basin Slope = 4.7 % Hydraulic length = 253 ft Tc method = LAG Time of conc. (Tc) = 8.20 min Total precip. = 3.34 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 1,779 cuft direct to bmp Q (cfs) Hyd. No. 1 -- 2 Yr 1.00 0.90 - - 0.80 0.70 0.60 _ 0.50 0.40 - - - 0.30 0.20 - 0.10 - 0.00 0 2 Hyd No. 1 Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 5 7 9 12 14 16 19 21 23 26 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 2 outfall a Hydrograph type = SCS Runoff Storm frequency = 2 rs Drainage area = 1.000 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 3.34 in Storm duration = 24 hrs Q (cfs 4.00 3.00 2.00 1.00 Hydrograph Volume = 8,135 cuft outfall a Hyd. No. 2 -- 2 Yr 0.00 -- 0.0 Tuesday, Jan 4 2011, 11:4 AM Peak discharge = 3.72 cfs Time interval = 1 min Curve number = 90 Hydraulic length = Oft Time of conc. (Tc) = 7.60 min Distribution = Type II Shape factor = 484 2.2 4.3 6.5 8.7 Hyd No. 2 Q (cfs) 4.00 3.00 2.00 1.00 n nn 10.8 13.0 15.2 17.3 19.5 21.7 v v v Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 3 outfall b Hydrograph type = SCS Runoff Storm frequency _ M Drainage area 0. 00 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 3.34 in Storm duration = 24 hrs Tuesday, Jan 4 2011, 11:4 AM Peak discharge = 1 Time interval = Curve number = 98 Hydraulic length = Oft Time of conc. (Tc) = 8.00 min Distribution = Type II Shape factor = 484 Hydrograph volume = 3,299 cuft Q (cfs 2.00 1.00 outfall b Hyd. No. 3 -- 2 Yr Q (cfs) 2.00 1.00 0.00 - 0 00 0.0 2.0 Hyd No. 3 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 4 total from outfalls ' Hydrograph type = ombine Storm frequency = 2 yrs Inflow hyds. _ , Tuesday, Jan 4 2011, 11:4 AM Peak discharge <;am cfs Time interval in Hyd rograph Volume = 11,434 cuft total from outfalls Q (cfs ) Hyd. No. 4 -- 2 Yr Q (cfs) 6 00 . 6.00 5 00 - . - - - 5.00 4 00 ' . - 4.00 3 00 - - . - -- 3.00 2 00 - - - - . 2.00 1 00 - - . 1.00 0.00 n nn ? 0.0 1 2.2 4.3 6.5 8.7 Hyd No. 4 Hyd No. 2 10.8 13.0 15.2 17.3 19.5 21.7 v V v Hyd No. 3 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 5 total runoff to bmp ' Hydrograph type = Combine Storm frequency 2 yrs Inflow hyds. 4 r Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 Tuesday, Jan 4 2011, 11:4 AM Peak discharge = . 9 cfs Time interval = min Hydrograph Volume = 13,213 cuft Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 0 2 Hyd No. 5 total runoff to bmp Hyd. No. 5 -- 2 Yr 5 7 9 Hyd No. 1 12 14 16 Hyd No. 4 19 21 23 1 0.00 26 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 6 Bioretention basin ' Hydrograph type = ervoir Storm frequency = 2 rs Inflow hyd. No. = 5 Reservoir name = Bioretention basin Tuesday, Jan 4 2011, 11:4 AM Peak discharge 3.38 cfs Time interval = min Max. Elevation = 369.30 ft Max. Storage = 5,062 cuft Storage Indication method used. Bioretention basin Q (cfs) Hyd. No. 6 -- 2 Yr l 6.00 5.00 4.00 3.00 2.00 1.00 0 00 Hydrograph Volume = 9,488 cuft Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 0 2 5 7 9 ' Hyd No. 6 Hyd No. 5 12 14 16 19 21 23 -?- 0.00 26 Time (hrs) Hydrograph Plot ' HYdraflow HYdro9raphs by Intelisolve ' Hyd. No. 7 Spillway Weir Hydrograph type = Diversion1 Storm frequency 2 yrs Inflow hydrograph = ' Diversion method = Pond - Bioretention basin L Q (cfs) 4.00 i 3.00 2.00 1.00 0.00 Hydrograph Volume = 0 cult Spillway Weir Hyd. No. 7 -- 2 Yr Q (cfs) 4.00 3.00 2.00 1.00 1 1 Tuesday, Jan 4 2011, 11:4 AM Peak discharge ,,,?„ 0.00 f4= Time interval = 1 min 2nd diverted hyd. = 8 Pond structure = Weir B 0.00 2 5 7 9 12 14 16 19 21 23 26 Time (hrs) Hyd No. 7 Hyd No. 6 Hyd No. 8 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 8 Riser Weir Hydrograph type = Diversion2 Storm frequency _ 2 rs Inflow hydrograph Diversion method = Pond - Bioretention basin Tuesday, Jan 4 2011, 11:4 AM Peak discharge 3Hmm D Time interval = in 2 nd diverted hyd. = 7 Pond structure = Weir B Hydrograph Volume = 9,488 cuft Q (cfs) 4.00 3.00 2.00 1.00 Q (cfs) 4.00 3.00 2.00 1.00 0.00 ' ' 1 11 i I 0.00 0 2 5 7 9 12 14 16 19 21 23 26 Time (hrs) Hyd No. 8 Hyd No. 6 Hyd No. 7 Riser Weir Hyd. No. 8 -- 2 Yr ' B'iomretention Basin ? 10-year storm i Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 1 direct to bmp Hydrograph type = SCS Runoff Storm frequency = 0 rs Drainage area = 000 ac Basin Slope = 4.7 % Tc method = LAG Total precip. = 4.99 in Storm duration = 24 hrs Tuesday, Jan 4 2011, 11:4 AM Peak discharge =(2.22 cfs Time interval = Curve number = 61 Hydraulic length = 253 ft Time of conc. (Tc) = 8.20 min Distribution = Type II Shape factor = 484 Q (cfs) o nn Hydrograph Volume = 4,824 cuft direct to bmp Hyd. No. 1 -- 10 Yr 0 2 5 7 Hyd No. 1 i 9 12 14 16 19 21 23 Q (cfs) 3.00 2.00 1.00 ---1 0.00 26 Time (hrs) 1 i Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 2 outer fall a ' Hydrograph type = SCS Runoff Storm frequency = 10 rs Drainage area = 1.000 ac ' Basin Slope = 0.0 % Tc method = USER Total precip. = 4.99 in ' Storm duration = 24 hrs Tuesday, Jan 4 2011, 11:4 AM Peak discharge - 6.07 cfs Time interval = min Curve number = 90 Hydraulic length = Oft Time of conc. (Tc) = 7.60 min Distribution = Type II Shape factor = 484 Q (cfs) 7.00 6.00 5.00 ' 4.00 