HomeMy WebLinkAbout310767_30 day poa_20210110PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 31-767 Go nty: Dupli�i
Facility Name: Mark Davis Farm 2
Certified Operator Name:
Mark Davis Operator Number:
1_ Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways_
Lagoon '1
Lagoon Name/1 MU 2
Spillway(Y or N): N
Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
Level(inches): 94
2_ Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures_
Five and 30 day Plans of Action are attached_ Hydraulic and agronomic balances are
within acceptable ranges_
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures_ A
30 day Plan of Action is attached_ Agronomic balance is within acceptable range_
Waste is to be pumped and hauled to off site locations_ Volume and PAN content of waste
to be pumped and hauled is reflected in section III tables_ Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information_ Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP_
Operation will be partially or fully depopulated_
"Attach a complete schedule with corresponding animal units and dates for depopulation
"if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3_ Earliest possible date to begin land application of waste:
1 hereby certify that 1 have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct_
Mark Davis
Facility Owner/Manager (print)
"fa., Daa s
Facility Owner/Manager (signature)
Phone: 910-284-'1 7'1 4
Date: 1/7/202'1
11_ TOTAL POUNDS OF PAN 5TO RED WITHIN STRUCTURAL FRE EBOP. RU ANU/OR 25 Y12._/24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1 _ Structure 1ID:
2_ Structure IID:
3_ Structure IID:
4_ Structure IID:
5_ Structure 1ID:
6_ Structure 1ID:
Md 2
n. lines 1 2 3 4 5 6=
line m =
line m =
line m =
line m =
line m =
line m =
1 031 _6 lb PAN
lb PAN
lb PAN
lb PAN
lb PAN
lb PAN
1 031 _6 Ib PAN
111_ TOTAL PAN BALANCE REMAINING FOR AVA LABLE CROPS UU RI NG 30 UAY DRAW DOWN
PE RIOU. UO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLI EU DURING THIS 30 UAY PE RI0U.
o_ tract #
p_ field if
q_ crop
r_ acres
s. remaining !RR-
2 PAN balance
(lb/acre)
t. TOTAL PAN
BALANCE FOR
FIELD (Has.)
columri r rE s
u_ application window'
Pivot
Small Grain
28.90
38.00
1098.2
10-1 thru 3-31
Pull 1
Pull 9
Small Grain
Fescue
3.93
2.32
50.00
180.00
196.5
417.6
10-1 thru 3-31
8-1 thru 7-31
State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period_
v_ Total PAN available for all fields (sum of column t) _
IV_ FACILITY'S PoA OVERALL PAN BALANCE
w_ Total PAN to be land applied (line n from section II) =
1712.3 lb. PAN
1 031 _6 lb. PAN
PoA (30 Day) 2/21 /00
x_ Crop's remaining PAN balance (line v from section III) _
y. Overall PAN balance (w - x) _
1712.3 lb. PAN
-681 lb. PAN
Line y must show as a deficit_ If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc_ For pump 8. haul and herd reduction options, recalculate new PAN based
on new information_ If new fields are to be included as an option for lowering lagoon level, add these fields to the
PAN balance table and recalculate the overall PAN balance_ If animal waste is to be hauled to another permitted
facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility_
NARRATIVE -
Irrigation to begin as conditions permit_
Waste Samples where taken on 1'1-30-2020
For further questions call:
Pond Creek Precision Agriculture Inc
Doug Atkins
910-27'1 -0363
NC Certified Technical Specialist
8001041
Po., (30 Day) 2/21 /00
PoA (30 Day) 2/21 /00
PoA (30 Day) 2/21 /00
PLAN OF ACTION (PoA) FO12 HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1_ Structure Name/Identifier
Md 2
2_ Current liquid volume in 25 yr_/24 hr_ storm storage 8. structural freeboard
current liquid level according to marker
b_ designed 25 yr_/24 hr_ storm a structural freeboard
line b - line a (inches in red zone) _
d_ top of dike surface area according to design
(area at below structural freeboard elevation)
line c/12 x line d x 7.48 gallons/ft a
3_ Projected volume of waste liquid produced during draw down period
I
14.0I
I
20.0I
inches
inches
6.0 inches
134000
ft2
501160 gallons
f_ temporary storage period according to structural design I '180ldays
g-
volume of waste produced according to structural design
h_ current herd # I 6400 I certified herd #
210994 I
6400I
actual waste produced = current herd # x line g
certified herd #
i_ volume of wash water according to structural design
excess rainfall over evaporation according to design
k_ (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
ft.
210994 ft.
OI
49000I
ft.
ft.
324126 gallons
I_ current waste analysis dated I 1'1/30/2020 I I 1.25 I1bs/'1000 gal_
m_ ((lines e + k)/1000) x line I =
REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
1031.6 lb._ PAN
PoA (30 Day) 2/21/00
Estimated
Estimated
Estimated
Estimated
PoA (30 Cosy) 2/21/00