Loading...
HomeMy WebLinkAbout20201560 Ver 1_Smith Rd New Permit Drawings_20210111 Highway North Carolina Department of Transportation Stormtivater I Highway Stormwater Program ` STORMWATER MANAGEMENT PLAN (Version 2.08; Released April 2018) FOR NCDOT PROJECTS WBS Element: 17BP.7.R.109 TIP No.: SF-780166 County(ies): Rockingham Page 1 of 1 General Project Information WBS Element: 17BP.7.R.109 TIP Number: SF-780166 Project Type: Bridge Replacement Date: 1/6/2021 NCDOT Contact: Galen Cail, PE Contractor/Designer: Kyle Stoffer Address: NCDOT Hydraulics Unit Address: HDR Engineering, Inc. of the Carolinas 1590 Mail Services Unit 555 Fayetteville Street, Suite 900 Raleigh, NC 27560 Raleigh, NC 27601 Phone: (919)707-6711 Phone: (910)398-9024 Email: gcail@ncdot.gov Email: kyle.stoffer hdrinc.com City/Town: Stoneville County(ies): Rockingham River Basin(s): Roanoke CAMA County? No Wetlands within Project Limits? Yes Project Description Project Length (lin. miles or feet): 0.208 miles Surrounding Land Use: Low Residential, Wooded Proposed Project Existing Site Project Built-Upon Area (ac.) 0.6 ac. 0.5 ac. Typical Cross Section Description: Smith Road (SR 1360): 2 paved lanes (total 20'wide), 8'shoulder on left side (11'with Smith Road (SR 1360): 2 paved lanes (total 20'wide), 2' shoulder on each side. guardrail),4'shoulder on right side (7'with guardrail). Annual Avg Daily Traffic (veh/hr/day): Design/Future: 560 Year: 2025 Existing: 280 Year: 2009 General Project Narrative: The North Carolina Department of Transportation (NCDOT) has proposed to replace Rockingham County Bridge#166 on Smith Road (SR 1360)over Pawpaw Creek. The (Description of Minimization of Water existing structure is a single span bridge (1@40'4")steel plank deck on I-Beams. The end bents are timber caps and piles. The proposed structure is a single span (1 @80'), 33" Quality Impacts) box beam with 4'deep caps. This structure has been designed to have as little environmental,wetland, and surface water impacts as possible. 2:1 roadway fill slope will be used in the wetland areas to minimize wetland impacts. Permanent drainage easement(PDE)will be set to have as little wetland impacts as possible. To avoid direct discharge of bridge storm water into the receiving water, deck drains are not required for the proposed bridge. Storm water impacts to the stream have been minimized by utilizing grated inlets and pipes to collect bridge storm water and use rip rap outlet protection at 16+29 RT to dissipate energy and discharge into the 3' base ditch with Class B Rip Rap. In the southwest quadrant a proposed V ditch with Class B Rip Rap transitions at 19+00 RT into the 3' base ditch with Class B Rip Rap. The 3' base ditch outlets onto rip rap at embankment to dissipate energy to provide a non-erosive outlet velocity to the stream. In the northwest quadrant an existing roadside ditch is transitioned at 11+50 RT to a V ditch with Class B Rip Rap. The flow is then conveyed to the left side of the road through a storm drain system to rip rap outlet protection at 12+10 LT to dissipate energy to provide a non-erosive outlet velocity. The sheet flow will flow 75'+/-tributary stream northeast of the project.Also in the northwest quadrant a typical roadside ditch transitions at 14+30 RT into a V ditch with Class B Rip Rap. The V ditch outlets onto rip rap at embankment to dissipate energy to provide a non-erosive outlet velocity to the stream. In the northeast quadrant there are no roadside ditches however there is an existing tributary stream will not be impacted from the project. In the southeast quadrant an existing roadside ditch transitions at 22+00 LT into a V ditch with Class B Rip Rap. The flow is turned out by the existing fill slope at 20+50 LT where it becomes diffused non- erosive sheet flow into a wooded area and flows 360'+\- before entering the stream. Due to the nature of low impact bridge replacement, the increases in stormwater discharges (post vs pre condition)are insignificant and the existing ditches do not need to be modified. Therefore, additional stormwater measures are not required. Waterbody Information Surface Water Body(1): I Pawpaw Creek NCDWR Stream Index No.: 22-30-6-(2) NCDWR Surface Water Classification for Water Body Primary Classification: Water Supply IV(WS-IV) Supplemental Classification: None Other Stream Classification: None Impairments: None Aquatic T&E Species? No Comments: - NRTR Stream ID: Buffer Rules in Effect: I N/A Project Includes Bridge Spanning Water Body? Yes Deck Drains Discharge Over Buffer? N/A Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? No (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no,justify in the (If yes, provide justification in the General Project Narrative) General Project Narrative) c .