3.00 2.00 1.00 0.00 Hydrograph Volume = 13,685 cuft outfall a Hyd. No. 2 -- 10 Yr Q (cfs) 7.00 0.0 2.0 4.0 6.0 ' Hyd No. 2 6.00 5.00 4.00 3.00 2.00 1.00 0.00 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve 1 Hyd. No. 3 out. fall b 1 Hydrograph type = SCS Runoff Storm frequency = 10 rs Drainage area = 0.300 ac ' Basin Slope = 0.0 % Tc method = USER Total precip. = 4.99 in 1 Storm duration = 24 hrs Tuesday, Jan 4 2011, 11:4 AM Peak discharge 2.01 cfs Time interval = min Curve number = 98 Hydraulic length = Oft Time of conc. (Tc) = 8.00 min Distribution = Type II Shape factor = 484 1 1 outfall b 1 Q (cfs) Hyd. No. 3 -- 10 Yr 3.00 i 1 1 2.00 1 1 1.00 1 ' 0.00 Hydrograph Volume = 5,047 cuft Q (cfs) 3.00 2.00 1.00 0.0 2.0 4.0 6.0 1 Hyd No. 3 8.0 0.00 10.0 12.0 14.0 16.0 18.0 20.0 Time (hrs) 1 1 1 1 f 1 1 1 1 1 1 1 1 1 1 1 1 1 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Tuesday, Jan 4 2011, 11:4 AM Hyd. No. 4 total from outfalls Hydrograph type Qgmb Ine Peak discharge - 8.Em9incfDs Storm frequency = 10 rs Time interval = Inflow hyds. = 2, 3 Hydrograph Volume = 18,732 cuft Q (cfs) 10.00 8.00 6.00 4.00 2.00 0.00 0.0 total from outfalls Hyd. No. 4 -- 10 Yr Q (cfs) 10.00 2.0 4.0 6.0 8.0 Hyd No. 4 Hyd No. 2 8.00 6.00 4.00 2.00 0.00 10.0 12.0 14.0 16.0 18.0 20.0 22.0 Hyd No. 3 Time (hrs) ' Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 5 total runoff to bmp Hydrograph type = Combine Storm frequency = 10 rs Inflow hyds. = 1, 4 i ' Q (cfs) 12.00 10.00 ' 8.00 6.00 4.00 2.00 0.00 Hydrograph Volume = 23,556 cuft total runoff to burp Hyd. No. 5 -- 10 Yr Q (cfs) 12.00 1 1 Tuesday, Jan 4 2011, 11:4 AM Peak discharge = =5cfs Time interval = 1 min 10.00 8.00 6.00 4.00 2.00 0.00 2 5 7 9 12 14 16 19 21 23 26 Time (hrs) Hyd No. 5 Hyd No. 1 Hyd No. 4 ' Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 6 Bioretention basin Hydrograph type = Re rvoir Storm frequency = 10 yrs ' Inflow hyd. No. _ Reservoir name = Bioretention basin ' Storage Indication method used. Q (cfs) 12.00 10.00 8.00 6.00 4.00 2.00 0.00 Bioretention basin Hyd. No. 6 -- 10 Yr Tuesday, Jan 4 2011, 11:4 AM Peak discharge = 3.84 cfs Time interval = 1 min Max. Elevation = 370.05 ft Max. Storage = 8,526 cuft Hydrograph Volume = 19,831 cult 2 5 7 9 Hyd No. 6 Hyd No. 5 12 14 16 19 21 23 Q (cfs) 12.00 10.00 8.00 6.00 4.00 2.00 --1 0.00 26 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve ' Hyd. No. 7 Spillway Weir ' Hydrograph type = Diversion1 Storm frequency = 10 rs Inflow hydrograph = 6 ' Diversion method = Pond - Bioretention basin ' Q (cfs) A AA Tuesday, Jan 4 2011, 11:4 AM Peak discharge = 0.44 cfs Time interval = 1 min 2nd diverted hyd. = 8 Pond structure = Weir B Hydrograph Volume = 119 cuft Spillway Weir Hyd. No. 7 -- 10 Yr Q (cfs) 4.00 3.00 2.00 1.00 1 1 - 0.00 2 5 7 9 12 14 16 19 21 23 26 Time (hrs) Hyd No. 7 Hyd No. 6 Hyd No. 8 Hydrograph Plot Hydraflow Hydrographs by Intelisolve ' Hyd. No. 8 Riser Weir ' Hydrograph type = Diversion2 Storm frequency = 1Ors ' Inflow hydrograph = 6 Diversion method = Pond - Bioretention basin Q (cfs) 4.00 ' 3.00 2.00 - ' 1.00 ' 0.00 - Hydrograph Volume = 19,712 cuft Riser Weir Hyd. No. 8 -- 10 Yr Q (cfs) 4.00 1 1 Tuesday, Jan 4 2011, 11:4 AM Peak discharge - q3.42 fs Time interval = n 2nddiverted hyd. = 7 Pond structure = Weir B 3.00 2.00 1.00 -- 0.00 2 5 7 9 12 14 16 19 21 23 26 Hyd No. 8 Hyd No. 6 Hyd No. 7 Time (hrs) 1 ? Bmiomretentimon ? Basin ? 100-year storm i Hydrograph Plot Hydraflow Hydrographs by Intelisolve ' Hyd. No. 1 direct to bmp ' Hydrograph type = SCS Runoff Storm frequency = 100 yrs Drainage area = ac ' Basin Slope = 4.7 % Tc method = LAG Total precip. = 8.01 in ' Storm duration = 24 hrs Q (cfs) a nn Tuesday, Jan 4 2011, 11:4 AM min Curve number = 61 Hydraulic length = 253 ft Time of conc. (Tc) = 8.20 min Distribution = Type II Shape factor = 484 Peak discharge = 5.79 cfs Time interval = Hydrograph Volume = 12,219 cuft direct to bmp Hyd. No. 1 -- 100 Yr Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 0 2 5 7 Hyd No. 1 9 12 14 16 19 21 23 -?- 0.00 26 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve ' Hyd. No. 2 outfal ' Hydrograph type = C unoff Storm frequency = di 00 rs Drainage area = 1.000 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 8.01 in ' Storm duration = 24 hrs Q (cfs) ' 12.00 10.00 ' 8.00 ' 6.00 4.00 ' 2.00 0.00 0.0 Hydrograph Volume = 24,121 cult 2.0 Hyd No. 2 Tuesday, Jan 4 2011, 11:4 AM Peak discharge = 10.31 cfs Time interval = min Curve number = 90 Hydraulic length = Oft Time of conc. (Tc) = 7.60 min Distribution = Type II Shape factor = 484 outfall a Hyd. No. 2 -- 100 Yr 4.0 6.0 8.0 Q (cfs) 12.00 10.00 8.00 6.00 4.00 2.00 0.00 10.0 12.0 14.0 16.0 18.0 20.0 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 3 outer fall b Hydrograph type = SCS Runoff Storm frequency = 100 rs Drainage area = 0.300 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 8.01 in Storm duration = 24 hrs mi Curve number = 98 Hydraulic length = Oft Time of conc. (Tc) = 8.00 min Distribution = Type II Shape factor WD = 484 Peak discharge 3Time interval = Q (cfs) I 4.00 i 3.00 - - - - ---- - r 2.00 _ _- 1.00 - - - \ I t 0.00 - `? 