HomeMy WebLinkAbout310767_30 day poa_20210110PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 31-767 Go nty: Dupli�i Facility Name: Mark Davis Farm 2 Certified Operator Name: Mark Davis Operator Number: 1_ Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways_ Lagoon '1 Lagoon Name/1 MU 2 Spillway(Y or N): N Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Level(inches): 94 2_ Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures_ Five and 30 day Plans of Action are attached_ Hydraulic and agronomic balances are within acceptable ranges_ X Liquid level is within the 25 year 24 hour storm elevations for one or more structures_ A 30 day Plan of Action is attached_ Agronomic balance is within acceptable range_ Waste is to be pumped and hauled to off site locations_ Volume and PAN content of waste to be pumped and hauled is reflected in section III tables_ Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information_ Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP_ Operation will be partially or fully depopulated_ "Attach a complete schedule with corresponding animal units and dates for depopulation "if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3_ Earliest possible date to begin land application of waste: 1 hereby certify that 1 have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct_ Mark Davis Facility Owner/Manager (print) "fa., Daa s Facility Owner/Manager (signature) Phone: 910-284-'1 7'1 4 Date: 1/7/202'1 11_ TOTAL POUNDS OF PAN 5TO RED WITHIN STRUCTURAL FRE EBOP. RU ANU/OR 25 Y12._/24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1 _ Structure 1ID: 2_ Structure IID: 3_ Structure IID: 4_ Structure IID: 5_ Structure 1ID: 6_ Structure 1ID: Md 2 n. lines 1 2 3 4 5 6= line m = line m = line m = line m = line m = line m = 1 031 _6 lb PAN lb PAN lb PAN lb PAN lb PAN lb PAN 1 031 _6 Ib PAN 111_ TOTAL PAN BALANCE REMAINING FOR AVA LABLE CROPS UU RI NG 30 UAY DRAW DOWN PE RIOU. UO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLI EU DURING THIS 30 UAY PE RI0U. o_ tract # p_ field if q_ crop r_ acres s. remaining !RR- 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (Has.) columri r rE s u_ application window' Pivot Small Grain 28.90 38.00 1098.2 10-1 thru 3-31 Pull 1 Pull 9 Small Grain Fescue 3.93 2.32 50.00 180.00 196.5 417.6 10-1 thru 3-31 8-1 thru 7-31 State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period_ v_ Total PAN available for all fields (sum of column t) _ IV_ FACILITY'S PoA OVERALL PAN BALANCE w_ Total PAN to be land applied (line n from section II) = 1712.3 lb. PAN 1 031 _6 lb. PAN PoA (30 Day) 2/21 /00 x_ Crop's remaining PAN balance (line v from section III) _ y. Overall PAN balance (w - x) _ 1712.3 lb. PAN -681 lb. PAN Line y must show as a deficit_ If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc_ For pump 8. haul and herd reduction options, recalculate new PAN based on new information_ If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance_ If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility_ NARRATIVE - Irrigation to begin as conditions permit_ Waste Samples where taken on 1'1-30-2020 For further questions call: Pond Creek Precision Agriculture Inc Doug Atkins 910-27'1 -0363 NC Certified Technical Specialist 8001041 Po., (30 Day) 2/21 /00 PoA (30 Day) 2/21 /00 PoA (30 Day) 2/21 /00 PLAN OF ACTION (PoA) FO12 HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD 1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1_ Structure Name/Identifier Md 2 2_ Current liquid volume in 25 yr_/24 hr_ storm storage 8. structural freeboard current liquid level according to marker b_ designed 25 yr_/24 hr_ storm a structural freeboard line b - line a (inches in red zone) _ d_ top of dike surface area according to design (area at below structural freeboard elevation) line c/12 x line d x 7.48 gallons/ft a 3_ Projected volume of waste liquid produced during draw down period I 14.0I I 20.0I inches inches 6.0 inches 134000 ft2 501160 gallons f_ temporary storage period according to structural design I '180ldays g- volume of waste produced according to structural design h_ current herd # I 6400 I certified herd # 210994 I 6400I actual waste produced = current herd # x line g certified herd # i_ volume of wash water according to structural design excess rainfall over evaporation according to design k_ (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period ft. 210994 ft. OI 49000I ft. ft. 324126 gallons I_ current waste analysis dated I 1'1/30/2020 I I 1.25 I1bs/'1000 gal_ m_ ((lines e + k)/1000) x line I = REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 1031.6 lb._ PAN PoA (30 Day) 2/21/00 Estimated Estimated Estimated Estimated PoA (30 Cosy) 2/21/00