January 8, 2021
DWR # 2020-1422
New Hanover County
Circle K
Attn: Andy Priolo
1100 Situs Court – Suite 100
Raleigh, NC 27606
Subject: APPROVAL OF 401 WATER QUALITY CERTIFICATION WITH ADDITIONAL CONDITIONS
Circle K (Airport Boulevard – Wilmington, NC 28405)
Dear Mr. Priolo:
You have our approval for the impacts listed below for the purpose described in your application dated
November 9, 2020, received by the Division of Water Resources (Division) November 9, 2020 and
payment received November 10, 2020, with subsequent information on December 14, 2020, December
22, 2020 and December 23, 2020. These impacts are covered by the attached Water Quality General
Certification Number 4139 and the conditions listed below. This certification is associated with the use
of the Nationwide Permit Number 39 once issued to you by the U.S. Army Corps of Engineers. Please
note that you should get any other federal, state or local permits before proceeding with your project,
including those required by (but not limited to) Sediment and Erosion Control, Non-Discharge, and
Water Supply Watershed regulations.
The Division has determined that the proposed project will comply with water quality requirements
provided that you adhere to the conditions listed in the enclosed certification and to the additional
conditions itemized below.
The following proposed impacts are hereby approved. No other impacts are approved, including
incidental impacts. [15A NCAC 02H .0506(b)]
Type of Impact
Amount Approved
(units)
Permanent
Amount Approved
(units)
Temporary
Stream N/A N/A
404/401 Wetlands 0.025 acres N/A
Open Waters 0.11 acres
N/A
This approval is for the purpose and design described in your application. The plans and specifications
for this project are incorporated by reference as part of this Certification. If you change your project,
DocuSign Envelope ID: 222E0680-E057-452A-A908-66D73BFAAE75
Circle K (Airport Boulevard – Wilmington, NC 28405)
DWR# 20201422
401 Certification
Page 2 of 3
you must notify the Division and you may be required to submit a new application package with the
appropriate fee. If the property is sold, the new owner must be given a copy of this Certification and is
responsible for complying with all conditions. [15A NCAC 02H .0507(d)(2)].
If you are unable to comply with any of the conditions of the attached Water Quality General
Certification or with the additional conditions itemized below, you must notify the Wilmington Regional
Office within 24 hours (or the next business day if a weekend or holiday) from the time the permittee
becomes aware of the circumstances.
The permittee shall report to the Wilmington Regional Office any noncompliance with, and/or any
violation of, stream or wetland standards [15A NCAC 02B .0200] including but not limited to sediment
impacts to streams or wetlands. Information shall be provided orally within 24 hours (or the next
business day if a weekend or holiday) from the time the permittee became aware of the non-compliance
circumstances.
Additional Conditions:
1. All mechanized equipment operated near surface waters shall be inspected and maintained
regularly to prevent contamination of surface waters from fuels, lubricants, hydraulic fluids,
or other toxic materials. Construction shall be staged in order to minimize the exposure of
equipment to surface waters to the maximum extent practicable. Fueling, lubrication and
general equipment maintenance shall be performed in a manner to prevent, to the
maximum extent practicable, contamination of surface waters by fuels and oils. [15A NCAC
02H .0506(b)(3) and (c)(3) and 15A NCAC 02B .0211 (12)]
2. The turbidity standard of 50 NTUs (Nephelometric Turbidity Units) shall not be exceeded as
described in 15 A NCAC 02B .0200. Appropriate sediment and erosion control practices must
be used to meet this standard. [15A NCAC 02B .0211 (21)]
This approval and its conditions are final and binding unless contested. [G.S. 143-215.5]
Statutes by filing a Petition for a Contested Case Hearing (Petition) with the North Carolina Office of
Administrative Hearings (OAH) within sixty (60) calendar days. Requirements for filing a Petition are set
forth in Chapter 150B of the North Carolina General Statutes and Title 26 of the North Carolina
Administrative Code. Additional information regarding requirements for filing a Petition and Petition
forms may be accessed at http://www.ncoah.com/ or by calling the OAH Clerk’s Office at (919) 431-3000.
One (1) copy of the Petition must also be served to the North Carolina Department of Environmental
Quality:
William F. Lane, General Counsel
Department of Environmental Quality
1601 Mail Service Center
Raleigh, NC 27699-1601
DocuSign Envelope ID: 222E0680-E057-452A-A908-66D73BFAAE75
Circle K (Airport Boulevard – Wilmington, NC 28405)
DWR# 20201422
401 Certification
Page 3 of 3
This letter completes the review of the Division under section 401 of the Clean Water Act and 15A NCAC
02H .0500. Please contact Tyler Benson at 910-620-7447 or Tyler.Benson@ncdenr.gov if you have any
questions or concerns.