0.0 2.0 4.0 6.0 Hyd No. 3 Tuesday, Jan 4 2011, 11:4 AM Hydrograph Volume = 8,250 cuft outfall b Hyd. No. 3 -- 100 Yr Q (cfs) 4.00 3.00 2.00 1.00 n nn 8.0 10.0 12.0 14.0 16.0 18.0 20.0v vv Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 4 total from outfalls Hydrograph type = Combine Storm frequency = 00 rs Inflow hyds. = 2, 3 Tuesday, Jan 4 2011, 11:4 AM Peak discharge = ?4m 6 cfs Time interval = in Hy drograph Volume = 32,372 cuft total from outfalls Hyd. No. 4 -- 100 Yr Q (cfs) 14.00 12.00 10.00 8.00 6.00 4.00 2.00 ? ao 1 0.00 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 4 Hyd No. 2 Hyd No. 3 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 5 total runoff to bmp Hydrograph type = Combine Storm frequency = 100 rs Inflow hyds. _ , 4 Tuesday, Jan 4 2011, 11:4 AM Peak discharge = 1933 cfs Time interval = mm Hydrograph Volume = 44,590 cuft total runoff to bmp Q (cfs) Hyd. No. 5 -- 100 Yr Q (cfs) 21 00 - - . 21.00 18 00 . - 18.00 15 00 . - - - 15.00 12 00 . 12.00 9 00 . 9.00 6.00 - 6.00 00 - 3 - - - . 3.00 0.00 - n nn 0.0 1 2.2 4.3 6.5 8.7 10.8 13.0 15.2 17.3 19.5 21.7 23.8- vv Hyd No. 5 Hyd No. 1 Hyd No. 4 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve S Hyd. No. 6 Bioretention basin Hydrograph type = Reservoir Storm frequency = 100 yrs Inflow hyd. No. = ' Reservoir name = Bioretention basin Tuesday, Jan 4 2011, 11:4 AM Peak discharge = 15.31 cfs Time interval = 1 min Max. Elevation = 370.60 ft Max. Storage = 11,504 cuft Storage Indication method used. Bioretention basin Q (cfs) Hyd. No. 6 -- 100 Yr ' 21.00 ' 18.00 - - - 15.00 - - - 12.00 - 9.00 -- - 6.00 - --- 3.00 - 0.00 Hydrograph Volume = 40,865 cult 0 2 5 7 9 t Hyd No. 6 Hyd No. 5 12 14 16 19 21 23 Q (cfs) 21.00 18.00 15.00 12.00 9.00 6.00 3.00 - L 0.00 26 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 7 S illway Weir Hydrograph type = iv gal 'on1 Storm frequency = Inflow hydrograph =410 Diversion method = Pond - Bioretention basin Q (cfs) 40 nn Hydrograph Volume = 7,988 cuft Spillway Weir. Hyd. No. 7 -- 100 Yr Q (cfs) 18.00 15.00 12.00 9.00 6.00 3.00 Tuesday, Jan 4 2011, 11:4 AM Peak discharge =C1 2.43 cfs Time interval = 1 min 2nd diverted hyd. = 8 Pond structure = Weir B 2 5 Hyd No. 7 7 9 Hyd No. 6 12 14 16 Hyd No. 8 19 21 23 --- 0.00 26 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 8 Riser Weir Hydrograph type = D' ion2 Storm frequency = 100 yrs Inflow hydrograph = 6 ' Diversion method = Pond - Bioretention basin Q (cfs) 18.00 15.00 12.00 9.00 6.00 ' 3.00 0.00 Hydrograph Volume = 32,877 cuft Riser Weir Hyd. No. 8 -- 100 Yr Q (cfs) 18.00 15.00 12.00 9.00 6.00 3.00 t 1 Tuesday, Jan 4 2011, 11:4 AM Peak discharge - 3.47 cfs Time interval = min 2nd diverted hyd. = 7 Pond structure = Weir B 0.00 2 5 7 9 12 14 16 19 21 23 26 Time (hrs) Hyd No. 8 Hyd No. 6 Hyd No. 7 ? Erosion Control Calculations TEMPORARY SEDIMENT BASIN #1 SEDIMENT POND CALCULATIONS PRE-GRADING DRAINAGE AREA = 1.84 ACRES DISTURBED AREA = 1.18 ACRES RUNOFF CHARACTERISTICS Tc = 5 MIN C = 0.43 NONE COMPOSITE I = 7.08 IN/HR 10- YEAR A = 1.84 ACRES Q = 5.6 CFS Q=CIA BASIN TYPE (TRAP, SKIMMER, RISER)= SKIMMER MAX AREA TRAP = 5 AC AMAX AREA SKIMME R= 10 AC REQUIRED STORAGE VOLUME 1.18 acres x 1800 ft3/ac = 2124 ft3 REQUIRED SURFACE AREA 5.6 cfs x 0.0075 = 0.04 ACRES 1823 ftz MINIMUM BASIN DEPTH = 3 FT TOP AREA FROM PLAN = 3340 SF BOT AREA FROM PLAN = 1420 SF SURFACE VOLUME AREA (ft) (ft) 7140 3340 TEMPORARY SEDIMENT BASIN #1 11SEDIMENT POND CALCULATIONS POST-GRADING W/SYSTEM Da SYSTEM = 1.3 ACRES C= 0.8 Da DIRECT FLOW= 1 ACRES C= 0.6 DISTURBED AREA = 1.36 ACRES C= 0.75 RUNOFF CHARACTERISTICS Tc = 10 MIN C = 0.71 NONE COMPOSITE I = 5.66 IN/HR 10- YEAR A = 2.3 ACRES Q = 9.3 CFS Q=CIA BASIN TYPE (TRAP, SKIMMER, RISER)= SKIMMER MAX AREA TRAP = 5 AC AMAX AREA SKIMME R = 10 AC REQUIRED STORAGE VOLUME 1.36 acres x 1800 ft3/ac = 2448 ft3 REQUIRED SURFACE AREA 9.3 cfs x 0.0075 = 0.07 ACRES 3033 ftz MINIMUM BASIN DEPTH = 3 FT TOP AREA FROM PLAN = 3340 SF BOT AREA FROM PLAN = 1420 SF SURFACE VOLUME AREA (ft) (ft) 7140 3340 Pond Report Hydraflow Hydrographs by Intelisolve Tuesday, Jan 4 2011, 11:22 AM Pond No. 1 - Sediment basin 1 Pond Data Pond storage is based on known contour areas. Average end area method used. Stage / Storage Table Stage (ft) Elevation (ft) Contour a rea (sqft) Incr. Storage (cult) Total storage (cult) 0.00 365.00 1,420 0 0 1.00 366.00 1,790 1,605 1,605 2.00 367.00 2,180 1,985 3,590 3.00 368.00 3,340 2,760 6,350 4.00 369.00 4,110 3,725 10,075 5.00 370.00 4,950 4,530 14,605 6.00 371.00 5,840 5,395 20,000 Culvert / Orifice Structures Weir Structures [A] [I3] [C] [D] [A] [I3] [C] [D] Rise (in) = 8.00 0.00 0.00 0.00 Crest Len (ft) = 16.00 1.00 8.00 0.00 Span (in) = 8.00 0.00 0.00 0.00 Crest El. (ft) = 369.00 368.00 370.00 0.00 No. Barrels = 1 0 0 0 Weir Coeff. = 3.33 3.33 2.60 0.00 Invert El. (ft) = 362.00 0.00 0.00 0.00 Weir Type = Riser Rect Broad --- Length (ft) = 98.00 0.00 0.00 0.00 Multi-Stage = Yes Yes No No Slope (%) = 3.26 0.00 0.00 0.00 N-Value = .013 .013 .000 .000 Orif. Coeff. = 0.60 0.60 0.00 0.00 Multi-Stage = n/a No No No Exfiltration = 0.000 in/hr (Wet area) Tailwater Elev. = 0.00 ft Note: Culvert/Orifice outflows have been analyzed under