\ r 1 ON © /\ dl`A1E 6CA'I'&PRWF(�'P N (�A NNO. mon TOTAL MOMS O 1\ 1385 IN STAT -Aid OF NORTH CAROLINA N.C. 171113.7.11,100 1 *TATO PRO/ROT ea F.A.PROI.NO. DOSOP.WIUON /11/111 1377 13591376 • 1360 1382 DIVISION OF HIGHWAYS C4 17 B P.7.R.109 1375 • PROJECT 1356 1355 LIMITS `- • 1350 1349 _l 1376 2zo( R 0CI�l1�lGHAM CO UNTY 1360 PERMIT DRAWING 1348 1392 SHEET 1 OF 9 1361 1397 1352 1351 G`I 1362 1396 LOCATION: BRIDGE NO. 166 OVER PRONG PAW PAW CREEK ON SR 1360 (SMITH ROAD) 1347 1386 1346 1361 1363 1397 N1391 TYPE OF WORK: GRADING, PAVING, DRAINAGE AND STRUCTURE 1406 1364 1326 1345 1344 ® C 1348 C...) 1367 / 1328 1365 20 LVICINITY MAPNOT TO SCALE) WETLAND AND SURFACE WATER IMPACTS PERMIT 3 O e sl:4 BEGIN PROJECT 17BP.7RJ09 \/1% 1.111141 —L— POC Sta.II+OOAO d',� END CONSTRUCTION ��� _ �0 TO V/R —Y— Sta.11+OOAO O x /�L END PROJECT l7BP.7RJ09 Vilill NV�� / .., —L— POT Sta.22+00.00 - • �� / Q* ' / r7,�p� * 3 �� / (� / i END BRIDGE / ' * / / —L— Sta.16+0/.17 ** i : * I P `--��� , SITE 2 �� i *; BEGIN APPROACH SLAB `'4�• �, �� ��Z— %� —L— Ste.15+08.00 \ � S --- — 1,• R / ' BEGIN BRIDGE p)SMPE�INO `l*��'� —L— Sta.15+18.84 *` ST�� [*DESIGN EXCEPTION: END APPROACH SLAB ? _�) o MIN. HORIZONTAL CURVE RADIUS \ —L— Ste.16+12.00 1 * l SAG VERTICAL CURVE K \ SITE 1 \ * i SITE 3 ii HORIZONTAL SSD VERTICAL SSD DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 1 I Prepared In the Office of Mott MacDonald for 1 ROADWAY DESIGN ENGINEER PLANS PREPARED BY: 3 DESIGN DATA PROJECT LENGTH DIVISION 7 „ PO Box 700 NORTH CAROLINA DEPARTMENT OF TRANSPORTATION M'Y' Fu quay-Varina,NC 27526 FORTH 01 L3 Cq ADT 2009 = 280 2018 STANDARD SPECIFICATIONS t919)552-2253 V1E14 �O = MOTT (9W9)552-2254 (Fax) LENGTH ROADWAY TIP PROJECT0.192 MILES MACDONALD .mottmaccom/americas , TIM JORDAN, PE ADT 2025 = 560 LETTING DATE: PROJECT ENGINEER RE LICENSE NO.F-0669 c. + + SIGNATURE LENGTH STRUCTURE TIP PROJECT = 0.016 MILES HYDRAULICS ENGINEER z= P' T HYDRAULICS ENGINEER ��V = 45 MPH DAVID FUH, PE z o '� o' �P �4$ TOTAL LENGTH TIP PROJECT = 0.208 MILES F HDR Engineering,Inc.of the Carolinas a OF T1aA 555 Fayetteville St,Suite 900 Raleigh,N.C.27001 SUB REGIONAL TIER N.C.B.E.L.S. License Number:F-0116 —?2 V LOCAL TIM POWERS, PE NCDOT CONTACT: O -O DIVISION BRIDGE = PROGRAM MANAGER RE i ) f 1 SIGNATURE J "DESIGN EXCEPTION: 1 \141,%t DETAIL A DETAIL B DETAIL C DETAIL D PROJECT REFERENCE SHEET NO. SPECIAL CUT DITCH LATERAL'V' DITCH LATERAL BASE DITCH MIN,HORIZONTAL CURVE RADIUS (NO to Scale) SPECIAL LATERAL'V'DITCH 17BP.7.R.109-ROCKINGHAM 166 4 DOSTRp CHAt,4El.or BASE DITCH (Not ro Scale) SAG VERTICAL CURVE K _a INor to Scale) b INmro Scale) ROADWAY DESIGN HYDRAULICS HORIZONTAL SSD ` Fill Natural Goo l i'.. Fill FIll ENGINEER ENGINEER ` VERTICAL SSD z D -Ta.Ta 9 G..�� $,°"� Ground D 1:F1. Fill D Pe Nororol ' as slop. µn°•T .. a•os Fi OE FRANK SMITH ESTATE ��j d d D d GEOTEXTILE Ground • D Min.D= 1H. 4a' Geaeeile Ge°lulile Max.d= 1 H. d n. Ft. i� L' T ofUner= CL B Rip-Rap Max.MI = 1 H. Min.D= 1 H. B. 3 H. Geote.Ble Max.d= 1 Ft. T b- 5 H. Min.D= 1 Ft. Typep-Rap Type of Liner- CL B Rip-Rap BEGIN PROJECT 178P.7RJ09Type of Liner= CL B Rip-Rap 6= 5 Ft. -L-STA.t5+63 TO 19+00 RT I Type of Liner= CLASS B Rip-Rap Max.d= 1 Ft. -L- POC Sta./1 FOOOO �/ L- PCC Sta./ •0e00 -L-STA,n+so To n+7s RT -L-$TA.14+30.71 TO 14+50 RT -L-STA.14+50 TO 15+35 RT -L-STA.19+00 TO 20+50 RT -L-STA.14+0.TO 22+00 LT -," OODS RETAIN 24"RCP END CONSTRUCTION PIPE CLEAN OUT _ _ WETLAND AND SURFACE WATER IMPACTS PERMIT MOTT MAcooNALD I.E,LLC HDR ENGINEERING 3z LF -Y- POT Sta.l/+OOAO Sta.11+75A0 LICENSE NO.F-0669 LICENSE NO.F-0116 ''^ CLASS B RIP RAP DOCUMENT NOT CONSIDERED FINAL EST.11 SONS UNLESS ALL SIGNATURES COMPLETED EST. SY GEOTEXTILE ' 'v 4, •"' - ` 6' REMOVE 4 LF ACK D�ARD REYNOLDS '- 8'STONE HW fe1e is, +.111 TONE EXISTING 24"RCP / ARYALLACE REYNOLDS SITE 1 •:,t, COLLAR& 4 RN 8 LF `\ / GOOD COND. �a O(Rce of: M M Po Bo.Toa _ X Td ` T y 47' Moir www.rn-Varies.NC 2)526 E%.24"RCP / ,II A. It00D5 • .DpNnlp www.m°nmoc.cembmericos h SEE ENLARGED ��� ounEr-G000 ✓S, v/ \ ,F , / .r' n RC •• •EX SILTED WOODS ?`�/ AREA SHEET��. re 4./ y / c 4A /� !� ��� HDan9neednq Inc.or the Carolinas 1'/ \ \ /� C'/ • // '`'4 sss Fa tlenlleslsuRnonuegnweio1 EXISTING DITCH �' / Q • STORE HW / N.C..E L S Lcense Number F 0116 SPECIAL GUT DITCH , �'.^,_ /irli` oL71FALL ST: RIP ���: / ,N j/ " • 7 R / /• � SEE DETAIL A ' \\ / • \' / VERTICAL SCALE HORIZONTAL SCALE �i \ - • '• /RP : //� p END PROJECT 1ilBP7RJ09 EXISTING DITCH * / EST.10 TONS RIP RAP �! F REMOVE : l5N /T. 1 1 2 2f 5 • EST.20 GEOTEXTILE /`'•�l EXISTING .0:'''` - - POT Sta.22+OOA0 At ii / d I I I�1� I I I�I� � ��r I'��. A BRIDGE l EXISTING DITCH / •I s4 • 24"RCP ,•,,`%coil F /'d �� ABUTMENTS //- // / PERMIT DRAWING V OUTFACE STABLE r• OUTLET I . - l ]r / /!. z' ,+ \ Ex s , le �' GRACIE Ce MARTIN_ESTATE /�//,% / SHEET 2 OF 9 WOOD 5 INE \ DITCH >i•, W 1 BEULAH C.WATKIS,ETAL / ,• W000s ` �/ \\ $1 J SITE 2 / �// . / GLI CCIASS B RIP P "� E%.24"RCP � �Ek� LL° /A ♦ ��OT EST.5 TONS EX.24"OOD �'XT.s7• \''(IIsHTABLEODS., , �',P• EXCAVATION / /Z:- / EST.15 SY GEOTEXTILE 30%SILTED ° \ LIMITS \; // / REMOVE W &4 LF p \��•,•'%• SPE IAL CUTDITCH �� /j/ * * /t' GRACIE C.MpRTIN ESTATE 2iEI5TING�24"RCP � , I i 4` SEEFETAIL A / BEULAH Ce ATKI S,ETAL I JI ► �\ , EST. 5 TONS RIP RAP / •J 14 N COLLAR& EXTEND 8 LF •0005 t ems' • .