Sincerely,
Morella Sanchez-King
Regional Supervisor
Water Quality Regional Operations Section
Division of Water Resources, NCDEQ – WiRO
Enclosures: GC 4139
cc: A. Granseur Dick, EC
Rachel Capito, USACE Wilmington Regulatory Field Office, EC
Lauren Norris-Heflin, Consultant, EC
DWR 401 & Buffer Permitting Branch file-LF
WiRO
DocuSign Envelope ID: 222E0680-E057-452A-A908-66D73BFAAE75
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF WATER RESOURCES
WATER QUALITY GENERAL CERTIFICATION NO.4139
GENERAL CERTIFICATION FOR PROJECTS ELIGIBLE FOR US ARMY CORPS OF ENGINEERS
• NATIONWIDE PERMIT NUMBER 18 (MINOR DISCHARGES),
• NATIONWIDE PERMIT NUMBER 29 (RESIDENTIAL DEVELOPMENT),
• NATIONWIDE PERMIT NUMBER 39 (COMMERCIAL AND INSTITUTIONAL
DEVELOPMENTS),
• NATIONWIDE PERMIT NUMBER 40 (AGRICULTURAL ACTIVITIES),
• NATIONWIDE PERMIT NUMBER 41(RESHAPING EXISTING DRAINAGE DITCHES),
• NATIONWIDE PERMIT NUMBER 42 (RECREATIONAL FACILITIES),
• NATIONWIDE PERMIT NUMBER 44 (MINING ACTIVITIES),
• NATIONWIDE PERMIT NUMBER 46 (DISCHARGES IN DITCHES),
• NATIONWIDE PERMIT NUMBER 51(LAND BASED RENEWABLE ENERGY GENERATION
FACILITIES), AND
• NATIONWIDE PERMIT NUMBER 52 (WATER BASED RENEWABLE ENERGY GENERATION
PILOT PROJECTS).
Water Quality Certification Number 4139 is issued in conformity with the requirements of
Section 401, Public Laws 92-500 and 95-217 of the United States and subject to the North
Carolina Regulations in 15A NCAC 02H .0500 and 15A NCAC 02B .0200 for the discharge of fill
material to surface waters and wetland areas as described in 33 CFR 330 Appendix A (B) (18, 29,
39, 40, 41, 42, 44, 46, 51 and 52) of the US Army Corps of Engineers regulations.
The State of North Carolina certifies that the specified category of activity will not violate
applicable portions of Sections 301, 302, 303, 306 and 307 of the Public Laws 92-500 and 95-
217 if conducted in accordance with the conditions hereinafter set forth.
Effective date: December 1, 2017
Signed this day: December 1, 2017
By
for Linda Culpepper
Interim Director
GC4139
Activities meeting any one (1) of the following thresholds or circumstances require written
approval for a 401 Water Quality Certification from the Division of Water Resources (DWR):
a) If any of the conditions of this Certification (listed below) cannot be met; or
b) Any impacts to streams from excavation or dredging other than excavation that is
conducted as preparation for installing permanent fill or structures; or
c) Total temporary and permanent impacts to streams greater than 150 feet; or
d) Any stream relocation or stream restoration; or
e) Complete dewatering and drawdowns to a sediment layer related to pond/dam
maintenance or removal; or
f) Total temporary and permanent impacts to wetlands or open waters equal to or greater
than one -tenth (1/10) acre; or
g) Any high -density project, as defined in 15A NCAC 02H .1003(2)(a) and by the density
thresholds specified in 15A NCAC 02H .1017, which:
L Disturbs one acre or more of land (including a project that disturbs less than one
acre of land that is part of a larger common plan of development or sale); and
ii. Has permanent wetland, stream or open water impacts; and
iii. Is proposing new built -upon area; and
iv. Does not have a stormwater management plan reviewed and approved under a
state stormwater program' or a state -approved local government stormwater
program2.