inlet and outlet contro l. Weir riser checked for orifice conditions. Stage (ft) 6.00 5.00 4.00 3.00 2.00 1.00 - Stage (ft) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 i I L I I I I o.oo 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00 22.00 24.00 26.00 Total Q Discharge (cfs) Stage / Discharge Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 6 Sediment Basin 1 Hydrograph type = Reservoir Storm frequency _ 2 yrs Inflow hyd. No. t Reservoir name = Sediment basin 1 Storage Indication method used. ' Q (cfs) C AA Tuesday, Jan 4 2011, 11:25 AM Peak discharge = 0.53 cfs Time interval = 1 min Max. Elevation = 368.29 ft Max. Storage = 7,448 cuft Hydrograph Volume = 6,859 cuft Sediment Basin 1 Hyd. No. 6 -- 2 Yr Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 0 3 5 8 11 ' Hyd No. 6 Hyd No. 5 13 16 19 21 24 -1 0.00 27 Time (hrs) I Hydrograph Plot Hydraflow Hydrographs by Intelisolve ' Hyd. No. 6 Sediment Basin 1 ' Hydrograph type = Reservoir Storm frequency = 10 yrs Inflow hyd. No. = 5 Reservoir name = Sediment basin 1 Tuesday, Jan 4 2011, 11:25 AM Peak discharge _ 3.37 cfs Time interval min Max. Elevation = 369.23 ft Max. Storage = 11,105 cuft Storage Indication method used. ' Q (cfs) 12.00 - _ 10.00 - 8.00 ' 6.00 - - - - 4.00 ' 2.00 _ 0 00 - Q (cfs) 12.00 10.00 8.00 6.00 4.00 2.00 ' - - 0 00 0 3 5 8 10 Hyd No. 6 Hyd No. 5 Hydrograph Volume = 17,203 cuft Sediment Basin 1 Hyd. No. 6 -- 10 Yr 13 15 18 20 23 25 28 Time (hrs) I Hydrograph Plot_ Hydraflow Hydrographs by Intelisolve Hyd. No. 6 Sediment Basin 1 Hydrograph type = Reservoir Storm frequency = 100 rs Inflow hyd. No. = 5 Reservoir name = Sediment basin 1 Tuesday, Jan 4 2011, 11:25 AM Peak discharge = 12.65 cfs Time interval = 1 min Max. Elevation = 370.58 ft Max. Storage = 17,722 cuft Storage Indication method used. Sediment Basin 1 Q (cfs) Hyd. No. 6 -- 100 Yr 21.00 18.00 15.00 - - 12.00 9.00 - - --- 6.00 - 3.00 0.00 Hydrograph Volume = 38,237 cuft 0 3 5 8 10 t Hyd No. 6 Hyd No. 5 Q (cfs) 21.00 18.00 15.00 12.00 9.00 6.00 3.00 13 15 18 20 23 a'- 0.00 25 Time (hrs) Calculate Skimmer Size Basin Volume in Cubic Feet Days to Drain* NC assume 3 days to drain 7,140 Cu.Ft 3 Days Skimmer Size Orifice Radius Orifice Diameter 2.0 Inch 0.8 Inch[es] 1.6 Inch[es] ECDesign( 2003 Channel Analysis Report Project Inforniation Last Update: 8/20/2008 5:31:36 PM Project Name: Chatham County LEC Description: City: Raleigh State: NC Units: English Notes: Channel Design Channel Name: to DI#1 Design Criteria Vegetation and Soil Flow Rate (Q) [Vegetated Vegetation Class Soil Filled Units: Channel Geometn Yes Bed Slope (ft/ft) D Req. Freeboard (ft) No Channel Length (ft) Channel Side Slopes Channel Bend false Bottom Width (ft) ' Left (H:1 V) 3 Bend Radius (ft) 0 Channel Depth (ft) Right (H:1 V) 3 Outside Bend Results esign Life: 1200 months Flow/Velocity 0.057 Discharge (cf/s) 1.41 Flow Duration (hrs) 24 77 Avg. Velocity (ft/s) 1.27 2 Required Factor of Safety 1 Avg. Flow Depth (ft): 0.34 Shear Stress (lbs/sgft) Pass (quantity Lining Materials Left Bottom Right Calculation Results Flow Depth (ft) Flow Area (ft) Hydraulic Radius (ft) Composite 'n' N'taximum Safety Maximum puted Allowed Factor Computed safety Allowed Factor 1.230 1.010 1.340 1.200 1.230 1.010 0.340 Left Wetted Perimeter (ft) 1.060 1.010 Bottom Wetted Perimeter (ft) 2.010 Right Wetted Perimeter (ft) 1.060 Total Wetted Perimeter (ft) 4.130 0.250 Avg. Velocity (ft/s) 1.270 0.1042 Avg. Discharge (cf/s) 1.410 (SY) I EC-DESIGN® 2003 page 1 8/20/2008 ECDesign® 2003 Channel Analysis Report FP Information Last Update: 8/20/2008 5:31:12 PM Project Name: Chatham County LEC Description: City: Raleigh State: NC Units: English Notes: Channel Design Channel Name: to DI#2 Units: English Design Life: 1200 months Design Criteria Vegetation and Soil Channel Geometry Flow/Velocity Flow Rate (Q) Vegetated Yes Bed Slope (ft/ft) 0.052 Discharge (cf(s) 0.62 Vegetation Class D Req. Freeboard (ft) Flow Duration (hrs) 24 Soil Filled No Channel Length (ft) 77 Avg. Velocity (ft/s) 1.26 Channel Side Slopes Channel Bend false Bottom Width (ft) 2 Required Factor of Safety Left (H:1 V) 3 Bend Radius (ft) 0 Channel Depth (ft) I Right (H:1 V) 3 Outside Bend Results Avg. Flow Depth (ft): 0.35 Velocity (ft/s) Shear Stress (lbs/sgft) Pass Quantity Lining Materials Computed Maximum Allowed Safety Factor Computed Maximum Allowed Safety Factor (SY) Left 1.220 0.960 Bottom 1.330 1.140 Right 1.2201 i 0.960 Calculation Results Flow Depth (ft) 0.350 Left Wetted Perimeter (ft) 1.110 Flow Area (ft) 1.080 Bottom Wetted Perimeter (ft) 2.010 Right Wetted Perimeter (ft) 1.110 Total Wetted Perimeter (ft) 4.230 Hydraulic Radius (ft) 0.250 Avg. Velocity (ft/s) 1.260 Composite's' 0.1029 Avg. Discharge (cf/s) 0.620 EC-DESIGNO 2003 page 1 8/2012008 ECDesign® 2003 Channel Analysis Report Project Information Last Update: 8/20/2008 5:35:22 PM Project Name: Chatham County LEC Description: City: Raleigh State: NC Units: English Notes: Channel Design Channel Name: to DI#3 Units: English Design Life: 1200 months Design Criteria Vegetation and Soil Channel Geometry Flow/Velocity Flow Rate (Q) Vegetated Yes Bed Slope (ft/ft) 0.037 Discharge (cf(s) 0.79 Vegetation Class D Req. Freeboard (ft) Flow Duration (hrs) 24 Soil Filled No Channel Length (ft) 80 Avg. Velocity (ft/s) 0.8 Channel Side Slopes Channel Bend false Bottom Width (ft) 2 Required Factor of Safety Left (H:1 V) 3 Bend Radius (ft) 0 Channel Depth (ft) 1 Right (H:1 V) 3 Outside Bend Results Avg. Flow Depth (ft). 