� /;.� \� �'� 'b. WOODS EST. 10 SY GEOTEXTILE \\ Z. / i .{ts�*,i • �� EXISTING DITCH •,�' d - - Zr 7 + • •� �` L I .4-.,,, EXISTING OUTFACE STABLE •IF�'_.`�j� �j / * / DETAIL E �� 1 ' � I "`' WOODS /�j/ / / f RIP RAP AT EMBANKMENT N w i' i 31 -L- PC SA2.1442578 �QII ��1 •I_ LEGEND -Y,l- POT Sta10+00.00 SPECIAL CUT DITCH F � -�� �` -•r . / Ditch 5mia. SEE DETAILA �•�n 4 _ - .r •,� / 1o•m -01 EST.10 EST.15 SY GEOTEXTILE ef-ii \,\ ♦ i• '���' \\ 7 _•. /X ODDS / erode ' ,-1 �� DENOTES PERMANENT _ �- r- ,r L' .� \ , W/ ` / Y. / Er-17STA'E.1:::: Q10= 1.8 cfss r A IMPACTSINSURFANE WATER V10= 1.8 fps LATERALV DITCH . TILAPID:�;/ � �(k� •" ��` �/ f orcD '` I (NON-EROSIVE) SEE DETAIL B - .�� `_ ,'F / TypeurLD / EST.30-BONS RI' RAP ,r �y V� _ - - DENOTES TEMPORARY " N /,�1 'r.\\�.(,�• - r� / 1I RT EST.60 SY GEOT ILE ` / / .� L\ •// I -L-STA.15+63 RT _AZ IMPACTS IN SURFACE WATER EST.40 CY DDE rT \ V� _ '- CO - ��� k� �'�.\��� �':._ -y��rGGjj%.• L I DETAIL F DENOTES EXCAVATION - 7 +' ♦ ,7' �' ,�� END SBG - •.'3������%��-��s���� '• J \ BANK STABILIZATION pT %j///7// IN WETLAND �� 7 ��` \\\' +y. LT& RT '�.. =�iiiii �`'� i, •� eye \''\T /*3' JAMES Re SMITH C , ' Imp, ♦ ��� `` L 1 Notro SE%GVATION ITY RIP RAP AT EMBANKMI NT I N �► �^ •4 .'7l / ;y SEE DETAIL E " ' 1 �T� R�� I� J2'CMP / DENOTES FILL IN EST.10 TONS RIP RAP '' 1;\ s� `s2' '..." v� ` 2 n1 �,�� WETLAND EST.15 SY GEOTEXTILE �L" �` _ i J i �. ,_., -� NTL 1.5:1 SLOPE S C7 ` ,.:. .._ ' , W 5 7�� GATE GEOTEXTILE(TTH 4H * * DENOTES MECHANIZED BANK STABLIZATION A/ eF A� ©•• v, Ca B �� r, * 4E SEE DETAIL F �� / LASS B RIP RAP 15�3P W ��` L \ \ r0 4E 4E 4F CLEARING ST.2 T•NS WiELBOWS ir. C7 ` SPECIAL JATERAL DITCH "EIP 3o'AecESs Type of Liner cuss II RIP RAP EST.25 TONS RIP RAP ppNNu� C EST.30 SY GEOTEXTILE A ` ST.7 S GEOTEXTILE SEE DETAIL D ut'fI EASEZT N EST.10 CY DDE - ' ,A . !. - PC Sta.16+13.40 ` WOODS 1 TIE EXISTING STR AM EST.45 TONS RIP RAP REF.DB 946 PG 1543 -L-STA.15+40 E ( ± INTO LATERAL EST.135 SY GEOTEXTILE 100 0 v No= 0.4 f;, 1� BASE DITCH SEE ENLARGED S_ (NON-EROSIVE) EXISTING DRC \ RIP RAP AT EMBANKMENT ROCK I‘ ouTFAO STABLE AREA SHEET 4 B L SEE DETAIL E W EST.15 TONS RIP RAP © / SITE 3 Uj 50C EST.25 SY GEOTEXTILE LATERAL BAS ITCH s ± PER COORDINATION WITH US ARMY CORPS 100 -010= 12.2 cfs SEE DETAIL C / PLAN V10= 2.0 fps EST.105 TONS RIP RAP \ OF ENGINEERS THE SMALL REMNANT POF R 1l Ld71�y VIEW lrc(p II- / ` (NON-EROSIVE) EST.300 SY GEOTEXTILE GRACIg C. RTI ESTATE ��r WETLAND WC AND JS SD OUTSIDE PROP P II���� �/ Eq \\VA\V/ SCALE: I - 10 0' H 0 R 1 Z a 1 EST.380 CY DDE BEULAH C.�ATKI S,ETAL\\ * * ROW IS TO BE CONSIDERED A LOSS. 11 IMPACTS ARE SUMMARIZED UNDER SITE 3 ICI • 11111111111111 0_ BEGIN PROJECT ■ I I • END PROJECT o STA. 11+00.00 ■ I �L- •■ ■ ■ •■■■� STA, 22+00.00 _Y_ 720 --I I 1 Ills 720 720 720 • . 1 BEGIN GRADE I •I I I END GRADE STA, 11+50.00 I I I I I STA.21+50.00 I O ` •I a•D EL = 703.26' 1 1 • •I •I • - EL = 695.34' 710 �5 1 I I • 1 1 i III 710 710 I 710 • o EX ST 1 1 1 1 PI = 20+70.OE ■ ■ END CONSTRUCTION 1 I ■ EL = 689.74' 111�� �1111° ND STA, 11+00,00 C -BEGIN SP DIT H RT I ■ - - VC = 150' ■■■�� �■ TO _ _ y 700 F Fv.A tiol.l; ° '�i ■■�■���=� •�■mo K - 66 HHIM= EXIST �.g• �i� ■ oiii�� 11 11 700 11 ■�111111111■1 � C ?Opo" ■■ PI = 13+60.00 ==' l=I7.a3r" - PI = 18+00.00�■� • o - ■■ ■ ■ ■ END GRADE 3 �� ■■ EL = 679.11' mE.NNE111111� ^1 � EL = 677.00' .o■■ o0 � �. ■■ ���_ i><a�Ta6�rr=rrrr�I ■ ■__ ■ STA.10+50,00 N �� �s� ��• II VC = 300' �m� aism. VC = 340' ■�� ■ III -� EL = 678.71' ��-_.�.._;=i■■■■=� 1.• K = 27 �m� �.rrdEX I.. K - 65 m•� m I T _ =MIMsIIIIIIIIIII1� I ■__.�.1„� J� ■■UUU 9�9 CO 11111111111 1 ■■■ ■ .1 ��� -� _ ■ ■��llr.�1l1' =L�Si■■■� ND SP DITCH LT ■ BRIDGE HYDRAULIC DATA • - IIIIIIIII I I _I '�"`�`� . ®`,-IIII_�L3 2 _I BI�L, � ■ �. ■ .••i■■•■w■•■■•ram 680 DESIGN DISCHARGE = 1850 CFS L . �.. ._ - �. �IULU■Ta.al.•:.,� .:1 .:1 ---L V r �`�... 680 `D DESIGN FREQUENCY = 25 YRS ■■=■ "■■rs,ns■� as■oil�r�■� J367j„'� CD = ■■ - BEGIN SP DITCH RT - - f- - •- - O n ■■■ ■ ■ DESIGN HW ELEVATION 67/J FT • ■■ L-STA.14+3o 71 i• ■■■"=I= _ =■■ n. �� ■■■ ■ ■ I BASE DISCHARGE = 2665 CFS ■■ ELEV.= 679.14 ,68,a 1 .i H ..........- C�lilM 670 BASE BASE FREQUENCY = 100 YRS ■■� .. ExISTIN ': •„• • 1 • 1 670 L ■■� �� - L-STA.15+35 II lino MUD S. ■�7.7� _ -��J.iird� t o- 11111�11111I 1111: ci o BASE Hw ELEVATION = 67G9 FT ll� �� ELEV.= 668.00' IIIIII•\ _ +. _+��iiiii��i�i�� PI = 10+35,00 z - OVERTOPPING DISCHARGE = 8300 CFS •• .. 3s KEY DE�i.■1i 1 T.. C - o■ ■ !. ■ ��IE��,��IE��,■**■ ��IE��, EL = 679.26' - ■•= == ( P) ■::!!.w�4 a ■L l--.31Bcvau ■ ■ g _ UUIUU Ui■i■�i VC = 30 o OVERTOPPING FREQUENCY = 5001- YRS ■■� �� Emir - - ■ ■ a ■ ■ ■n■■•.