Projects that have vested rights, exemptions, or grandfathering from state or locally -
implemented stormwater programs and projects that satisfy state or locally -
implemented stormwater programs through use of community in -lieu programs require
written approval.; or
h) Any permanent impacts to waters, or to wetlands adjacent to waters, designated as:
ORW (including SAV), HQW (including PNA), SA, WS-I, WS-II, Trout, or North Carolina or
National Wild and Scenic River; or
i) Any permanent impacts to coastal wetlands [15A NCAC 07H .0205], or Unique Wetlands
(UWL) [15A NCAC 02H .0506]; or
j) Any impact associated with a Notice of Violation or an enforcement action for
violation(s) of NC Wetland Rules (15A NCAC 02H .0500), NC Isolated Wetland Rules (15A
NCAC 02H .1300), NC Surface Water or Wetland Standards (15A NCAC 02B .0200), or
State Regulated Riparian Buffer Rules (15A NCAC 02B .0200); or
k) Any impacts to subject water bodies and/or state regulated riparian buffers along
subject water bodies in the Neuse, Tar -Pamlico, or Catawba River Basins or in the
Randleman Lake, Jordan Lake or Goose Creek Watersheds (or any other basin or
watershed with State Regulated Riparian Area Protection Rules [Buffer Rules] in effect
at the time of application) unless:
L The activities are listed as "EXEMPT" from these rules; or
1 e.g. Coastal Counties, HQW, ORW, or state -implemented Phase II NPDES
2 e.g. Delegated Phase II NPDES, Water Supply Watershed, Nutrient -Sensitive Waters, or Universal Stormwater
Management Program
Page 2 of 11
GC4139
ii. A Buffer Authorization Certificate is issued by the NC Division of Coastal
Management (DCM); or
iii. A Buffer Authorization Certificate or a Minor Variance is issued by a delegated or
designated local government implementing a state riparian buffer program
pursuant to 143-215.23.
Activities included in this General Certification that do not meet one of the thresholds listed
above do not require written approval.
I. ACTIVITY SPECIFIC CONDITIONS:
1. If this Water Quality Certification is used to access residential, commercial or industrial
building sites, then all parcels owned by the applicant that are part of the single and
complete project authorized by this Certification must be buildable without additional
impacts to streams or wetlands. If required in writing by DWR, the applicant shall provide
evidence that the parcels are buildable without requiring additional impacts to wetlands,
waters, or state regulated riparian buffers. [15A NCAC 02H .0506(b)(4) and (c)(4)]
2. For road construction purposes, this Certification shall only be utilized from natural high
ground to natural high ground. [15A NCAC 02H .0506(b)(2) and (c)(2)]
3. Deed notifications or similar mechanisms shall be placed on all lots with retained
jurisdictional wetlands, waters, and state regulated riparian buffers within the project
boundaries in order to assure compliance with NC Wetland Rules (15A NCAC 02H .0500), NC
Isolated Wetland Rules (15A NCAC 02H .1300), and/or State Regulated Riparian Buffer Rules
(15A NCAC 02B .0200). These mechanisms shall be put in place at the time of recording of
the property or individual parcels, whichever is appropriate. [15A NCAC 02H .0506(b)(4)
and (c)(4)]
4. For all dam removal projects meeting the definition under G.S. 143-215.25 and
requirements under G.S. 143-215.27 of a professionally supervised dam removal, the
applicant shall provide documentation that any sediment that may be released has similar
or lower level of contamination than sediment sampled from downstream of the dam in
accordance with Session Law 2017-145.
5. For the North Carolina Department of Transportation, compliance with the NCDOT's
individual NPDES permit NCS000250 shall serve to satisfy this condition. All other high -
density projects that trigger threshold Item (g) above shall comply with one of the following
requirements: [15A NCAC 02H .0506(b)(5) and (c)(5)]
Page 3 of 11
GC4139
a. Provide a completed Stormwater Management Plan (SMP) for review and approval,
including all appropriate stormwater control meAsure (SCM) supplemental forms and
associated items, that complies with the high -density development requirements of 15A
NCAC 02H .1003. Stormwater management shall be provided throughout the entire
project area in accordance with 15A NCAC 02H .1003. For the purposes of 15A NCAC
02H .1003(2)(a), density thresholds shall be determined in accordance with 15A NCAC
02H .1017.
b. Provide calculations to document that the project will not cause degradation of
downstream surface waters. Documentation shall include a detailed analysis of the
hydrological impacts from stormwater runoff when considering the volume and velocity
of stormwater runoff from the project built upon area and the size and existing
condition of the receiving stream(s).
Exceptions to this condition require application to and written approval from DWR.