0.33 Velocity (ft(s) Shear Stress (Ibs/sgft) Pass Quantity Lining Materials Computed Maximum Allowed Safety Factor Computed Maximum Allowed Safety Factor (SY) Left 0.770 0.650 Bottom 0.840 0.770 Right 0.770 0.650 Calculation Results Flow Depth (ft) 0.330 Left Wetted Perimeter (ft) 1.050 Flow Area (ft) 0.990 Bottom Wetted Perimeter (ft) 2.000 Right Wetted Perimeter (ft) 1.050 Total Wetted Perimeter (ft) 4.100 Hydraulic Radius (ft) 0.240 Avg. Velocity (ft/s) 0.800 Composite'n' 0.1324 Avg. Discharge (cf/s) 0.790 EC-DESIGN® 2003 page 1 8/20/2008 Channel Design Channel Name: to DI#4 Design Criteria Flow Rate (Q) and Soil Vegetated Vegetation Class Soil Filled Units: Channel Geometry Yes Bed Slope (ft/ft) D Req. Freeboard (ft) No Channel Length (ft) Channel Side Slopes Channel Bend false Bottom Width (ft) Left (H:1 V) 3 Bend Radius (ft) 0 Channel Depth (ft) Right (H:1 V) 3 Outside Bend esign Life: 1200 months Flow/Velocity 0.037 Discharge (cf/s) 0.79 Flow Duration (hrs) 24 63 Avg. Velocity (fVs) 0,8 2 Required Factor of Safety 1 Results Avg. Flow Depth (ft): 0.33 Velocity (ft/s) Shear Stress (lbs/sgft) Pass Lining Materials Left Com puted Maximum Allowed Safety Factor Computed Maximum Allowed Safety Factor 0.770 0.650 Bottom 0.840 0.770 Right 0.770 0.650 Calculation Results Flow Depth (ft) Flow Area (ft) Hydraulic Radius (ft) Composite In, 0.330 Left Wetted Perimeter (ft) 0.990 Bottom Wetted Perimeter (ft) Right Wetted Perimeter (ft) Total Wetted Perimeter (ft) 0.240 Avg Velocity (ft/s) 0.1324 Avg Discharge (cf/s) Quantity (SY) 1.050 2.000 1.050 4.100 0.800 0.790 EC-DESIGNS 2003 page 1 8/20!2008 ECDesign® 2003 Channel Analysis Report Appendices NEW YORK DOT DISSIPATOR METHOD FOR USE IN DEFINED CHANNELS (Source: "Bank and channel lining procedures", New York Department of T ransportation, Division of Design and Construction, 1971.) NOTE: To use the following chart you must know: (1) Q full capacity (2) Qio (3) V full (4) V10 where Q = discharge in cfs and V = Velocity in FPS. ESTIMATION OF STONE SIZE AND DIMENSIONS FOR CULVERT APRONS Step 1) Compute flow velocity V at culvert or paved channel outlet. Step 2) For pipe culverts Do is diameter. For pipe arch, arch and box culverts, and paved channel outlets, Dp = A. where A. = cross-sectional area of flow at outlet. For multiple culverts, use D. = 1.25 x D. of single culvert. Step 3) For apron grades of 10% or steeper, use recommendations For next higher zone. (Zones 1 through 6). 25- 20- F is- 0- 0 ul 10 - -LOWS 1 0-- 01 Figure 8.06c Ii1 11 11111r 111 it 11 1111x11 11111111111 11111 1111 11. 11'1:111111 1111 1111111 II'I' x11 1 11 111 I 1111 1 1,1 1 111 11111 111 111 11111111 I 1111.11 1,1111 111111 II 111111111 x11111111111• Il 111 I I •111111 1111' I 1 r G 111 X11 111 ??? 1 111 11 ' Iii 11 11 111 1111 1111 111 11111 1111 I 1 111111111111111111111 1 1t11 11 11111 11111111 111111111 111111 IIII1111I111 II I1 !111111 111111111111111111111 11111111111 1111 111 I 111 11 III 111111 111. rll 1 111 1 1111111 1111 1 '1111 111111! III 1111111111 11111111 1111111 11111 1111111 .1111111 III IIi11 111 II11 '111 111 t11 1111 III 1 1 1 11111.1 1 1 1111 1111 1111 1 111 11 IIi11111i11111? ' 11 ?111i111?i?? II I i' 1 1 II 1 1111 IIr11 1111111111111 11x1 111115 111 1111111 11111111111 ICI II 111 J 11111 II?i1111111 1111111 111 ?' III 1 111 II IIIIIII111 I t 1 1 1 11 11111111 1 -I 11 III ? 111 1111111 I 111111 111111 111 •111 1111 II 1 1111 111 11 11 11 11111 I 1 111 III 111 11 11 11111111 11111 11111111 '11 11111111 1111111 III 111 II?111111 I 1111 11111! 11 IIII 1 1;1!11111 1111111 111 11! 111111111 111 I III 11 III II 1 (IIII 11111111111 1111111 II t1 111111 111 Ilr 111 II ' 1 Illy 111. 11111111111 1111 ' 11 1111 1 11.1111 1111 III 11111111 1 1111 f 11111 II 1 1111111 III II1111111 11111 111 11 q 11 II 1 III 1 111 1111111 11 II G 111 11 3 11 111 111 4 i?1111111111 1 11 111 Illy 111 11 I IIIIrrl11111111 II 11 1111111111 111 II 111111 I 111111 I 1111 1111 1111 I I 1111111 11111111 1 II I 111 111 11111 II 111111 1111 IIIli111 111 11111 1111 III 111 II II II II I 111111111 111 111 1111 111 11111 II111 I 1111111 111 11111 11111111, 11111111 11111 II11 II 1111 111111 III 111 III 1111111 I I 1 1111 11111111 Il 1 III II11 II 'IIII III IIII II II ry11 ti .11 .u1 I I ? 