-•-•� = - z 0 660 OVERTOPPING ELEVATION = 678.6 FT ■■� �■■■■■■■■■■ ■■■■■ �F�■��FA `DIMDI■ AV,•■• � • ■ "s . •■ 660 660 K19 660 U MI::: 1111111111 • A7,�I17.1 Ni"4� • ■SLOE 5: 2 GipT y •15 e c>-I_'G ■ w o DATE OF SURVEY = //-9-20I7 6, NeeMAI y• (Tw: ,t,. 1 I 1 w O �II ■ MU_U', •PAY�1 LMI ■z ■ ■ ■r Cv• oo ■o ■ o BEGIN GRADE WS.ELEVATION nunnn ■ ■ ■ ■ !!!!!!! ■ n N-,_5' o = 662J FT ■■ ■�� : BANK STABILI 1LLU/JW M21,1;751c1■:4YMt:13a'pr_RxTlii"il;■7_ _ ■ • ■■■■■�=■=■��■■■ STA. 10+10.01 z L AT DATE OF SURVEY UU U we Ass II RIP F••! I■r31 FISIi�L�r-��.� Niiiii iiarir_.Ato ., i ••••• �i�••• EL w�_ 650 11 12 13 14 I I($ PEI151I I15�■ 16 17 18 19 20 21 22 650 650 • 10 11 679.78 - 650 �o 11 • •DESIGN EXCEPTION: \ --------__-_-___----680 -_--���"R ^--��� --- DETAIL A DETAIL B DETAIL C DETAIL D PROJECT REFERENCE SHEET NO. \ SPECIAL CUT DITCH LATERAL'V' DITCH LATERAL BASE DITCH MIN.HORIZONTAL CURVE RADIUS - _ - -------------------- - - �------6 - - (Nrm scpl SPECIAL LATERAL'V'DITCH 17BP.7.R.109-ROCKINGHAM 166 4 SAG VERTICAL CURVE K \ BASE mu ___ _ -- �8 - ---- (Naito Scale) I Not to Stole/ (Not to Scale) ______ __ - e� b ROADWAY DESIGN HYDRAULICS HORIZONTAL SSD `\\-�h� ------___-- - --\-,,,, ---\- o' siege Nma,pl G,oap' `,H FIII FRI ENGINEER ENGINEER _-- ------ ------ --- - \-\� Greun • Ground lAt. Slone Na1pml 3'oa 0 - �\- enrol 3'\ e< Fill D Sbpe VERTICAL SSD W.B•-11'1R .Ta - e D ° d D ceotExTRe Ground \as 1 slop. \�' �ll`1\^. \\ v �\\ \ r ' - , R-S �5S ATE`---------- . - d d D -\\C\\ \\\ \\�'\ \;- �� ,J--- - - - No Min.D= 1FI. \\\\ 1\\\l=�\�] '\ \\ \\\l \ p i-a• \ - -- -- - -\\- Gemeoile Geotelile Max.d= 1 Fr. �\\\\\\\\ 1\it\\.\'' \\\\\�1\ \\\\\l/ � W -- ---- -- -- --- --� ----\ \ \ Min.D= 1FI. Mood- lk. Min.D= 1Ff. e}� R _ - •675�-- \ \ Max.d= 1 F. Max,d= 1 Ft. b= 5 FL GeoreMile \\\\\\\ n`T+�{\ I�AI Z{\` L' 1[:.\ � 1 '�- -- -- \ \ \ \ Type o(Uner I CL B Rip-Rap TYPe of Liner= CL B Rip-Rap Max.d= 1 Ft. \)�I1/\\_ �,�C/l- r , T, \\'��- 'i -Q�.�- j�-:C eQm -- -\ -^ /----al'-- \ \ \ \ _L-STA.11+50 TO 11+75 RT Type of Liner= CL B Rip-Roo 6= 5 Ft. _L-STA.15+63 TO 19+00 RT I Type of Liner= CLASS B Rip-Rap llllll I1 I I L \ II 1 \\ �-Y`•'vC\'- .1.- - - \ ...... -L-STA.14+30.71 TO ,4+50 RT 11 11111 \, 11\\ \\1\\11 1 ill \\I - - \• - - N ,\ J I/ \ \ \ `\ -L-STA.20+55 TO 22+00 LT -L-STA.14+50 TO 15+35 RT I\c'\ ll'. o) \\I\\ 1 )))Ill/\\ -- - ` --\\ `\\\ \ rFif RUC ___ ` \ \ -'- - .gyp i /// -L-STA.19+OOTO 20+50R`/ --- nj1 \1 /// �' u l I'Icy' 1°- \ __g'•-\: A`) 4p�6P-_ \r _OD'COW /%L��/"f , - / ', , - 11 1\\11 / I , I I I 1 \ /.....-`-- `\ PINE` t`.EA ULLT` \\\\\ = I / 1EJ \ MOTT MACDONALD 18 E,LLC HDR ENGINEERING 1\-\`/\ I 1 l .I\ I I .5_,,,,,` \ ` - \ \I / / �� / / LICENSE NO.F-0669 LICENSE NO.F-0116 \` -e \ \\ -_�=� Sta.lI�OOAO r POT SYe.7L+�.QO' � a._ ,, %\ s „ \\ \" C�g3�B,RIP �9` . \1. // \ \\ I - ,�,, WETLAND AND SURFACE WATER IMPACTS PERMIT • l ,\, C ) -`\\ CSL t /^"' _ \�\ \N\BEST.3 N5 b \E\\\�\\. <`-\\\'0\ s //�/ \1111` ',/ / , /� / -/^1)I y` DOCUMENT NOT CONSIDERED FINAL - \ \ ,;.,--i -\\\ \ 7..T_ 1:X1N \ \\\\ •\* \ \ \'� / / / *---;,--„'„,/,';',;),., /) I `'i UNLESS ALL SIGNATURES COMPLETED //'' / - \\�\\ *;tea---=--.-- -``� \�\ \\ \ 1 \`-\\\\moo\\-•\\\\I\\ . '/ /// /�__ / / r / " L '/ 1 I I I I I II IIIIIIIIiI IIiIIIIILI'lllll I1 1�t \ \ I`\1-\ YI/1I / 1/IAc /i \..\ - �.'• \ R \'E\4 L \\ l\ /, /_ _ /'/ 1 / I I I I 1 11 t•I II!I wig III II I II_I-'l I I I I I I I I 1 \ \ \ g•/ENE HW // ' / //% Prepared in the ,./..../..... / 1'14 \\s. ' -=;pF•;' \\ is itIG'24 gel\ \ \\ / •per /r /,-- g� / , ( I / /ii , / c / // orRae ar: M _==I`' 'c v: I \•• ` `t�°�a "gyp\/L�\\\���\\ //.;/ ���OLbS/ ) ATE 1 I I I 1 I I1 I II I I IIII I II I III I I II I I I I I I I I I l \ \ \ \ CooD2oNr 'T / _ / \ \ /i�/ M PO Box 700 /--- =$-� \ \ (Co/ •: \\\\ \ !1 - \\ x _- �-. /s,` \ /o\ / I I I / 11 I IOSI I I Illllll IIIII I I I I I I I I 1\\\ \ \ \ ` //,„ r / / �7,/,� 'Illy �j r _ - -_� \\\� �IE:' -\J\�1 xl"31-�\\ `\ \ \\� a`� 1 I✓/i / I F •'`� } ' V `//�/n\\ // C 1.1 m I� I I I I I \ tlo //iii, ////^ , �„ - MACD www rnoVan na.NC zT5x6 -- �J� 6G1 I 1 1111 III I III 1 \\ \ 09 /� / dj/1 , / '„ epoNALD.n,...roonrop<wnwroearp. ,..\. \\ SEE ENLARG 1 I m I� III ill 1 I 1 \\ \ 159 „�/„ , ,!y ' r_ ___ ==_ .c- +�: `` \ \ I '`\> ,. � Q % QJ /"' ' / ci,%//.Cx� \ ' / / AREA SH T ' I/ALII111111111111i1111111111111\Ill\\\`'l \ \ ` --'%/'' I/'- ` ,/ 7/rmi" ll// <\ �7 -"� --��� �I \ �-' �° o \ \ \�5' ' k9' . \ / / I��M I I I I I I IIIIII I III'1Il\I 1 \\\\\ „��� 4//,!\, - / HDR En9 needn9 Inc.arena Carolinas // / /,I ^ ti /L \ \ . 51 �, '(+\ / \ / //. / 1 \ 1 m 1 \ \-t\\ _�ii l 5/XONE/ '/ \ 7 i% 01 N�a.uenlsslLS e�se�rR�mcer"F oit�s r //// r y ` \ E ISTI G DI CHI �p . • .�, \ I I I III Illllll 1 111 9\\\\ \ \\\ \\\7jm��'%- / R�' // a' ///' // /.- L,/ =,- /s\ -�S �./ \\ \\ \o AALL T .p�p as.