II. GENERAL CONDITIONS:
1. When written authorization is required, the plans and specifications for the project are
incorporated into the authorization by reference and are an enforceable part of the
Certification. Any modifications to the project require notification to DWR and may require
an application submittal to DWR with the appropriate fee. [15A NCAC 02H .0501 and .0502]
2. No waste, spoil, solids, or fill of any kind shall occur in wetlands or waters beyond the
footprint of the impacts (including temporary impacts) as authorized in the written approval
from DWR; or beyond the thresholds established for use of this Certification without
written authorization. [15A NCAC 02H .0501 and .0502]
No removal of vegetation or other impacts of any kind shall occur to state regulated riparian
buffers beyond the footprint of impacts approved in a Buffer Authorization or Variance or
as listed as an exempt activity in the applicable riparian buffer rules. [15A NCAC 02B .0200]
3. In accordance with 15A NCAC 02H .0506(h) and Session Law 2017-10, compensatory
mitigation may be required for losses of greater than 300 linear feet of perennial streams
and/or greater than one (1) acre of wetlands. Impacts associated with the removal of a
dam shall not require mitigation when the removal complies with the requirements of Part
3 of Article 21 in Chapter 143 of the North Carolina General Statutes. Impacts to isolated
and other non-404 jurisdictional wetlands shall not be combined with 404 jurisdictional
wetlands for the purpose of determining when impact thresholds trigger a mitigation
requirement. For linear publicly owned and maintained transportation projects that are not
determined to be part of a larger common plan of development by the US Army Corps of
Engineers, compensatory mitigation may be required for losses of greater than 300 linear
feet per perennial stream.
Page 4 of 11
GC4139
Compensatory stream and/or wetland mitigation shall be proposed and completed in
compliance with G.S. 143-214.11. For applicants proposing to conduct mitigation within a
project site, a complete mitigation proposal developed in accordance with the most recent
guidance issued by the US Army Corps of Engineers Wilmington District shall be submitted
for review and approval with the application for impacts.
4. All activities shall be in compliance with any applicable State Regulated Riparian Buffer
Rules in Chapter 2 of Title 15A.
5. When applicable, all construction activities shall be performed and maintained in full
compliance with G.S. Chapter 113A Article 4 (Sediment and Pollution Control Act of 1973).
Regardless of applicability of the Sediment and Pollution Control Act, all projects shall
incorporate appropriate Best Management Practices for the control of sediment and
erosion so that no violations of state water quality standards, statutes, or rules occur. [15A
NCAC 02H .0506 (b)(3) and (c)(3) and 15A NCAC 026.0200]
Design, installation, operation, and maintenance of all sediment and erosion control
measures shall be equal to or exceed the requirements specified in the most recent version
of the North Carolina Sediment and Erosion Control Manual, or for linear transportation
projects, the NCDOT Sediment and Erosion Control Manual.
All devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil)
sites, including contractor -owned or leased borrow pits associated with the project.
Sufficient materials required for stabilization and/or repair of erosion control measures and
stormwater routing and treatment shall be on site at all times.
For borrow pit sites, the erosion and sediment control measures shall be designed,
installed, operated, and maintained in accordance with the most recent version of the
North Carolina Surface Mining Manual. Reclamation measures and implementation shall
comply with the reclamation in accordance with the requirements of the Sedimentation
Pollution Control Act and the Mining Act of 1971.
If the project occurs in waters or watersheds classified as Primary Nursery Areas (PNAs), SA,
WS-I, WS-II, High Quality Waters (HQW), or Outstanding Resource Waters (ORW), then the
sedimentation and erosion control designs shall comply with the requirements set forth in
15A NCAC 046 .0124, Design Standards in Sensitive Watersheds.
6. Sediment and erosion control measures shall not be placed in wetlands or waters except
within the footprint of temporary or permanent impacts authorized under this Certification.
Exceptions to this condition require application to and written approval from DWR. [15A
NCAC 02H .0501 and .0502]
7. Erosion control matting that incorporates plastic mesh and/or plastic twine shall not be
used along streambanks or within wetlands. Exceptions to this condition require
application to and written approval from DWR. [15A NCAC 02B .0201]
Page 5 of 11
GC4139
8. An NPDES Construction Stormwater Permit (NCG010000) is required for construction
projects that disturb one (1) or more acres of land. The NCG010000 Permit allows
stormwater to be discharged during land disturbing construction activities as stipulated in
the conditions of the permit. If the project is covered by this permit, full compliance with
permit conditions including the erosion & sedimentation control plan, inspections and
maintenance, self -monitoring, record keeping and reporting requirements is required. [15A
NCAC 02H .0506(b)(5) and (c)(5)]
The North Carolina Department of Transportation (NCDOT) shall be required to be in full
compliance with the conditions related to construction activities within the most recent
version of their individual NPDES (NCS000250) stormwater permit. [15A NCAC 02H
.0506(b)(5) and (c)(5)]
9. All work in or adjacent to streams shall be conducted so that the flowing stream does not
come in contact with the disturbed area. Approved best management practices from the
most current version of the NC Sediment and Erosion Control Manual, or the NC DOT
Construction and Maintenance Activities Manual, such as sandbags, rock berms,
cofferdams, and other diversion structures shall be used to minimize excavation in flowing
water. Exceptions to this condition require application to and written approval from DWR.