5' 10, 15' 20' 25' DIAMETER (Ft.) Rev. 12/93 8.06.5 4 1,1-q' w- ? ? I•Z? 13S`? • 4 ? w ?iC ? ? L X LENGTH OF APRON W Z 0 APRON MATERIAL TO PROTECT TO PREVENT SCOUR CULVERT HOLE USE L2 ALWAYS L2 L1 1 STONE FILLING (FINE) CL. A 3 X Da 4 x D. 2 STONE FILLING (LIGHT) CL. B 3 X Do 6 x D. 3 STONE FILLING (MEDIUM) CL. 1 4 X Do 8 x D. 4 STONE FILLING (HEAVY) CL. 1 4 X Do 8 x D. 5 STONE FILLING (HEAVY) CL. 2 5 X Do 10 x D. 6 STONE FILLING (HEAVY) CL. 2 6 X Do 10 x D. 7 SPECIAL STUDY REQUIRED (ENERGY DISSIPATORS, STILLING BASIN OR LARGER SIZE STONE). t-igure Bmcl Width = 3 times pipe dia. (min.) DETERMINATION OF STONE SIZES FOR DUMPED STONE CHANNEL LININGS AND REVETMENTS Step 1. Use figure 8.06.b.3 to determine maximum stone size (e.g. for 12 Fps = 20" or 550 lbs. Step 2. Use figure 8.06.b.4 to determine acceptable size range for stone (for 12 FPS it is 125-500 lbs. for 75% of stone, and the maximum and minimum range in weight should be 25-500 lbs.). NOTE: In detennining channel velocities for stone linings and revetment, use the following coefficients of roughness: Diameter Manning's Min. thickness (inches) "n" of lining (inches) _Aj Fine 12 Light 6 0.035 12 18 Medium 13 0.040 18 24 Heavy 23 0.044 30 36 (Channels) (Dissapators) 8.06.6 Rev. 12/93 Appendices NEW YORK DOT DISSIPATOR METHOD r-r-S st " FOR USE IN DEFINED CHANNELS (Source: "Bank and channel lining procedures", New York Department of to Transportation, Division of Design and Construction, 1971.) V to ' NOTE: To use the following chart you must know: ?? (1) Q full capacity (2) Q,0 (3) V full (4) V10 where Q = discharge in cfs and V = Velocity in FPS. ESTIMATION OF STONE SIZE AND DIMENSIONS FOR CULVERT APRONS Step 1) Compute flow velocity V at culvert or paved channel outlet. Step 2) For pipe culverts Do is diameter. For pipe arch, arch and box culverts, and paved channel outlets, Do = Ao where A. = cross-sectional area of flow at outlet. For multiple culverts, use D. = 1.25 x D. of single culvert. Step 3) For apron grades of 10% or steeper, use recommendations For next higher zone. (Zones 1 through 6). 2: 2( a. U O is 5 0 0 ?? 'i " ;? 111 r 1,1 1 1 ? 1 I„ 111 ;I?I?I; 111;111 111 771 \I??Ilii 1111 1111111 I rllil,l;l 11 ' r 111 .1 , 1 ' '?I i' ' 11 111 rill ili C 1 il; ;11111 li 1111 iii?? ??11 1?11i? G 111 11, 111 1? •I ,11 1 1 'II I 111 1111 X11 11 ?Il? II I '11 1111?'Illll 1111 rl• 111 Ilr 'Ill ' 11111 11 ' 1 1 111111x1 1111 1111111 111 11 I IIII1111111,111111! 1111111 I I 1111111 1 11 1 11111 111 11111 II' ' 111111 111 '11 111 III 111 111111 111 111 111 11• ICI 11 1 11 111' 1111 111' 11111 111111! 'Ill 111111111 11111 1111111 11111 1111 1111111 III 11111,1 111 1111 •111 111 r 1 1111 1 11: 1111 1111 1 1 11111 11 111 11x11111111 1il II I? Ii111111111 7 ? X1,1 11111 ' 1 i 1 ? 11 II Ilii ?1?1 X11111111 11t 1 II11 II p 111 11111111 111,1111111 111 1111 II?C 111;1 '1;111111111; 11,1111 111 ' 111 1 111 I 1 1 1 1 1 I 11111111111 1111111 111 11 ? 111 1111111 1 I 1 111 111111111 111111111 111 I ' ' I 1111 111 II ?? ?1 II 'Il 11111 II 11' 11,111 1 11 111111 11111111 1 II III 1111 1111111 111111111111111 111 1111 ? ill III I I1 111!11111 1111111, 111 11!1 1111111111 1 I III •1 1111 1111 IIIII 111,111 I 1111111 II 11111 .1 111 1111 rll II 1111 II11 II? 11111111111 111 ' 11 1111 111 •1111 111111 111 11 111111 ' x11111 11111111: 1111 1 1111111 11111 III rf 11 111 III 1111 1111111 II ?; G II 11 3 ?I 111 111 4 11111111111' III II I II11 111 11 111111 111111111 II 1 ' 1'111111 1 I 1 1111 111,11111 I 1111 I I ill ? 1111 I I I I I 1111111 11111111 111 1 1 11 11111 II 111,11 11 1111 ;11 111 11111 Ili 'III 111 11 1I 1'111 1 11111111' 11 111 1111111 1111 11111 II II 1111111 III 11,11 11x11111. I 1 11111 II111 111111111 I I 1111, 111111111 1111111 1111111 1111 11 I II III 11111111 111 II III 1111 II 111 III 11 II 11 1 2<' 3C '?' EO" 1u' 15' 20' 25' DIAMETER (Ft.) Figure 8.06c Rev. 12/93 8.06.5 F8 b - t . C), -Z- x1.d 41 Use LENGTH OF APRON Z APRON MATERIAL TO PROTECT TO PREVENT SCOUR N CULVERT HOLE USE L2 ALWAYS L2 L1 1 TONE FILLING (FINE) CL. A 3 X Do 4 x D. 2 STONE FILLING (LIGHT) CL. B X Do E 6 x D. 3 STONE FILLING (MEDIUM) CL. 1 E4 X Do 8 x D. 4 STONE FILLING (HEAVY) CL. 1 4 X Do 8 x D. 5 STONE FILLING (HEAVY) CL. 2 5 X Do 10 x D. 6 STONE FILLING (HEAVY) CL. 2 6 X Da 10 x D. 7 SPECIAL STUDY REQUIRED (ENERGY DISSIPATORS, STILLING BASIN OR LARGER SIZE STONE). rigure s.uba Width = 3 times pipe dia. (min.) DETERMINATION OF STONE SIZES FOR DUMPED STONE CHANNEL LININGS AND REVETMENTS Step 1. Use figure 8.06.b.3 to determine maximum stone size (e.g. for 12 Fps = 20" or 550 lbs. Step 2. Use figure 8.06.b.4 to detennine acceptable size range for stone (for 12 FPS it is 125-500 lbs. for 75% of stone, and the maximum and minimum range in weight should be 25-500 lbs.). NOTE: In determining channel velocities for stone linings and revetment, use the following coefficients of roughness: Diameter Manning's Min. thickness A (inches) "n" of lining (inches) Fine 3 0.031 9 12 Light 6 0.035 12 18 Medium 13 0.040 18 24 Heavy 23 0.044 30 36 (Channels) (Dissapators) 8.06.6 Rev. 12/93 o we kca. uarr?> -m Riprap Aprons for Low Tailwater (downstream flow depth < 0.5 x pipe diameter) Culvert Lowest value Intermediate val ues to interpolate from Hi hest value Diameter Q LA p50 Q LA D50 Q LA D50 Us Ft In Us Ft In Ofs Ft In 4 6 5 7 8 2.5 . 3 9 131 6 14 17 8,5 . 10 9 3.5 15 20 16 17 7 7 25 20 12 15 11 4 35 22 10 40 60 25 29 14 18 27 13 14 5 5 5 50 26 12 80 33 19 36 16 . 6 70 29 14 110 37 22 56 20 7 90 33 15.5 140 41 24 82 22 8 5 140 40 18 220 50 28 120 26 . 10 160 . 