`... , , /.,/ //r \ \Ls \ ss \1. • - �ii=,s' ice- .E_., ��j/ n^� /i i'/ kP AT2UL61Tk. _ �_ \ �" RA•� ':, ''/� / .9I/ R /// /\ \ / I I IIIII ill 11111\\\ \\\\ \ \ s•\�-_-� _i / ,/\ Ii Ir/ /////i \� /�-- s \-�� \\ \ \ \ / / / _' / -//� //jam - I \ \ / I 0 / //. / - '/"1,,/ VERTICAL SCALE HORIZONTAL SCALE - \\ \ = \ 1/// - / / / /,JJ/ I I III I1�7 1 �' \ , /P -, 1 1) 1 ��� \1� ' � Y-10' r_8t9'_ \l' \ \.,,,, \ \ \ / .. , / \ \ / _ _ D tf' /� - �i ///r' 1 z z ' s' ////� -\I� a,o\\\\\ / \\\ \ / F yi / REMOVE ! r 'i , / 6+ - 1 / / / I I I I I I I �I •1, rd.�e_, %^l ai/' / _ I a 1/ // 1�11 1�11/- =-e;- �Er FgTRii1=\ 1 ��- \� \`\\ \ \ \/// p n' EXISTING y I -- = �r% �.' '/ \ /i )1 N oz.; \\\ 1 1jet / I �, III III 1 I 1 1 \- - / /,; , /\ a' /� I i' - \ ^ /Y \ d \ BRIDGE -' f ,h l / / I 1 r // i - X �)//,///7�� \\\ �,� `��\,• `7��8��\\L�i - - ABUTMENTS i•,I��� `"Y EXISTING ALL ABLE - / / \I I L., \`\..,'-'''-.."::-:_..;=.-,..-'''',,'" -.T�j^ / / kbJ I�b • f II I11 6400 -./ill\ urir/ \\ c � - . /Y�/ /6NUTFALLSTABLE / / / n III I I ��'��\1 .^�,�i?��=' %,• �. � /i .;'�� /, Jif�/I PERMIT DRAWING C - ,. a .. 0•F00%E \1y I /U//�/ \ iL.,\ ,i~,:,,. ,- • ,��� CIEC. I T�rT�E / III I ,\I\`\� . ,'' �'��,/ _ , .� {/ /i/l// SHEET 3 OF 9 -O - ' rn /„U/� r E\� �I \`\�\ \ Q\., • _:0I••-I ' _'i,:. \\\ \ T ��i. \BEl1LAH C. Ana s.m , / �/ �\\\\-*`\\-s-,z_.4`\i'zi \/I/----d _- /l/1 ..• , -j///�ggpR/lrmtnnlmv/nlnnlnnll ll GLI - \ / -\>r,. . \\ t, \ � J/ III. . ,. � /y --__,:.--,---.,,\ '' LkSb�.A1P/ - f+. \ �� @�• .v ,..5.... - \\"�o-* , - /� �L//7, (Ai./1/ l /m r//IIII/lull///11w11 1 1 1 1 11 7 1111 I I o _ \�-\ i� 5 /!///mo d\\ - \\\\ �dt �' \\ \\1C_�. N. I \ 1 gyp';"T L' EXCAVATION ._ \ \ \ \\\��c< i\''\ _ / /`/'/y'. A /l,rl/l//////////ll/IIII\\\1�111111/I1nil I O �_- - -i� \ /,1,--GE FF.-017., -\ \ \\1 1♦ - \ ` \ \.R� ..,.�\\\/; LIMITS Q-\ 1 l 1 \\\ \\\\\\ \\\\`III/\ (`_• •/, e 1/ %/ ' Ill, ll !///�/%///ll/jlll lr/II IIII)IIIIIII II - - �2 Tj . \\ ,\�, ' � ` /T l/ 1 / l I11111IIII llllllll ll ltlt v \� l �(�llfi��\�\\l//'//r E vJ\aiR I I 1 1C I \w�\\ C� \ • C' to I I I111111111 II \ \ ' 1 11 \\ \ : PE IAL CUT DITk I \ \\\ )C},'\� 11\ * * / I 1 , I IIIII111l;kl1 1111111111 6 \ / \I ^\\ =dl:Y• aa \ 1 )//I)5 tr•..\ .,1��� 1 rr�\���• �' _ I PE FETAIL A / ) \ \C \ \\\\\ - H \ I ,YII' ��edfd' i,'JrJ�I� L \ \\\-------_ /1 J L\\�,x• N>ILya'lRC\ Illllll \ ` „��\\'r '��1' a\ ,Yf,9 ,'/ ,_ \- R :1 \\b \�r ~ :\�\\;'- / ,',/9 \/% /II /1 L' 1041 " ^RTA-IIII0IIIIIIIIII II11\\\\\\1111111111111 In _ •--��'\/ /f/%--Irl1/Li/' \3'E N�� -s,`1\\\\\\�Il , \\1 - r t ( � ''77VV 1 I i EST. 5 TONS IP RA' \\\Q. \1 �\ - I I ( IIII 1 I o_ ,_ _-- ,,,/ 1 I- // /\ \\\\ \ \ \\ \\\11/ _ II r \'iOOD$ 1 / \ EST. t0 S,Y-GEOTE LE \\\ • I \ ,• Ls I I I II I1111111111 IIIII,nu4VlllIIIII\IIIII\\\\\\\\IIIHII11111 �q/ •� I I II I II111-111 - - Ill j% ` a � 1(r E? �\ \\xH � -- 1 / -^\ I L 1 E UTPAIL STABLP \\\\\\ \6 ,s' _ • *, \ I 1 1 I I I11 1 I I� £/ // \\ - \\ �\ \\\\\ \\\\ 11 �l �SN ` /.% 1\-' '„ ' /' / .r l\, �,*le / _6�' ,,..cola /I �) i(11111 IhI111\llli DETAIsBA u B � ///�%\`-- --\\\\\ \\\\ \ \\ \\\1 1-�- - � r ✓ \� \ Ob5 ^,.. / �, �- L \� I1 1I RIP RAP AT EMBANKMENT s - - - - - i --`\\ / / I • - . v - 1/ \ I j l I IIII \11 ,\ rc.r..-\Z f0-�,. -` \ \\\\\ \\\\ 1 i // .1 \ - I I l l I II II \ u -mia. E - - \ \\9� 1L \b�� // 'F''i' •-- - \`\ / /' • /• / �.17,..,-,'` i '' I / l > I I I I I I I IIII llllll\\ D rcn t.o'ro, z/\ LEGEND -Y \a ? ►°To' "9 \ in \\IItil l,' '• , / 4 4 ay'� --�\ i' T % /"��•=--i \ U/ / I I I11 ill 0' \\\ \\\\\ \ / ..� • • -- -���_S'� --- /' / I / 1 I) III I I I 1 Groa. \\ \ \\ \\\\� �\ vi& 6•I l) I //I \ ;�t- �\ _ -11 / ,,/, ( / / I I I llllll\\\ -D \\\Z\ \\\\\\\\ it Sul / / � �l.Y ...AA, ' -- --_ -------,1 , - - _- %-�? ice: _ -T o i l )1 4 r, 11 I �l // \ \\ \ \\\ \\\\ hR *Ig / '&, /c „ / . . \\ '• ,. _ , / / i,�.. -�/ /\ ' , \ I 1\ IInII II) Ill\\ \\\ L %� DENOTES PERMANENT . - \\ \\ \\\`reps}\\V1g\ 1 L ib 4\\, �i +� 4, ,,.�--L ___ / //! v� •./ s-` / �\ �K'('�i 111r(///( llllll//llllll\\\\\\` GEOTEXTILE ///A IMPACTS IN SURFA E WATER .........,.....\\ \ \\cr \iKND\ \\\\\11111‘. . ' I 3�*/ I I - 1, // ..........0_ ' u1� - I \ \ \j( \ \\\ f AIB I I Y ♦b nl� - If , 1/� / j//1 -/ 1 \ 1 / I \\( I(I1111 I)\\\\\\\ • p.p Ln.r= cuss II RIP P � DENOTES TEMPORARY \ \\\� i �� �'- _- P ° '' �, / 7 I- II I ( /I rl, 1\Ili 111 \ \\\\-+ \ \\\\ \ \\\\\\\\\lTtJl1\\\ 7' ilc5 pFi1 TL /', 1 � ".'tit ' •� \•tr. -���'_ / I l L 3 // 1/, yy--` II 1I -i \\\\\,\ ,, L-STA.15+35 RT c0 fjAK IMPACTS IN SURFACE WATER ,\\ \\ \\\\\\ 1 i' e 1-\%4 4�I1 Ir / \, !L\ � ,--- _ 0, ',. II \ I I 1 I I 1 J I11 \\\` -L-STA.15+63 RT � .��\\� \\\ \\\��\\\\\\��\III \�4p\E` \q\ \\\\I\l(/ I / ,'; VF -� ,f_' .�� //I /, fit'\�/ '�' \(�I �'^,�t �°I I 1 1 I I I 1 I\\\) 11 n F.,\\\\`\\\\. T DENOTES EXCAVATION \ \\\\ \\� \\\\\\\\\\\\ Hai,, ;�a e}[N<r \ \I I///Q/y�-.': ,,4*.,,,,,,,,,,.._�� ENDTSBe>` !'g" / �i �� �� '� 1 L ' - - �'%\ % 1 /J / 1 I 1 I \I \\IIII 111 I'6\ \\ \\`\ DETAIL F OT ////// IN WETLAND '\�\\ �\`\\\\\\ \\\\\\\\ \ \ • \I I\Sl MC \1\III 111\I I I rII) re' eI I �INN 1. +.4 LT 8, 0\ q'���_ � "�// �Ir, r� • 4._ - - E '-', •\. -\ (\\ mil I I I 111 \\ 1\ \\ BANK STABILIZATION y\\ 4 1, �� �, Y 1 \\ INotro Scale/ C \\\\\\\ '�-�\\\\\\ \\ d, „ \1 � 1 I 1 \ - ` ^ - _�� �I�� / uYl'' �:\,, ✓ F" \ \ ! N`� \ \J \SIr�I I 1 I I \ - \ `\\\ `9E' P R h" 1 I 11 0 e' �► .. \,�,a _ \ •- I . ''' 'may ,�� L F s \`,,, 1 I \ 1 1 71 11 1 1 / / DENOTES FILL IN \\\`\\\\\\\\\\\\\\\\\\\\\\\\\\\ \ ‘\ \\\1\)1111111111 I 11�T� '...