HomeMy WebLinkAboutNCC204908_NOI Application_20210111Action History (UTC-05:00) Eastern Time (US & Canada)
Subrrit by Anonymous User 10/28/2020 9:17:27 AM (NCG01 NOI Submission)
Approve by Meloy, Michael 10/29/2020 7:56:16 AM (Review - Construction NOI 34371)
• Clark, Paul reassigned the task to Meloy, Michael 10/28/2020 3:00 PM
* thx
• The task was assigned to Clark, Paul by round robin distribution 10/28/2020 9:17 AM
The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: October 30, 2020 5:00
PM 10/28/2020 9:17 AM
Subnut by Selkane, Aziza 1/11/2021 10:57:35 AM (Payment Verification for NCC204908)
* Ryan E Francis
• Selkane, Aziza assigned the task to Selkane, Aziza 1/11/2021 10:57 AM
• The task was assigned to DEMLR NCG01 Payment Team. The due date is: December 10, 2020 5:00
PM 10/29/2020 7:56 AM
.• SThF� ';
1
NORTH CAROLINA
EnrlronmertW quallly
A. Project Information
Part A.
Project Location and Waterbody Information
Are you submitting r No
an NOI that was r Yes
rejected before?
Previous Rejected 34354
NOI No.
Prior Reviewer Michael Meloy
Name
1a. Project Name * Adams Electric Company Charlotte Office
1 b. Specific Lot This field may be used to list specifc lot numbers.
Numbers
1 c. Parcel ID List all PI\b associated w ith this project.
Number(s) (PIN)
2. County* Mecklenburg
3. Highway or Street 5920 Harris Technology Boulevard
Address* Street name only is acceptable if no address number assigned yet
4. CityorTownship* Charlotte
5. State * NC
6. Zip Code* 28269
7. Latitude* Enter the latitude in decimal degrees
35.3370
8. Longitude * Enter the longitude in decimal degrees (MJSTbe negative)
-80.8350
If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of
North Carolina. Look for the coordinates in the bottom left corner.
9. Date to Begin* 11/01/2020
Estimated Construction Project Start Cate
10. Date to End * 06/30/2021
Estimated Construction Project End Cate
11. SIC (Primary)* Industrial (1541)
Standard Industrial aassification for Development
12. Acres to be 3.00
disturbed* (including off -site borrow and waste areas)
13. Total site area 2.85
(acres) *
14. Post- 1.75
construction (Estirrated)
impervious area
(acres) *
NCC Project NCC-MECKL-2020-Adams Electric Company Charlotte Office
Tracking ID Assigned autorratically
Below you must enter waterbody information for surface waters affected by this project. Please consult
DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please
enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You
may enter up to 3 waterbodies if needed.
15a. Receiving Long Creek
Waterbody* Narreof waterbody into which storrrwater runoff will discharge
15b. Waterbody 11-120-(0.5)
Index No. * NCWaterbody Index Nurrber
Stormwater V No
discharges will flow r Yes
to additional
wate rs *
16a. Is this project r Yes
subject to the NC r No, not subject to NC SPCA
Sediment Pollution
Control Act?*
B. Permittee Information
Part B. ^
F2rnittee Inforrration - Legally Fbsponsible Entity and Individual
Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application
form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same
organization. That person must be a responsible corporate officer who owns or operates the construction activity, such
as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV,
Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part
IV, Section B, Item (6) of that permit.
1. Organization Legally Pesponsible Entity
Name * BRASFIELD & GORRIE, L.L.C.
It pernittee is an individual (i.e., organization does not apply), enter first and last narre in this field.
Note: The organization name must match the business entity name registered with the NC Secretary of State. You can
verify the registration here.
2. First Name * Ryan
If Corporation, enter Faegistered Agent First Wre
3. Last Name* Francis
It Corporation, enter Pbegistered Agent Last %rre
3b. Title Assistant Project Manager
4. Permitee E-mail rfrancis@brasfieldgorrie.com
Address*
5. Permittee 17044308829
Telephone No.*
6. Permittee Mailing Street Address
Address* 521 East Morehead Street
Address Line 2
Suite 500
City
Charlotte
Check box if the
street address the
same as mailing
address
7. Permittee Street
Address*
Fbstal / Zip Code
28202
V Yes
Street Address
521 East Morehead Street
Address Line 2
Suite 500
city
Charlotte
Fbstal / Zip Code
28202
State / Ffovince / Fbgion
NC
Country
United States
State / Ftovince / Region
NC
Country
United States
8. Type of Ownership is only individual if an individual is naned in B.1. above.
Ownership* Non -Government
C. Site Contact Information
Part C.
Roject Site Contact Inforrration
...........................................................................................................................................................................................................................................................................