39 17 260 52 26 4 220 46 19 _ 320 64 37 BMP OPERATION AND MAINTENANCE MANUAL L Chatham County Law Enforcement Center Parking Lot Modifications and Expansion Prepared For: Chatham County 12 East Street P.O. Box 1809 Pittsboro, NC 27312 Prepared by: Rivers and Associates, Inc. 6131 Falls of Neuse Road, Suite 300 Raleigh, NC 27609 (919) 848-3347 Rivers & Associates Inc. Job #2008107 Bioretention Operation and Maintenance A maintenance record on this BMP shall be kept in a log in a known set location. Records of maintenance items to include dates, inspector's name, type of maintenance, etc. shall be kept. Any deficient BMP elements noted in the inspection shall be corrected, repaired or replaced immediately. Important inspection and maintenance procedures: - Immediately after the bioretention cell is established, the plants will be watered twice weekly if needed until the plants become established (commonly six weeks). - Snow, mulch or any other material will NEVER be piled on the surface of the bioretention cell. - Heavy equipment will NEVER be driven over the bioretention cell. - Special care will be taken to prevent sediment from entering the bioretention cell. - Once a year, a soil test of the soil media will be conducted. After the bioretention cell is established, it shall be inspected once a month and within 24 hours after every storm event greater than 1.0. Maintenance activities shall be performed as follows: 1. Inspect the bioretention area system for soil and mulch erosion, vegetated cover, and general condition after every significant runoff producing rainfall event and at least monthly. Remove trash as needed. 2. Repair eroded areas immediately, re-seed, re-plant, and re-mulch as necessary to maintain good vegetative and mulch cover. 3. Remove accumulated sediment as needed to maintain good infiltration. When the filtering capacity diminishes substantially (e.g., when water ponds on the surface for more than 24 hours), the top few inches of material must be removed and replaced with fresh planting soil material. Regardless of infiltration capacity, accumulated sediment in the bioretention basin shall be removed when the depth is reduced to 75% of the original design depth. The system shall be restored to the original design depth without over-excavating. Over-excavating may cause the required water table separation to be reduced and may compromise the ability of the system to perform as designed. Removed sediment shall be disposed of in an appropriate manner and shall not be handled in a manner that will adversely impact water quality (i.e. stockpiling near a stormwater treatment device or stream, etc.). 4. Replace, or add additional mulch as needed. Removal of the old mulch layer before applying the new layer is recommended every 2 to 3 years. 5. Prune trees and shrubs and remove debris on an annual basis. Grassed vegetation should not exceed 6 inches in height. 6. Treat all diseased trees and shrubs whenever needed. Remove and replace all dead and diseased vegetation considered beyond treatment every 6 months. 7. Replace support stakes yearly (in the spring). Replace deficient stakes or wires whenever needed. 8. Soil testing shall be conducted annually to determine pH and any accumulation of toxins in the planting media. Lime or other alkaline substances shall be applied as recommended per the soil test and toxic soils shall be removed, disposed of properly and replaced with new planting media. 9. All components of the bioretention area system shall be maintained in good working order. 1 of 3 BMP element: Potential problems: How to remediate the problem: The entire BMP Trash/debris is resent. Remove the trash/debris. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to bioretention cell erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. The inlet device: pipe, The pipe is clogged (if Unclog the pipe. Dispose of the stone verge or Swale applicable). sediment off-site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the swale if necessary to swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Stone verge is clogged or Remove sediment and clogged covered in sediment (if stone and replace with clean stone. a licable). The pretreatment area Flow is bypassing Regrade if necessary to route all pretreatment area and/or flow to the pretreatment area. gullies have formed. Restabilize the area after grading. Sediment has accumulated to Search for the source of the a depth greater than three sediment and remedy the problem if inches. possible. Remove the sediment and restabilize the pretreatment area. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. The bioretention cell: Best professional practices Prune according to best professional vegetation show that pruning is needed practices. to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Tree stakes/wires are present Remove tree stake/wires (which six months after lantin can kill the tree if not removed). 