HomeMy WebLinkAbout710014_30 day poa cover sheet_20210110PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 1 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 16 b. designed 25 yr./24 hr. storm & structural freeboard 20 c. line b - line a (inches in red zone) = 4 d. top of dike surface area according to design ft2 (area at below structural freeboard elevation) e. line c x line d x 7.48 gallons = 318273 gallons 12 ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design _180 g. volume of waste produced according to structural design 118684 h. actual waste produced = current herd # x line g = 118684 certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design 76562_ k. (lines h + i +i) x 7.48 x 30 days = _243406_ gallons line f 4. Total PAN to be land applied during draw down period I. current waste analysis dated _1.28 M m. (lines e + k) x line 1 = 718 1000 inches inches inches 127650 ft3 days ft3 ft3 ft3 Ib/1000 117W_1►1 PoA (30 Day) 2/21 /00 1 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. structure ID: 1 line m = 718 lb 2. structure ID: 3. structure ID: 4. structure ID: 5. structure ID: 6. structure ID: n. lines 1 +2+3+4+5+6 = line m = lb PAN line m = lb PAN line m = lb PAN line m = lb PAN line m = lb PAN 718 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAYDRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CAN NOT BE APPLIES DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR-2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s u. application window' 7046 131-4 cc 15.73 50 771 Sept-april PoA (30 Day) 2/21 /00 2 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day drawn down period v. Total PAN available for all fields (sum of column t) _ IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) _ PAN x. Crop's remaining PAN balance (line v from section III) _ PAN y. Overall PAN balance (w - x) _ PAN 771 lb. PAN _718 0 771 lb. -53 lb. Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: Irrigation will continue as weather and field conditions permit. Additional land is available for pumping if needed. PoA (30 Day) 2/21 /00 3 PoA (30 Day) 2/21 /00