�_- '�_\_\ -. 4� 'k•„... - I 1 I \\- yL^.2nLIy / 1 ) 1 \ )9 /I IIIII)1 ))I ' 1 1/)�l REXXCAATION ITYP) ��� WETLAND \\\\ \\\ \\\\\\\\\\\\\\\\\\\�\ .\I�IL�\ \�;,\\\\\\\\\�\111\\Ill JT. i. I�,T `� 1 s � ' _ ( \ ./ / 1)//'111 11111 l�1 r l/ 1.5.15L0 �DX- �\ \\\\ \\ \ '�. � �'•• ......• - - ,- \��� ..•,. \ - V/ � �/�(• Gy E ) II '///'II/ I I I I I11/l l �//�/r/ PE mp) 5z dE iE iF DENOTES MECHANIZED '\\\ \\\\\\\\\ \t\\\*\\\\:\\t\\\\\\\\\\\\\\\\\\i\\\\\\\\\\\\\\\ \� \ CX�AL) .IUf /,/ qL' • Ia �,� -/',• , / I \l ( / / 111111111IIl/, /, /// GEOTDDLE(TYPI I *'***g, CLEARING ��\$i\\\\\\\\\\ \ \\ \U\\\\ \ \�,; L\\�\\\\\\\\ \I{IS,1 \ `j- 7�R RAP\ 15p - 1 girt; _.: \ "�'' I - I , 1-v R I 1 1 / /l 1 I / ///, t {/` �.% �1.'i ''.. �,/I�I \ I H !l l I IIII l / \ \ \ Q\�,,`? \ n GEOTEX�ILE WiELBOWS i / '4' ` \\�•- \ \ I l� / \ SPECIALJlTERAL DITC I Er,d / 1 17r 1 I 1'1,-.1,III 1 I//•l lI//////// ryye orLoer cuss n RIP Imp - \\\\\�\\\\\\\\\\\\\\\\�\\\\\\\ \ \�\\ 1"\• 1\�. 1�E s ± ,j000s T 1 \ EST.45 4IL D / )J ( ( ry ( I I I 111I 11 1,,, //// II ' - PC Sta.16+13.40 •\ l \ \ �I TI EXI TISiR All' \ EST.45[ONS RP RAP < S .pB aPB PJ 1 / I 1 I 1 111 / / / // -Lr STA.15+40 C \\\\\\\\k(CC \\�\\\\\\\\\W\\�11il\\\\\\\\\\\\\\all IIII L'�\q4\\ \\.��111( I I - \I / B\ 1 INTO CAT L \ \EST.\t\5 GE TEXTILE )Vt. I I 1 I 11I I 1 I 1 I i I 1 11111 I l/l,l�/, ///r// 0 100 0 \,\\\\\, \\\k\\\\\\Vs4tC \s,: „I:.,11111 II1`,y\\ 9,111\ Q10=-0.4 cfs ( I J\< r \ \ I BASE DITCH \ 1f-'/ �+ / ,1y1 Ill I11/ll IIII//////// //////////Lill //////i/i0////// . / \ / EXISTING DEC \ 1 ) \ S/L� I E'T �1•. WI i I j 1 I I IIIIIIIIllllllr///ll//////r////////////i//ii/i/r///f//////// i \\\\\'�\\\\\\\�,,\\,\\\\\\\\\\\\\ \\\\\\\\\\\\\\\\111 Illllll\`\ I\ J NOPA ROSIVE) I'-1 ; I s I /\ OUTFACE STABLE\ ' \\ I /°\� \..`\ \ 1 I I \ / / I RV III I ////////////////�//////////////,///////// /' \\\\\\\\\\\\\\ \\\\\\JMt\VVPR\\\'t\'MBA\V \\\._, \\iw,1- )\,\' / 1 III IIIIIIIIIIIIIIIII!/1 I Ill!////////////////////////'6/r////�/' \\\\\\\\\:\\\\ \\\\\�\ :, \\\ \\ ,\,\\:\\\\\ \\\\\ m , I I 'AREA ,SWEETI I I1'mil!IIIIIII111I/I11111111�uu111//////;////////////,//// ////�// LE 50 00 •\\\\\\\\ � \\ `\\\\ \ \.t�.; U\•\\k\U\\\U�\I\fll�`\ <\\)� \\^ LATERAL BASED, \ (�ItE13i 1 r 1 / 1 I l 1 I 1 1 llllll u1 III a n/////////// / .\\\\\\\\\ \ ,\\\\`�\\\\\ \\\\\\\\\\\\\� \�Sa�\\\\\\\\\\\��\\;\\ '\/\\\ r;<10=-122 ch-_SE�DETAILC/ © \C \ \[± \\lc \/\p EI OINEERS TIONSNV.ALHkEM T OR,FS/ 1 , ) I 1 1 I 1171111),IIIIIIIII,IIII II II IIIIIJI111111/////I/I////////�////////////////, \ \\ \ \\ vlD= 2.0 ST.105 TONS RIP'RAP - 1\ Q I(Q p{4N I IIII I I llllll`is1`IIIIIIII/1//Illllll///////// //r/'////// II_ / \\\\\\\\\\\ \\\\\O.\\\\\\\\\\\\\\\\\\\\%\\\ \\\\\\\\\\\a',,c�\'A\\\\\\\.\a\\\\\\\\\\ -\\\i,.04-EROI E) EST. $Y GEOTEXTILE Clpr C. RTIN ESTATE ` \ �3 S WETLAND IS/Cr1y�D J' SD OUTSIDE p� I I II,�,µ,�`1 1I IIIIII.IIIIIIIII II 1 I / /'r// / /// SCALE. I - 100 HORIZ. .\\\\\\\\\\\\O\\\\\\\�,.\\\\\\\\\s.....\\\\\\ v\\\\\\%,\\,C\\%\\e\\,\0\\\\\ \,,\ ',EST. CY DDE LPH C.�ATKIN5,ETAL\s-1 1* I� ROW 1IS 1`O dON•IDER�D A LOSS I A 9 �zi I I 1 I II-Li IIII ,II,IIIIIII Illllll�IIr1111,1111//I////// //i// c, \\\). \ \ \\ \\y\\\\\\\\\ \\\\\\ \\\\\\.. \\\\\\\\\U,1 \\ \ \ \ / imPAC75/IRE MMAR ED UNDER SITE$ I I / 1 / I 1 'I I l l ll l 1, 1 ,Ill 1I 11J 11111111111I I/111111II r1( / / ///// W I1Ir1'flf11I111 ' BEGIN PROJECT IIII Illllll-IIIIIIIIIIIimmu111111nnniI1111111111111111111111111111111i ,II,-,..1111,1,1111•11� END PROJECT IIII 111111 111111111111M1111111111111111111111111111111111111111111111111111111111111■ -L_ ■11■ ■MM1111■1■IIII.II��111■■11111111111■■111■111.1111111 _Y_ ■■■■■■■��■■■�■■■� STA. 22+00.00 T 720 .. STA. 11+00.00 ■■ mum�moom■mo■■-■■��■■■��■■■■ 720 720 720 I 111111111 = 1 BEGIN GRADE END GRACE 1 1 STA, 11+50.00 STA,21+50P00 N D EL = 703.26'j EL = 695.84' 710 'I �� 710 710 710 o EX ST PI = 20+70.OE END CONSTRUCTION _ ____ __ 11111■111111 STA. 11+00.00 C GIN SP DIT H RT \ ■■■ •i■•••_••_� == :� =::■ VC = 150' iiiii■ii■� TO - n- ■ ■■�■o=o�m �� ■l ..■�� K = 66 ■oomo EXISTIII y 11 " _ 7011 '�)- ''':•• :11111111111.■IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIHHII■11=� mm�1�■■1� IIIII■1 700 700 700 ?Opoa •■ ��■■■ PI = 13+60.00 ■ar7rer■riolRLflr.1T�Bl� pi = 18+00.00m■�NN=■�� N o m■ 1 �NNn■ R!OUN9H71p1�� ■ END GRADE i■■■ ■■=■�■ 1.'`w ■ii1 EL = 679.11' ■ y I�1ts EL = 677.00' R TT ■■■■m■mm . 111 ;.. .m■■■ ee� I�{ ` ■ STA.10+50.00 VC = 300' VC = 340' n�000 ■o■ nNN=o■=o■� ■■■■.■.■an:,r.