1. Primary Site
Scott
Contact - First
Name *
2. Primary Site
Dameron
Contact - Last
Name *
3. Title
Assistant Superintendent
4. Site Contact E-
SDameron@brasfieldgorrie.com
mail Address*
5. Site Contact
7043518507
Telephone No.*
6. Organization
Brasfield & Gorrie
Name
7. Site Contact
Street Address
Mailing Address*
521 E Morehead St
Address Line 2
500
City
State / Rovince / Region
Charlotte
NC
Fbstal / Zip Code
Country
28202
United States
8. Consultant Name
(Optional)
First and Last narre
9. Consultant E-mail
This person will be copied on all correspondence.
10. Consultant
Telephone No.
11. Billing E-mail (For Annual Fee correspondence)
Default is legally responsible person e-rail (older NOts may not populate)
12. Billing (For Annual Fee correspondence)
Telephone Default is legally responsible person telephone (older NOls ray not populate)
D. E&SC Plan
Part D. ^
Erosion & Sediment Control (E&SC) Ran Approval Information
......................................................................................................................................................................................................................................................................................................................................
1. Date E&SC Plan 06/01/2020
Approved *
2. E&SC Plan Project LDGP-202000111
Number/ID * Assigned by agency or local program
3. E&SC Plan f State DEQ Office
Approved by* r Local Program
4. Local Program* City of Charlotte
Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a
complete application. Please also upload a site map showing the overall extent of the project (for linear projects, can
include the beginning point and end point coordinates in the "Notes" box below).
5. E&SC Plan Charlotte Land Development - Letter of Approval.pdf 27.21 KB
Approval letter or Mast beRFforml
Grading Permit
6. Site Location Map Mast be RDFfornat (lint 20 NB)
Rease do not upload entire set of E&SC plans.
7. Notes (Optional) Provide any additional information that night help the reviewer better understand how uploaded documents support
the application. Include additional w aterbodies if necessary.
8. NOI Certification NOI Certification Form.PDF 800.27KB
Form Mast be FDFformat
This is an Express F No
Review Project* r Yes
E. Certification
North Carolina General Statute 143-215.66 (1) provides that:
Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other
document filed or required to be maintained under this Article or a rule implementing this Atide; or who knowingly makes a false statement
of a material fact in a rulemaking proceeding or contested case under this Atcle; or who falsifies, tampers with, or knowingly renders
inaccurate any recording or monitoring device or method required to be operated or maintained under this Amide or rules of the
Commission implementing this Atcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand
dollars ($10,000).
Under penalty of law, I certify that:
17 I am the person responsible for the construction activities of this project, for
satisfying the requirements of this permit, and for any civil or criminal penalties
incurred due to violations of this permit.
rJ The information submitted in this NOI is, to the best of my knowledge and belief,
true, accurate, and complete based on my inquiry of the person or persons who
manage the system, or those persons directly responsible for gathering the
information.
* 17 I will abide by all conditions of the NCG010000 General Permit and the
approved Erosion and Sediment Control Plan.
* rJ If the Erosion and Sediment Control Plan approved by the delegated program is
not compliant with Part II (Stormwater Pollution Prevention Plan) of the
NCG010000 General Permit. I will nonetheless ensure that all conditions of Part
II of the permit are met on the project at all times.
* 17 I hereby request coverage under the NCG010000 General Permit and
understand that coverage under this permit will constitute the permit
requirements for the discharge(s) and is enforceable in the same manner as an
individual permit.
Specify if you are:* r The Legally Responsible Person named on this Notice of Intent
r Authorized Responsible Person' (signing on behalf of Legally Responsible
Person named in Part B)
Important: The person who electronically signs this Certification above must be the same person who signs the NOI
Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible
person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who
owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager
that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more
information on signatory requirements, see Part IV, Section B, Item (6) of that permit.
Signature
r
Type Name* Ryan Francis
Title Assistant Project Manager
Organization Legally Ibsponsible Entity
BRASFIELD & GORRIE, L.L.C.
Date * 10/28/2020
F. Tracking and COC Info
NOI Tracking No. 34371
NC Reference No.
NCG01-2020-4908
Uses 'count_nurrber' variable (increrrented by SP)
Certificate of
NCC204908
Coverage (COC)
Uses 'count number' variable (increrrented by SP)
No.*
Count Number 4908
Sequential nurrber for subrrittal that is incremented by Stored Frocedure
COC Year 2020
Year of date reviewed (used to assign YY digits after "NOC' in COCno.)
Initial Invoice No. NCC204908-2020
Invoice Due Date 11/28/2020
Initial Fee $ 100.00
Invoice Status OPEN