2of3 1 1 1 E 1 n BMP element: Potential problems: How to remediate the problem: The bioretention cell: Mulch is breaking down or Spot mulch if there are only random soils and mulch has floated away. void areas. Replace whole mulch layer if necessary. Remove the remaining much and replace with triple shredded hard wood mulch at a maximum depth of three inches. Soils and/or mulch are Determine the extent of the clogging clogged with sediment. remove and replace either just the top layers or the entire media as needed. Dispose of the spoil in an appropriate off-site location. Use triple shredded hard wood mulch at a maximum depth of three inches. Search for the source of the sediment and remedy the problem if possible. An annual soil test shows that Dolomitic lime shall be applied as pH has dropped or heavy recommended per the soil test and metals have accumulated in toxic soils shall be removed, the soil media. disposed of properly and replaced with new Planting media. The underdrain system Clogging has occurred. Wash out the underdrain system. (if applicable) The drop inlet Clogging has occurred. Clean out the drop inlet. Dispose of the sediment off-site. The drop inlet is damaged Repair or replace the drop inlet. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. -ENU ,01 - feii i?e1 -? 5_.. Remove trash and debris Monthly R Check and repair an eroded areas Monthly Remulch an void areas Monthl Check Vegetation and replace any damaged lant materials Monthly Inspect for ponding, washed out areas, soil conditions Monthly Perimeter mowing Monthly Inspect collection system for proper functioning Quarterly Reseed grass swale or border Annually A 1 new mulch Annually Pruning Annually Perform soil test and replace soil if needed Annuall Repair broken pipes As needed Replace rip rap that is chocked with sediment As needed Remove sediment As needed Replace mulch Eve three ears 3 of 3 Bioretention Inspection Checklist Project Name: Project Address: Owner's Name: Owner's Address: BMP name and location: Inspection Date: 5• F J _. Na t:S ?.. i Clear of trash and debris Banks/Surrounding areas mowed Unwanted vegetation Plant condition and a earance Mulch condition Condition of swale or border M - A - I -7 F, r Evidence of erosion or washed out areas ?vtw Fore ba condition if resent Evidence of sediment in facili -- Condon of dissi pater at inlet Condition of dissipater at outfall ? Condition of i e or ??talc ca! Condition of outletldro boy ? _ ?_ Standing water-drawdown time must be between 48-120 hours Soil Condition Action Recommended ( for any items marked U, attach additional sheets as needed): Action Taken (for any items marked U, attach additional sheets as needed): Additional Comments (attach additional sheets as needed): Permeable Pavement Operation and Maintenance A maintenance record on this BMP shall be kept in a log in a known set location. Records of maintenance items to include dates, inspector's name, type of maintenance, etc. shall be kept. Any deficient BMP elements noted in the inspection shall be corrected, repaired or replaced immediately. Important operation and maintenance procedures: - Stable groundcover will be maintained in the drainage area to reduce the sediment load to the permeable pavement. - The area around the perimeter of the permeable pavement will be stabilized and mowed, with clippings removed. - Any weeds that grow in the permeable pavement will be sprayed with pesticide immediately. Weeds will not be pulled, since this could damage the fill media. - Once a year, the permeable pavement surface will be vacuum swept. - At no time shall wet sweeping (moistening followed by sweeping) be allowed as a means of maintenance. - There shall be no repair or treatment of Permeable Pavement surfaces with other types of pavement surfaces. All repairs to Permeable Pavement surfaces must be accomplished utilizing permeable pavement which meets the original pavement specifications. - Concentrated runoff from roof drains, piping, swales or other point sources, directly onto the permeable pavement surface shall not be allowed. These areas must be diverted away from the permeable pavement. Initial Inspection: Permeable Pavements shall be inspected monthly for the first three months for the following: BMP element: Potential problem: How to remediate the problem: The perimeter of Areas of bare soil and/or In the event that rutting or failure of the groundcover the permeable erosive gullies have occurs, the eroded area shall be repaired immediately pavement formed. and permanent groundcover re-established. Appropriate temporary Erosion Control measures (such as silt fence) shall be installed in the affected area during the establishment of permanent groundcover, and any impacted area of permeable pavement is to be cleaned via vacuum sweeping. The surface of the Rutting / uneven This indicates inadequate compaction of the pavement permeable settlement base / sub-base. If rutting or uneven settlement on the pavement order of 1/z inch or greater occurs, permeable pavement shall be removed and base / sub-base re-compacted, smoothed, and permeable pavement shall then be re- installed. Base and sub-base compaction shall be monitored by a licensed geotechnical engineer to ensure that infiltration capacity of base and sub-base are not compromised b compaction and smoothing processes. The pavement does not Vacuum sweep the pavement. If the pavement still dewater between storms, does not dewater, consult a professional. or water is running off. 1 of 2 n 1 1 1 1 1 Additional Comments (attach additional sheets as needed):