■ar:onrs: ■■■ ■ ��n■ K = 27 ■ ra■ u K �■---■ s/;11/ . __ EL = 678.71' o •.1 1■■■�ffli��YJ:R„■1�1� ... �..y . ��� 65 ■�--mm J� k sfi-1..._ 690 690 690 1111111111111111111111111111■1 111111= ....1111 11 11 111 1 ■■■ __ �-. - _ WIIIIIIIIIIIIIIIIIIIIIIIIII■Illllll=� d�I�■al'_€iu•v �_-■■iG■■ END SP DITCH LT- .. BRIDGE HYDRAULIC DATA IIIIIIIIIIIIIIIIIIIIII:I1MIIIII.I �� iii�'; F Cillllll_ �ItN 680 DESIGN DISCHARGE = /850 CFS ■■ l�i��■1 �� �i �■■Py� ,I .• 'I I 680 680 ■■ 680 Imoms III '� �„ _ �� `° DESIGN FREQUENCY = 25 YRS �= -_ - �� ���T+7 - o T 7: ■■■■■■_IIII■■■■ - --�-■.� o i�� 111111111 CD = ■■ - BEGIN SP DITCH RT -- --- ■■■■■■�■■■■ ■■■�� - �� ■ n DESIGN HW ELEVATION 67/J FT ■■ L-STA.to+3o 71 \i �000��I1:__ == I_■ li BASE DISCHARGE = 2665 CFS ELEV.= 679.14 °del e ' I ' ■1 _�' E II■■�■■■■■ •:T• ■■ I I■■■� 1-r�ai a ■■■■ !IIII .� ■�E, ( 111111111111111111 670 670 670 670 BASE FREQUENCY = 100 YRS . • . • ...)16 EXtSTIN0 ■■■.9■■■= l� r..n• _c - L-STA.15+35 - ■ I MUD S ■■■_'Z;■� - - _____G _ 01 BASE l-1W ELEVATION = 671.9 FT ELEV.= 668.00' Ini11� `� 7 1111 - -_=- �mi�.■�m ■ IIII■■ PI = 10+35.00- j c OVERTOPPING DISCHARGE 8300 CFS ■■ii �f... I I = ■■■■■■■■■■■■■■■ 3.5' •KEY DE - _ ` wpm M- p F, Illllll■11111111111 VC _ 30 z co 660 OVERTOPPING ELEVATION 678.6 FT III ' e I- RA"r.T - _ o OVERTOPPING FREQUENCY 500+ YRS nnnnnnm r) ■■■ ' ■■■■� •i• _, o DATE OF SURVEY = 11-9-20/7 IIIIIIIIIIIIIIII �� �� I.I I •III I Hwalo s55'1 IIIIIIIIIIIIIIIIII 660 660 K = 19 = 660 y 1 - ^�S MI a_ 11LLJ O ■■■■■■■■■■■■■■■■■■■■ ■■ :b•:1!•,•II 11. L _U'. PAY I1LMI -- z ■■ ■ ■ ■■ BEGIN GRADE WS.ELEVATION ■ I■ ni i� n »N' = ss2✓ FT IIIIIIIIIIIIIIIIIIII BANK$TABILI 11LLY ri�•.■�E�Tr 1 STA. 10+10.01 z L AT DATE OF SURVEY W C ASS II RIP f' n ,,. rioN = 4ccY EL = 679.78' w 650 I i(suaPenl5l,l I ■ illl'Me .F; 1.1P111a1' 9//.%/Iec. 650 650 650 `� I 11 12 13 14 15 16 17 18 19 20 21 22 10 11 PROJECT REFERENCE SHEET NO. 17BP.7.R.109-ROCKINGHAM 166 4A ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER MOTT MACDONALD I8 E,LLC HEIR ENGINEERING LICENSE NO.F-0669 LICENSE NO.F-0116 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Prepared in the Office at: M O M Po er,)DD OMACDONAD FR9ROY-Vanoc om ri,NC�)Sl6 EXISTING DITCH hICIIN Engineering, nc.of the Carolinas \``�,�JX F�� N.C.555 B.E.L.IS SUcebIu�Number F-01106 N. PERMIT DRAWING — /I SHEET 4 OF 9 GLI 11161 —A k DI thihn.,..,.14" �t�AG . 331" A\ GALL WOODS tiq STABLE QP 41111k \ EXISTING DITCH �pJ I I S ) / OUTFACE STABLE a • • MAG / / nND; - -.. 4.....:;.4ze ie'' , 14 'ON, Al 411114p -.11111111111! /.- '41M ` tt 1111!ISIo,,i.**/-fr T:" 44P1-:�` . ,T ,, xIi&i ro \\'�\.. Jam' .' 'Mcp4111111P--'' 11P44r,4,0 c F \\\yam'/�. � 4SBW *** ` 4 4 ro DILAPIDAT Z•• r 4 E lit 0 10 -4444 Al �,►► IV I ",'`► . ',�\ 2 G cc Ver.. . t'0.0... N �F , Pi��/p :: y`\ LEGEND # C m • 'S tb6,, F/ DENOTES PERMANENT W......_°4wA IMPACTS IN SURFACE WATER 7 r , F DENOTES TEMPORARY m L IMPACTS IN SURFACE WATER u w WOODS 0 L .f I 'a c i DE WETLAND FILL IN / r A L a * * ** DENOTES MECHANIZED CLEARING (U * * *'�(' LD O DETAIL SHEET FOR LJ Q10= 1.8 cfs Q10= 0.4 cfs �+ V10— 1.8 fps V10= 0.8 fps c15 (NON—EROSIVE) (NON—EROSIVE) ro Q10= 12.2 cfs F.y V10= 2.0 fps ,50 (NON—EROSIVE) 4= 0 fU Wo W7 .7 20 40 mZa No= SCALE; III= 40' HORIZ, W=ti PROJECT REFERENCE SHEET NO. 17BP.7.R.109-ROCKINGHAM 166 4A ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER MOTT MACDONALD I8 E,LLC HEIR ENGINEERING LICENSE NO.F-0669 LICENSE NO.F-0116 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Prepared in the Office of: M O TT MPDoo, DD OMAACDONPID Fwww9Vmotimoccom no,NC]15]6 EXISTING DITCH HDR Engineering,Inc.of the Carolinas _ \``�,�)X F�� N.C.555 B.E.L.ISSUkee 900 umber,F-07601 116 N. PERMIT DRAWING ti T / VI I '� / SHEET 5 OF 9GLI I \ 1 I I I I '\ c\\„1/4\ \\ , I , 1 ICI , I„ I, 1 N ,k, , ��A /' ' I \\\\‘\\105Zi_L\4Asss, ,, ,•••\ , .,, ,,A,6„;0-5,,,, h-k 'r,„, ' „,,,,,,1:6,G4i , , , .....,..,_ . .. ._,. , , ,„.6, \\ \04.,.. \ \ ,\.,...,,,,,. ..\1. . ,\ \ L ,, /, ikerir \`\ \\\\ ,\\ / \ — \�' /� /' EXISTING DITCH \I/166) \ ••\N\ \\ \ \ 1 \ ` 3 i\ �.' _/ �r OUTFACE STABLE „4„,„,4.01, . , / / / / Il ��/ / / i'� /t'�V _. / / , / 4,,,,,06 --,,,,e , AIRrikki...._Okrie 4* 4.14,-1 N , I '''' *iltzl 411iip lt. N ' to / / / / 0 / / �"lil- I % / � I Q / / ._ , / O ID \ 1 1 1 1 / / / I / U� / / /' v v v I I l / / / // , j0liF/ I / n ' / i41 / / / '� co \ \ \ 1 \ \ \ " I / 1 1 1 i leo k AI i irlt-Vet RINI* >,,F ' v v 1 1 • -�, / '' '�►' �l::t�, _ LEGEND '6 / 1 1 1 1 I I I \ I I l I / \ b �`/ / i / �'44i11 1..\ DENOTES PERMANENT -6 1 I I 1 I 1 1 \ \ \ / / / / /,/ / ' / / © . ���i�i�� / ���� IMPACTS IN SURFACE WATER _ \\t / I I I 1 1 1 \ \ 1 I I / / I / '� / / , / / j 1 © . v�l `\\\\\\\ I\ \ \ I 1 1 1 1 1 1 1 1 1 l'/� // / / / / ' DENOTES TEMPORARY O \� \\\\\\ \ \ \\I 1 I I 1 I I 1 \ / •i •1�1 / / * IMPACTS IN SURFACE WATER a \ �\\\\ \ \\\\\\ \ 1 \ \\ \i 1 1 1, I16 / I /L/ / DENOTES FILL IN c \\\\\ \\\ \ \\ III \\I 1 1 1 /J41 1 I //// / /\ // WETLAND \\ \\ \\ \\ \ 1 1 1 I I1\11 NN. It \ //i n \ a * * ** DENOTES MECHANIZED N * * *•]f CLEARING m ,p-11�p, /p♦�,� L SST H E T�I�� T, FOR S�)�) 0 �� 1 d J1��F w r•!