[15A NCAC 02H .0506(b)(3) and (c)(3)]
10. If activities must occur during periods of high biological activity (e.g. sea turtle nesting, fish
spawning, or bird nesting), then biological monitoring may be required at the request of
other state or federal agencies and coordinated with these activities. [15A NCAC 02H
.0506(b)(2) and 15A NCAC 04B .0125]
All moratoriums on construction activities established by the NC Wildlife Resources
Commission (WRC), US Fish and Wildlife Service (USFWS), NC Division of Marine Fisheries
(DMF), or National Marine Fisheries Service (NMFS) shall be implemented. Exceptions to
this condition require written approval by the resource agency responsible for the given
moratorium. A copy of the approval from the resource agency shall be forwarded to DWR.
Work within a designated trout watershed of North Carolina (as identified by the
Wilmington District of the US Army Corps of Engineers), or identified state or federal
endangered or threatened species habitat, shall be coordinated with the appropriate WRC,
USFWS, NMFS, and/or DMF personnel.
11. Culverts shall be designed and installed in such a manner that the original stream profiles
are not altered and allow for aquatic life movement during low flows. The dimension,
pattern, and profile of the stream above and below a pipe or culvert shall not be modified
by widening the stream channel or by reducing the depth of the stream in connection with
the construction activity. The width, height, and gradient of a proposed culvert shall be
such as to pass the average historical low flow and spring flow without adversely altering
flow velocity. [15A NCAC 02H .0506(b)(2) and (c)(2)]
Page 6 of 11
GC4139
Placement of culverts and other structures in streams shall be below the elevation of the
streambed by one foot for all culverts with a diameter greater than 48 inches, and 20% of
the culvert diameter for culverts having a diameter less than or equal to 48 inches, to allow
low flow passage of water and aquatic life.
If multiple pipes or barrels are required, they shall be designed to mimic the existing stream
cross section as closely as possible including pipes or barrels at flood plain elevation and/or
sills where appropriate. Widening the stream channel shall be avoided.
When topographic constraints indicate culvert slopes of greater than 5%, culvert burial is
not required, provided that all alternative options for flattening the slope have been
investigated and aquatic life movement/connectivity has been provided when possible (e.g.
rock ladders, cross vanes, etc.). Notification, including supporting documentation to include
a location map of the culvert, culvert profile drawings, and slope calculations, shall be
provided to DWR 60 calendar days prior to the installation of the culvert.
When bedrock is present in culvert locations, culvert burial is not required provided that
there is sufficient documentation of the presence of bedrock. Notification, including
supporting documentation such as, a location map of the culvert, geotechnical reports,
photographs, etc. shall be provided to DWR a minimum of 60 calendar days prior to the
installation of the culvert. If bedrock is discovered during construction, then DWR shall be
notified by phone or email within 24 hours of discovery.
If other site -specific topographic constraints preclude the ability to bury the culverts as
described above and/or it can be demonstrated that burying the culvert would result in
destabilization of the channel, then exceptions to this condition require application to and
written approval from DWR.
Installation of culverts in wetlands shall ensure continuity of water movement and be
designed to adequately accommodate high water or flood conditions. When roadways,
causeways, or other fill projects are constructed across FEMA-designated floodways or
wetlands, openings such as culverts or bridges shall be provided to maintain the natural
hydrology of the system as well as prevent constriction of the floodway that may result in
destabilization of streams or wetlands.
The establishment of native woody vegetation and other soft stream bank stabilization
techniques shall be used where practicable instead of rip -rap or other bank hardening
methods.
12. Bridge deck drains shall not discharge directly into the stream. Stormwater shall be
directed across the bridge and pre-treated through site -appropriate means to the maximum
extent practicable (e.g. grassed swales, pre -formed scour holes, vegetated buffers, etc.)
before entering the stream. -Exceptions to this condition require application to and written
approval from DWR. [15A NCAC 02H .0506(b)(5)]
Page 7 of 11