Loading...
HomeMy WebLinkAbout090131_Plan of Action (POA)_20201113 flo l ecievec OH PLAN OF „C lTIION (RDA) FOR MGM FREEBOARD AT ANIMAL F cCIU u HES Facility Number:ber: a�. - `� ! County: l!e� ! r`) ;F . • Facility Name: (I VA I a .t 5 WUa f( i&1i4 Certified Operator Name: C.ktortn( I1C GDCD(Ven Operator v 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. • Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Lagoon Name/Identifier (ID): t Spillway (Yes or No): Level (inches): 1 (e • 2. Check sill applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within . acceptable ranges. ,/ V Liquid level is within the`25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to'be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval fri m the Division of Water Quality prior to transfer of:Waste to a site net ctvered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. . -attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon • freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: . 11_1_(i-I 2,Oao I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. • Nr\all Ilina G-cctien Phone: ct to -01 h& b Facility Off er/Manager(print) • • e Date:• I, //3) °2t) Facility Owner/Manager(signature) PoA Cover Page 2/21/00 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR.STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: White Plains line m= 97.3 lb PAN 2. Structure ID: line m= lb PAN 3. Structure ID: line m= lb PAN 4. Structure ID: line m= lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m= lb PAN n. lines1 +2+3+4+5+6= 0 97.3IbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract# p. field# q. crop r. acres s.remaining!RR-t.TOTAL PAN u.application window 2 PAN balance BALANCE FOR (lb/acre) FIELD(lbs.) column r x s 4742 1 overseed 5.35 75.00 401.3 Mar-Sept 4742 2 overseed 4.51 75.00 338.3 Mar-Sept **guestimate on PAN left-has pumped 1 time. 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v.Total PAN available for all fields(sum of column t)= 739.5 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied(line n from section II)= 97.3 lb. PAN x. Crop's remaining PAN balance(line v from section III)= 739.5 lb. PAN y. Overall PAN balance(w-x)= -642 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump&haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: Will begin pumping as soon as field conditions allow. PoA(30 Day)2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier(ID): White Plains 2. Current liquid volume in 25 yr./24 hr. storm storage&structural freeboard a. current liquid level according to marker 16.0 inches b. designed 25 yr./24 hr. storm &structural freeboard 19.0 inches c. line b-line a (inches in red zone) = 3.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 48000 ft2 e. line c/12 x line d x 7.48 gallons/ft3 89760 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 44543 ft3 h. current herd# 6060 certified herd# 6060 actual waste produced = current herd# x line g = 44543 ft3 certified herd# i. volume of wash water according to structural design 0 ft3 j. excess rainfall over evaporation according to design 28000 ft3 k. (lines h + i+j)x 7.48 x 30 days/line f= 90437 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 9/29/2020 0.54 lbs/1000 gal. m. ((lines e+ k)/1000)x line I= 97.3 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA(30 Day)2/21/00 PLAN OFACTION (irO [1111/ FOR HIlGH FREEBOARD AT ANIMAL FACILIITIES Facility Number: 9 County:. i I!1(.G40 Q Facility Name: D Lv I G fl(?C. r Vl l S(l >) . • Certified Operator Name: D of V l d (` on r~ fcl Operator • 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. • Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Lagoon Name/Identifier(ID): ! • • Spillway (Yes or No): Level (inches): I(0 dr • 2. Check ail applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. \ Liquid level is within the 25 year 24 hour storm elevations for one or mo re re structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. • Waste is to be pumped and hauled tb-offf site locations. Volume and PAN content of waste to pumped and hauled is reflected in section Ill tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure apprsval from the Division of Water Quality prior to transfer of waste' to a site net covered in the facility's certified nimnal waste management plan. Operation will be partially or fully depopulated. • - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: II I3, 2,0 2 JT) l hereby certify that I have reviewed the inf.rmation listed above and included within the attached Plan of Acti'n, and to the best of my knowledge and ability, the information is accurate and correct D O I C( 6 0 0 oLor\ Phone: C l 0 B 7c c- O 0 Facility Owner illanager(print) 1,7,y C;)�- —t ®ate: I I l !32bZb Facility Owner/lanager(signature) . PoA Cover Page 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier(ID): David Gooden 1 2. Current liquid volume in 25 yr./24 hr. storm storage&structural freeboard a. current liquid level according to marker 16.0 inches b. designed 25 yr./24 hr. storm &structural freeboard 19.0 inches c. line b-line a(inches in red zone) _ • 3.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 95836 ft2 e. line c/12 x line d x 7.48 gallons/ft3 179213 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 145388 ft3 h. current herd# 4410 certified herd# 4410 actual waste produced = current herd# x line g = 145388 ft:3 certified herd# i. volume of wash water according to structural design 0 ft3 j. excess rainfall over evaporation according to design 58333 ft3 k. (lines h+ i+j)x 7.48 x 30 days/line f= 253972 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 9/29/2020 0.84 lbs/1000 gal. m. ((lines e+ k)/1000)x line I= 363.9 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA(30 Day)2/21/00 Il. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: David Gooden 1 line m= 363.9 lb PAN 2. Structure ID: 2 line m= lb PAN 3. Structure ID: 3 line m = lb PAN 4. Structure ID: line m= lb PAN 5. Structure ID: . line m= lb PAN 6. Structure'ID: line m = lb PAN n. lines 1 +2+3+4+5+6= 363.9lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract# p. field# q. crop r. acres s.remaining IRR•t.TOTAL PAN u.application window' 2 PAN balance BALANCE FOR (lb/acre) FIELD(lbs.) column r x s 4696 14A overseed 3.70 50.00 185.0 Sept-April 4696 14B overseed 3.60 50.00 180.0 Sept-April 4696 15A overseed 3.30 50.00 165.0 Sept-April 4696 15B overseed 3.30 50.00 165.0 Sept-April 4696 15C overseed 3.20 50.00 160.0 Sept-April 4696 15D overseed 1.80 50.00 90.0 Sept-April 4696 7A overseed 1.00 50.00 50.0 Sept-April 4696 7B overseed 2.50 50.00 • 125.0 Sept-April 4696 7C overseed 2.50 50.00 125.0 Sept-April 4696 9A overseed 1.85 50.00 92.5 Sept-April 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v.Total PAN available for all fields (sum of column t)= 1337.5 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied(line n from section II)= 363.9 lb.PAN x. Crop's remaining PAN balance(line v from section III)= 1337.5 lb. PAN y. Overall PAN balance(w-x)= -974 lb. PAN NARRATIVE: Pumping will begin as soon as field conditions are acceptable. used partial fields to get a negative balance.