�L 1�F w 11 � 1 �1 ®�L� Q10= 1.8 cfs Q10= 0.4 cfs V10= 1.8 fps SITE V10= 0.8 fps (NON—EROSIVE) (NON—EROSIVE) Q10= 12.2 cfs zY V10= 2.0 fps (NON—EROSIVE) 4= 0 c0U Wc, WU Z .0 0 20 40 .-T-A .: SCALE: III= 40' HORIZ. .3=ti PROJECT REFERENCE SHEET NO. 17BP.7.R.109-ROCKINGHAM 166 4B ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER Mon Mnco -°i c EN�iNEEaiNc LICENSE NO.F-0669 LICENSE NO.F 0116 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Prepareda in the / , Office f: M o om I MATT Fww9w morym�ri c<NC 2)Sl6 COorvnID /v� \ 1J r \ FY N.CBE.LIISe51L59ileInonse Number -0116 SIT - PERMIT DRAWING ce SHEET 6 OF 9 GLI _ • WOODS • EXISTING DITCH " Q 4 OUTFALL STABLE J xif \F W00DS 6) ti ,-...7 , ,,------, 's"----'-'''''-'s-'------, ...014kilidi _ w lai- - w �_\ Rp SR B � 6 __ �_ ST \\ - TQ �a � at CO -----..4:-...., iiMMIMIlliffalliarairiP.rmr-A0 ------ /y/ M ` si•�► aP � __ ICIRIr eggfr 40, 4hiarftir-4"1111r . ' ��CC W i'a _ ik,1111M :iir:ii6,u4r1..= W S illarAllingir © LEGEND '- g m `— �• L —\ / DENOTES PERMANENT _ �� � \ \�// IMPACTS IN SURFACE WATER �'^ WOODS l �vv�/i�i'%7", DENOTES TEMPORARY I I //� IMPACTS IN SURFACE WATER a 0 al I ± \ W DENOTES FILL IN j� / WETLAND ± el 3 EXISTING DITCI'l ± * * ** DENOTES MECHANIZED OUTFALL STABLE * * ** CLEARING 3 SIT 4 cO PER COORDINATION WITH US ARMY CORPS OF ENGINEERS THE SMALL REMNANT OF F�TAIL SHE ��T ® r WETLAND WC AND JS SD OUTSIDE PROP dy SITF, 2 AND 3 ROW IS TO BE CONSIDERED A LOSS. c5o IMPACTS ARE SUMMARIZED UNDER SITE 3 40 0 Zc, WU WO Z-- 20 40 NzO 2 w Z-g e, SCALE: I"= 40' HORIZ. 4B ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER MOTT MACDONALD I S E LLC HDR ENGINEERING LICENSE NO.F-U66o LICENSE NO.F-0116 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Prepared in the Office of. M // ,, xU/ �j I \ \ \ \ \ , M PO Box TDD // / '�/ 1 \\ \ \\ \ \ \\\\\ \\\ NACDOER4G Fawwwa.moltmaOc.<om 27526 // \ \ \ \ \\\\ F/� HDR Engineering Inc.of Ue Carolinas // ` \\\\\\\\\\\ N.C.B.E.L.ksl,Earese Raleigh:F-01616 N.C.B.E.LS.License Number F-0116 // // I SIT/ \ \ '' r ) Al�V / I \ \ \\ \\\\\�\` PERMIT DRAWING / I -_----, i GLI / I \ 1 `\ \ \ \ \\` SHEET 7 OF 9 `\ WOODS \ 1 a\ \ \ \ 6� ,' ___. 1i EXISTING DITCH - '�d i `\ `\ '_'� / ,' OUTFALL STABLE 1 1 / \ '90 • ` bobs,/ 7\ , — /\ /` , I , ,' ,' _,-_,�;-,0'L , cs \ `� \ qn�! ----- ---- - : -: %��- / // _ _ __ / _ • `D .!fir.- \` -- _ -_- - ---_:—- _-____ _---- � I //' l Ampasa, � ' �l /I - I n �� �� � ������c — ,,'2 .--..,, • 211611.mgraiir/AIN MAIIIIP27,44$0 off, ,,,,00..., \ s., . Ilk . . -- IF- ---;-\.. -,..-411rior4r _ .40,,, .4 1:41e00r. ''''.610100-401411,1Airlik--., -.1 ------ \ \,_ ---- @ : I w �w`RRA►�� /� i`4 �Ysrrii�ll/ ter- . • ��.. rasw, �i� / ��• . IN _____ \ E \ v \ ����� I 0\ \ ,I ,\ LEGEND 1 ^ AIL �\ C ,+ \` y _ `- / \ \ I\ \ \ \ 1 / / / DENOTES PERMANENT '� ` - \ `\ \ I I / �i /// IMPACTS IN SURFACE WATER ,/ 2 \ \\ \ ± ODDS \ \ 11\ I I \ Vim r Al DENOTES TEMPORARY m / \ 1 I \ \ I \ \ \ !I 1 At IMPACTS IN SURFACE WATER o I /►� \ I \ \ _e 11 r——^I `, \\ \\ �t. \\ \I \\ I,,\\ j ,\ \\ 3 I ' \ �� 1 I /\ \ I / 1 * # #* DENOTES MECHANIZED N 1 EXISTING DITCI-� \ I , \\ , : \ r\ , * CLEARING ,-- OUTFALL STABLE \ \�' 1' L_, \ 4 \ **610 m SITE 3 PER COORDINATION WITH US ARMY CORPS OF ENGINEERS THE SMALL REMNANT OF *ifDETAILT FOR, ���-1 WETLAND WC AND JS SD OUTSIDE PROP s; SITE 2 AND 3 ROW IS TO BE CONSIDERED A LOSS. oem IMPACTS ARE SUMMARIZED UNDER SITE 3 40 0 E 20 40 il SCALE: III= 40' HORIZ. 0 5 10 I PROJECT REFERENCE SHEET NOIiiiiErl . 17BP.7.R.109 -ROCKINGHAM 166 X-6 PRELIMINARY PLANS Do NOT UM FOIL OONFTROOFION SI E 2 & SITE 3 PERMIT DRAWING WETLA\ID SHEET 8 OF 9 -a F9n t t of 8.9n 0.f 60 0060 N 680 W I __]— 'f 675.14 19 +50.00ezo _ . -L- _ • v 140 1:0 120 1"0 100 90 80 70 60 50 40 30 20 10 0 10 20 30 40 90 60 70 80 90 100 1"0 1.� -0 190 C 0 d LI O 01 e HSITE 2 g W WETLAND N 5a • I; :: - --- --- ---- ----� T' ''' --- - - :►n 18+00.00 667. O N E PAO —L- m mI °I 150 1°0 1:0 1:0 1"0 100 90 80 To 60 50 40 30 20 10 0 10 20 30 40 90 60 7080 90 100 1"0 1 0 1:0 1 0 150 o' e' 0 O Zm o75 Zs a.e Wo - I - a WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing 1 Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream I I No. (From/To) Size/Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 -L- 15+43 to 15+46 1@80'; 33" BOX BEAM < 0.01 < 0.01 68 18 2 -L- 16+37 TO 19+57 0.11 0.01 0.02 < 0.01 42 3 -L- 19+06 TO 19+55 0.01 20 TOTALS*: 0.12 0.01 0.02 I < 0.01 < 0.01 130 18 *Rounded totals are sum of actual impacts NOTES: Per coodination with David Bailey, US Army Corps of Engineers, due to the majority of the wetland being filled in and a proposed ditch thru wetland WC, NC DEPARTMENT OF TRANSPORTATION the remnant of wetland WC and JS SD outside ROW will have a significant reduction in functional value and should be considered a loss. The wetland DIVISION OF HIGHWAYS impacts are included under Site 3. Jan 6, 2021 ROCKINGHAM COUNTY BRIDGE #166 17BP.7.R.109 Revised September 2014 SHEET 9 OF 9